Shree Umiya Brochure final

8

Transcript of Shree Umiya Brochure final

About Us

Pre-engineered Steel Buildings are designed to suit very specific customer requirements Uponfinalizing the requirements, The Primary and Secondary structures are factory-prepared andare assembled at site. The concept is a huge success story in The U,S. and Europe and hasmade inroads into Indian market less than a decade back. However, most of the productionunits coming up today are Pre-engineered Steel Buildings.

SUSPL Have our workshop at Dhavat, Karjan, Vadodara with highly Qualified & ExperiencedEngineering Personnel in Manufacturing & Project Management.

Most Affordable and flexible Pre-Engineered Building system is ideal for anylow / high rise industrial, institutional or commercial application with excellentfeatures such as speed of construction, quality, and strength with value addition. A finishedproduct in itself - include frames, walls, roofing, cladding, connection bolts and accessories.

Pre-Engineering Building

PEB System is zero maintenance & superior in strength

It is having an attractive appearance

PEB System has protection against non uniform weathering

PEB System VS CSB SystemExcellent resistant in transit to corrosion & storage strain

This system reduces energy loads on buildings due to longterm bright surface that helps to retain heat reflectivity

It is a higher level technology & innovation & betterproduct over conventional material

[email protected]

Applications

Schools

Recreational

Buildings

Indoor Stadium Roofs

Outdoor Stadium Canopies

Railway Platform Shelters

Bridges

Auditoriums

Gas Stations

Showrooms

Vehicle Parking Sheds

Metro Stations

Warehouses

Factories

Offices

Workshops

Property Pre Engineered Buildings Conventional Steel Buildings

STRUCTURE WEIGHT

DESIGN

SAFETYANDRESPONSIBILTY

DELIEVERY

FOUNDATION

ERECTIONSIMPLICITY

ERECTION COST & TIME

OVERALL PRICE

ARCHITECTURE

Lighter ( 30% than conventional steel)

Quick and Efficient

Specialized computer analysis and designprograms optimize material required.

Single source of responsibilityis there because all the job isbeing done by one supplier.

Delivered in Short Period ( 6 to 8 weeks)

Simple design, easy toconstruct and light weight

Since the connection of componentsis standard, erection is faster.

Price per square meter may be as low asby 30% than the conventional building.

Outstanding architectural design can beachieved allow cost using standardarchitectural details and interfaces

Erection is provided at the sit bythe manufacturer

Cost effective , faster endless number ofequipment same required for erection.

Heavier

Slow and Tedious

Substantial engineering and detailing work is required

Multiple responsibilities can result in question of who isresponsible when the components do not fit in properly,

insufficient material is supplied or parts fauldperform particularly at the supplier/contractor interface

Require Longer Period (20 to 26weeks)

Extensive, heavy foundation required

The connections are normally complicated anddiffer from project to project.

Costlier (20% than PEB ) , time-consuming and heavyequipments are required for erection.

Special architectural design and features must bedeveloped for each project which often require

research and thus resulting in higher cost.

There has to be separated allocation of laborfor the purpose of erection

Higher price per square meter

Advantage of PEB System Over CSB System

www.shreeumiyastructure.com

Infrastructure

This infrastructure is divided into various departments such as production, sales and marketing,quality controlling and many more which help us in producing the products in bulk. The alldepartments are efficiently managed by the professionals who have experience in their respectivedomain. We also make changes according to the advancement in the technology to offer superiorquality goods to the clients.

Fully covered shed with crain facilities to load and unload material with capacity upto 30 mt. Inhouse weight scale facility. We have developed the state of the art infrastructure which is advancedin technology and equipped by ultra modern machinery.

