POSITION OF ON GOING PRIVATE SIDINGS PROPOSALS OVER S.E.RAILWAY SIDING PROPOSAL UNDER CONSTRUCTION : No. of rakes per day PFR date of RTC Date of DPR Date of ESP SIP Inward Outward Total Approval 1 Miner 0 5.20 5.20 27.01.06 2 0 0.90 0.90 31.5.2006 17.10.07 Sl. No. Station & Section Name of Industry Type of Industr y Submiss ion In principl e approval given Applicati on submitted for RTC on Date of RTC issue Submiss ion Approva l Submiss ion Approva l of SIP on Gaganpo sh/ BNDM- BXF M/s. Monnet Ispat Ltd. 18.01.0 6 30.01.200 6 17.4.200 6 Applican t asked for extensio n on 01.8.201 3 which has been refused as matter is sub- judice. 10.03.0 6 01.06.0 6 09.06.0 6 17.04.0 7 Alt.- I on 01.01.0 8 Alt- II on 18.07.0 8 Barajam da /DPS- BBN M/s. Taurian Iron & Steel lLtd. Exporte r 22.12.0 5 16/25.1. 06 11.12.06 (local RTC) 25.05.0 6 26.10.0 6 16.10.0 6

Transcript of Siding List Sent From COM Office

Under ConstructionJul-14POSITION OF ON GOING PRIVATE SIDINGS PROPOSALS OVER S.E.RAILWAYSIDING PROPOSAL UNDER CONSTRUCTION :Sl. No. Station & SectionName of IndustryType of IndustryNo. of rakes per dayPFR date ofRTCDate of DPRDate of ESPSIPInwardOutwardTotalSubmissionIn principle approval givenApplication submitted for RTC on Date of RTC issueSubmissionApprovalSubmissionApprovalApproval of SIP onCurrent status1Gaganposh/ BNDM-BXFM/s. Monnet Ispat Ltd.Miner05.205.2018.01.0627.01.0630.01.200617.4.2006 Applicant asked for extension on 01.8.2013 which has been refused as matter is sub-judice. 10.03.0601.06.0609.06.0617.04.07 Alt.-I on 01.01.08 Alt-II on 18.07.08The siding constructed on Railway land. Not eligible as per FM 12/2008. Matter referred to Railway Board on 17.02.10. Mean while party moved Kolkata High Court. Kolkata High Court passed an interime order 19.03.2013 with the direction to asses land licensing fees in accordance with Railway Board letter dtd. 10.02.2005 and thereafter allow to commission the siding till such time any final decision comes out from the single bench of Hon'ble court. Affidavit in opposition affirmed on 17.12.2013. Contenpt petition filled by the Petitioner which was heard by the Division Bench on 01.04.14 and 16.05.14. As per direction of Hon'ble court revised land licensing bill was asseced which was paid by the Petitioner through court on 16.05.2014. As per Hon'blr courts order Railway Board directed to issue connissioning order on completion of their pending work. Railway Board directed to allow commission the siding as per extant rule at the time of commissioning and the same has been communicated to the petitioner.2Barajamda /DPS-BBNM/s. Taurian Iron & Steel lLtd.Exporter00.900.9022.12.0516/25.1.0631.5.200611.12.06 (local RTC)25.05.0626.10.0616.10.0617.10.07The siding was to be constructed on Railway land. The siding owner has requested for commissioning, but since not eligible as per FM 12/2008, the matter referred to Railway Board on 17.02.10.3Barbil /DPS-BBNM/s. Rungta Mines Ltd.Miner00.740.7401.02.0608.03.0624.3.200601.06.0621.04.06. Rev. on 08.12.06.17.07.06. Rev. on 30.05.0714.06.0607.02.08All the sidings were to be constructed on Railway land. Not eligible as per FM 12/2008. Matter referred to Railway Board on 17.02.10. However the siding of M/s USHA Martin Ltd has been open as a public siding w.e.f 09.11.2009.4Bolanikhadan /DPS-BYXM/s. Feegrade & Co. (P) Ltd.Miner00.560.5610.05.0622.09.0607.11.200614.11.200711.12.0607.12.0721.12.0728.03.085Gua/ DPS GuaM/s. Usha Martin ltd.Steel Manf.00.740.7419.05.0629.01.200410.3.0428.08.0631.01.0724.01.0724.12.076Gua / DPS-GUAM/s. Rungta Mines Ltd.Miner00.740.7401.02.0608.03.0624.3.200601.06.0621.04.0617/18.7.0625.09.0629.08.07. Alt.-I on 16.10.077Bolanikhadan /DPS-BYXM/s. Khatau Narbheram & Co. Ltd.Trader01.931.9321.07.0622.09.0616.10.2012 05.01.07 Applicant requested for extension the matter referred to Railway Board. 18.12.0607.12.0721.12.0729.01.088Jaruli- Nayagarh/ DPS-JRLI-NYGM/s. Rungta Mines Ltd.Miner00.740.7401.02.0603.03.0624.3.200601.06.0626.05.0606.02.0728.12.0603.05.07Not eligible as per FM 12/2008. Matter pending in High Court/Kolkata.9Jaruli/ DPS-JRLIM/s. Essel Mining Industries Ltd. (Appahatu)Miner03.343.3421.01.0601.02.0623.03.0602.09.0602.01.0723.02.0720.09.07Not eligible as per FM 12/2008. Matter pending in High Court/Kolkata.10Mahalimarup TATA-ROUM/s. Jupiter CementCement2.052.484.5326.08.0815.12.0817.11.200815.12.0806.02.0922.07.0903.01.0926.04.10Land licensing proposal not submitted by CKP Division. M/s. Jupiter Cement have appointed M/s. Picasona Rail Engineers for their new consultant. Party advised to midify the ESP in view of 