Sichuan Reconstruction ProjectAll-Team Meeting

17 Jun 2009

Page 2: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Sitting plan

Team A Team E

Team D

Team B Team C

Page 3: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Agenda• 1630-1645 Project update (Dr. Fok and Dr. Yu)

• 1645-1655 Team A• 1655-1705 Team B• 1705-1715 Team C• 1715-1725 Team D• 1725-1735 Team E• 1735-1745 Publication Editorial Team

• 1745-1815 Detailed descriptions of the project and tour arrangement.

• 1715-1830 Collection of flight information and logistics arrangement

Page 4: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Project update

Page 5: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

On 11 April 2009

Page 6: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

On 13 Jun 2009

Page 7: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Classrooms

Page 8: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Classrooms

Page 9: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Classrooms

Page 10: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

On the roof

Page 11: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Computer Room

Server PositionSolar Panel Inverter position

Page 12: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Safety

Page 13: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Can you guess

what is it?

Page 14: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Toilet

Page 15: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Reports from each team

Page 16: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Detailed descriptions of the project and tour arrangement

2 Aug – 9 Aug 2009

Page 17: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 1 (Sun)• CA412  

– HK/Chengdu – 11:10 / 13:45 

• Travel to Deyang primary school directly for a preliminary site inspection

Page 18: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 1 (Sun)• Settle down in the hotel 德阳东电宾馆 • Dinner

• Prepare with food and drinks

• Project briefing

Page 19: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

德阳东电宾馆 • http://www.51766.com/channel/intro/dongdian• 地址:

– 德阳市黄河西路 189 号 618000 [ 四川 - 德阳 ]

• 热线: 0838 - 2411421 • 传真: 0838 - 2409620

Page 20: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Hotel

City Center

Page 21: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

In the city center

Page 22: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 2 (Mon)

• Installation work– Team A – Install Solar panels– Team B – Install projectors and solder

connectors – Team C – Lay UTP cables and plug

connectors, install PC and servers

Page 23: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 2 (Mon)

– Team D • Morning: train students and teach

ers on video story telling• Afternoon: Go to city centre to int

erview the Secretary of the local Education Bureau

– Team E – take video clips and follow the interviews

Secretary of the Deyang Education Bureau

Page 24: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Lunch arrangement

• You may prepare your own food

• Or you may eat in the near-by restaurant

• To be paid and prepare by yourselves!

Page 25: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 3 (Tue)• Installation work

– Team A – Install Inverters– Team B – Install PCs– Team C – ETV server and CLP Games, install

https://www.clpyoungpower.com/tc/climateChange/index.aspx

Page 26: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 4 (Wed)

• Morning: Caring Party

• 學生講故事、唱歌、跳舞、做遊戲等等

Page 27: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Possible venues for the caring activity

Page 28: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 4 (Wed)• Afternoon: On-line interactive class• Team C,D,E• Room capacity: 30-40

Internet

USB Video Capture

USB Video Capture

Sichuan side HK side @HKU

Prof. SP ChowDr. Allan YuenDr. Raymond Ho?

Page 29: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 4 (Wed)

• 活動程式:– 1 、雙方主持人相互介紹參加活動的現場嘉賓和參加活動的川港

師生– 2 、嘉賓致辭:– 旌陽區教育局領導致辭– 香港政府局長致辭– 港區人大代表何鍾泰博士致辭– 香港大學副校長致辭– 3 、曾大玉校長簡介學校情況並宣讀“至所有香港愛心人士的一

封信”。– 4 、川港師生互動。 – 5 、川港合唱一首歌 ------“ 大中國”(四川学生带领)“献专业。

连川港” (香港学生带领) 結束本次活動。

Page 30: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Who’s who

四川科协崔部长

袁盛春老师 曾大玉校長校长 曾老师

旌陽區教育局周局長

Page 31: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 4 (Wed)

• How about others?– Watch live

broadcast in the next room?

– Team A and B can play games with the students in the computer room

– Take farewell photos…etc.

