Significant Changes to the PEC 2009

129
Significant Changes to the Philippine Electrical Code 2009 Edition Jaime V. Mendoza, MTM Jaime V. Mendoza, MTM Board Member Board Member PROFESSIONAL REGULATION COMMISSION BOARD OF ELECTRICAL ENGINEERING

description

Significant Changes to the PEC 2009

Transcript of Significant Changes to the PEC 2009

Page 1: Significant Changes to the PEC 2009

Significant Changesto the

Philippine Electrical Code 2009 Edition

Jaime V. Mendoza, MTMJaime V. Mendoza, MTM

Board MemberBoard Member

PROFESSIONAL REGULATION COMMISSION

BOARD OF ELECTRICAL ENGINEERING

Page 2: Significant Changes to the PEC 2009

2

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

PEC – 2009 (8th Edition)

BEE Resolution No. 12 Series of 2009 –Adoption of the Revised (8th Edition)Philippine Electrical Code Part I as Part of the Rules and Regulations Concerning the Practice of Electrical Engineering and as Referral Code in Accordance with the National Building Code – Sept. 14, 2009.

Published in the Philippine Star last February 18, 2010 (Thursday) page B-10

Page 3: Significant Changes to the PEC 2009

3

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

R. A. 7920R. A. 7920

An Act For, A More Responsive and Comprehensive Regulation For the Practice, Licensing, and Registration of Electrical Engineers and Electricians.

Sec. 4 Powers and Duties of the Board

The Board shall exercise executive The Board shall exercise executive

/administrative or quasi/administrative or quasi--legislative (rulelegislative (rule--

making) or quasimaking) or quasi--judicial (investigative) judicial (investigative)

powers in carrying out the provisions of powers in carrying out the provisions of

this Act.this Act.

Page 4: Significant Changes to the PEC 2009

4

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Powers of the Board

Sec. 29. Revocation of Certificates of Registration and Suspension from the Practice of the Profession.

The Board shall have the power, upon proper notice and hearing, to revoke any certificate of registration of any registrant, to suspend him from the practice of the profession or to reprimand him for any specified in the preceding section, or for the use of perpetration of any fraud or deceit in obtaining a certificate of registration, or for gross negligence or incompetence or for unprofessional or dishonorable conduct, for violation of this Act, the rules and regulations and other policies of the Board and the Code of Professional Ethics.

Page 5: Significant Changes to the PEC 2009

5

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Licensing

Definition – a permission granted by competent authority to engage in a practice of profession or business or in an activity.

A PEE who designed, signed, and sealed an electrical plans – means he/she guaranteed the safety of the electrical plans for 15 years in accordance to Civil Code.

PEE, REE or RME who signed as in-charge of installations also guaranteed the safety of the electrical installations for 15 years.

You can only guaranteed the safety of your electrical designs/installations if you are well-versed in the Philippine Electrical Code.

“Licensing guarantees the safety

of your works!!!!”

Page 6: Significant Changes to the PEC 2009

6

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

PURPOSE OF PEC

The primary objective of the code is to establish basic materials quality and electrical works standards for the safe use of electricity for light, heat, power, communications, signaling and for other purposes.

“Practical safeguarding of persons and property from hazards arising from the use of electricity”

THE PHILIPPINE ELECTRICAL CODEKEY TO SAFETY AND FIRE PREVENTION

COMPLIANCE TO THE PEC WILL ENSURE SAFETY AND

PREVENT ELECTRICAL FIRES

Page 7: Significant Changes to the PEC 2009

7

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

The Philippine Grid/Distribution

Codes

Performance

Standards

• Power Quality

• Reliability

• System Loss

GRID/DISTRIBUTION

DEVELOPMENT

PLANNING CRITERIA

The Philippine Electrical Code

Safety

Standards

• Design and Specifications

• Installation

• Operation & Maintenance

Page 8: Significant Changes to the PEC 2009

8

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Consideration should be given for future expansion of electrical systems but this is not a Code requirement.

The PEC is a safety standard, not a design guide. Electrical designs must comply with the requirements of PEC to ensure safety.

Energy management, maintenance, and power quality issues aren’t within the scope of the PEC.

THE PHILIPPINE ELECTRICAL CODE

Page 9: Significant Changes to the PEC 2009

9

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Philippine Electrical Code

Enforcement

1. This Code is intended for mandatory application by government bodies exercising legal jurisdiction over electrical installation.

2. These government bodies will have the responsibility of implementing the provision of this Code in deciding on the approval of equipment and materials and for granting the special permission contemplated in this Code, where it assured that equivalent objectives can be achieved by establishing and maintaining effective safety.