3rd line made by Railways, and subsequent changes in existing yard plan.11*BJMD-BBN/ DPS-BBNM/s. Sesa Goa Ltd.Mining02.902.9015.10.0813.02.0916.7.200811.11.0806.05.0931.08.0924.09.0904.01.10IPA given on 13.02.09. DPR approved on 31.08.09. ESP approved on 04.01.10. Siding under construction. Land licensing plan not submitted by party. The construction of the siding is at present stuck up for a decision on the take-off point as this is comming up on a curvature. In the meeting held on 19.12.2013 CTPM advised Party/Consultant to resolve the matter with Engineering Department as these are technical issues. Decision given to consultant to sbumit plan with take-off from curve flattered from 6 degree to 4.5 degree. In the meeting held on 19.03.2014 M/s BARSYL their consultant intimated that ESP with take off point for flatter curve from 6 degree to 4.5 degree will be submitted to CE(G) by 24.03.2014. CE (G) confirmed that there is dispute between Party and consultant about their work order.12Bandamunda/ TATA-ROUM/s. Inovative B2B Logistics Soloution (P) Ltd.Container0.290.791.0930.10.0725.05.08RTC not required for container13.08.0828.07.0927.07.0911.09.09. Alt-I 23.01.10Party wants to close the proposal as they are not able to take possession of Railway land alloted to them.13Jaruli/ DPS-JRLIM/s. Partham Steel Ltd.Trader01105.05.0606.06.0601.6.200629.03.0708.06.0617.07.0618.08.06Lead line commissioned as loading line on 31.01.2007. Prtivate siding yet to be constructed. Party not yet deposited Rs. 5 crores. SLP in Supreme Court is disposed of in favour of Railways.14Jaruli /DPS-JRLIM/s. Tarani Minerals Ltd.Trader01105.05.0606.06.0601.6.200611.01.0708.06.0617.07.0628.06.0618.08.06Lead line commissioned as loading line on 31.01.2007. Prtivate siding yet to be constructed. Party not yet deposited Rs. 5 crores. Matter pending in HC/Kolkata.Regarding Tarini Minerals no hearing after 17.05.2011. Matter pending in court. Part hearing has been released by Hon'ble Judge. Railway Advocate was advised to take up the matter in the appropriate bench.15Barajamda-Barbil /DPS-BBNM/s. Durgapur Metaliks Ltd.Manafucture00.810.81April,0707.09.0724.7.200807.11.0830.11.0725.01.1001.02.1019.11.10 Alt-I on 22.11.11No SIPBridge No. 10 & 11 which had flaws have been dismentled and new bridge drawing have been approved. Siding under construction. Land licensing plan approved on 10.02.12. Land licensing proposal is under scrutiny by Engineering Department. 16Kalunga/ TATA-JSGM/s. Mahavir Ferro Alloys Ferro0.310.120.4310.05.07 (PFT on 19.02.13 to CCM(FM )07.09.07 IPA for Green filed PFT on 10.04.2013.)16.3.200704.12.0710.01.0821.08.09 Comments of DPR (PFT) received: CE(G)- on 04.06.14 CEE- on 15.05.14 CSTE- ON 10.06.14 CME- ON 13.06.14 CCM (FM)- on 01.05.14 FA&CAO- Sr.DOM- on 10.04.1422.09.0930.12.09IPA for Green field PFT has been accorded on 10.04.2013. Party deposited Rs. 1 crore as security money on 20.05.2013. DPR submitted by thier consultant on 10.03.2014 and circulated to all concerned on 20.03.2014 for examination. Party was asked to depoait 2% balance codal charges along with Service Tax on 31.03.2014. Comments from concern department received and sent party/consultance on 23.06.2014 for necessary compliance. Compliance is awaited.17Kalunga/ TATA-JSGM/s. Nixon Steel & Power Ltd.Sponge iron0.280.120.4020.06.0606.08.0715.01.0528.11.0721.08.0922.09.0930.12.09Party has been advised to acquire the required land. Reply awaited. Further, DRM/CKP was advised to review the proposal on 29.11.2012.Sr. DOM/CKP vide letter dated 28.11.2013 intimated that further dealing traffic of M/s. Nixon Steel & Power is not feasible in the station. 18Bandhadih/ BJE-BKSCM/s. Electrosteel Steel Ltd. (Phase- I)ISP5.92.58.4023.07.0723.4.200718.08.08 (amendment 06.01.10)12.07.0915.10.0902.10.0915.01.10. Alt.- I on 20.09.12.Under construction. Construction of lead line is held up for land acquisition problem. Station Building plan of Bandhdih approved by this office sent to CPDE on 26.02.2014. Plan with CCM for approval. ESP of Bandadih station has been approved by CTPM on 02.04.2014 in connection with withdrwal of common user traffic faclity.19Mechada/ HWH-KGPM/s. Madras CementCement Manf.1.60.31.918.07.0608.11.0622.02.2010 & Details asked for on 14.6.2010 / 14.3.2011. Not replied.RTC not yet received06.03.0721.11.0722.04.0811.08.11Case referred to Railway Board on 25.01.2012 for decision regarding construction and commissioning of the siding involving Railway land.20Durgachak/ PKU-HLZM/s. Electrosteel Casting Ltd.ISP0.230.170.3720.01.0606.02.0622.3.200525.07.0630.05.0614.11.0617.11.0618.07.0703.12.13Under