GODSHALL KANE O’ROURKE ARCHITECTS, LLC KEVIN R. GODSHALL, AIA · DAMON ROYAL KANE, AIA EMERITAS · P. MICHAEL O’ROURKE, AIA 300 BROOKSIDE AVENUE BUILDING 18, SUITE 150 AMBLER YARDS AMBLER, PA 19002 T: 215.646.2003 www.gkoarchitects.com Shop Drawing/ Submittal Review Project Name: Villa Joseph Marie High School Auditorium Addition GKO Project #: 2339 Submittal For: 23 74 35 1750-01 Aaon RTUs Date Submitted: 2/22/18 Corrections or comments made during this review does not relieve the Contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for; confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordination of his work with that of all other trades; and performing his work in a safe and satisfactory manner. Reviewed By: Jason Mulligan, GKO Date Returned: 3/20/18 Comments: No Exceptions Taken Furnish As Corrected Revise and Resubmit Rejected/ Resubmit

Transcript of Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to...

Page 1: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

G O D S H A L L K A N E O ’ R O U R K E A R C H I T E C T S , L L C

KEVIN R. GODSHALL, AIA · DAMON ROYAL KANE, AIA EMERITAS · P. MICHAEL O’ROURKE, AIA

300 BROOKSIDE AVENUE BUILDING 18, SUITE 150 AMBLER YARDS AMBLER, PA 19002 T: 215.646.2003 www.gkoarchitects.com

Shop Drawing/ Submittal Review

Project Name: Villa Joseph Marie High School

Auditorium Addition

GKO Project #: 2339

Submittal For: 23 74 35 1750-01 Aaon RTUs Date Submitted: 2/22/18

Corrections or comments made during this review does not

relieve the Contractor from compliance with requirements of

the drawings and specifications. This check is only for review

of general conformance with the design concept of the project

and general compliance with the information given in the

contract documents. The contractor is responsible for;

confirming and correlating all quantities and dimensions;

selecting fabrication processes and techniques of construction;

coordination of his work with that of all other trades; and

performing his work in a safe and satisfactory manner.

Reviewed By: Jason Mulligan, GKO

Date Returned: 3/20/18

Comments:

☒ No Exceptions Taken

☐ Furnish As Corrected

☐ Revise and Resubmit

☐ Rejected/ Resubmit

Page 2: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for: confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades; and performing his work in a safe and satisfactory manner.

Submittal Review Cover Sheet

Project Name: Villa Joseph Marie High School - Auditorium Addition

Client: GKO Architects

Submittal #: 23 74 35 - 1

Submittal Name: Rooftop AC Units

Reviewed By: Gene Hoffman

Date: 03.12.2018

☒ No Exceptions Taken ☐ Revise & Resubmit

☐ Rejected/Resubmit ☐ Furnish as Corrected

☐ Furnish as Corrected and Resubmit

Engineer’s Review Comments:

Page 3: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Villa Joseph Marie High School

Auditorium

NBRI Project No: 1750

Villa Joseph Marie High School

1180 Holland Road

Holland, PA  18966

Twining Construction Company

1801 2nd St. Pike

Richboro, PA  18954

Aaon

H.C. Nye Company, Inc.

2999 Revere Street

Harrisburg, PA 17111

237435 Rooftop Air Conditioning Units

APPROVED: X APPROVED AS NOTED:

BY: Date:

Justin Rogers No.

Project Manager

Date: 2/19/2018

311 County Line Road, Suite 31, Gilbertsville, PA 19525

Project:

Specification Section:

SUBMITTAL COVER SHEET

CONTRACTORʹS REVIEW

Owner:

General Contractor:

Manufacturer:

Subcontractor / Supplier:

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
ghoffman
KCBA
ghoffman
Typewriter
X
ghoffman
Typewriter
3-12-2018
ghoffman
Typewriter
GAH
Page 4: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

1

H.C. Nye Company, Inc. Environmental Solutions

2999 Revere Street; Harrisburg, PA 17111 (717) 561-2500; Fax: (717) 561-2577

SUBMITTAL DATA

DATE: February 7, 2018

JOB NAME: Villa Joseph Marie HS – Auditorium Addition

CONTRACTOR: NB Rogers, Inc.

EQUIPMENT: Packaged Rooftop Units (Tag: RTU-1 thru 6)

MANUFACTURER: Aaon, Inc.

SALESMAN: Tim Wenrich

SUBMITTAL NOTES:

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 5: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2

H.C. Nye Company, Inc. Environmental Solutions

2999 Revere Street; Harrisburg, PA 17111 (717) 561-2500; Fax: (717) 561-2577

Submittal Notes: (6) Aaon Packaged Rooftop Units (Tag: RTU-1 thru 6) To Include the following:

- 2” Double Wall Construction w/R13 Spray Foam Insulation - RTU-1, 2, 3 shall have horizontal supply and bottom return without use of a plenum curb - RTU-4, 5, 6 shall have bottom supply and return - Voltage 460v-3ph-60hz - Single Point Power Connection - R410A Refrigerant - Copeland digital scroll compressors, capable of modulating to 10% of rated capacity - Fully modulating economizer with enthalpy control - Factory installed power exhaust fans with VFD's - Modulating Hot Gas Reheat Coil - factory installed - Stainless steel natural gas fired heat exchanger with modulating control valve (except RTU-6) - Factory installed hot water heating coil - RTU-6 only - 2" Pleated pre-filter - 30% Eff with 4" thick - 85% efficient filters - 115v Convenience Outlet (Factory Wired) - Supply Fan w/VFD - Non-fused Disconnect Switch - Phase and brown out protection - Stainless Steel Drain Pan - Factory Installed DDC Controller with required sensors - Terminal block for connection to field supplied smoke detectors - 1-Year Unit Parts Only Warranty (Labor Not Included) - 5-Year Compressor Parts Only Warranty (Labor Not Included) - 25-year non-pro rated warranty on the SS heat exchanger - parts only - Factory authorized start up - 18" high roof curb with duct kits with 1" spring isolation rails, curb installed on flat roof

***ITEMS NOT INCLUDED***

- Rigging, hauling, installation - Air Flow Stations - Smoke detectors - Labor warranty - Seismic ratings for roof curb

* Factory start up requires a minimum of 3 weeks notice prior to schedule.

*Pre-start up checklists must be submitted with request to schedule a date.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 6: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1 2 3A

3B

3C

3D 4A

4B

4C 5A

5B

5C

5D 6A

6B

6C

6D

7

8

9A

9B

9C

9D

R N A - 0 1 6 - C - 0 - 3 - D A A 0 A - D B 1 K 0 : 0 1 - D Q 0 J - G 0 0 - 0 0 0 0 - C L B G - Q C - C B 0 0 - 0 0 - E 0 - 0 - A N 0 - E B - B K 0 B - 0 0 - 0 0 0 - A A 0 A 0 0 - E 0 0 0 0 0 - 0 0 0 0 0 0 X

10A

10B

11A

11B

12

13A

13B

13C

14

15

16A

16B

16C

16D

17A

17B

18A

18B

18C

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Tag: RTU #1, 2

(Values do not account for changes described in SPA)

Job Information Unit Information **WEIGHT AND PERFORMANCE DO NOT INCLUDE SPA

Job Name: Approx. Op./Ship Weights: Job Number: Supply CFM/ESP: Site Altitude: Pre-Filter FV / Qty: Refrigerant Coil Filter FV / Qty:

Exhaust CFM/ESP/TSP: Outside CFM: Ambient Temperature: Return Temperature:

Villa Joseph Marie 3606 / 3606 lbs. (±5%)Job #14238 5000 / 1 in. wg.0 ft 240.00 fpm / 6R-410A 240.00 fpm / 6

5000 / 0.50 / 0.75 in. wg.170092 ºF DB / 74 ºF WB75 ºF DB / 62 ºF WB

Static Pressure External: Economizer: Evaporator: Heating: Coil Filters Clean: Cabinet: Dirt Allowance Re-Heat Coil: Total:

1.00 in. wg. 0.09 in wg0.15 in wg 0.20 in wg0.21 in wg 0.08 in. wg.0.35 in. wg. 0.03 in wg

2.11 in wg

Cooling Section Heating SectionGross Net

Total Capacity: Sensible Capacity: Latent Capacity: Mixed Air Temp: Entering Air Temp: Lv Air Temp (Coil): Lv Air Temp (Unit) Digital Comp. Capacity Ratio: Supply Air Fan: SA Fan RPM / Width: Exhaust Air Fan: EA Fan RPM / Width:

Evaporator Coil: Evaporator Face Velocity:

188.93 180.89 MBH139.41 131.37 MBH49.52 MBH80.78 ºF DB 66.44 ºF WB80.78 ºF DB 66.44 ºF WB54.40 ºF DB 53.44 ºF WB55.87 ºF DB 54.04 ºF WB100%1 x 270 @ 2.83 BHP993 / 4.965"1 x RM220A @ 1.38 BHP1197 / 4.920"

19.9 ft² / 3 Rows / 14 FPI251.7 fpm

PreHeat Type: Std (No Preheat)

Heating Type: Heating CFM: Total Capacity: OA Temp: RA Temp: Entering Air Temp: Leaving Air Temp: Input: Heater Qty: Consumption: Total Turndown Ratio:

Nat. Gas Heat5000218.7 MBH0.0 ºF DB / -1.0 ºF WB75.0 ºF DB / 62.0 ºF WB49.5 ºF DB / 46.6 ºF WB90.0 ºF DB / 62.9 ºF WB270.0 MBH1270.0 MBH3:1

Re-Heat Coil: Capacity: 84 MBH LA DB / WB: 70.00 ºF / 59.53 ºF RH: 54%

Rating Information

Listing Model: RN-016-3-H-BAAY-V0-21-000-A

Cooling Capacity (MBH): 184.0 Cooling EER: 11.8 Cooling IEER: 13.8 Rated in accordance with AHRI 340/360

Application EER @ Op. Conditions: 10.7

Electrical Data Rating: Minimum Circuit Amp: Unit FLA: Maximum Overcurrent:

460V/3Ø/60Hz 4036 50

Qty HP VAC Phase RPM FLA RLA Compressor 1: 1 460 3 12.6 Compressor 2: 1 460 3 12.2 Condenser Fans: 2 0.75 460 3 1080 1.8 Supply Fan: 1 5.00 460 3 1170 8.1 Exhaust Fan: 1 2.00 460 3 1760 3.4 Combustion: 1 0.25 460 1 3210 0.9

Cabinet Sound Power Levels*

Octave Bands: 63 125 250 500 1000 2000 4000 8000 Discharge LW(dB): 83 83 87 83 79 80 76 72

Unit Rating

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:06:56 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 7: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Return LW(dB): 85 84 81 72 71 70 65 59 *Sound power levels are given for informational purposes only. The sound levels are not guaranteed.