Page 10: Significant Changes to the PEC 2009

10

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Philippine Electrical Code

Interpretation

Upon recommendation of the Code Upon recommendation of the Code

Committee, the Committee, the Board of Electrical Board of Electrical

Engineering shall render the final Engineering shall render the final

decisiondecision in the interpretation of any in the interpretation of any

portion of the Philippine Electrical portion of the Philippine Electrical

Code, in case of controversy.Code, in case of controversy.

Page 11: Significant Changes to the PEC 2009

11

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

The National Electrical CodeThe first documented case of a Code as a requirement of rules was published on 16th Nov.1881 entitled “The Dangers of Electric Lighting”.

The first NEC was developed in 1897, eighteen after the invention of incandescent light bulb by Thomas A. Edison.

Since 1911, the NFPA of Quincy, Massachussets, has been responsible for the maintenance and publication of the NEC.

Regularly revised (every three years) to reflect the evolution of products, materials, and installation techniques.

21 Separate Committee, each consisting of 15-20 persons. Members of each committee meet several times, discuss proposed changes, accepting some and rejecting others, and rewrite (as required) the sections of the Code that were assigned to their committee.

Page 12: Significant Changes to the PEC 2009

12

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

THE PHILIPPINE ELECTRICAL CODE

Code Arrangement

Page 13: Significant Changes to the PEC 2009

13

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

CLASSIFICATION OF CODE RULES

1. Wiring Design Rules

2. Installation Rules

3. Manufacturing Rules

THE PHILIPPINE ELECTRICAL CODE

Page 14: Significant Changes to the PEC 2009

14

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Wiring design rules used to determine sizes and rating of circuit conductors and devices.

Example:

1. Branch circuit conductors supplying a single motor shall have an ampacity not less than 125% of the full-load current. Section 4.30.2.2

2. The disconnecting means for motor circuits shall have an ampere rating of at least 115% of the full-load current rating of the motor. Section4.30.10.10(a)

THE PHILIPPINE ELECTRICAL CODE

CLASSIFICATION OF CODE RULES

Page 15: Significant Changes to the PEC 2009

15

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Installation rules

Example:

1. A disconnecting means shall be located within sight from the motor controller. Section4.30.102

2. In class II Division I Locations, motors, generators, and other rotating electric machinery shall be dust ignition proof or totally enclosed pipe ventilated and shall be approved for class II locations. Sections 5.02.8

THE PHILIPPINE ELECTRICAL CODE

CLASSIFICATION OF CODE RULES

Page 16: Significant Changes to the PEC 2009

16

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Manufacturing rules

Example:

Section 4.30.1.7

A motor shall be marked with the following information:

1) Manufacturer’s Name

2) Rated Volts and Full-load Amperes

3) Rated Frequency and Number of Phases, if an alternating current motor, etc.

4) Rated full-load speed

THE PHILIPPINE ELECTRICAL CODE

CLASSIFICATION OF CODE RULES

Page 17: Significant Changes to the PEC 2009

17

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Various Categories of the Code Rules which apply in a Motor and the Circuits

The Philippine Electrical Code

Page 18: Significant Changes to the PEC 2009

18

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

ELECTRICAL FIRES

If a fault develops, the current (and heat energy) can increase to the extent that either the appliance burns out, the connecting wiring overheats and melts the plastic insulation or the plug and socket may burn out.

An electrical fire then occur where the overheated wiring, motor, plug, etc. are in contact with or close to flammable or combustible material.

ELECTRICAL FIRE can be defined as a fire where an electric current or electrical fault is found to have been the source of ignition.

Page 19: Significant Changes to the PEC 2009

19

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Components that Create a Fire or Explosion

Triangle of Fire

combustion

Very Significant on PEC Installation Rules!!!

Page 20: Significant Changes to the PEC 2009

20

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Regularly revised (every three years) to reflect the evolution of products, materials, and installation techniques.

21 Separate Committee, each consisting of 15-20 persons. Members of each committee meet several times, discuss proposed changes, accepting some and rejecting others, and rewrite (as required) the sections of the Code that were assigned to their committee.

Significant Changes to thePhilippine Electrical Code 2009 Edition

Page 21: Significant Changes to the PEC 2009

21

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Change Type in the PEC 2009

1. New

2. Revision

3. Relocated

4. Reorganization

5. Universal Change

6. Deletion (310.5)

Page 22: Significant Changes to the PEC 2009

22

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

New - Definitions

AHJ – Authority Having Jurisdiction

Bonding Jumper, System

Coordination (Selective)

Electrical Practitioner, Licensed

Electrical Practitioner, Non-Licensed

Guest Rooms

Guest Suite

Handhole Enclosure

Page 23: Significant Changes to the PEC 2009

23

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Guest Room

An accommodation combining living, sleeping,sanitary and storage facilities.