construction. Completation drawing sent to Division on 17.06.13 for approval. SIP & RCC approved by CSTE office. CRS approval under process by division. Division was advised to intimate the status of the case on 26.03.2014. Reply awaited.21Durgachak / PKU-HLZM/s. Taurian Iron & Steel Ltd.Exporter0.50.30.816.01.0606.02.06Not appliedNot yet received05.05.0614.11.0628.10.0619.07.07Siding on Railway land. Hence Approval withdrawn. Party moved to HC/Kolkata.22Balasore KGP-BHCM/s. Balasore Alloys LtdSponge Iron1.461.4610.07.0707.09.0703.8.200730.06.0824.01.0822.08.0824.09.0816.07.10Land licensing proposal approved by GM on 19.09.2012. Siding under construction. Land licensing agreement not executed. CE (G) was advised to intimate the present position of the case on 26.09.13 and 02.12.2013. Now, M/s Balasore Alloys has has deposited Land Licensing fees at DEN/KGP office on 02.06.2014. 23Jharsuguda / TATA-JSGM/s. Sterlite Energy Ltd.Power Plant1401424.11.0719.02.08RTC not required.27.05.08. Revised DPR on 18.4.11.30.10.08. Approved on 10.01.12.20.4.12Engg. plan approved on 20.04.2012. CE (G) was advised to communicate directly with party or their cosultant for submission of L-section plan on 26.09.13. L-section plan submitted by consultant sent to division for verification by Engineering department.24*Jaraikela/ TATA-ROUM/s. Electrosteel Casting Ltd.ISP03.703.7014.10.0814.01.0923.4.200727.03.0916.09.0927.01.1028.07.1116.03.2012 (ALT -1 on 13.02.13.)ESP approved on 16.03.2012. ALT- 1 approved on 13.02.2013. Land licensing plan approved on 04.07.13. Land licensing proposal is pending with Division.25Ranital / KGP-BHCM/s. Sridih Transport Co. Pvt. Ltd.Logistics2.21.23.411.06.0827.07.0919.01.200919.01.10 (local RTC)12.09.0921.09.1013.01.1116.04.12 (Sh- 2 of 2), 05.11.12 (Sh- 1 of 2)Land licensing plan approved on 10.10.12. Land licensing proposal is under approval of PHOD committee level. PHOD minutes under approval for land licensing. Party/Consultant was advised to submit progress report on the construction of their siding and reviewed traffic projection. They were also requested to submit a Power Point presentation to GM/SER on 24.04.2014, which is awaited.26BKSC/ BKSC-GMOM/s. HPCLPOL Depot0.400.401.01.1012.7.201020.07.1115.07.1028.02.201211.10.12 Rly Board's approval is receieved for utilisation of Railway land and ALT plan is approved on 22.04.2014. bridge drawings submitted on 29.05.2014 as per consultant.27Singhpokaria/ RKSN-DPSM/s. Jupiter CementQuarry22.484.4801.09.0815.12.0817.11.200815.12.0821.02.0919.08.0917.09.0921.06.13 ALT on 29.11.2013.ESP approved on 21.06.2013. ALT plan and L-section is approved on 29.11.2013. In the new scheme prepared by CAO (Con)'s office. No regrading will be required but Railway Board's condonation will be needed. Jupiter cement has agreed to bear their portion of Cost.28Godapiashal/ KGP-ADAM/s. OCL India Ltd.Cement1.30.82.130.03.201205.07.1211.10.200620.12.200611.09.1224.05.1303.06.14ESP approved on 03.06.2014 * Applied against paper notification as per FM-12 of 2009

Engg Plan Under ApprovalJul-14POSITION OF ON GOING PRIVATE SIDINGS PROPOSALS OVER S.E.RAILWAYENGINEERING PLAN IS UNDER APPROVAL :Sl. No. Station & SectionName of IndustryType of IndustryNo. of rakes per dayPFR date ofRTCDate of DPRDate of ESPSIPInwardOutwardTotalSubmissionIn principle approval givenApplication submitted for RTC on Date of RTC issueSubmissionApprovalSubmissionApprovalApproval of SIP onCurrent status29*Jaruli /DPS-LRLIM/s. Kalinga Mining Corporation Ltd.Mining01122.09.0818.08.0906.10.200929.07.1025.11.0928.02.1129.03.1103.03.2014Plan approved on 03.03.2014 and Regiser under CE's No.- S-2434/14 Sh- 1 & 2. SIP,LLP and Bridge drawing is not yet submitted. 30Banspani/ DPS-JRLIM/s. Shyam DRISponge Iron Manafucture011.811.830.10.0605.03.0718.4.200726.07.064.06.0718.12.07Party not yet deposited Rs. 5 crores. Matter pending in HC/Kolkata.31Champajharan/ BNDM-BXFM/s. Rexon Strips Ltd.Sponge Iron Manafucture0.30.20.524.11.0524.03.0625.3.200431.01.0505.10.0623.03.07M/s. MBB was advised to explore the further possibility of avoiding regrading of the main line and submit feasibility report, which is awaited. Party was advised to submit the same at the earliest otherwise proposal will be processed for cancellation vide letter dated 26.09.13. Reply awaited.32Shewbabudih/ BHE-BKSCM/s. Electrosteel Steel Ltd. (Phase- II)ISP5.92.58.402.05.0707.09.0723.4.200706.08.1027.02.0806.11.0808.07.1019.12.13ESP approved on 19.12.2013. Registered under CE's DRG No.- S-2432/13. SIP and LLP is not yet submitted. 