Unit Rating

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:06:56 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 8: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

JOB INFORMATION: WHEEL SPECIFICATION: Job Name: Max RPM: Job Tag: Diameter x Qty: Rep Firm: Width%: Date: Tip Speed:

Inertia:

Villa Joseph Marie 1,800RTU #1, 2 27.4 in. x 1

8102/07/2018 7,123 FPM

16 WR²

OPERATING CONDITIONS: MOTOR SELECTION: Air Flow: Rated HP / Bypass: Static Pressure: Frame Size: Plenum DP: Nominal RPM: Inlet Grill DP: VAC/PH/HZ: TSP: Efficiency Site Altitude: Enclosure Type: TSP @ Sea Level: Max Inertial Load:

5,000 CFM 5 / No2.11 in. Wg. 215T0.00 in. Wg. 11700.00 in. Wg. 460V/3Ø/60Hz2.11 in. Wg. Premium / 0.8950.00 Ft ODP2.11 in. Wg. 117 WR²

FAN PERFORMANCE: FAN SOUND POWER (Inlet/Outlet): RPM: Octave Band: (Re 10^-12 watts) BHP: 1 2 3 4 5 6 7 8 Efficiency: In/Out Velocity: Plenum Out Velocity: SOUND POWER A-Weighted: 83 / 88 dB

Max Duct SP with Blocked Airway: 2.3 in. Wg. @ 993 rpm

9932.8358.7% 79 78 76 74 76 76 75 741305/1366 FPM 81 81 85 84 82 83 80 7683 FPM

RPMBHPSYSTEMEfficiencySP SurgeCFM Min

Supply Fan Model: 270 @ 993 RPM and 81% WidthDesign Conditions: 5000 CFM @ 2.11" SP

CFM x 100087654321

SP

2

1

0

BH

P

7

6

5

4

3

2

1

0

40%

20%

0%

RPM: 993

BHP: 2.83

EFFICIENCY: 58.67

27.0" STAR Plenum

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:06:56 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 9: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

JOB INFORMATION: WHEEL SPECIFICATION: Job Name: Max RPM: Job Tag: Diameter x Qty: Rep Firm: CFM: Date: Tip Speed:

Inertia:

Villa Joseph Marie 2,200RTU #1, 2 22.0 in. x 1

500002/07/2018 6,894 FPM

5 WR²

OPERATING CONDITIONS: MOTOR SELECTION: Air Flow: Rated HP / Bypass: Static Pressure: Frame Size: Relief Dampers DP: Nominal RPM:

VAC/PH/HZ: TSP: Efficiency Site Altitude: Enclosure Type: TSP @ Sea Level: Max Inertial Load:

5,000 CFM 2 / No0.50 in. Wg. 145T0.25 in. Wg. 1760

460V/3Ø/60Hz0.75 in. Wg. Premium / 0.8650.00 Ft ODP0.75 in. Wg. 27 WR²

FAN PERFORMANCE: FAN SOUND POWER (Inlet/Outlet): RPM: Octave Band: (Re 10^-12 watts) BHP: 1 2 3 4 5 6 7 8 Efficiency: In/Out Velocity: Plenum Out Velocity: SOUND POWER A-Weighted: 85 / 85 dB

11971.3843.0% 85 85 85 80 74 72 67 611529/1684 FPM 85 85 85 80 74 72 67 6183 FPM

RPMBHPSYSTEMEfficiencySP SurgeCFM Min

Exhaust Fan Model: RM220A @ 1197 RPM and 100% WidthDesign Conditions: 5000 CFM @ 0.75" SP

CFM x 100054321

SP

2

1

0

BH

P

5

4

3

2

1

0

60%

40%

20%

0%

RPM: 1197

BHP: 1.38

EFFICIENCY: 43.03

22.0" STAR Plenum

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:06:56 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 10: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1 2 3A

3B

3C

3D 4A

4B

4C 5A

5B

5C

5D 6A

6B

6C

6D

7

8

9A

9B

9C

9D

R N A - 0 1 6 - C - 0 - 3 - D A A 0 A - D B 1 K 0 : 0 1 - D Q 0 J - G 0 0 - 0 0 0 0 - C L B G - Q C - C B 0 0 - 0 0 - E 0 - 0 - A N 0 - E B - B K 0 B - 0 0 - 0 0 0 - A A 0 A 0 0 - E 0 0 0 0 0 - 0 0 0 0 0 0 X

10A

10B

11A

11B

12

13A

13B

13C

14

15

16A

16B

16C

16D

17A

17B

18A

18B

18C

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Tag: RTU #1, 2 Job Name: Villa Joseph Marie Unit Submittal For: Job Number: Job #14238 Unit Submittal Date: February 07, 2018

