Sheboygan River Dredging Project
2012“Short Term Inconvenience for a Long Term Gain”
By: Chad Pelishek, Development Manager
![Page 2: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/2.jpg)
`
![Page 3: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/3.jpg)
Total of ~350,000 cy of material to be removed. Three major fish and habitat restoration
projects Three offloading/dewatering sites. Approximately 200 trucks per day on Indiana
Ave. Approx. 100 trucks per day on Penn Ave and S.
14th Street. 24 hours a day 7 days a week dredging
operations. Bright Lights, Dust, Noise, etc. will occur.
Short Term Inconveniences
![Page 4: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/4.jpg)
8th Street and 14th Street Boat Launches closed.
Discouraging of canoers/kayakers from mouth of river to Taylor Drive Bridge.
Docks will be relocated during construction. Traffic Impacts along truck routes. Portions of Kiwanis Park closed.
Short Term Inconveniences
![Page 5: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/5.jpg)
![Page 6: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/6.jpg)
![Page 7: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/7.jpg)
Redevelopment Opportunities of underutilized property.◦ Allows for reinvestment of the riverfront with up to
10 feet of depth for development docking from 8th Street to 14th Street Bridge.
◦ Case Study by Illinois-Indiana Sea Grant in 2011:Findings1. Sheboygan River was viewed as an asset but has a
negative stigma.2. Depth was a primary concern of the interviewees.3. Remediation will result in economic revitalization.4. Quality of Life and Aesthetics viewed as potential
improvements of remediation.
Long Term Gains
![Page 8: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/8.jpg)
Additional Depths. 10-16 feet from the 8th Street bridge to the mouth.
Allow for additional cruise ships like:
Long Term Gains
![Page 9: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/9.jpg)
With Tourism, we are working to secure the Blount Cruise Ships stops in Sheboygan next Summer:
Long Term Gains
![Page 10: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/10.jpg)
Long Term GainsFish and Wildlife Habitat Restoration
![Page 11: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/11.jpg)
Long Term Gains
![Page 12: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/12.jpg)
Long Term Gains
![Page 13: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/13.jpg)
Help with increasing the local economic benefit of $8.7m that is spent on recreational activities related to the waterfront.
New development potential in 2013 of approximately $3.5 Million adjacent to the riverfront.
Slated to begin end of May, early June and be completed by Fall 2012.
Changes the perception of “its got the perception of being dirty, I wouldn’t go swimming in it as you might glow!”, stated a local resident.
Long Term Gains
![Page 14: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.](https://reader031.fdocuments.net/reader031/viewer/2022013115/56649e565503460f94b4d7e2/html5/thumbnails/14.jpg)
Sheboygan River Dredging Project
2012“Short Term Inconvenience for a Long Term Gain”
By: Chad Pelishek, Development Manager
Questions?