Integrated Demand Management (IDM)

• Department within Eskom’s Customer Services Division

• IDM is dedicated to ensuring short-term security of electricitysupply through implementation of various initiatives aimed atoptimizing energy.

• The Initiatives are NERSA funded through the MYPD approvals.

• Key focus

• Energy Efficiency Initiatives

• Load Management Initiatives technologies,

• Consumer Behavior and awareness Initiatives

Residential initiatives Implemented By Eskom

Energy Efficiency initiatives

• CFL Mas Rollout

• Residential Mass Rollout (Technology Basket)

• Residential Rebates Programmes

Load Management Initiatives

• Residential Load Management (RLM) Programme

• Awareness Programmes

2014/03/27 3

2014/03/27 42014/03/27

Why Residential?

17:00 - 21:00

Demand

at peak

periods

amounts

to over

30%

Residents: greatest contributors to peak time

loads Aim to optimize energy usage

EE Initiatives: CFL Mass Rollout

2014/03/27 5

• Objective: Replace Incandescent with CFLs

• The programme is entirely on tender bases

• Programme consist of:

• Supply /procurement of CFLs

• PM Companies per Region (Operating Units)

• Multiple Installation Teams per Region ( Operating Units)

• Crushing and Disposal (both Incandescent and CFLs)

• Preference is given to small companies based on BBBEE level status.

• Target areas: Predominantly lower LSM and few higher LSM

• Temporary jobs creation in communities where the rollout is targeted.

CFL Mass Rollout

2014/03/27 6

7 296 911

11 159 852

5 391 855

15 128 288

6 182 860

8 912 538

-

2 000 000

4 000 000

6 000 000

8 000 000

10 000 000

12 000 000

14 000 000

16 000 000

Central Eastern NorthWestern

Northern Southern Western

CFLs Installed

CFLs Installed

CFL Mass Rollout

2014/03/27 7

More than2000 MW

Typical Incandescent to CFL Profiles

2014/03/27 8

Residential Rebates Programme

Solar Water Heaters Rebate

• Installed Over 380 000 SWHs installed in 7 years

• Low Pressure (incl. Load Reduction programme) and and High Pressure

• Target Market: Low and High LSMs

Residential Heat Pump Rebate

• Installed over 17 000 Residential Heat Pumps in 3 years

• Both Integrated and Split Systems

• Target Market: High LSM

2014/03/27 9

Residential Mass Rollout (RMR)

2014/03/27 10

• Target Market: High LSM

• Phase 1 and 2 completed Phase 3 Postponed.

• Turn-Key Implementation on a tender process

• Basket Technology Offer

• CFLs

• Geyser and swimming pool Timer

• Shower heat

• LED downligter

• Geyser Blanket (optional)

Residential Load Management

2014/03/27 11

• ADMD – After Diversity Maximum Demand, Calculated or Assumed

• Pure Load Management means Neutrality – Area(energy) under the

graph

• Control of come back load

• Types of projects

• Extension projects – One way Communications

• New projects – Two way Communications

-

2 000.0

4 000.0

6 000.0

8 000.0

10 000.0

12 000.0

14 000.0

16 000.0

Dem

an

d (

kW

)

Time (Half Hourly)

RLM Weekday Profile

Baseline

Proposed

Residential Load Management

2014/03/27 12

Residential Load Management Implementation

2014/03/27 13

Awareness Initiatives

• Power Alert, Beat the Peak and w inter campaigns

2014/03/27 14

5pm to 9pm switch off campaign: Phase 2 - Why

5pm to 9pm switch off campaign: Phase 1: Introduce geyser and pool pump characters

Lets Beat The Peak!!!

Thank you

Email: [email protected]: 011 800 8639