Base Option Description

RN Generation RN Series

A Major Revision Major Revision A

016 Unit Size Sixteen

C Series C Series

0 Minor Revision Minor Revision 0

3 Voltage 460V/3Ø/60Hz

D Compressor Style R-410A Variable Capacity Scroll Compressor

A Condenser Style Microchannel Air-Cooled Condenser

A Indoor Coil Configuration Standard Evaporator

0 Cooling Heat Exchanger Construction Standard

A Cooling Staging 1 Variable Capacity Comp + 1 On/Off Comp

D Heat Type Natural Gas

B Heat Construction Stainless Steel Heat Exchanger

1 Heat Designation 270 MBH

K Heat Staging Modulating Gas Heat - Temperature Control

0 Heat Pump Auxiliary Heating No Heat Pump

Feature Option Description

0 1. Unit Orientation Standard Access - Hinged Access Doors with Lockable Handles

1 2. Supply & Return Locations Horizontal Configuration - End Supply--End Return

D 3A. Supply Fan Configuration 1 Fan + Factory Installed VFD

Q 3B. Supply Fan Size 27" Direct Drive Backward Curved Plenum - 100% Width Aluminum

0 3C. Supply Fan Motor Type High Efficiency Motor (1,200 nominal rpm)

J 3D. Supply Fan Motor Size 5 hp

G 4A. Outside Air Section Economizer + Power Exhaust

0 4B. Energy Recovery Type No Energy Recovery

0 4C. Energy Recovery Size No Energy Recovery

0 5A. Return Fan Configuration Standard

0 5B. Return Fan Size Standard

0 5C. Return Fan Motor Type Standard

0 5D. Return Fan Motor Size Standard

C 6A. Exhaust Fan Configuration 1 Fan + Factory Installed VFD

L 6B. Exhaust Fan Size 22" Backward Curved Plenum Fan - 100% Width Aluminum

B 6C. Exhaust Fan Motor Type High Efficiency Motor (1,800 nominal rpm)

G 6D. Exhaust Fan Motor Size 2 hp

Q 7. Outside Air Control CO2 Override + Fully Mod. Act. - Enthalpy Limit

C 8.Return and Exhaust Air Options Standard Barometric Relief EA Dampers

C 9A. Unit Filter Type 2" Pleated MERV 8 + 4" Pleated MERV 13

B 9B. Unit Filter Size & Location High Efficiency Filters in Standard Position

0 9C. Final Filter Type No Final Filters

0 9D. Filter Options None

Unit Submittal

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:06:56 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 11: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Feature Option Description

0 10A. Refrigeration Control A None

0 10B. Blank Standard

E 11A. Refrigeration Options A Modulating Hot Gas Reheat

0 11B. Blank Standard

0 12. Refrigeration Accessories None

A 13A. Unit Disconnect Type Single Point Power - Non-fused Disconnect Power Switch

N 13B. Disconnect 1 Size 100 Amps

0 13C. Blank Standard

E 14. Safety Options Remote Safety Shutdown Terminals

B 15. Electrical Accessories Phase & Brown Out Protection

B 16A. Control Sequence Single Zone VAV Unit Controller - VAV Cool + CAV Heat

K 16B. Control Supplier WattMaster VCC-X

0 16C. Control Supplier Options None

B 16D. BMS Connection & Diagnostics BACnet MSTP

0 17A. Preheat Configuration Standard - None

0 17B. Preheat Sizing Standard - None

0 18A. Option Box Location None

0 18B. Option Box Size None

0 18C. Option Box Accessories None

A 19. Outside Air Accessories Outside Air Hood

A 20. Cabinet Options Base Insulation

0 21. Blank Standard

A 22. Maintenance Accessories Factory Wired 115V Convenience Outlet

0 23. Code Options Standard - ETL U.S.A. Listing

0 24. Shipping Splits Standard

E 25.Air-Cooled Condenser Accessories VFD Condenser Fan Head Pressure Control

0 26. Blank Standard

0 27.Water-Cooled Condenser Accessories None

0 28. Energy Recovery Accessories None

0 29. VFD Options Standard

0 30. Miscellaneous Options Standard

0 31. Blank Standard

0 32. Blank Standard

0 33. Blank Standard

0 34. Blank Standard

0 35. Warranty Standard Warranty

0 36. Cabinet Material Galvanized Cabinet - Double Wall + R-13 Foam Insulation

X 37. Specials & Paint SPA + Premium AAON Gray Paint Exterior Paint

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1 2 3A

3B

3C

3D 4A

4B

4C 5A

5B

5C

5D 6A

6B

6C

6D

7

8

9A

9B

9C

9D

R N A - 0 1 6 - C - 0 - 3 - D A A 0 A - D B 1 K 0 : 0 1 - D Q 0 J - G 0 0 - 0 0 0 0 - C L B G - Q C - C B 0 0 - 0 0 - E 0 - 0 - A N 0 - E B - B K 0 B - 0 0 - 0 0 0 - A A 0 A 0 0 - E 0 0 0 0 0 - 0 0 0 0 0 0 X

10A

10B

11A

11B

12

13A

13B

13C

14

15

16A

16B

16C

16D

17A

17B

18A

18B

18C

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Tag: RTU #1, 2 Job Name: Villa Joseph Marie Unit Submittal For: Job Number: Job #14238 Unit Submittal Date: February 07, 2018

