Since our founding in 1995, SPS has been dedicated to producing high quality Ductile Iron valves and fittings in Jeddah, Saudi Arabia. Our special blend of engineering expertise, craftsmanship, quality materials and sophisticated manufacturing processes have been the driving force behind SPS success in domestic and international markets.
In 2000, SPS set-up a foundry factory equipped with modern technology producing manhole covers & frames, gratings and valves casting.
In 2002, SPS again established a new factory producing a wide range of GRP/FRP/RTR and Pre-Insulated pipes ranging from 100mm up to 2600mm, and pressure rating of 6 bars to 25 bars.
In January 2004, SPS established an advanced facility with fully automated extrusion machinery producing High Density Polyethylene pipes (HDPE) with a minimum production output of 8,500 tons per year ranging from 16mm up to 400mm with pressure ratings of 5 bars to 16 bars.
2
Is to make SPS about quality products that meet the requirements of all applicable standards as well as customers’ specifications, to be cost efficient and environmentally friendly, and exceed customers’ expectations.
Our Vision:
Our Mission:
Is to maintain our high quality standard, be reliable and deliver the best customer experience in our markets.
Our Values:
P - Passionate in delivering resultsI - IntegrityP - Providing excellenceE - Exceed the expectations of customersS - Shoulder responsibility for our products
3
SPS Organization Chart
Production Sales & Marketing
General Manager
AssistantGeneral Manager
HRQuality/ Safety
Sales team Customer Satisfaction
LogisticsPurchasing
Quality System QA/QC in-charge
Safety team
GRPValves
FoundryHDPE
Plants Manager
Finance /IT
AccountsIT supportCollections
GovernmentRelations /
4
Incoming Material
ReceivingVendor Implement
Corrective & PreventiveAction
Reject Material
Warehouse
Acceptance Level
Reject
Accept
Inspection
MarkAccept label Mark Reject label
IQC Process
5
Finished Product
Rework
Corrective & Preventive Action
Delivery
Warehouse
Acceptance Level
Inspection
Accept
Reject
QA Process
6
FACTORIES
7
Location: Phase 4, Industrial City, Jeddah, Saudi Arabia
• Total Area: 13,500 square meters
• Accreditation: ISO 9001:2008
• Employees: Direct – 65 people
• Capacity: 500,000 Meters / year
Main Products:
• GRP Pipes & Fittings
• Pre Insulated Pipes & Fittings
GRP Factory
8
Can produce 24 meters / hour Size range: 100mm up to 1800mm Stiffness: 2,500 Pa, 5,000 Pa, 10,000 Pa Pressure ratings: 6 bar, 10 bar, 16 bar & 25 bar
GRP (Glass Reinforced Polyester) Pipes
HELICAL WINDING CONTINIOUS WINDING
Can produce 60 meters / hour depending on the diameter Size range 300mm up to 2600mm Stiffness: 2,500 Pa, 5,000 Pa, 10,000 Pa , 12500 Pa Pressure ratings: 6 bar, 10 bar, 16 bar & 25 bar
9
GRP Standard
10
Filament-Wound Reinforced Thermosetting Resin PipeASTM D 2996-88
Fiberglass (Glass-Fiber-Reinforced Thermosetting-Resin Sewer and Industrial Pressure Pipe
ASTM D3754-88
Fiberglass Pressure PipeAWWA C950
Fiberglass Pipe Design ManualAWWA M45
Gravity SewerSASO 1577
Pressure SewerSASO 1578
Fiberglass (Glass-Reinforced Thermosetting-Resin Pressure Pipe)
ASTM D3517-88
Specification for Glass fiber reinforced plastic (GRP) pipes and fitting to use for water supply or sewerage
BS 5480-90
GRP Machinery
Specializes in producing GRP pipes and fittings from small to big
ranges with standard specifications, through filament helical
winding and continuous filament winding processes
Helical Filament winding is produced in a process on a computer
controlled machine by adjusting relative speed of mandrel rotation
and glass distribution head movement. Helical reinforced layer with
different angles can be wound
Continuous Filament winding process only produces cylindrical
parts like pipes, based on a special continuous mandrel design
11
Advantages of GRP Pipes