Page 24: Significant Changes to the PEC 2009

24

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Guest Suite

An accommodation with two or more contiguous roomscomprising a compartment, with or without doors betweensuch rooms, that provides living, sleeping, sanitary, and storage facilities.

Page 25: Significant Changes to the PEC 2009

25

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

New Provision

PEC 2.10.1.5 (c) Identification for Branch Circuits, page 69

(c) Ungrounded Conductors

Where the premises wiring system has branch circuits supplied from more than one nominal voltage system, each ungrounded conductor of a branch circuit, where accessible shall be identified by system. The means of identification shall be permitted to be by separate color coding, marking tape, tagging, or other approved means and shall be permanently posted at each branch-circuit panelboard or similar branch-circuit distribution equipment.

Page 26: Significant Changes to the PEC 2009

26

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

PEC 2.10.1.5 (c) – Identification for Branch Circuit for Ungrounded Conductors

Page 27: Significant Changes to the PEC 2009

27

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

New Provision

2.10.1.8(b)(2) –GFCI Protection Other than Dwelling

Commercial and institutional kitchens –for the purposes of this section, a kitchen is an area with a sink and permanent facilities for food preparation and cooking. (Culinary Schools)

Page 28: Significant Changes to the PEC 2009

28

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

New Provision

2.10.1.8(b)(4) –GFCI Protection Other than Dwelling

Outdoor in Public Spaces – for the purpose of this section a public space is defined as any space that is for use by, or is accessible to the public.

Page 29: Significant Changes to the PEC 2009

29

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

2.10.1.8(b)(5) –GFCI Protection Other than Dwelling

(5)Outdoor , where installed to comply with 2.10.3.14 Heating, Air-conditioning, and Refrigeration Outlet

New Provision

Page 30: Significant Changes to the PEC 2009

30

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Page 31: Significant Changes to the PEC 2009

31

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

New Provision

2.10.1.8(c)Boat Hoists

GFCP for personnel shall be provided for outlets that supply boat hoists installed in dwelling unit locations

Page 32: Significant Changes to the PEC 2009

32

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

b) Other than Dwelling Units

1) Bathrooms*

2) Commercial and institutional kitchens

3) Rooftops*

4) Outdoors in public spaces

5) Outdoors, where installed to comply with 2.10.3.14

* Including in PEC 2000

2.10.1.8 GFCI Protection for Personnel

Page 33: Significant Changes to the PEC 2009

33

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

PEC-2.10.1.8 (a)

a) Dwelling Units1. Bathrooms2. Garages3. Outdoors4. Crawl spaces at or

below grade level5. Unfinished

basements6. Kitchens for

countertopappliances

7. Wet bar sinks8. Boathouses (New Provision)

GFCI Protection for Personnel

Page 34: Significant Changes to the PEC 2009

34

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

2.10.1.12.Arc-FaultCircuit Interrupter Protection

(b) Dwelling Unit Bedrooms – All single phase, 15 and 20 A branch circuits supplying outlets installed in dwelling unit bedrooms shall be protected by a listed AFCI. Combination type installed to provide protection of the branch circuit.

New Provision

Page 35: Significant Changes to the PEC 2009

35

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Arc-Fault Circuit Interrupter

An AFCI is a device intended to open the circuit whenit detects the current waveform characteristics that are unique to an arcing fault.

Page 36: Significant Changes to the PEC 2009

36

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

AFCI

Page 37: Significant Changes to the PEC 2009

37

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Ground Fault Circuit Interrupter

A GFCI is designed to protect persons against electric shock.

It operates on the principles of monitoring the unbalanced current

Between the ungrounded and the grounded neutral conductor.

Page 38: Significant Changes to the PEC 2009

38

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

p88

New Provision

Page 39: Significant Changes to the PEC 2009

39

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Revised - Definition

Dwelling Unit – one or more rooms for the use of one or more persons as a housekeeping unit with space for eating, living, sleeping, and permanent provisions for cooking and sanitation. PEC 2000

Dwelling Unit – a single unit, providing complete and independent living facilities for one or more persons, including permanent provisions for living, sleeping, cooking, and sanitation. (PEC 2009)

Page 40: Significant Changes to the PEC 2009

40

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

2.10.1.8(a)(8) GCFI Protection

Laundry, utility, and wet bar sinks –where the receptacles are installed to serve the countertop surfaces and are located within 1.8 m (6 ft) of the outside edge of the sink.

