Sishen Mine FINAL slides - angloamerican.com/media/Files/A/Anglo-American-PLC-V... · Da Silva...

13
Site Visit to Sishen Mine 14 April 2010

Transcript of Sishen Mine FINAL slides - angloamerican.com/media/Files/A/Anglo-American-PLC-V... · Da Silva...

Site Visit to Sishen Mine14 April 2010

• Large hematite ore body: ±14km x 3.2km x 400m: 2.4bt resource 1.6bt reserve• Hard ore: 60:40 lump to fine ratio• Mining started in 1953; First ore exported in 1976• Highly mechanized, continuous blending mining operation

• Entire Run-of-Mine (ROM) beneficiated – Dense medium separation (DMS) - drums and cyclones– JIG gravity separation – Coarse, medium and fine jigs

• Products– 25mm 66% Fe lump– 25mm 64% Fe lump– 27 and 20mm 66% Fe lump – niche products– 8mm 65% Fe course sinter – niche product– 6.3mm 64% Fe fines

• Consistent product quality is ensured through final product blending and reclaiming at Sishen before dispatch to customers

• Export ore is transported via the Sishen-Saldanha Iron Ore Export Channel (IOEC) to Saldanha port

2

Summary: Kumba Iron Ore

Sishen Mine Management Team

Andrew LootsGeneralManager

HannesCronjeMining

Manager

LambertMostert

EngineeringManager

Nico SmitPlant Manager

Retief LouwManager BI

Gerhard BritsProjectsManager

SusanBezuidenhoutManager HR

HanneckeDa SilvaManagerFinance

Anel MaraisManager SD

HowardNicholas

Manager SHE

SupplyManagerVacant

LTIFR - SISHEN MINE - 2010 - YTD

0.85

0.480.51

0.29

0.22 0.23

0.14

0.09

0.06

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

HISTORY 0.85 0.48 0.51 0.29 0.22 0.23 0.14 0.09

ACTUAL 0 0.13 0.17 0 0 0 0 0 0 0 0 0

SISHEN TARGET 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06

2002 2003 2004 2005 2006 2007 2008 2009 Jan-10

Feb-10

Mar-10

Apr-10

May-10

Jun-10

Jul-10

Aug-10

Sep-10

Oct-10

Nov-10

Dec-10

2010 - Sishen Target - 0.06

4

Safety: LTIFR Sishen and Safety Achievements 2009

• LTIFR = 0.09, the best ever.• TRCFR = 1.32, the best ever.• LTIs for the year 2009 = 9, the best ever.• Man hours worked without LTI = 5 443 746, the best ever.• Safe days = 102, the best ever.• Fatalities = 0, the first year since 2004 without a fatal.

LTIFR – Sishen Mine – 2010 – YTD

5

View of ore body

6

Summary of Production trends2006 2007 2008 2009

Total Tons Handled (Including Contractors) 108,146,936 122,223,344 128,852,640 152,961,734

ROM to Crusher Production 32,252,855 32,965,188 44,282,717 52,169,049

Expit Waste 59,081,159 65,696,664 64,207,926 81,266,739

Expit Stripping Ratio 1.902 1.713 1.440 1.758

Resource (Mt) 691.5 1,316.00 1,565.30 1,362.10

Reserve (Mt) 1,053.80 1,032.50 956.9 911.5

Truck Fleet (Primary Equipment) 55 55 62

Shovel Fleet (Primary Equipment) 15 14 16

39,387,67834,038,60629,723,60128,691,977Total Production

Production 2006 2007 2008 2009

DMS 28,691,977 29,550,673 28,394,804 28,957,233

JIG 172,928 4,746,532 10,430,445

Additional 897,270

BENEFICIATION 8-Modules

FeedBunkers

3331 tph

6500 hpa

Coarse JIGnr 1

Fine JIGnr 1

Medium JIGnr 1

SEPROMFEED Bed 1

SEPROMFEEDBed 2

TERTIARYCrusher &Screening

21.7Mtpa

3179 tph

6825 hpa

3981 tph

5451 hpa

Lump Fine7,9

Mtpa5,1

Mtpa

Blending beds

Final Products

-8mmdewatering

1998 tph

Jig Plant Flow Diagram

Monthly Jig Plant Yield

0

10

20

30

40

50

60

70

Oct

-08

Nov

-08

Dec

-08

Jan-

09

Feb-

09

Mar

-09

Apr-

09

May

-09

Jun-

09

Jul-0

9

Aug

-09

Sep

-09

Oct

-09

Nov

-09

Dec

-09

Jan-

10

Feb-

10

Mar

-10

Month

Ave

rage

Mon

thly

Yie

ld

Monthly Jig Plant Yield

PRIMARY & SECONDARY

Crusher

Quaternary Crushing

Washing &Screening

FineCyclone

CoarseCyclone

MediumDrum

CoarseDrum

DRSScreening

TERTIARYCrusher

IN-PITCrusher

Quaternary Screening

Blending beds

Lump DRS DR C.S. FineOre Ore Ore Ore

Final Products

Up Current Classifier

Ore

DMS Plant Flow Diagram

74%

76%

78%

80%

82%

84%

86%

88%

90%

2005 2006 2007 2008 2009 2010 YTD

Average Yield DMS 2005 to 2009

11

Asset Optimisation

Project Bokamoso: Initial achievements

+561kt58ktDaily ROM

stackedJig Plant

+2348.1%39%OEE

+572454m1558mDaily metres

drilledDrilling and Blasting

-291.7 hours2.39 hoursMean time to

repair (shovels)

+2764.8%51%OEE

+40305kt218ktDaily tonnes

handledTrucks and Shovels

% improvement vs. baseline

February 2010 performanceBaselineKPIs

12

Asset OptimisationProject Bokamoso: Initial achievements

150000

170000

190000

210000

230000

250000

270000

290000

310000

330000Ba

selin

e

Mar Ap

r

May Jun

Jul

Aug

Sep

Oct

Nov Dec Jan

Feb

TTH Baseline 2 per. Mov. Avg. (TTH)

Education• Whole school development• Teacher development• Integration of SD into HR interventions

• Rural libraries• Early Childhood Development

Multipurpose SkillsTraining Centre• Enterprise development:training, mentoring, support

• Various skills programmes• Community access (rural)

Health

SLP• Delivering long term sustainable value

SIOC CommunityDevelopment Trust• Alignment• Partnerships

Small business Start-up Hubs• Expand Sishen Hub• New business hubs at Thabazimbi and Kolomela

• Resourcing the hubs

2010:Priorities

Social and Community Development Initiatives