![Page 1: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/1.jpg)
Signal Hill Professional Center:Implementing a Concrete Structural System
Joseph Henry,Structural OptionDr. Linda Hanagan, Advisor
Penn State Architectural EngineeringSenior Thesis, Spring 2006
![Page 2: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/2.jpg)
Building IntroductionDesign Background
•68,000 square feet of open office space•Four Aboveground Floors•Pre-framed for a bank, first floor•Commercial/Light Industrial District of Manassas, VA•Standard Suburban Office Building
JOSEPH HENRYStructuralHanagan, Advisor
![Page 3: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/3.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 4: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/4.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 5: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/5.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 6: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/6.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 7: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/7.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 8: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/8.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 9: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/9.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 10: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/10.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 11: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/11.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 12: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/12.jpg)
Building IntroductionDesign Background
JOSEPH HENRYStructuralHanagan, Advisor
![Page 13: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/13.jpg)
Building IntroductionNotable Features, M Group Architects
21,000 square feet of parking area achieved through excavating into sloping site
JOSEPH HENRYStructuralHanagan, Advisor
![Page 14: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/14.jpg)
Building IntroductionNotable Features, M Group Architects
Structure over parking area slopes with natural terrain
JOSEPH HENRYStructuralHanagan, Advisor
![Page 15: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/15.jpg)
Building IntroductionNotable Features, M Group Architects
“SlenderCast” precast concrete wall system by Smith-Midland strives to:
JOSEPH HENRYStructuralHanagan, Advisor
•Reduce thermal transmission by up to 25%•Protect façade from superstructure movement
![Page 16: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/16.jpg)
Building IntroductionExisting Structural System, Morabito
Consultants
Goals
JOSEPH HENRYStructuralHanagan, Advisor
•To reduce floor section thickness and structure weight•To lengthen spans for more open office space•To utilize as few laborers as possible
![Page 17: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/17.jpg)
Concrete Structural DesignExisting Structural System, Morabito
Consultants
JOSEPH HENRYStructuralHanagan, Advisor
Roof Structure: 3” deck on W12x16 Beams, W18x40 Girders
Office Floors 2-4: 3.5” Slab on 3” composite deck, W10x15 Beams, W21x44 Girders
Parking Deck/First Floor: 4” Slab on 2” composite deck, W10x15 Beams, W24x76 Girders
![Page 18: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/18.jpg)
Concrete Structural DesignExisting Structural System, Morabito
Consultants
JOSEPH HENRYStructuralHanagan, Advisor
Roof Structure: 3” deck on W12x16 Beams, W18x40 Girders
Office Floors 2-4: 3.5” Slab on 3” composite deck, W10x15 Beams, W21x44 Girders
Parking Deck/First Floor: 4” Slab on 2” composite deck, W10x15 Beams, W24x76 Girders250 psf Fire
Engine Load
![Page 19: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/19.jpg)
Building IntroductionExisting Structural System, Morabito
Consultants
Undulating Parking Structure
JOSEPH HENRYStructuralHanagan, Advisor
•Attached to first floor diaphragm via coped beams and W6x25 hangers
![Page 20: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/20.jpg)
Building IntroductionExisting Structural System, Morabito
ConsultantsLateral System
JOSEPH HENRYStructuralHanagan, Advisor
•Seismic Load Controls with 170k base shear•Moment Frames on building perimeter anchored to shear walls in basement
![Page 21: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/21.jpg)
Thesis IntentUniversity of Leeds
JOSEPH HENRYStructuralHanagan, Advisor
![Page 22: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/22.jpg)
Design ProblemManassas, Virginia
JOSEPH HENRYStructuralHanagan, Advisor