Interchangeable C,Z & L Machine H-Beam Machine

CNC Shearing Machine CNC Controlled Plasma

Coil Cut To Length Machine

Slitting Machine

Sheeting Pro�le Machine

Saw Welding Machine

[email protected]

Arched Multi SpanMulti Gable (MG)Tapered Column ClearSpan (TCCS)

Mono SlopeCrane BuildingMulti Span “1” (MS-1)

Roof SyatemMezzanineMulti Span “2” (MS-2)

Lean-ToCurved RafterMulti Span “3” (MS-3)

Standard Primary Frame

1100mm

EAVESTRUT

PURLIN

1500mm(TYPICAL)

RIDGELINE

10

X

400mm ROOFSHEETING

EAVE STRUT

GIRTRAFTER

COLUMNFINISHEDFLOORLEVEL

WALLSHEETING

200mm200mm

EA

VE

HE

IGH

T

BUILDING WIDTH

Metal Building System

Building system a custom design to meet client requirement. The Building parameters are:

Design Load

Building Lengthup to 15m

Building Heightup to 30m

Roof Slope1/10 & 1/2-0

www.shreeumiyastructure.com

Roofing System

We Are Expert In Roofing System The Multitec built-up roof system consists of ribbedsteel panels and allow the application of a built-up roof system. The steel panel is fixedto the secondary framing by self-drilling screws. The panel overlaps are fastenedwith stitching screws.

IT Can be used for complex roof shapesEconomical rain water drainage Attractiveand economical Easy to install Cost-effectiveenergy efficienc y Long-term per formanceReduced peak height Simple and economicalparapets Fully integrated accessories: skylights,smoke vents, polycarbonate vaults, roof curbsHigh degree of thermal insulation (dependingon the specification of the built-up roof system)An increase of safety and water tightness thanksto the strength of its fixation

Advantages of Roofing System

Roofing and Wall Cladding System

TECHNICAL SPECIFICATION OF PPGI TECHNICAL SPECIFICATION OF GALVALUME

Substrate: IS 513 Cold Rolled Steel Coils

Tensile Strength : 240Mpa-550Mpa

Galvanizing : As per IS 277

Zinc Coating : 120 GSM – 150 GSM

Pre-painting: IS 14246

Type of Coating: RMP/SMP

Total Coated Thickness (TCT):

0.50mm - 0.80mm

Substrate: 55% Aluminum, 43.4% Zinc &

1.6% Silicon

Tensile Strength : 550Mpa

Coating Standard : As per AS 1397-1993

Coating Mass : AZ 150

Base Metal : High Tensile Steel

Total Coated Thickness (TCT) : 0.47mm -

0.60mm

The secondary framing is normally Z purlins fixed with 1.5m purlin spacing to the primaryframing. The thermal insulation varies depending on the type of the built-up roof adopted.

[email protected]

Accessories

Specializing in the steel fabrication works of heavy & large structures in India, Contact“SUSPL” and that boiler house structures for the petrochemical, power industry and alsoairports, flyovers, bridges for the infrastructure projects. We are the leading top 10 sheetmetal fabrication and steel fabrication manufacturers, suppliers company in India.

Keeping in mind the various requirements of the customers, we are engaged in renderingStructures Fabrication. These are rendered using the latest technology. Apart from this, weare offering this structures fabrication service range at the budget-friendly market price.

Structure Fabrication Services offered come in light weight construction finish as well asare capable of handling high load strength which make these suitable for temporary orpermanent erections as well as for use in earthquake prone areas. Providing forenvironmental friendly usage, these buildings are also easy and quick to construct.

Following the diversified patrons’ needs, we are offering this fabrication service in variousdimensions at rock bottom prices.

Customize Steel Fabrication Contractor Gantry Rails & Crane Girders Boiler Houses & Heavy Power Plants

Steel Structural Supports Balance of Steel Plant Structures Steel Fabrication Design & Drawing

Fabrication Strucutre

Fastners

Turbo VentsRoof MonitorLouvers

Ridge Vent

Insulation

Deck Sheet

Z/C Purlin

Brace Rod

www.shreeumiyastructure.com

Factory AddressS. No. 781, At Vill.- Dhavat, TA.- Karjan, Dist.-Vadodara - 391240

Office Address10, Vishnu Industrial Estate, Opposite Narsingh Ji Industrial Estate,

Pratapnagar, Vadodara, Gujarat-390004.

[email protected]