33Basulia-Sutahata/ PKU-HLZM/s. Haldia Energy Ltd.Power Plant303.0017.03.0808.03.10RTC not required 20.04.1119.03.1216/17.07.12ESP approved by this office and sent to CE (G) on 23.12.2013. Plan is under approval by Engineering department. IPA for temporary arrangement given on 24.12.2013. Further, DPR of temporary arrangement approved on 13.03.2014. ESP of temporary arrangement approved on 06.05.2014. Plan related to doubling (7 sheets) sent to CE (Con) for approval. The approval of CTE and CPDE will be taken.34JOC-Bero/ ASN-CNIM/s. DVCPower Plant4.0104.0124.10.0812.11.08RTC not required.01.10.10.29.05.12DPR approved on 29.05.2012. ESP sent to division by on 21.03.13 for approval. Some observations has been raised from the Divisional level. Compliance submitted by M/s. RITES and under approval at Divisional level.35Haludpukur/ TATA- BMPRM/s. IOTLPOL Depot0.500.501.12.0818.01.10RTC not required25.08.1122.11.12DPR approved on 22.11.2012. RTC not granted by Railway Board. Since applicant is not enduser. Matter has been referred to Adv./MKTG to clarify whether POL is covered under PFT. Further M/s. IOTL was also requested to intimate whether they are interested in PFT or not on 26.09.2013 and 26.11.2013. IOTL vide letter dated 11.12.13 requested Railway Board for approval of RTC treating the same as private siding and also requested this office take up the matter with Railway Board. Case has been refered to Railway Board on 13.01.2014 for issueing necessary guide line in this regard. Progress of the siding is pending for issue of RTC. Board's decission that terminal should be treated as PFT instead of siding was communicated to M/s. IOTL on 16.04.2014. The representation of IOTL was sent to Board on 19.05.2014.36Gua/ DPS-GUAM/s. Bhusan Power & Steel Ltd.ISP01129.09.0815.01.0904.02.200919.01.1028.06.1109.11.1224.12.12DPR approved on 09.11.2012. ESP sent to division on 07.06.13 for approval by Engineering Department. Division returned the plan unapproved to the party as approval of common user facilities at Gua was pending. Now the for common user facility has been approved on 17.02.2014. ESP is under examination at Divisional level.37*Gua/ DPS-GUAM/s. Orissa Manganese & Minerals Pvt. LTD.Mining02.972.9715.10.0815.01.0916.01.200919.03.0924.11.1109.11.12DPR approved on 09.11.2012. Party has deposited balance Codal charges to 2% of the Codal charge along with Service Tax on 24.06.14. ESP not yet submitted. 38*Gua/ DPS-GUAM/s. Jindal Steel & Power ltd.ISP05.00529.09.0804.03.0927.8.200710.06.0827.05.0909.11.12DPR approved on 09.11.2012. ESP sent to division on 04.07.13 for approval by Engineering Department. A discussion was held on 28.11.2013 at Divisional level regarding ESP of the said proposal. Now the for common user facility has been approved on 17.02.2014. ESP is under examination at Divisional level.39Birarajpur/ KND-GMHM/s. Adhunik Power & Natural Resources LtdPower Plant1.201.2017.01.117/8.12.1120.02.200810.07.0814.02.1209.11.1223.12.201331.03.14DPR approved on 09.11.2012. ESP approved on 31.03.2014 and Register CE's No. S-2435/14. L-section submitted by M/s. RITES is under examination by Engineering Department.40*MMVR/ DPS-JRLIM/s. Dr. Sarojine Pradhan Mining0.043.103.1429.09.0817.02.0924.02.200923.4.09Rev DPR on 29.08.1228.03.2013.28.11.13DPR approved on 28.03.2013. ESP & LLP was submitted to CE (G) on 28.11.2013. Plan sent to Division on 16.12.13 & LLP on 13.12.2013 by Engg. Department for approval at Divisional level. Engg. Plan return to party with a request to resubmit the plan through approved consultant on 08.04.2014. Plan not yet submitted.41*JLRI-NYG/ DPS-JRLI-NYGM/s. Serajuddin & Co.Mining08804.02.1105.03.201229.8.201231.12.201201.10.1207.10.1311.11.13DPR approved on 07.10.2013. ESP & LLP submitted to CE (G) on 11.11.2013. ESP sent back to consultant for compliance of divisional observations by Engg. Dept. On 09.12.2013. Further consultant re-submitted the plan to CE (G)'s office on 02.01.2014. CE (G) returned the plan to party on 13.01.2014 for gradient problems and also informed them to engage new consultant as the validity of earlier consultant expired. Plan not yet submitted.42Balasore/ KGP-BHCM/s. NOCCIInfrastructure provider31426.08.201015.03.201208.10.2012RTC not yet received05.10.1208.10.1310.12.13DPR approved on 08.10.2013. ESP sent to division on 17.12.2013 by Engg. Dept. LLP sent to Division on 13.12.2013 for approval.43Barbil/ DPS-BYXM/s. Grewal Associates Trader0.80.51.301.04.0929.05.0925.7.200818.06.1026.08.09/ 20.12.1211.12.1324.01.2014M/s. Grewal Associates have filed a WP in Orissa High