Unit Submittal

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:06:57 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 12: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1 2 3A

3B

3C

3D 4A

4B

4C 5A

5B

5C

5D 6A

6B

6C

6D

7

8

9A

9B

9C

9D

R N A - 0 1 6 - C - 0 - 3 - D A A 0 A - D B 1 K 0 : 0 1 - D Q 0 J - G 0 0 - 0 0 0 0 - C L B G - Q C - C B 0 0 - 0 0 - E 0 - 0 - A N 0 - E B - B K 0 B - 0 0 - 0 0 0 - A A 0 A 0 0 - E 0 0 0 0 0 - 0 0 0 0 0 0 X

10A

10B

11A

11B

12

13A

13B

13C

14

15

16A

16B

16C

16D

17A

17B

18A

18B

18C

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Tag: RTU #1, 2 Job Name: Villa Joseph Marie VCCX For: Job Number: Job #14238 VCCX Date: February 07, 2018

Hardware Included For VCCX Controller

Part # Included Parts Assigned Channel BACnet PointV87900 VCCX CONTROLLERV13050 OSA Temp/Hum Sensor EBUS2 communicating sensor AI:16,AI:17,AI:18,AI:19V09300 Space Digital Temp/Hum Sensor EBUS3 communicating sensor AI:12,AI:13R82890 Supply Temp Sensor - Field Installed VCCX control point AI 3 AI:9V09320 Duct Mount C02 EBUS4 communicating sensor AI:29R37030 Building Pressure Sensor VCCX control point AI 5 AI:23

Supply Fan Control Signal 0-10VDC VCCX control point AO 1 AI:22Economizer VCCX control point AO 2 AI:30Building Pressure Control Signal VCCX control point AO 4 AI:24

R62330 Proof of Air Flow VCCX control point BI 1 BI:6Safety Shut Down VCCX control point BI 8 BI:26Supply Fan Configured Relay point BI:63Exhaust Fan Configured Relay Point BI:64

V61520 DIGITAL REFRIGERATION MODULER57800 Comp Discharge Temp A RSMD point TEMP1 AI:56R57800 Comp Discharge Temp B RSMD point TEMP2 AI:57V38391 Suction Pressure Sensor B RSMD point AI3 AI:54V38391 Suction Pressure Sensor A RSMD point AI1 AI:48V38410 Discharge Pressure Sensor A RSMD point HP-1 AI:50V38410 Discharge Pressure Sensor B RSMD point HP-2 AI:55

Modulated Condenser Signal B RSMD point AO2 AI:44Modulated Condenser Signal A RSMD point AO1 BI:Comp Status Input A RSMD point BIN1Comp Status Input B RSMD point BIN2 BI:79Emergency Shutdown RSMD point BIN4 BI:81,82Condenser Enable AB RSMD Fixed Relay point BI:78,BI:85Comp Enable A RSMD Fixed Relay point AI:46Comp Enable B RSMD Fixed Relay point BI:77,BI:84Condenser Enable B RSMD Fixed Relay point BI:86

V12100 MODULATING HOT GAS REHEAT MODULEReheat HGR Valve MHGRV-X AI:42

V12090 MODULATING GAS MODULEModGas Gas Valve Signal MODGAS-XModGas High Speed Enable MODGAS-X AI:43ModGas Low Speed Enable MODGAS-X

VCCX Components

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:06:57 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 13: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

CLEARANCES

LOCATION

OUTSIDE AIR

20*

(BACK)

SUPPLY AIR

(FRONT)

LEFT SIDE

RIGHT SIDE

TOP UNOBSTRUCTED

6

60

6

*CLEARANCE IS MEASURED FROM

THE END OF THE OUTSIDE AIR

RAIN HOOD

FRONT VIEW

RIGHT SIDE VIEW

BACK VIEW

TOP VIEW

DETAIL A DETAIL B

SPECIAL RN SERIESC- CABINET HORIZONTAL AIR COOLED

ECONOMIZER WITH POWER EXHAUST ANDBOTTOM RETURN

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 14: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

MATERIAL:

TOLERANCES

FRAC.:

DEC.

ANG.

UNLESSOTHERWISESPECIFIED

+/- 1/32 < 48 INCHES+/- 1/16 > 48 INCHES

+/- 0.03 < 48 INCHES+/- 0.06 > 48 INCHES

+/- 1°

_

_

DWG BY:

CKD BY:

APPD BY:

DATE REV

REV BY ECN NUMBER DATE

DRAWING NUMBER

AAON INC.2425 S. YUKON TULSA, OKLAHOMA

SHEET /SQUARE FT. :

11

A

N/A

01/16/18 AN/A DT002868-001

kce-ac

catalog corner weight villa joseph marie 16t rnc

138.162

C OF G

838 LBS. 862 LBS.

919 LBS.946 LBS.

TOTAL WEIGHT = 3565 LBS.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 15: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

RIGHT SIDE VIEW

TOP VIEW

RN SERIESC- CABINET KNOCKDOWN CURB HORIZONTAL

AIR COOLED~ 16 - 30 TON

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 16: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 17: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1 2 3A

