SINO IRON PROJECT COOLING WATER SYSTEM
Transcript of SINO IRON PROJECT COOLING WATER SYSTEM
www.kgc.net.au 3/55 John St. Bentley WA 6102
P: +61 8 9258 4393 F: +61 8 9258 4417 E: [email protected]
4 LOCATION CAPE PRESTON, WA
4 CLIENT MCC MINING (WA) PTY LTD
4 STATUS: COMPLETED
4 PERIOD OF ASSIGNMENT YEAR 2012
4 CONTRACT VALUE $18 M
4 PROJECT OVERVIEW
STRUCTURAL, MECHANICAL AND PIPING INSTALLATION FOR THE GRINDING MILL COOLING WATER SYSTEM
The project is consisted of
230 tonnes of structural steel
7 cooling towers; 6 refrigerated chillers
Associated pumps, tanks, and ancillaries
Over 6,000m of process piping to AS4041
Development of weld procedures for pipe welding; Pipe installation
4 MAIN SUBCONTRACTOR Burgess BLA CPC Goldfields
4 REFEREE Xingyong ZHAO Principal’s Representative MCCM Construction Department 1 Sino Iron Project at Cape Preston Tel: 08 9184 8827 Mobile: 0467 444 867 Email: [email protected]
4 PROJECT MANAGER Mark Fidler & Klaus Hartmann
4 SITE MANAGER Wenge Liu
4 CHIEF ENGINEER Harry Yang
PROJECT REFERENCE
PROJECT NAME: SINO IRON PROJECT COOLING WATER SYSTEM