HISTORY AN ENGINEERING, DESIGN& MANUFACTURING COMPANY ESTABLISHED IN 2000
STARTED IN THE FIELD OF FLOW ELEMENTS AND RESTRICTION ORIFICES
THE FIRST PROJECT: MTBE IMPROVEMENT PLAN PROJECT, BIPC, IRAN
FROM 2010, WE HAVE DEVELOPED THE ACTIVITY ON “PROCESS PACKAGES”
NOW WE ARE EQUIPPED WITH 30,000 MAN-DAY /YEAR
SINA WORK SHOP IS POSITIONED IN 5000 M2 OF CLOSED SALON
ANNUAL TURN-OVER OF ABOUT 600 BILLION RIALS
ENTITIES
1) HEAD OFFICE AND WORK SHOP, SHIRAZ, IRAN: WWW.SINACONTROL.COM
2) TURKISH OFFICE, GTS COMPANY, ISTANBUL: WWW.GTSCO.COM.TR
3) CANADA OFFICE, TORONTO: WWW.SINACONTROL.CA
1
23
CAPABILITIESMANAGEMENT, DESIGN, ENGINEERING& TECHNOLOGY ARRANGEMENT
MANUFACTURING OF: PROCESS PACKAGES FLOW ELEMENTS
SUPPLY OF EQUIPMENT, PROCUREMENT SERVICE
COMMISSIONING& SITE TECHNICAL ASSISTANCE
POSITION IN APPROVED VENDOR LISTSSINA IS PLACED IN THE APPROVED VENDOR LIST OF THE MOP AND IOOC FOR PSA(PRESSURE SWING ADSORPTION), DEHYDRATION AND GAS PURIFICATION PACKAGES:
- REGISTERED IN THE LONG LIST OF MOP (MINISTRY OF PETROLEUM) SUPPLIERS
- REGISTERED UNDER CODE NUMBER OF 6098 FOR IOOC
PRODUCTS
FLOW ELEMENTS: ORIFICE FLOW NOZZLE VENTURI TUBE RESTRICTION ORIFICES
PRODUCTS
REFERENCES FOR FLOW ELEMENTS
PROCESS TREATMENT PACKAGE
PSA (PRESSURE SWING ADSORPTION)
DEHYDRATION
GAS RECOVERY, PURIFICATION& FGRU
VRU (VAPOUR RECOVERY UNIT)
PSA (PRESSURE SWING ADSORPTION) ABADAN Refinery Start-up
Tabriz Refinery H2, 60,000 Nm3/h Esfehan Refinery H2, 45,000 Nm3/h
Lavan Refinery H2, 5,000Nm3/h
GAS RECOVERY, PURIFICATION& FGRU
1. PSA (PRESSURE SWING ADSORPTION)
2. MEMBRANE
3. CRYOGENIC
GAS RECOVERY, PURIFICATION& FGRU Purge Gas Ethylene Recovery in MARUN PC EO/EG unit by Membrane Tech.
FGRU; Proposal for Tabriz , Regal, Zagros PCPGRU; Proposal for Farsashimi, Arak LLDPE &EO/EG, Fanavaran,
Pardis PCVRU; 10 sites in NIOPDC
PRODUCTS
REFERENCES FOR PROCESS PACKAGES CONTAINS TWO DOING PROJECTS, WHILE IN MANY MORE PROJECTs ALSO SINA IS PRESENT IN THE BIDDING
STAGE.
FEED SPEC.PRODUCT SPECS.
CAPACITY
OF THE
PLANT
DATE OF
ACTUAL
COMPLETION
DATE OF
COMMENCEMENTDESCRIPTION OF THE WORK DONEPROJECT TITLE/ CLIENT
SR.
NO.
CR1 HYDROGEN
PRODUCT IS FED TO PSA
PACKAGE
HYDROGEN IN PURITY
OF 99.95 MOL%
15’000
NM3/HRSEPTEMBER 2017JANUARY 2015
BASIC & DETAIL ENGINEERING/ SUPPLY OF
ADSORBENTS/ PROCUREMENT SERVICES/
EQUIPMENT MANUFACTURING& SUPPLY/ PRE-
COMMISSIONING, COMMISSIONING& CONSTRUCTION
SUPERVISION/ PERFORMANCE TEST
HYDROGEN PSA PACKAGE
/
ABADAN OIL REFINING
COMPANY
1
EOEG PLANT PURGE GAS
IS FED TO ERU
ETHYLENE
SEPARATION
EFFICIENCY: ≥ 93%
2’800
NM3/HRJANUARY 2017OCTOBER 2015
BASIC & DETAIL ENGINEERING/
MANUFACTURING& SUPPLY/ PRE-COMMISSIONING,
COMMISSIONING& CONSTRUCTION SUPERVISION/
PERFORMANCE TEST (MEMBRANE PACKAGE IS
SUPPLIED BY BORSIG)
ETHYLENE RECOVERY
PACKAGE /
MARUN PETROCHEMICAL
COMPANY
2
PROCESS REQUIRED THF
IS DEHYDRATE
THF
(TETRAHYDROFURAN)
DEHYDRATION TO 10
PPMW WATER
CONTENT
1’500
KG/HRSEPTEMBER 2017JUNE 2017
BASIC & DETAIL ENGINEERING/ SUPPLY OF
ADSORBENTS
THF DEHYDRATION
PACKAGE /
SHAZAND PETROCHEMICAL
COMPANY
3
SINA-BORSIG MEMBRANE JOINT AGREEMENT
AGREEMENT SIGNED AT JULY 2016
PARTIES AGREED FOR: MARKETING& OFFERING CUSTOMERS COMMUNICATION SKID FABRICATION& LOCALIZATION
MEMBRANE FOR PROCESS & ENVIRONMENT
Emission Control:Terminals & RefineriesMarine LoadingCar Filling Station
MEMBRANE FOR PROCESS & ENVIRONMENTProduct Recovery:
PE ProductionPP ProductionEO/EG ProductionPVC & Rubber ProductionSeal Gas Application
MEMBRANE FOR PROCESS & ENVIRONMENT
Gas Separation:Hydrogen SeparationFuel Gas Conditioning Unit
INNOVATE AND GO GREEN WITH SINATHANK YOU