3B

3C

3D 4A

4B

4C 5A

5B

5C

5D 6A

6B

6C

6D

7

8

9A

9B

9C

9D

R N A - 0 1 3 - C - 0 - 3 - D A A 0 A - D B 1 K 0 : 0 1 - D Q 0 J - G 0 0 - 0 0 0 0 - C L B G - Q C - C B 0 0 - 0 0 - E 0 - 0 - A N 0 - E B - B K 0 B - 0 0 - 0 0 0 - A A 0 A 0 0 - E 0 0 0 0 0 - 0 0 0 0 0 0 X

10A

10B

11A

11B

12

13A

13B

13C

14

15

16A

16B

16C

16D

17A

17B

18A

18B

18C

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Tag: RTU #3

(Values do not account for changes described in SPA)

Job Information Unit Information **WEIGHT AND PERFORMANCE DO NOT INCLUDE SPA

Job Name: Approx. Op./Ship Weights: Job Number: Supply CFM/ESP: Site Altitude: Pre-Filter FV / Qty: Refrigerant Coil Filter FV / Qty:

Exhaust CFM/ESP/TSP: Outside CFM: Ambient Temperature: Return Temperature:

Villa Joseph Marie 3608 / 3608 lbs. (±5%)Job #14238 4000 / 1 in. wg.0 ft 192.00 fpm / 6R-410A 192.00 fpm / 6

4000 / 0.50 / 0.70 in. wg.110092 ºF DB / 74 ºF WB75 ºF DB / 62 ºF WB

Static Pressure External: Economizer: Evaporator: Heating: Coil Filters Clean: Cabinet: Dirt Allowance Re-Heat Coil: Total:

1.00 in. wg. 0.07 in wg0.24 in wg 0.14 in wg0.15 in wg 0.05 in. wg.0.35 in. wg. 0.04 in wg

2.04 in wg

Cooling Section Heating SectionGross Net

Total Capacity: Sensible Capacity: Latent Capacity: Mixed Air Temp: Entering Air Temp: Lv Air Temp (Coil): Lv Air Temp (Unit) Digital Comp. Capacity Ratio: Supply Air Fan: SA Fan RPM / Width: Exhaust Air Fan: EA Fan RPM / Width:

Evaporator Coil: Evaporator Face Velocity:

152.52 145.61 MBH113.98 107.07 MBH38.54 MBH79.68 ºF DB 65.62 ºF WB79.68 ºF DB 65.62 ºF WB52.77 ºF DB 52.26 ºF WB54.35 ºF DB 52.92 ºF WB100%1 x 270 @ 2.43 BHP977 / 4.352"1 x RM220A @ 0.85 BHP1006 / 4.920"

14.6 ft² / 4 Rows / 14 FPI274.3 fpm

PreHeat Type: Std (No Preheat)

Heating Type: Heating CFM: Total Capacity: OA Temp: RA Temp: Entering Air Temp: Leaving Air Temp: Input: Heater Qty: Consumption: Total Turndown Ratio:

Nat. Gas Heat4000218.7 MBH0.0 ºF DB / -1.0 ºF WB75.0 ºF DB / 62.0 ºF WB54.4 ºF DB / 49.9 ºF WB105.0 ºF DB / 68.5 ºF WB270.0 MBH1270.0 MBH3:1

Re-Heat Coil: Capacity: 74 MBH LA DB / WB: 70.00 ºF / 59.09 ºF RH: 53%

Rating Information

Listing Model: RN-013-3-H-BAAY-V0-21-000-A

Cooling Capacity (MBH): 144.0 Cooling EER: 12 Cooling IEER: 14.3 Rated in accordance with AHRI 340/360

Application EER @ Op. Conditions: 11.0

Electrical Data Rating: Minimum Circuit Amp: Unit FLA: Maximum Overcurrent:

460V/3Ø/60Hz 3532 45

Qty HP VAC Phase RPM FLA RLA Compressor 1: 1 460 3 9.7 Compressor 2: 1 460 3 10.6 Condenser Fans: 2 0.75 460 3 1080 1.8 Supply Fan: 1 5.00 460 3 1170 8.1 Exhaust Fan: 1 2.00 460 3 1760 3.4 Combustion: 1 0.25 460 1 3210 0.9

Cabinet Sound Power Levels*

Octave Bands: 63 125 250 500 1000 2000 4000 8000 Discharge LW(dB): 82 82 84 81 77 79 75 71

Unit Rating

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:07:24 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 18: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Return LW(dB): 80 81 76 66 68 67 61 55 *Sound power levels are given for informational purposes only. The sound levels are not guaranteed.

Unit Rating

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:07:24 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 19: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

JOB INFORMATION: WHEEL SPECIFICATION: Job Name: Max RPM: Job Tag: Diameter x Qty: Rep Firm: Width%: Date: Tip Speed:

Inertia:

Villa Joseph Marie 1,800RTU #3 27.4 in. x 1

7102/07/2018 7,008 FPM

16 WR²

OPERATING CONDITIONS: MOTOR SELECTION: Air Flow: Rated HP / Bypass: Static Pressure: Frame Size: Plenum DP: Nominal RPM: Inlet Grill DP: VAC/PH/HZ: TSP: Efficiency Site Altitude: Enclosure Type: TSP @ Sea Level: Max Inertial Load:

4,000 CFM 5 / No2.04 in. Wg. 215T0.00 in. Wg. 11700.00 in. Wg. 460V/3Ø/60Hz2.04 in. Wg. Premium / 0.8950.00 Ft ODP2.04 in. Wg. 117 WR²

FAN PERFORMANCE: FAN SOUND POWER (Inlet/Outlet): RPM: Octave Band: (Re 10^-12 watts) BHP: 1 2 3 4 5 6 7 8 Efficiency: In/Out Velocity: Plenum Out Velocity: SOUND POWER A-Weighted: 82 / 87 dB

Max Duct SP with Blocked Airway: 2.2 in. Wg. @ 977 rpm

9772.4353.0% 79 76 75 74 74 74 73 721044/1093 FPM 81 81 83 82 80 82 79 7567 FPM

RPMBHPSYSTEMEfficiencySP SurgeCFM Min

Supply Fan Model: 270 @ 977 RPM and 71% WidthDesign Conditions: 4000 CFM @ 2.04" SP

CFM x 1000654321

SP

2

1

0

BH

P

5

4

3

2

1

0

40%

20%

0%

RPM: 977

BHP: 2.43

EFFICIENCY: 52.96

27.0" STAR Plenum

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:07:24 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 20: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

JOB INFORMATION: WHEEL SPECIFICATION: Job Name: Max RPM: Job Tag: Diameter x Qty: Rep Firm: CFM: Date: Tip Speed:

Inertia:

Villa Joseph Marie 2,200RTU #3 22.0 in. x 1

400002/07/2018 5,794 FPM

5 WR²

OPERATING CONDITIONS: MOTOR SELECTION: Air Flow: Rated HP / Bypass: Static Pressure: Frame Size: Relief Dampers DP: Nominal RPM:

VAC/PH/HZ: TSP: Efficiency Site Altitude: Enclosure Type: TSP @ Sea Level: Max Inertial Load:

4,000 CFM 2 / No0.50 in. Wg. 145T0.20 in. Wg. 1760

460V/3Ø/60Hz0.70 in. Wg. Premium / 0.8650.00 Ft ODP0.70 in. Wg. 27 WR²

FAN PERFORMANCE: FAN SOUND POWER (Inlet/Outlet): RPM: Octave Band: (Re 10^-12 watts) BHP: 1 2 3 4 5 6 7 8 Efficiency: In/Out Velocity: Plenum Out Velocity: SOUND POWER A-Weighted: 80 / 80 dB

10060.8552.0% 80 82 80 74 70 68 62 551223/1347 FPM 80 82 80 74 70 68 62 5567 FPM

RPMBHPSYSTEMEfficiencySP SurgeCFM Min

Exhaust Fan Model: RM220A @ 1006 RPM and 100% WidthDesign Conditions: 4000 CFM @ 0.70" SP

CFM x 10004321

SP

1

0

BH

P

2

1

0

60%

40%

20%

0%

RPM: 1006

BHP: 0.85

EFFICIENCY: 52.02

22.0" STAR Plenum

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:07:24 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 21: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1 2 3A

3B

3C

3D 4A

4B

4C 5A

5B

5C

5D 6A

6B

6C

6D

7

8

9A

9B

9C

9D

R N A - 0 1 3 - C - 0 - 3 - D A A 0 A - D B 1 K 0 : 0 1 - D Q 0 J - G 0 0 - 0 0 0 0 - C L B G - Q C - C B 0 0 - 0 0 - E 0 - 0 - A N 0 - E B - B K 0 B - 0 0 - 0 0 0 - A A 0 A 0 0 - E 0 0 0 0 0 - 0 0 0 0 0 0 X

10A

10B

11A

11B

12

13A

13B

13C

14

15

16A

16B

16C

16D

17A

17B

18A

18B

18C

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Tag: RTU #3 Job Name: Villa Joseph Marie Unit Submittal For: Job Number: Job #14238 Unit Submittal Date: February 07, 2018

Base Option Description

RN Generation RN Series

A Major Revision Major Revision A

013 Unit Size Thirteen

C Series C Series

0 Minor Revision Minor Revision 0

3 Voltage 460V/3Ø/60Hz

D Compressor Style R-410A Variable Capacity Scroll Compressor

A Condenser Style Microchannel Air-Cooled Condenser

A Indoor Coil Configuration Standard Evaporator

0 Cooling Heat Exchanger Construction Standard

A Cooling Staging 1 Variable Capacity Comp + 1 On/Off Comp

D Heat Type Natural Gas

B Heat Construction Stainless Steel Heat Exchanger

1 Heat Designation 270 MBH

K Heat Staging Modulating Gas Heat - Temperature Control

0 Heat Pump Auxiliary Heating No Heat Pump

Feature Option Description

0 1. Unit Orientation Standard Access - Hinged Access Doors with Lockable Handles

1 2. Supply & Return Locations Horizontal Configuration - End Supply--End Return

D 3A. Supply Fan Configuration 1 Fan + Factory Installed VFD

Q 3B. Supply Fan Size 27" Direct Drive Backward Curved Plenum - 100% Width Aluminum

0 3C. Supply Fan Motor Type High Efficiency Motor (1,200 nominal rpm)