![Page 23: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/23.jpg)
Design ProblemManassas, Virginia
JOSEPH HENRYStructuralHanagan, Advisor
![Page 24: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/24.jpg)
Design ProblemManassas, Virginia
JOSEPH HENRYStructuralHanagan, Advisor
![Page 25: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/25.jpg)
Design ProblemManassas, Virginia
JOSEPH HENRYStructuralHanagan, Advisor
![Page 26: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/26.jpg)
Thesis OutlineConcrete Structural Design
Design Includes:
JOSEPH HENRYStructuralHanagan, Advisor
•Floor Slab•Lateral System•Columns•Footings•Connection to Parking Structure
![Page 27: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/27.jpg)
Thesis OutlineConcrete Structural Design
Design Includes:
JOSEPH HENRYStructuralHanagan, Advisor
•Floor Slab•Lateral System•Columns•Footings•Connection to Parking Structure
•Structural Efficiency•Architectural Impact•Cost/Schedule Impact•Possibility of Green Design
Evaluated Through:
![Page 28: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/28.jpg)
Concrete Structural DesignFloor System
Two Way Slab Types
JOSEPH HENRYStructuralHanagan, Advisor
•Flat Plate•Flat Slab with Edge Beams•Flat Slab with Drops•Flat Slab with Drops and Edge Beams•Flat Slab with Beams between all columns
![Page 29: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/29.jpg)
Concrete Structural DesignFloor System
Two Way Slab Types
JOSEPH HENRYStructuralHanagan, Advisor
•Flat Plate•Flat Slab with Edge Beams•Flat Slab with Drops•Flat Slab with Drops and Edge Beams•Flat Slab with Beams between all columns
Evaluated Using
•Direct Design Method•ADOSS
![Page 30: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/30.jpg)
Concrete Structural DesignFloor System
Two Way Slab Types
JOSEPH HENRYStructuralHanagan, Advisor
•Flat Plate•Flat Slab with Edge Beams•Flat Slab with Drops•Flat Slab with Drops and Edge Beams•Flat Slab with Beams between all columns
Evaluated Using
•Direct Design Method•ADOSS
Using Four Column Layouts
![Page 31: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/31.jpg)
Concrete Structural DesignFloor System
Column Grid, Existing Layout
JOSEPH HENRYStructuralHanagan, Advisor
Maximum Bay Size = 20’-0”x30’-0”
![Page 32: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/32.jpg)
Concrete Structural DesignFloor System
Column Grid, Alternative #1
JOSEPH HENRYStructuralHanagan, Advisor
Maximum Bay Size = 30’-0”x30’-0”
![Page 33: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/33.jpg)
Concrete Structural DesignFloor System
Column Grid, Alternative #2
JOSEPH HENRYStructuralHanagan, Advisor
Maximum Bay Size = 20’-0”x21’-0”
![Page 34: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/34.jpg)
Concrete Structural DesignFloor System
Column Grid, Alternative #3
JOSEPH HENRYStructuralHanagan, Advisor
Maximum Bay Size = 25’-0”x21’-0”
![Page 35: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/35.jpg)
Concrete Structural DesignFloor System
Problems:
JOSEPH HENRYStructuralHanagan, Advisor
Solutions:
![Page 36: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/36.jpg)
Concrete Structural DesignFloor System
Problems:
JOSEPH HENRYStructuralHanagan, Advisor
•Flexure •Thicker Slab, Beams between all columns
Solutions:
![Page 37: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/37.jpg)
Concrete Structural DesignFloor System
Problems:
JOSEPH HENRYStructuralHanagan, Advisor
•Flexure
•Deflection
•Thicker Slab, Beams between all columns
•Edge Beam
Solutions:
![Page 38: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/38.jpg)
Concrete Structural DesignFloor System
Problems:
JOSEPH HENRYStructuralHanagan, Advisor
•Flexure
•Deflection
•Architecture
•Thicker Slab, Beams between all columns
•Edge Beam
•Larger Spans
Solutions:
![Page 39: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/39.jpg)
Concrete Structural DesignFloor System
Problems:
JOSEPH HENRYStructuralHanagan, Advisor
•Flexure
•Deflection
•Architecture
•Shear
•Thicker Slab, Beams between all columns
•Edge Beam
•Larger Spans
•Drops, Larger Columns
Solutions:
![Page 40: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/40.jpg)
Concrete Structural DesignFloor System
JOSEPH HENRYStructuralHanagan, Advisor
Column Grid, Alternative #1
Maximum Bay Size = 30’-0”x30’-0”
![Page 41: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/41.jpg)
Concrete Structural DesignFloor System
JOSEPH HENRYStructuralHanagan, Advisor
Roof Structure: 8” Slab with 3.5” drops