Page 32: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 5 (Thu)Morning: Visit the Eastern Electrical Factory

Page 33: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 5 (Thu)

Afternoon:

德阳 什邡 汉旺 成都

Page 34: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 5 (Thu)

3pm Visit and cheer up another HKU project team in 什邡

Page 35: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 5 (Thu) 4:30pm Memorial activities in 汉旺

Page 36: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 5 (Thu) Memorial activities in 汉旺

• Present flowers• Speech by student representatives• One minutes silent

Page 37: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 5 (Thu)

• We will stay in the University of Electronics Science and Technology of China in Chengdu

Page 38: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 6 (Fri)• Academic Interflow Conference• Each team will present 10-15 minutes• Presenters:

– Team A:– Team B:– Team C: Jacqueline Ho– Team D:– Team E:

• Suggested topic:– Related to the reconstruction project– Related to China/HK collaboration – About our U life

Page 39: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 6 afternoon – Day8

Official mission completed

Free Time

Page 40: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 6 (Fri)

• Possible arrangement (to be arranged by students)

Page 41: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 7 (Sat)

• Free time (to be arranged by students)

Page 42: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Day 8 (Sun)

• CA427  Chengdu to HK

• 16:00 / 18:25

Hotel

Page 43: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

日期 早上 下午 晚上2/8 从香港出发四川成都

CA412  11:10 / 13:45 

到达四川成都,直达德阳小学习

准备和购买补充物资

3/8 实地安装访问当地老师

实地安装访问当地老师

休息

4/8 实地安装访问当地老师

实地安装教授当地学生英语

准备关爱交流大会预演川港在线实时互动教学

5/8 实地安装德阳小学习关爱交流大会

技术转移进行首次川港在线实时互动教学

休息

6/8 访问东方电机厂 访问什邡及汉旺

休息

7/8 川港两地大学学术交流会议

自由活动 休息

8/8 自由活动 自由活动 休息

9/8 自由活动 出发成都机场CA427 16:00 / 18:25

旁晚出发回香港

Summary

Page 44: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Ask not what your country can do for you - ask what you can do for

your country. 

John Kennedy

Page 45: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Ask not what you’re the team can do for you - ask what you can do for the

team!

Dr. W.Fok

Page 46: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Some of us have already committed some duties?

• Team Leaders: – Sharon Mui (A), Yau Kai Ming (B), Luk Chuen Kit (C), Maomao Wu

(D), Alison Huy (E)• Solar Panel Frame Designers:

– Sharon Mui, Hau Chi Hang,• Caring activity Program Secretary: Sharon Tai• Network Designer: Luk Chuen Kit • ETV Server Developer: Chiu Ho Ming • CLP Clean Energy Educational Game: David Chan• On-line Interactive Class Technical Secretary: Eric Au Yeung• Publication Editor: Zoe Yiu• Photographer: Kam Ling• T-shirt designers: Jacqueline Ho, Ken Law

Page 47: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Post Duties Responsible person(s)

General Secretary Take minutes and record, prepare contact list, call meetings,

Logistics Secretary Flight and accommodationConfirm name list, arrange rooms, keys

Catering Secretary Prepare delivery food, if necessary

T-shirt Designer Graphics design and arrange printing and production

Banner Designer Design banner and arrange printing

Program Secretary: Caring Party

Arrange activities and program run-down of the caring party design the games, prepare music, song…etc.

Call for volunteers

Page 48: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Call for volunteers

Post Duties Responsible person(s)

Program Secretary: On-line Interactive Class

Liaison with the Primary School, arrange the run-down, be the MC of the event

Lisa Deng and Dr. Yuen

Program Secretary: Visit another HKU team in 什邡

Liaison with another HKU team which stationed in 什邡 for another reconstruction projectArrange the visit and let our teams knows what they are doing.

Program Secretary Memorial activity in汉旺

Prepare flowers, prepare the speech, host the one-minutes silent

Program Secretary: Academic Interflow Conference

Arrange the program run-downCoordinate with each teamBe the MC of the event

Page 49: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

Random draw

http://www.randomizer.org/form.htm

Page 50: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

What’s next• On-line class rehearsal (Team C and Team D

work together)– Date: 30 Jun 2009 (Tue)– Time: 2pm-4pm– Venue: CYC602 (simulate Sichuan side) and CYC603

(simulate HK side)

Internet

USB Video Capture

USB Video Capture

Page 51: Sichuan Reconstruction Project All-Team Meeting 17 Jun 2009.

What’s next

• Next All-team meeting (Tentative)– Date:8 Jul (Wed) (3 weeks later)– Time: 5:00pm-6:30pm– Venue: CYC 603

• Agenda– Team leaders reports– All Program Secretaries should have prepared the

detailed rundown of the program and brief the team– Mark final arrangements