Court regarding ownership of their private land. DPR approved on 11.12.2013. ESP submitted to CE (G) on 24.01.2014. Plan sent to division on 06.02.2014 by Engineering Department for approval. M/s. Aarvee Associates consultant intimated that the approval of plan has been stuck up for the clarification on position of a ROB at the further end of the siding. CE (G) was approved the proposal for diversion of road in lieu of ROB with some stipulation. This office has no objection if the shunting neck become 70 M instead of 90 M as suggested by Sr.DEN/CKP.44Gua/ DPS-GUADPR for common portion at Gua in connection with proposaed private siding to serve M/s. JSPL, M/s. BPSCL & M/s. OMML at Gua.OMM 16.01.200919.3.200904.05.1217.02.1404.03.14DPR approved on 17.02.2014. ESP submitted to Engg. Department on04.03.2014. Plan return to consultant with observations for necessary compliance by Engg department. Compliance submitted by M/s S.R.Chaudhuri to Engg. Department and S&T department on 27.-6.2014. * Applied against paper notification as per FM-12 of 2009

DPR under ApprovalJul-14POSITION OF ON GOING PRIVATE SIDINGS PROPOSALS OVER S.E.RAILWAYSIDING PROPOSAL WHERE DPR IS UNDER EXAMINATION AND TO BE PROCESSED FOR APPROVAL :Sl. No. Station & SectionName of IndustryType of IndustryNo. of rakes per dayPFR date ofRTCDate of DPRDate of ESPSIPDPRInwardOutwardTotalSubmissionIn principle approval givenApplication submitted for RTC on Date of RTC issueSubmissionApprovalSubmissionApprovalApproval of SIP onCurrent status45Jharsuguda/ TATA-JSGM/s. MCLCoal Mines015.715.711.12.0319.12.0316.10.0907.03.13.DPR for Barpalli yard approved on 07.03.2013. IPA for double line Fly over arrangement given on 10.06.2013 with a request to submit FLS for fly over arrangement and yard modification by 17.06.2013. FLS report submitted by M/s. RITES/BBS is approved on 29.08.13, a meeting was held on 08.08.2013 to complete phase -I work by Dec'14 as per Board's decision. ESP of 5 yard plan was approved and sent to CE (Con)-II on 01.11.13. CE(Con-II) has sent Four original tracing plan with the comments of CSTE(Con) that four ESP of phase-I approved.Yard plan for phase-II also decided in a meeting on 13.02.2014 that a n alternate station will have common loop. furthe, Ms MCL was requested to advise M/s RITES/BBS to sibmit DPR of double line fly over connection on 01.04.2014, which is awaited. Further, M/s. MCL vide letter dated 07.04.2014 requested to furnish data for calculation of IRR for approval of M/s. MCL and CIL Board for doubling of Jharsuguda-Barpalli-Sardaga line including Fly over. Accordingly, FA&CAO (WST) and CCM (FS) was requested to furnish necessary data directly to M/s. MCL on 22.04.2014.The data submitted by FA & CAO (TA) was sent to M/s MCL on 21.05.2014. A meeting was hold on 14.05.2014 with GM/SER and CMD M/s MCL. MT was appraised of the position and requested to have a core monitoring and implemention them to keep the execution on fasr track on 19.05.2014. CE(Con)II was intimated that the provision of long loop to be kept at Barpali and either at Likera or Kechobahal. A conceptual plan was also send to CE(Con)II on 21.05.2014 for perusal. CE (Con) indicated that it is not possible to provide long loop at Barpalli. L-section has been finalised for long loop at Kechobahal station on 26.05.2014. Junction arrangement ex-JSG and the cabin between DTV-JSG in under finalisation by CE(CON). Ferro print of ESP for connectivity of Dhutra yard in PH - I was approved by CTPM on 23.06.2014.46Kuarmunda/ ROU-BRMPM/s. BOXTANT Logastic Ltd.Container00.530.5322.08.0725.05.08Not required being Container07.05.11Compliances of the obseravtion on DPR is awaited from party. Party has been advised to furnish comments within 15 days on 19.09.2013. Otherwise proposal will be processed for cancellation. 47*Jaruli /DPS-JRLIM/s. Thakur Prasad Sao & Sons Ltd.Mining01.861.8630.09.0817.02.0925.02.200913.08.0905.05.09IPA given on 17.02.09. Alligment problem party/consultant was advised to submit fresh junction arrangement plan on 31.10.2013. Considering approved ESP of M/s KMC. As decided in the meeting on 19.12.2013 a ferro print of Jaruli along with proposed siding of M/s. KMC was give to M/s. Modern Transport to suggest a feasible take-off point in the lay out without curtling any existing facilities within one month. M/s. Modern Taransport requested for one more month time for finalising alligement, which is agreed by this Railway on 06.03.2014. Reply awaited.48*Barbil-Bolanikhadan/ DPS-BYXM/s. Thakur Prasad Sao & Sons Ltd.Mining03.863.8630.09.0813.02.0925.02.200913.08.0920.05.09IPA