Laundry, utility, and wet bar sinks –where the receptacles are installed within 1.8 m (6 ft) of the outside edge of the sink.

Revised - Definition

Page 41: Significant Changes to the PEC 2009

41

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

GFCI Protection for Personnel

7. Dwelling Wet Bar Sinks

Page 42: Significant Changes to the PEC 2009

42

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Page 43: Significant Changes to the PEC 2009

43

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Garage – a building or portion of a building in which one or more self-propelled vehicles carrying volatile flammable liquid, for fuel or power are kept for use, sale, storage, rental, repair, exhibition, or demonstrating purposes, and all that portion of a building that is on or below the floor or floors in which such vehicles are kept and that is not separated there from by suitable cutoffs.

Garage – A building or portion of a building in which one or more self-propelled vehicles can be kept for use, sale, storage, rental, repair, exhibition, or demonstration purposes.

Revised - Definition

Page 44: Significant Changes to the PEC 2009

44

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Relocated -Definition

Solidly Grounded – PEC 2000

Grounded, Solidly – PEC 2009

Page 45: Significant Changes to the PEC 2009

45

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

2.1.1.6(b) Means of IdentyingGrounded Conductors PEC-2000

(b) Sizes Larger than 14 mm2. Aninsulated rounded conductor larger than 14 mm2 shall be identified either by a continuous white or natural gray outer finish or by three continuous white stripes on other than green insulation along its entire length or at the time of installation by a distinctive white marking at its terminations. This marking shall encircle the conductor or insulation.

Page 46: Significant Changes to the PEC 2009

46

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Page 47: Significant Changes to the PEC 2009

47

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Sizes Larger Than 14 mm2. An insulated conductor larger than 14 mm2 shall be identified by one of the following means:

1) By a continuous white or gray cover finish.

2) By three continuous white stripes along its entire length on its entire length on other than green insulation

3) At the time of installation, by a distinctive white or gray marking at its terminations. This marking shall encircle the conductor or insulation.

2.1.1.6(b) Means of IdentyingGrounded Conductors PEC-2009

Page 48: Significant Changes to the PEC 2009

48

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Section 2.0.1.6 (a)

Page 49: Significant Changes to the PEC 2009

49

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

(d) Grounded Conductors of Different Systems. Where conductors of different systems are installed in the same raceway, cable, box, auxiliary gutter, or other type of enclosure, one system grounded conductor, if required, shall have an outer covering conforming to Section 2.1.1.6(a) or (b). Each other system grounded conductor shall have an outer covering of white with a readily distinguishable different colored stripe (not green) running along the insulation, or other and different means of identification as allowed by Section 2.1.1.6(a) or (b) that will distinguish each system grounded conductor.

2.1.1.6(d) Means of Identifying Grounded Conductors PEC-2000

Page 50: Significant Changes to the PEC 2009

50

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

(d) Grounded Conductors of Different Systems. Where grounded

conductors of different systems are installed in the same raceway,

cable, box, auxiliary gutter, or other type of enclosure, each grounded

conductor shall be identified by system. Identification that distinguishes

each system grounded conductor shall be permitted by one of the

following means:

(1) One system grounded conductor shall have an outer

covering

conforming to 2.0.1.6(a) or 2.0.1.6(b).

(2) The grounded conductor(s) of other systems shall have a

different outer covering conforming to 2.0.1.6(a) or 2.0.1.6(b) or by an

outer covering of white or gray with a readily distinguishable colored

stripe other than green running along the insulation.

(3) Other and different means of identification as allowed by

2.0.1.6(a) or 2.0.1.6(b) that will distinguish each system grounded

conductor.

This means of identification shall be permanently posted at each

branch-circuit panelboard.

2.1.1.6(d) Means of Identifying Grounded Conductors PEC-2009

Page 51: Significant Changes to the PEC 2009

51

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

An Example of Conductor Color Coding

120/240 –V, Single Phase

208Y/120 –V, Three-Phase

480Y/277-V, Three-Phase

Phase A Black Black Brown

Phase B Red Red Orange

Phase C Blue Yellow

Neutral White White with red Stripe

Gray

Page 52: Significant Changes to the PEC 2009

52

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Section 2.0.1.6 (d) (1)

Page 53: Significant Changes to the PEC 2009

53

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Mixing Grounded Neutral Conductors Different System Sec. 2.0.1.6(d)(2)

Page 54: Significant Changes to the PEC 2009

54

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Section 2.0.1.7(c)

Page 55: Significant Changes to the PEC 2009

55

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Branch Circuits

A. Tamper-Resistant Receptacles in Dwellings Unit (406.11) (NEC-2008)

Why do you think it is a tamper-

resistant receptacle?