Office Floors 2-4: 10” Slab with 3.5” drops, 4.5” drops at exterior columnsParking Deck/First Floor: 11” Slab with 3.5” drops, 7” drops under parking live load
![Page 42: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/42.jpg)
Concrete Structural DesignFloor System
JOSEPH HENRYStructuralHanagan, Advisor
![Page 43: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/43.jpg)
Concrete Structural DesignLateral System
Location
JOSEPH HENRYStructuralHanagan, Advisor
•Limited wind pressures, seismic will control•170k seismic base shear increases to 354k under concrete system
•Drift•Structural Strength
Considerations
![Page 44: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/44.jpg)
Concrete Structural DesignLateral System
Drift Analysis from ETABS Model
JOSEPH HENRYStructuralHanagan, Advisor
•Rigid Diaphragm with Columns rigidly attached•Lateral Loads applied to only top 4 diaphragms•Drift measured from Basement Floor
![Page 45: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/45.jpg)
Concrete Structural DesignLateral System
Drift Analysis from ETABS Model
JOSEPH HENRYStructuralHanagan, Advisor
Roof: 0.876”Floor 4: 0.773”Floor 3: 0.607”Floor 2: 0.394”Floor 1: 0.186”
Acceptable Drift:H/400 = 1.57”
![Page 46: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/46.jpg)
Concrete Structural DesignLateral System
Structural Analysis from ADOSS Model
JOSEPH HENRYStructuralHanagan, Advisor
•Horizontal Loads applied to Frame•Flexure satisfactory•Larger unbalanced moments at interior columns at Floors 2 and 3 a problem•Larger columns necessary
![Page 47: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/47.jpg)
Concrete Structural DesignColumns and Footings
Using Moments and Loads from Structural Models
JOSEPH HENRYStructuralHanagan, Advisor
•Column sizes dictated by shear in floor system•Per CRSI, minimum reinforcement in columns generally satisfactory•Footing sizes drastically increase by 3-4x in area, by almost 2x in thickness
![Page 48: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/48.jpg)
Concrete Structural DesignConnection to Parking Structure
Beam Connection to Undulating Parking Structure
JOSEPH HENRYStructuralHanagan, Advisor
•Torsion•Elevation
![Page 49: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/49.jpg)
Concrete Structural DesignConnection to Parking Structure
JOSEPH HENRYStructuralHanagan, Advisor
![Page 50: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/50.jpg)
Concrete Structural DesignAdditional Considerations
Beam Connection to Undulating Parking Structure
JOSEPH HENRYStructuralHanagan, Advisor
Steel Design Concrete Design
![Page 51: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/51.jpg)
Concrete Structural DesignSummary
JOSEPH HENRYStructuralHanagan, Advisor
•Drop panel system used throughout to combat shear•Concrete Moment Frames sufficient for drift and lateral load resistance•Column sizes dictated by shear and not axial loads•Footing sizes drastically increase•Connection to undulating parking structure achieved through beam
![Page 52: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/52.jpg)
Concrete Structural DesignMethods of Evaluation (Breadth Analyses)
JOSEPH HENRYStructuralHanagan, Advisor
•Architectural Impact: Number of Parking Spaces, Size of Obstructing Columns, Façade
•Cost/Schedule Impact: Overall Cost, Erection Time, and Local Adjustments
•Possibility of Green Design: Structural, Cost, and Aesthetic Implications of a Green Roof
![Page 53: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/53.jpg)
Architectural Design (Breadth 1)Overview and Problem Statement
JOSEPH HENRYStructuralHanagan, Advisor
•Parking Area: New Column Layout overlaps with interior driveway by 2’-6”•Office Layouts: Interior Corridor area needs to be moved to accommodate parking area and new column layouts•Façade Layouts: 24” wide columns block windows
![Page 54: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/54.jpg)
Architectural Design (Breadth 1)Overview and Problem Statement
JOSEPH HENRYStructuralHanagan, Advisor
![Page 55: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/55.jpg)
Architectural Design (Breadth 1)Overview and Problem Statement
JOSEPH HENRYStructuralHanagan, Advisor
•Parking Area: New Column Layout overlaps with interior driveway by 2’-6”•Office Layouts: Interior Corridor area needs to be moved to accommodate parking area and new column layouts•Façade Layouts: 24” wide columns block windowsFloorplan evaluated by the Building Owner and Managers Association Industry Standard
Façade evaluated by simplifying Precast Panel use
![Page 56: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/56.jpg)