given on 13.02.09. Revised alligement keeping provision for Grewal siding was submitted by consultant on 09.11.2012. The same was not processed as party refused to pay codal charges on already examined DPR. Letter issued on 28.11.2013 to deposit necessary Codal charges. In the meeting held on 19.12.2013 party/consultant was requested to submit land documents for Lasarda siding. M/s. Modern Transport have submitted the notarised copy of land documents at Lasarda siding on 26.02.2014. Party/Consultant was advised to submit specific land document on 07.03.2014. In the meeting held on 19.03.2014 M/s. Modern Transport agreed to submit initial land documents. Reply awaited.49 *NOMD-BJMD/ DPS-BBNM/s. MSPLMining03.713.7115.10.0819.03.200915.10.200827.11.0826.06.09It was proposed to privide a take- off for the siding from the Dn. Main line with a provision of new cross over between Up and Dn main line along with provision of a Block Cabin to controle the siding movement as well as to split the 14 Km. long block section between NOMD-BJMD. Since provision of loop line is not feasible the above arrangement appears to be the only feasible solutation though it deviate from the stipulation of FM circular 01 of 2009. Board was requested to examine the matter and intimate whether such arrangement can be permitted as exceptional case. Case refered to Rly. Bd. on 03.06.11. Reply of Board is under examination. File with Engg. Dept. since 07.03.2014. M/s. MSPL have confirmed that they will engage an approved consultant and submit the proposal complying the Railway's observations.50Pendrasali/ RKSN-DPSM/s. Rungta Mines Ltd.Steel Plant2.513.5028.07.1025.08.1017.5.201010.02.1004.01.11Comments received from concerned departments sent to consultant on 23.11.12 for necessary compliance. M/s MBB their consultant requested railway to give some time to submit compliance of different departments on 29.08.13. Party was advised to intimate definite time period of submission of compliances on 28.10.2013 and 25.11.2013. Last reminder issued on 26.12.13. Reply awaited.51Jhantipahari/ ADA-BQAM/s. Ankit Metal Ltd.Sponge Iron Manafucture0.20.10.306.05.0808.03.1006.08.1024.03.11M/s Ankit Metal has been given 15 days time to send their reply on 19.09.2013 or their proposal will be processed for cancellation.52Ramkanali/ ADA-ASNM/s. Shyam Steel Ltd.Sponge Iron0.51.21.7015.05.0830.03.1003.6.200920.07.1003.02.11Revised proposal submitted by party is not acceptable. M/s Shyam steel was informed if the comments along with Codal charge and service tax on Codal charges is received within 15 days the proposal will be processed for cancellation on 19.09.2013.53Mahalimarup/ TATA-ROUM/s. Corporate Ispat Alloys LtdSteel Plant7310.0018.10.1006.04.1125.4.201104.08.1120.06.12Comments received on DPR from different Department was sent to consultant/ party on 07.11.2012 for necessary compliance. Party vide letter dated intimated that the proposal to be kept in abeyance till further instruction. Board was requested to issue necessary instruction for dealing with such non responsive proposal on 16.01.2014. Reply awaited.54Haludpukur/ TATA-BMPRM/s. Bhusan Power & Steel Ltd.ISP3.203.201.09.0825.06.0910.4.2012 RTC not yet received21.08.12DPR is already approved by COM. The letter of DPR approval will be issued after M/s BPSL deposit necessary codal charges. Codal charges has not yet been deposited.55Sardiah/ KGP-TATAM/s. Onkar IspatIntegrated Steel Plant2.20.93.122.11.1016/17.07.1218.10.2012RTC not yet received21.01.13IPA given on 16/17.07.12. DPR submitted by consultant circulated on 08.02.2013.Observation of concerned Department sent to Party/Consultant on 26.11.2013 for necessary compliance. Compliance received on 25.02.2014 and 10.03.2014circulated to all concerned on 11.03.2014. In the meeting held on 09.04.2014 CE (G) intimated that ESP submitted with DPR had various discrepancies. The approval of DPR by Engineering Department is held up as the site feasibility is not established according to to the plan submitted by them. Revised ESP submitted but returned again with comments. Consultant / Party not yet comply the observation of Engineering department. 56Basulia-Sutahata/ PKU-HLZM/s. Haldia Dock Complex (Salukkhali)Port1st. Ph.- 1 2nd. Ph.- 1 3rd. Ph.-11st. Ph.- 3 2nd. Ph.- 7 3rd. Ph.- 191st. Ph.- 4 2nd. Ph.- 8 3rd. Ph.- 2013/14.06.201113.02.2012RTC Not required31.12.2013IPA given on 13.02.2012. DPR circulated on 14.01.2014 followed by reminder dtd. 25.02.2014. Observations sent to consultant for compliance. In the meeting held on 11.06.2014 with M/s KOPT and M/s RITES officials, they were requested to submit addendum to thier DPR presently under examination depending on thier traffic.57JSG/ ROU-JSGM/s. Container Corporation Container12.11.0903.09.13RTC Not required24.02.14IPA given on 03.09.2013. DPR submitted by M/s. RITES/BBS on 24.02.2014 iand circulated to all concerned on 05,03.2014 for examination. In the meeting held on 22.05.2014 it was decided that M/s RITES/BBS will submit compliance, revised plan and estimate. Compliance is awaited. * Applied against paper notification as per FM-12 of 2009