…..To increase safety for children.

…..maybe that your son, daughter, or

grandchildren that you will save…

Page 56: Significant Changes to the PEC 2009

56

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Branch Circuits

A. Tamper-Resistant Receptacles in Dwellings Unit (406.11) (NEC-2008)

Page 57: Significant Changes to the PEC 2009

57

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Reorganization – Article 2.20Branch-Circuit, Feeder, and Service Calculations

2000 Article 2.20 2009 Article 2.20

Part Sections Part Sections

I. General 2.20.1.1- 4 I. General 2.20.1.1 -5

II. Feeders and 2.20.2.1 - 14Services

II. Branch Circuit 2.20.2.1 - 7Load Calculations

III. Optional 2.20.3.1 - 7Calculations forComputing Feeder and Service Loads

III. Feeder and 2.20.3.1 - 23Service LoadCalculations

IV. Method for 2.20.4.1 - 2Computing Farm Loads

IV. Optional Feeder2.20.4.1 - 9And Service LoadCalculations

V. Farm Calculation 2.20.5.1- 4

Page 58: Significant Changes to the PEC 2009

58

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Universal Change

A universal change throughout the 2009 PEC is the replacement of “computed load” and “demand load” with “calculated load.” For example, the term demandload is being replaced with calculated load to improve clarity and to reduce confusion, especially when related to “calculated load” and “demand factor.”The term calculated load includes demand factor, the concepts of diversity, and historical data.

Page 59: Significant Changes to the PEC 2009

59

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

2.30.6 Service Equipment –Disconnecting Means

a) Location

a) Readily Accessible Location. The service disconnecting means shall be installed at a readily accessible location of a building or a structure. For a building, the service disconnecting means shall be installed either at the outside wall or inside nearest point of entrance of the service conductors to the building.

Page 60: Significant Changes to the PEC 2009

60

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Page 61: Significant Changes to the PEC 2009

61

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

2.30.6 Service Equipment –Disconnecting Means

a) Location

2) Bathrooms. Service disconnecting means shall NOT be installed in bathrooms.

Page 62: Significant Changes to the PEC 2009

62

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Page 63: Significant Changes to the PEC 2009

63

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

The title of Article 2.50 has been changed from “Grounding” to “Grounding and Bonding.”

Change Significance: The scope of the article clearly covers both grounding and bonding. Adding the term bonding to the title of the article is appropriate, and is consistent with the fact that there are generally as many bonding requirements and provisions included within Article 2.50 as there are grounding requirements, if not more.

Article 2.50 Grounding and Bonding

Page 64: Significant Changes to the PEC 2009

64

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Page 65: Significant Changes to the PEC 2009

65

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

2.50.1.2 Definitions (Revision)

Effective Ground-Fault Current Path – An intentionally constructed, permanent, low impedance electrically conductive path designed and intended to carry current under ground-fault conditions from the point of a ground fault on a wiring system to the electrical supply source and that facilitates the operation of the overcurrent protective device or ground-fault detectors on high-impedance grounded systems.

Page 66: Significant Changes to the PEC 2009

66

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Effective Ground-Fault Current Path

Metal parts of premises wiring are bonded to an effectiveground-fault current path that has sufficiently low impedanceto quickly clear line-to-case faults by opening the circuit protection device.

Page 67: Significant Changes to the PEC 2009

67

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Effective Ground-Fault Current Path

Page 68: Significant Changes to the PEC 2009

68

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Effective Ground-Fault Current Path

Page 69: Significant Changes to the PEC 2009

69

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Earth is Not an Effective Ground-Fault Current Path

Page 70: Significant Changes to the PEC 2009

70

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Ground Fault- An unintentionally, electrically conducting connection between an ungrounded conductor of an electrical circuit and the normally non-current-carrying conductors, metallic enclosures, metallic raceways, metallic, or earth.

2.50.1.2 Definitions

Page 71: Significant Changes to the PEC 2009

71

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

2.50.1.2 Definitions

Ground-Fault Current Path- An electrically conductive path from the point of ground fault on a wiring system through normally non-current-carryingconductors,equipment, or the earth to the electrical supply source.