High corrosion resistance
Very smooth inner pipe surfaces minimizes friction and pressure loss and simplifies hygienic measures
High stiffness classes available
High abrasion resistance
UV resistance
Low operating and maintenance costs
Service life of more than 50 years
Light weight, where weight of GRP is only a quarter the weight of ductile iron pipe and is around a tenth the
weight of concrete pipe
12
Pre-insulated Pipes
Using pre-insulated piping system reduces the following:
Heat transfer
Size of chiller used
Energy consumption
Insulation:
SPS pre-insulated pipes use polyol foam insulation. This rigid foam provides the lowest thermal conductivity
of any commercially available factory application for insulation. It has a high compressive strength and is
dimensionally stable13
Pre Insulated Pipe
Pre-insulated Piping Systems
InsulationCore Casing
PURSteel HDPE GRP HDPE GRP Other
ISO Polyol
14
HDPE Factory
Location : Phase 5, Industrial City, Jeddah, Saudi Arabia
Total Area : 11,250 square meters
Accreditation : ISO 9001- 2008
Employees : Direct – 20 people
Capacity : 2,000 Meters / day
Main Product : HDPE Pipes
According to BS EN 12201 complies with – ISO 4427
DIN 8074
15
Polyethylene Technical Specifications
Yield stress 23 Mpa ISO 527
Elongation at yield 9 % ISO 527
Tensile modulus 900 Mpa ISO 527
Notched impact strength 26 Kj/m2 ISO 179 / 1ea
20o c 13 Kj/m2 ISO 179 / 1ea
16
HDPE (High Density Polyethylene) Pipes
HDPE Pipes range from 16 mm up to 400 mm diameters. The factory uses advancedmachinery and equipment which are operated by qualified engineers and technicians.
Applications:
Sewage pumping mains
Fire mains
Chilled water
Submarine pipelines
Industrial and chemical applications
Welding technique for HDPE pipes
Butt fusion welding
Electro fusion welding
17
Advantages of Polyethylene (PE100)
High impact and breakage resistance.
Very high resistance to direct sunlight. This is supplied by ultraviolet light resistance agent mixed to the PE raw
material
Not affected by earth movements such as landslides, earthquakes, etc.
PE pipes do not require concrete block at the place like bending and tee separations
Many different pressure resistance options, PE pipes can be produced resistant to 12 different pressure classes
from 2.5 bar up to 32 bar
High resistance to chemicals, not affected by corrosion, decay and abrasion
Perfect leak proof, no crack, no break and no deformation
Availability of more than one connection method (butt welding, electro fusion welding , push fit sockets etc.)
18
Foundry Casting Factory
Product Line:
Includes Manhole covers and frames for different uses (electricity, sewage and telephones) Inspection Rooms
Many types of Gratings (Catch Basin) with Top Quality finished products
SPS Ability and Advantages:
Computerized production system, precise inventory control techniques, sophisticated engineering and design, responsive management and active sales services
Five units of induction furnace enables us to produce alloying metals, each unit melting out 2 tons / hour
Pattern shop can create any complicated engineering items out of drawing specifications
19
Product: Casting Factory
Location : Phase 4, Industrial City, Jeddah, Saudi Arabia
Total Area : 13,500 square meters
Accreditation : ISO 9001 - 2008
Employees : 45 People
Melting capacity: 10 tons / hour
Five induction furnaces
Main Products:
Manhole covers and frames
Gratings
Valve Casting
Standard : Gray Cast Iron BS 497/A/B/C
Ductile Iron: BS EN 124
We manufacture anti-theft manhole covers and frames with hingeand three locking systems.
Product: Casting Factory
21
Features: The intelligent solution regarding safety Ductile Iron GGG50/40 Loading class D400 Innovative master key for locking system Cover hinged with frame 120 deg of inspection
We developed our manhole cover with a master key to prevent anyone interfering with it.