Architectural Design (Breadth 1)Existing Design
JOSEPH HENRYStructuralHanagan, Advisor
•Total Rentable Area: 36,730 square feet•R/U Ratio: 16.74%•Underground Parking Spaces: 44
![Page 57: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/57.jpg)
Architectural Design (Breadth 1)Alternative #1
JOSEPH HENRYStructuralHanagan, Advisor
•Total Rentable Area: 37,740 square feet•R/U Ratio: 14.77%•Underground Parking Spaces: 48
![Page 58: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/58.jpg)
Architectural Design (Breadth 1)Alternative #2
JOSEPH HENRYStructuralHanagan, Advisor
•Total Rentable Area: 37,027 square feet•R/U Ratio: 16.09%•Underground Parking Spaces: 46
![Page 59: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/59.jpg)
Architectural Design (Breadth 1)Alternative #3
JOSEPH HENRYStructuralHanagan, Advisor
•Total Rentable Area: 37,116 square feet•R/U Ratio: 15.90%•Underground Parking Spaces: 47
![Page 60: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/60.jpg)
Architectural Design (Breadth 1)Floorplan Study Summary
JOSEPH HENRYStructuralHanagan, Advisor
•Average Annual Rental Value per usable square feet in Prince William County is $25•Parking Spaces, if rented, could cost $50/month
Increased Annual Revenue to the Owner:$7,425 to $21,150
![Page 61: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/61.jpg)
Architectural Design (Breadth 1)Façade Study
JOSEPH HENRYStructuralHanagan, Advisor
•Precast Panels can be shifted and moved to suit the structural layout•Horizontally, panels adhere to 3’-9” and 5’-0” modules•Vertically, the design details draw from base-shaft-capital office building icon
![Page 62: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/62.jpg)
Architectural Design (Breadth 1)Façade Study, Horizontal Play
JOSEPH HENRYStructuralHanagan, Advisor
![Page 63: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/63.jpg)
Architectural Design (Breadth 1)Façade Study, Horizontal Play
JOSEPH HENRYStructuralHanagan, Advisor
![Page 64: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/64.jpg)
Architectural Design (Breadth 1)Façade Study, Horizontal Play
JOSEPH HENRYStructuralHanagan, Advisor
![Page 65: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/65.jpg)
Architectural Design (Breadth 1)Façade Study, Horizontal and Vertical Play
JOSEPH HENRYStructuralHanagan, Advisor
![Page 66: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/66.jpg)
Architectural Design (Breadth 1)Façade Study, Horizontal and Vertical Play
JOSEPH HENRYStructuralHanagan, Advisor
![Page 67: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/67.jpg)
Architectural Design (Breadth 1)Façade Study, Horizontal and Vertical Play
JOSEPH HENRYStructuralHanagan, Advisor
![Page 68: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/68.jpg)
Architectural Design (Breadth 1)Façade Study, Most Economical Redesign
JOSEPH HENRYStructuralHanagan, Advisor
•Windows completely free of column obstructions•Maximum number of panels re-used•Panels kept under 30’-0” wide
![Page 69: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/69.jpg)
Architectural Design (Breadth 1)Façade Study, Most Economical Redesign
JOSEPH HENRYStructuralHanagan, Advisor
•Windows completely free of column obstructions•Maximum number of panels re-used•Panels kept under 30’-0” wide
![Page 70: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/70.jpg)
Cost/Schedule Analysis (Breadth 2)
Cost Estimates from R.S. Means 2006
JOSEPH HENRYStructuralHanagan, Advisor
•Composite Steel Costs $1,147,371 over 13.5 weeks•Concrete Costs $1,351,453 over 16 weeks•$200,000+ cost difference in favor of Steel
![Page 71: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/71.jpg)
Cost/Schedule Analysis (Breadth 2)
Concrete vs. Steel, Local Influences
JOSEPH HENRYStructuralHanagan, Advisor
•Local Cost Adjustments
![Page 72: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/72.jpg)
Cost/Schedule Analysis (Breadth 2)
Concrete vs. Steel, Local Influences
JOSEPH HENRYStructuralHanagan, Advisor
•Lead Times: After Design Completion, Procurement, Submittals, and Approvals, it takes 12 weeks to produce structural steel and only 3 weeks to produce rebar•Supply and Demand: Washington DC area on Portland Cement Association’s “tight cement supply” list for 2005 and 2006
•Weather: Per ACI 318-05 concrete must be kept above freezing, which may add cost and duration
![Page 73: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/73.jpg)
Green Roof Addition (Breadth 3)Overview of Green Roof Types
JOSEPH HENRYStructuralHanagan, Advisor
Information from Roofscapes, Inc.