Page 72: Significant Changes to the PEC 2009

72

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Article 2.50

2.50.2.5(b) Main Bonding Jumper

2.50.2.11 Grounding Separately Derived Alternating-Current Systems

2.50.2.13 Buildings or Structures Supplied by Feeder(s) or Branch Circuit(s)

2.50.3 Grounding Electrode System and Grounding Electrode Conductor

2.50.10 Grounding of Systems and Circuits of 1 kV and Over (High Voltage)

Page 73: Significant Changes to the PEC 2009

73

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

3.10.1.4 Conductors in Parallel

The paralleled conductors in each phase, polarity, neutral, or grounded circuit conductor shall comply with all the following:

1. Be the same length

2. Have the same conductor material

3. Be the same size in circular mil area

4. Have the same insulation type

5. Be terminated in the same manner.

Why?????? …….. See FPN:

Page 74: Significant Changes to the PEC 2009

74

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

3.10.1.5 Minimum Size of Conductors

The minimum size of conductors shall be as shown in Table 3.10.1.5, except as permitted elsewhere in this Code.

Removal of 10 previous exceptions were not needed

Page 75: Significant Changes to the PEC 2009

75

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

3.10.1.6 Shielding

In this section’s exception, the voltage has been reduced from 8 kV to 2.4 kV for use of unshielded conductors. Cables operated at a voltage higher than 2.4 kV will now be required to be shielded.

Many cable manufacturers specifically recommend against the use of non-shielded cable above 2 kV because of arcing problems and cables without shielding have a very high failure rate.

Page 76: Significant Changes to the PEC 2009

76

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

3.10.1.8 Locations

d) Locations Exposed to Direct Sunlight. Insulated conductors and cables used where exposed to direct rays of the sun shall comply with one of the following: (be of a type listed for sunlight resistance or listed and marked “sunlight resistant”)

1) Cables listed, or listed and marked , as being sunlight resistant

2) Conductors listed, or listed and marked , as being sunlight resistant

3) Covered with insulating material, such as tape or sleeving, that is listed and marked ,as being sunlight resistant.”

Page 77: Significant Changes to the PEC 2009

77

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

3.10.1.10 Temperature Limitation of Conductors

The PEC 2009 has added a new Fine Print Note with information on derating for conduits on rooftops that have direct sunlight exposures; 17ºC is the indicated value to be added to the outdoor ambient temperature to compensate for the direct solar gain.

Page 78: Significant Changes to the PEC 2009

78

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Page 79: Significant Changes to the PEC 2009

79

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

3.10.1.15(b)(2) Adjustment Factors

A new last sentence has been added to 3.10.15(b)(2)(a) to require that individual conductors of paralleled sets be counted as current-carrying conductor. This is intended to clarify varying interpretations of whether each conductor of a paralleled set of conductors is required to be counted individually or if all of the conductors count as one for the purpose of derating. Clearly, each conductor of the parallel set is required to be counted individually for the purposes of rating.

Page 80: Significant Changes to the PEC 2009

80

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Page 81: Significant Changes to the PEC 2009

81

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Configuration Conductor if Neutral is Counted

DeratingPercentage

Conductorsif Neutral is Not Counted

DeratingPercentage

All conductors in single conduit

12 9

4 conductors in 3 conduits or cables

4 3

All conductors in metal wireway or auxiliary gutter

12 9

All conductors in nonmetallic wireway or auxiliary gutter

12 9

Page 82: Significant Changes to the PEC 2009

82

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Table 3.10.1.15(b)(2)(a) Adjustment Factors for More than Three Current-

Carrying Conductors in a Raceway or Cable

Number of Current-

Carrying Conductors

Percent of Values in Tables 3.10.1.16

Through 3.10.1.19 as Adjusted for

Ambient

Temperature if Necessary

4 – 6

7 – 9

10 – 20

21 – 30

31 – 40

41 and above

80

70

50

45

40

35

Page 83: Significant Changes to the PEC 2009

83

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Configuration Conductor if Neutral is Counted

DeratingPercentage

Conductorsif Neutral is Not Counted

DeratingPercentage

All conductors in single conduit

12 50 9 70

4 conductors in 3 conduits or cables

4 80 3

Not

required

All conductors in metal wireway or auxiliary gutter

12

Not

required 9

Not

required

All conductors in nonmetallic wireway or auxiliary gutter

12 50 9 70

Page 84: Significant Changes to the PEC 2009

84

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

(4) Neutral Conductor.

a) A neutral conductor that carries only the unbalanced current

from other conductors of the same circuit shall not be required

to be counted when applying the provisions of

Section3.10.1.15(b)(2)(a).

b) In a 3-wire circuit consisting of two phase wires and the

neutral of a 4-wire, 3-phase wye-connected system, a common

conductor carries approximately the same current as the line-

to-neutral load currents of the other conductors and shall be

counted when applying the provisions of Section

3.10.1.15(b)(2)(a).

c) On a 4-wire, 3-phase wye circuit where the major portion of the

load consists of nonlinear loads, harmonic currents are

present in the neutral conductor; the neutral shall therefore be

considered a current-carrying conductor.