Modification proposalsJul-14POSITION OF MODIFICATION OF EXISTING PRIVATE SIDINGS PROPOSALS OVER S.E.RAILWAYSl. No. Station & SectionName of IndustryType of IndustryNo. of rakes per dayPFR date ofRTCDate of DPRDate of ESPSIPInwardOutwardTotalSubmissionIn principle approval givenApplication submitted for RTC on Date of RTC issueSubmissionApprovalSubmissionApprovalApproval of SIP onCurrent statusSIDING COMMISSIONED BUT SOME WORK YET TO BE COMPLETED:58Lohardaga/ RNC-TORIM/s. HINDALCO Mining01.71.718.10.04No Application09.11.0431.12.0413.04.200513.11.09Compenent authority has extended further time period to operate the Lohardaga siding on temporary basis upto 31.12.2014 with some stipulation on 01.07.2014.59Damodar/ DMAIISCo-Burnpur (From 0.7 to 2.9 MTPA)ISP5.572.738.3019.11.200510.8.200608.5.200627.11.0827.4.0714.10.0807.7.0919.01.1003.10.12Compleation drawing approved on 20.12.13 and under CE's No.- S-2431/13. IISCO authority requested to expediate OHE work in their inplant yard including EIG. GM (Traffic) was requested for processing of rail link between Radhanagar and Barachak on Eastern Railway. They have been informed to provide connectivity as per participative mode as Railway Board had not sanctioned their link due to finical crunch on 04.06.2014. 60NOMD/ DPS-BBNTISCO-NOMDISPNo ApplicationModification portion of siding commissioned. Additional loop constructed on railway land. Party asked to deposit Rs.10 crores and execute Land Licensing agreement afresh on 10.10.2013. Joint survey report and plan submitted by Sr. DOM/CKP was examined and Sr. DOM/CKP was advised to send his views for installation of Weigh Bridge on Railway land on 09.12.2013,. Process of approval for IMWB has been initiated for approval through COM, CCM, CME and PCE. GM approved the proposal. CME (Plg) was requested to processe the case obtaning dispensation from RDSO on 20.05.2014.UNDER CONSTRUCTION:61BolaniKhadan/ BBN-BYXSAIL-BolaniKhadan Loading sidingMines0.007.727.7228.10.200427.12.200408.5.2006Not available30.6.0631.01.200606.7.200623.7.2007 (Alt-I approved in July'11)Work is in progress. Laying of line No.- 6 and shunting neck completed. OHE and S&T works is under progress. Construction of Line No.- 7 will take another three months time as per M/s. SAIL. NOC for RTC sent to Railway Board on 27.11.2013.62Adityapur & Tatanagar/ TATA-GMHTATA STEEL (From 6.8 to 10 MTPA)ISP20.5811.8732.4504.5.200907.7.200918.2.200815.11.1004.8.0915.11.201006.12.1028.4.2011ADTP not received. Tata Stn.- 22.02.13.Work under progress.63MMVRBSPX-PDPHM/s. Tata Sponge IronSponge Iron0.20.8125.03.0628.08.0621.8.200408.07.0510.01.0704.10.0721.09.0725.05.08The modification is on Railway Land. Alteration Plan approved on 19.02.2014 and Register under CE's No.- S-2392/08 Sheet 2a, Alt-2. CCN(FM) was advised to notify the modification of the siding temporarily for a period of one year from the date of commercial notification on 14.07.2014. 64Jaruli/ JRLI-PDPHM/s. Banspani Iron LtdMiner03.53.505.12.9629.05.98Not Available31.07.9706.12.9916.07.2009 (Alt-I)08.12.10Party is not yet executed land licensing agreement. Case is under Arbritation. Siding agreement signed. CCM (FM) has been advised for commissioning of the 3rd line of the existing siding.The proposal for installation of IMWB was returned to Sr.DOM/CKP on 27.08.13 and 12.11.2013 for necessary clarification.65SLJR/ TATA-KGPM/s. Lafarge India LtdCement2.063.94602.8.200811.02.200902.12.200801.06.201016.08.1001.02.12Siding modification work completed. Party to execute the private siding agreement. Consultant was advised to submit department wise compleation cost to CE (G) for verification on 30.09.13. Further, CE (G) was advised to intimate whether additional land has been used for proposed modification 13.08.13. Reply awaited. Compleation cost submitted by consultant directly to CE (G) on 09.10.13. The same has been send to division for physical verification on 03.02.2014 by Engineering Department.66Muri/ RNC-MURIM/s. HINDALCOAlumina Plant1.50.5224.01.05No ApplicationJune'0505.09.0616.07.12Under