Simplifiying the use of IEC 61850 over HSR/PRP with PTP
-
Upload
doris-hurley -
Category
Documents
-
view
24 -
download
1
description
Transcript of Simplifiying the use of IEC 61850 over HSR/PRP with PTP
http://www.ucaiug.orgJoin Us Now at:
http://www.ucaiug.org
Simplifiying the use of IEC 61850 over HSR/PRPwith PTP
And TESTING
System-on-Chip engineering
SoCe
Low-latency HSR/PRP/IEEE 1588 IP corefor seamless integration into SAS
equipment
IED
IED
IED
IED
IED
Substation Bay 1
HSR-1 (62439-3-Clause 5)
Ring Network
PRP-1 (62439-3-Clause 4) Redundant Ethernet Network
v
LAN A
LAN B
GPS
HSR/PRP Switch IP
IED
IED
IED
IED
Substation Bay 2
IED
IED
IED
IED
IED
Substation Bay N
HSR/PRP Switch IP
HSR-1 (62439-3-Clause 5)
Ring Network
HSR-1 (62439-3-Clause 5)
Ring Network
IED
HSR/PRP Switch IP
SCADA
v v v v
NCC NCC
Redbox
System-on-Chip engineering
SoCe
• 10/100/1GE copper & fibre support• Modules and development kits• System-on-Chip solution• Low power version• IEC 61850 messages hardware processing