Section 3.10.1.15(b)(4)

Page 85: Significant Changes to the PEC 2009

85

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Notes

For metal auxiliary gutters, 3.66.2.14(a) indicates that derating is not required so long as the number of current-carrying conductors at any cross section does not exceed 30. A similar statement is included for sheet metal wirewaysin 3.76.2.13.

Derating for the number of current-carrying conductors in non-metallic auxiliary gutters and wireways is required, beginning at four-current carrying conductors, because conductors in non-metallic enclosures do not dissipate heat as well as those in sheet-metal enclosures.

Page 86: Significant Changes to the PEC 2009

86

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Introduction

Art. 6.95 contains many requirements to keep that supply of water uninterrupted.

For example:

1. Locating the pump so as to minimize its exposure to fire.

2. Ensuring that the fire pump and its jockey pump have a reliable source of power.

3. It makes sense to keep fire pump wiring independent.

Page 87: Significant Changes to the PEC 2009

87

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Introduction

Other requirements seem wrong at first glance, until you remember why the fire pump is there in the first place.

For example:

1. The disconnect must be lockable in the closed position.

2. Fire pumps power circuits cannot have automatic protection against overload.

Page 88: Significant Changes to the PEC 2009

88

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Introduction

“ It’s better to run the fire pump until its winding melt, than to save the fire pump and lose the facility”

And the intent of Article 6.95 is to save the facility.

Page 89: Significant Changes to the PEC 2009

89

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.1 Scope

a) Covered

1) Electric power sources and interconnecting circuits

2) Switching and control equipment dedicated to fir pump drivers

b) Not Covered

1) The performance, maintenance, and acceptance testing of the fire pump system, and the internal wiring of the components of the system

2) Pressure maintenance (jockey or makeup) pumps

Page 90: Significant Changes to the PEC 2009

90

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.3 Power Sources for Electric-Motor Driven Fire Pumps

a) Individual Source

1) Electric Utility Service. A separate service from a connection located ahead of but not within the service disconnecting means.

2) On-Site Power. An on-site power supply, such as generator, located and protected to minimize damage by fire is permitted to supply a fire pump.

Page 91: Significant Changes to the PEC 2009

91

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.3 Power Sources for Electric-Motor Driven Fire Pumps

a) Electric-Utility Service Connection

Page 92: Significant Changes to the PEC 2009

92

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.3 Power Sources for Electric-Motor Driven Fire Pumps

a) Electric-Utility Service Connection

Page 93: Significant Changes to the PEC 2009

93

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.3 Power Sources for Electric-Motor Driven Fire Pumps

2) On-Site Power Production Facility

Page 94: Significant Changes to the PEC 2009

94

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.3 Power Sources for Electric-Motor Driven Fire Pumps

b) Multiple Sources

1) Generator Capacity. Shall have sufficient capacity to allow normal starting and running 0f the motor(s) driving the fire pump(s) while supplying other simultaneously operated load.

2) Feeder Sources.

3) Arrangement. The power sources shall be arranged so that a fire at one will not cause an interruption at the other source.

Page 95: Significant Changes to the PEC 2009

95

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.3 Power Sources for Electric-Motor Driven Fire Pumps

2) Feeder Sources

Page 96: Significant Changes to the PEC 2009

96

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Dedicated transformer and overcurrentprotection sizing can be broken down into three requirements.

1. The transformer must be size to at least 125% of the sum of the loads.

2. The transformer primary overcurrent device must be at least a specified minimum size.

3. The transformer secondary must not contain any overcurrent device whatsoever.

6.95.1.5 Transformers

Page 97: Significant Changes to the PEC 2009

97

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.5 Transformers

The overcurrent device in the primary of a transformer supplying a fire pump installation. The device is required to be sized to carry the locked-rotor current motor(s) and associated fire pump accessory equipment indefinitely.

Page 98: Significant Changes to the PEC 2009

98

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.6 Power Wiring

a) Service and Feeder Conductors.

Supply conductors must be physically routed outside buildings and must be installed in accordance with Article 2.30. Where supply conductors cannot be routed outside buildings, they must be encased in 2 inches or 50 mm of concrete or brick.

Page 99: Significant Changes to the PEC 2009

99

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.6 Power Wiring

b) Circuit Conductors.

Fire pump supply conductors on the load side of the final disconnecting means and overcurrent device(s) must be kept entirely independent of all other wiring. They can be routed through a building using one of the following methods:1) Be encased in a minimum 2 inches or 50 mm of

concrete

2) Be within an enclosed construction dedicated to the fire pump circuit(s) and having a minimum of a 1-hour fire-resistant rating

3) Be listed electrical circuit protective system with a minimum 1-hour fire rating.