Construction. Working procedure has been finalised and approved by COM. Accordingly, Sr. DTM/RNC was advised to formulate JPO on 04.04.2014. DRM/RNC was also requested to interven in the matter on 28.05.2014.67BNDM & Dumetra/ BNDM-ROUSAIL-Rourkela ( From 3 to 4.5 MTPA)ISP11.376.0517.4210.11.0512.12.0516.8.200831.12.08.October 200714.10.200810.6.200911.04.13BNDM, Dumetra & ROU no SIP approved after 11.04.13.ESP for ROU expansion approved on 11.04.13 . Modification of In-plant yard is processed. Permission for connectivity at DMF has been requested by M/s. SAIL. NOC of Electical and S&T departments communicated on 14.02.2012 and Engineering Department on 09.03.2012. L- section and land licensing plan to be submitted by party.68Sankrail/ HWH-KGPM/s. Ambuja CementCement1.010.631.6408.12.1019.07.1113.9.2005/ 29.8.201126.10.98 23.12.14 (Rev.)07.10.2011.19.03.201222.05.1202.06.14 ESP approved on 02.06.2014 and registered under CE"s drawingf No. S-2438/14, Sh- 1&2. ESP UNDER APPROVAL:69Dhutra/ ROU-JSGM/s. Ultra TechCement1.82.34.102.05.2011Proposal accepted on 27.06.201116.8.201130.01.1217.02.201122.11.1206.12.12DPR approved on 22.11.2012. Plan approved on 27.02.2014 and Register under CE's No. S- 2433/14 Sh No.- 1 & 2. Bridge drawing sent to CBE on 05.04.2014.70Belatant/ BJE-MHQM/s. S&T Mining08.06.201115.03.2012MultiUser RTC Not required28.08.201212.07.13Plan return to CE(G) unapproved on 25.03.2014 as it shows certain portion of railway land. CE(G) requested Sr.DEN(Cord)/ADA to send clarification on the issue on 21.04.2014.Clarification submitted by division is under examination by Engg. Department.71KNF/ MHQ-GUMOMadhuband WasheryCoal Washery3 rakes3 rakes16.01.201326.03.201311.09.201306.05.2014 DPR approved on 06.05.2014.SIDING PROPOSALS WHERE DPR IS UNDER EXAMINATION AND TO BE PROCESSED FOR APPROVAL:72Bokaro Steel City/ BKSCSAIL-Bokaro (From 4.8 to 7 MTPA)ISP17.617.7225.3222.8.200705.10.200728.3.200810.6.0814.8.08M/s. SAIL have now proposed to drop the proposal. Party was advised to deposit codal charge on 19.09.13. They have proposed expansion to 10.5 MTPA. But no payment of codal charges paid.73MMVR-BSPX/ DPS-JRLIJoda East Bin direct entry of M/s. TISCO (JEDE)5 rakes5 rakes07.08.201203.01.201324.06.13IPA given on 03.01.2013.Compliance submitted by M/s. RITES/BBS on the observations on DPR of various Department sent to concerned departments on 26.12.13 for examination. In the meeting held on 17.01.2014 party & consultant requested to to comply the observations. Copy of revised drawing submitted by them sent CE (G) and CME for their examination and comments on 07.04.2014.Comments from CE(G) & CME (Plg) received. Further compliance submitted by RIRES/BBS sent to CE(G) & CME (Plg) on 24.06.2014 for their examination. Meeting held on 08.07.2014, with TISCO and RITES. Pending issues sorted out. DPR has been put up for approval. 74Gamaria/ TATA-SINIM/s. Usha Martin Ltd.5/6 rakes0.3 rakes5/6.3 rakes13.07.201214.06.201329.01.200419.07.13IPA given on 14.06.2013. DPR submitted by them circulated on 12.08.2013. DPR already approved by COM. In the mean time party was advised to deposit balance 2% codal charges along with Service Tax on codal charges on 18.03.2014. Party has not yet deposited Codal charges and Service Tax on Codal charges. The letter of DPR approval will be issued after deposition of necessary codal charges by party/consultant. 75Gokulpur/ KGP-TATAM/s Rashmi Metaliks Ltd1.500.301.8021.05.13The reply submitted by M/s RML has been examined and M/s RML has been requested to furnished a clear picture of inward and outward flow of traffic with relation to raw materials and finished products in metric system and also requested to submit about the enduser and quantity of the sellable iron ore fines as rates policy of railways is different from domestic use and export use on 26.05.2014. Party was again requested to submit necessary information on 27.06.2014, which is awaited.76Barbil/ BJMD-BBNM/s. Kalinga Iron Works0.08 rakes0.16 rakes0.24 rakes12.02.1319.09.1330.01.14.IPA given on 19.09.2013. DPR circulated to all concerned on 13.02.2014. in the meeting held on 22.05.2014 it was decided that M/s RITES/BBS will submit compliance, revised plan and estimate. S&T comments to be submitted by 30.05.2014. Compliancew submittd by RITES/BBS was sent to CE(G), CSTE and CEDE on 01.07.2014. Compliance of other department is awaited.77Mechada. HWH-KGPKolaghat TPSTPS5 rakes5rakes30.08.1313.01.201411.03.14IPA given on 13.01.2014. DPR circulated on 21.03.2014 is under examination by various departments. Comments of Sr. DOM awaited.