Product: Casting Factory
22
Feature: Fall protection grate under the cover
We also developed it with net (or basket) to protect from falling in the chamber in case anyone left the cover open
23
Product: Casting Factory
Feature Electrical switch for opening and
closing by Scada system
We again developed our manhole cover and frame to be with limit switch (sensor) to indicate whether the cover is open or closed on Scada system (control room)
Location : Phase 4, Industrial City, Jeddah, Saudi Arabia,
Total Area : 11,250 square meters
Accreditation : ISO 9001:2008
Employees : 37 People
Capacity : 6000 ton / year
Valves Factory
24
Valves Factory: Main Products
25
Gate Valve Design: BS 5163 AWWA C500 Pressure: 10,16,25 bars
Gate Valve Socket for PVC Design: DIN 3202 P1 Pressure: 16 bars
Gate Valve Design: BS 5163 Pressure: 10,16,25 bars
Gate Valve, Rising Stem Design: MSS SP-70 Pressure: ANSI B16-10
Valves Factory: Main Products
26
Butterfly Valve: Design: BS 5155 Pressure: 10,16,25 bars
Check Valve W/Hydraulic Damper Design: BS 5163 Pressure: 10,16,25 bars
Control Valve Design: DIN Pressure: 10, 16, 25 bars
Double Air Release Valve Design: AWWA C512E Pressure: 10,16,25 bars
Valves Factory: Main Products
27
Y-Strainer Design: BS 4504 Pressure: 10,16,25 bars
Universal Coupling Design: DIN Pressure: 10,16,25 bars
Dismantling Joint Design: DIN 2633 Pressure: 10,16,25 bars
Flange Adaptor Design: BS 4504 / ANSI B16.5 Pressure: 10, 16, 25 bars
Valves Factory: Main Products
28
Storage:
When valves are stored for some time (2 months or
more) before being fitted, storage should be in the
original delivery crates or cases
Storage Conditions:
Valves should be stored off the ground in a clean,
dry indoor area
Protect the valve from temperature and humidity
extremes, and exposure to excessive dust, moisture,
vibration, deformations and sunlight
Warning:
For safety reasons it is important to take the followingprecautions before starting to work on the valve:
1. Personnel making any adjustment to the valves
should utilize suitable equipment. All required
personal protection means should be worn.
2. The line must be depressurized before installing
the valve.
3. Installation and handling of the valves should only
be done by personnel that are trained in all aspects
of manual and mechanical handling techniques.
4. Misuse of the valve is not allowed. The valve,
handles, actuators and other parts may not be
used as climbing tools.
Storage and Handling
29
IMPORTANT:
Before valves are installed or used the following
actions are recommended:
1. Valves/parts have to be inspected and thoroughly
cleaned if required.
2. Rubber parts need to be greased with silicone
grease if not present anymore.
3. All surfaces in contact with seats have to be
thoroughly cleaned and greased with silicone
grease if stored for more than 5 months.
HANDLING:
To prevent damage during handling the valves should be:
1. Lifted by hand or using appropriate lifting equipment.
2. protected from external events e.g. bumps, hitting and
vibrations during transport.
3. Any flange protection needs to be removed before the
valve is mounted in the pipeline.
4. Lift the valve with great care from the transport
package (crate, pallet).
5. While handling or installing the valve, ensure that no
damage occurs to the valve, the pneumatic/electrical or
hydraulic actuator or other instruments.
Storage and Handling
30
31
KING SAUD UNIVERSITY
KING ABDULAZIZ UNIVERISTY32
PRINCESS NOURA BINT ABDULRAHMAN UNIVERSITY
KING ABDULLAH ECONOMIC CITY
33
KING FAISAL UNIVERSITY (AL-HASA)
KING ABDULAZIZ ENDOWMENT PROJECT -MAKKAH34
ROYAL COMMISSION
SALINE WATER CONVERSION CORPORATION35
MINISTRY OF WATER
NATIONAL WATER COMPANY36
King Abdullah Sea Port - Jeddah
Development of Corniche - Jeddah37
Mayasem Project - Jeddah
Ministry of Housing Projects38
Approvals- National Water Company
39
ISO Certificate
40
WRAS Certificate
41
Approvals – Ministry of Water and Electricity
42
Approvals – Ministry of Water and Electricity
43
Approvals – Ministry of Housing
44
THANK YOU
45