Page 100: Significant Changes to the PEC 2009

100

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.6(c)(2) BC Conductor Size

Fire Pump Motor

Branch Circuit Conductor Size

Branch circuit conductors to a single fire pump

motor must have a rating not less than 125% of the

motor

FLC as listed in Table 4.30.14.2 or 4.30.14.4

From Table

4.30.14.5(b)

Page 101: Significant Changes to the PEC 2009

101

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.7 Voltage Drop

The voltage drop at the line terminals of the controller

when the motor starts (locked-rotor current), must not

drop more than 15% below the controller’s rated voltage.

Page 102: Significant Changes to the PEC 2009

102

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.95.1.7 Voltage Drop

Fire Pump Conductor Size – Voltage Drop

Page 103: Significant Changes to the PEC 2009

103

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80 Swimming Pools, Fountains, and Similar Installations

Article 6.80 - applies to decorative pools and fountains; swimming, wading, and wave pools; therapeutic tubs and tanks; hot tubs; spas; hydromassage bathtubs; and similar installation including pools used in religious services where participants are immersed in water. The installations covered by this article can be indoors or outdoors, permanent or storable, and may or may not be directly supplied by electrical circuits of any nature.

Page 104: Significant Changes to the PEC 2009

104

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.1.2 Definitions

Page 105: Significant Changes to the PEC 2009

105

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.1.2 Definitions

Page 106: Significant Changes to the PEC 2009

106

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.1.3 Other Articles

Page 107: Significant Changes to the PEC 2009

107

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.1.8 Overhead Conductor Clearance

Page 108: Significant Changes to the PEC 2009

108

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.1.8 Overhead Conductor Clearance

Page 109: Significant Changes to the PEC 2009

109

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.1.12 Maintenance Disconnecting Means

Page 110: Significant Changes to the PEC 2009

110

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2 Permanently Installed Pools

Page 111: Significant Changes to the PEC 2009

111

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2 Permanently Installed Pools

Page 112: Significant Changes to the PEC 2009

112

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.3(a)(4) Restricted Space

Page 113: Significant Changes to the PEC 2009

113

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.3(a)(5) GFCI Protection

Page 114: Significant Changes to the PEC 2009

114

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.3(a)(5) GFCI Protection

Page 115: Significant Changes to the PEC 2009

115

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.3(a)(5) GFCI Protection

Page 116: Significant Changes to the PEC 2009

116

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

4.11.1.4(b) Lighting Systems Operating at 30 V or less

10 ft = 3 m

Page 117: Significant Changes to the PEC 2009

117

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.3(b) Luminaires

Page 118: Significant Changes to the PEC 2009

118

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.4(a)(4) Underwater Luminaires

Page 119: Significant Changes to the PEC 2009

119

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.4(f) Branch-Circuit Wiring

Page 120: Significant Changes to the PEC 2009

120

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.7 Equipotential Bonding

Page 121: Significant Changes to the PEC 2009

121

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.2.7 Equipotential Bonding

Bonding of conductive metal parts in a swimming pool.

Page 122: Significant Changes to the PEC 2009

122

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.4.2 Emergency Switch forSpas and Hot tubs

Page 123: Significant Changes to the PEC 2009

123

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.4.4 Indoor Installations of Spas and Hot Tubs

Page 124: Significant Changes to the PEC 2009

124

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.4.5 GFCI Protection

Page 125: Significant Changes to the PEC 2009

125

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.5 Fountains

Page 126: Significant Changes to the PEC 2009

126

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.80.7 Hydromassage bathtubs

Page 127: Significant Changes to the PEC 2009

127

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

6.82 Natural and Artificially Made Bodies of Water –(New Article)

An artificially made of body of water. The electrical equipmentassociated with pumps used to circulate water in this artificialpond is subject to the requirements of Article 6.82.

Page 128: Significant Changes to the PEC 2009

128

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Definitions

Artificially Made of Bodies of Water – Bodies of water that have been constructed or modified to fit some decorative or commercial purpose such as, but not limited to, aeration ponds, fish farm ponds, storm retention basins, treatment ponds, irrigation (channel) facilities. Water depths may vary seasonally or be controlled.

Natural Bodies of Water – Bodies of water such as lakes, streams, ponds, river, and other naturally occuring bodies of water, which may vary in depth throughout the year.

Page 129: Significant Changes to the PEC 2009

129

Significant Changes to the

Philippine Electrical Code 2009

BOARD OF ELECTRICAL ENGINEERING

PROFESSIONAL REGULATION COMMISSION

Thank You !!!!

GOOD Morning!

&