![Page 74: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/74.jpg)
Green Roof Addition (Breadth 3)Why a Green Roof?
JOSEPH HENRYStructuralHanagan, Advisor
![Page 75: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/75.jpg)
Green Roof Addition (Breadth 3)Why a Green Roof?
JOSEPH HENRYStructuralHanagan, Advisor
![Page 76: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/76.jpg)
Green Roof Addition (Breadth 3)Why a Green Roof?
JOSEPH HENRYStructuralHanagan, Advisor
![Page 77: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/77.jpg)
Green Roof Addition (Breadth 3)Why a Green Roof?
JOSEPH HENRYStructuralHanagan, Advisor
![Page 78: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/78.jpg)
Green Roof Addition (Breadth 3)Implications of Green Roof
JOSEPH HENRYStructuralHanagan, Advisor
Increased Costs
•For enlarged roof system: $17,500 for steel, $30,000 for concrete•$10-13 to install and 4-6 man hours per 1000 square feet per year to maintain•$90,000 to $117,000 to install (10% of structural system price)•$720 to $1,080 to maintain
![Page 79: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/79.jpg)
Green Roof Addition (Breadth 3)Implications of Green Roof
JOSEPH HENRYStructuralHanagan, Advisor
Increased Costs
•For enlarged roof system: $17,500 for steel, $30,000 for concrete•$10-13 to install and 4-6 man hours per 1000 square feet per year to maintain•$90,000 to $117,000 to install (10% of structural system price)•$720 to $1,080 to maintain
Benefits
•Per LEED Green Building Rating System, eligible for 1 point (Heat Island Effect: Roof, Credit 7.2)•Reduced noise transmission through roof structure•Increased R-values in roof system
![Page 80: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/80.jpg)
Final ConclusionsOriginal Composite Steel Design Review
Pro
JOSEPH HENRYStructuralHanagan, Advisor
•Light•Small Columns•Cheaper•Faster
•Average 12” deeper section depth than concrete•Complicated connections at parking structure•Less drift resistance•Time consuming fire protection needed
Con
![Page 81: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/81.jpg)
Final ConclusionsReinforced Concrete Design Review
Pro
JOSEPH HENRYStructuralHanagan, Advisor
•Smaller floor section depth•Simpler connections to parking structure•More drift resistant•No fireproofing required•More effectively resists water damage from green roof
•Heavy system with larger footings•Large obstructing columns•More expensive by $200,000•Longer erection time by 2.5 weeks
Con
![Page 82: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/82.jpg)
Final ConclusionsRecommendations
Hybrid Structure: Concrete up to First Floor Composite Steel Above
JOSEPH HENRYStructuralHanagan, Advisor
•Fireproofing simplified between office area and underground parking•Better appearance, smaller section depth in parking area•Simplified connections to parking structure•Good cost and schedule compromise•Concrete first floor helps resist lateral loads
![Page 83: Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.](https://reader036.fdocuments.net/reader036/viewer/2022062803/56649f3d5503460f94c5d43b/html5/thumbnails/83.jpg)
Thank YouQuestions and Comments?
JOSEPH HENRYStructuralHanagan, Advisor