J 3D. Supply Fan Motor Size 5 hp

G 4A. Outside Air Section Economizer + Power Exhaust

0 4B. Energy Recovery Type No Energy Recovery

0 4C. Energy Recovery Size No Energy Recovery

0 5A. Return Fan Configuration Standard

0 5B. Return Fan Size Standard

0 5C. Return Fan Motor Type Standard

0 5D. Return Fan Motor Size Standard

C 6A. Exhaust Fan Configuration 1 Fan + Factory Installed VFD

L 6B. Exhaust Fan Size 22" Backward Curved Plenum Fan - 100% Width Aluminum

B 6C. Exhaust Fan Motor Type High Efficiency Motor (1,800 nominal rpm)

G 6D. Exhaust Fan Motor Size 2 hp

Q 7. Outside Air Control CO2 Override + Fully Mod. Act. - Enthalpy Limit

C 8.Return and Exhaust Air Options Standard Barometric Relief EA Dampers

C 9A. Unit Filter Type 2" Pleated MERV 8 + 4" Pleated MERV 13

B 9B. Unit Filter Size & Location High Efficiency Filters in Standard Position

0 9C. Final Filter Type No Final Filters

0 9D. Filter Options None

Unit Submittal

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:07:24 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 22: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Feature Option Description

0 10A. Refrigeration Control A None

0 10B. Blank Standard

E 11A. Refrigeration Options A Modulating Hot Gas Reheat

0 11B. Blank Standard

0 12. Refrigeration Accessories None

A 13A. Unit Disconnect Type Single Point Power - Non-fused Disconnect Power Switch

N 13B. Disconnect 1 Size 100 Amps

0 13C. Blank Standard

E 14. Safety Options Remote Safety Shutdown Terminals

B 15. Electrical Accessories Phase & Brown Out Protection

B 16A. Control Sequence Single Zone VAV Unit Controller - VAV Cool + CAV Heat

K 16B. Control Supplier WattMaster VCC-X

0 16C. Control Supplier Options None

B 16D. BMS Connection & Diagnostics BACnet MSTP

0 17A. Preheat Configuration Standard - None

0 17B. Preheat Sizing Standard - None

0 18A. Option Box Location None

0 18B. Option Box Size None

0 18C. Option Box Accessories None

A 19. Outside Air Accessories Outside Air Hood

A 20. Cabinet Options Base Insulation

0 21. Blank Standard

A 22. Maintenance Accessories Factory Wired 115V Convenience Outlet

0 23. Code Options Standard - ETL U.S.A. Listing

0 24. Shipping Splits Standard

E 25.Air-Cooled Condenser Accessories VFD Condenser Fan Head Pressure Control

0 26. Blank Standard

0 27.Water-Cooled Condenser Accessories None

0 28. Energy Recovery Accessories None

0 29. VFD Options Standard

0 30. Miscellaneous Options Standard

0 31. Blank Standard

0 32. Blank Standard

0 33. Blank Standard

0 34. Blank Standard

0 35. Warranty Standard Warranty

0 36. Cabinet Material Galvanized Cabinet - Double Wall + R-13 Foam Insulation

X 37. Specials & Paint SPA + Premium AAON Gray Paint Exterior Paint

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1 2 3A

3B

3C

3D 4A

4B

4C 5A

5B

5C

5D 6A

6B

6C

6D

7

8

9A

9B

9C

9D

R N A - 0 1 3 - C - 0 - 3 - D A A 0 A - D B 1 K 0 : 0 1 - D Q 0 J - G 0 0 - 0 0 0 0 - C L B G - Q C - C B 0 0 - 0 0 - E 0 - 0 - A N 0 - E B - B K 0 B - 0 0 - 0 0 0 - A A 0 A 0 0 - E 0 0 0 0 0 - 0 0 0 0 0 0 X

10A

10B

11A

11B

12

13A

13B

13C

14

15

16A

16B

16C

16D

17A

17B

18A

18B

18C

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Tag: RTU #3 Job Name: Villa Joseph Marie Unit Submittal For: Job Number: Job #14238 Unit Submittal Date: February 07, 2018

Unit Submittal

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:07:25 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 23: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1 2 3A

3B

3C

3D 4A

4B

4C 5A

5B

5C

5D 6A

6B

6C

6D

7

8

9A

9B

9C

9D

R N A - 0 1 3 - C - 0 - 3 - D A A 0 A - D B 1 K 0 : 0 1 - D Q 0 J - G 0 0 - 0 0 0 0 - C L B G - Q C - C B 0 0 - 0 0 - E 0 - 0 - A N 0 - E B - B K 0 B - 0 0 - 0 0 0 - A A 0 A 0 0 - E 0 0 0 0 0 - 0 0 0 0 0 0 X

10A

10B

11A

11B

12

13A

13B

13C

14

15

16A

16B

16C

16D

17A

17B

18A

18B

18C

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Tag: RTU #3 Job Name: Villa Joseph Marie VCCX For: Job Number: Job #14238 VCCX Date: February 07, 2018

Hardware Included For VCCX Controller

Part # Included Parts Assigned Channel BACnet PointV87900 VCCX CONTROLLERV13050 OSA Temp/Hum Sensor EBUS2 communicating sensor AI:16,AI:17,AI:18,AI:19V09300 Space Digital Temp/Hum Sensor EBUS3 communicating sensor AI:12,AI:13R82890 Supply Temp Sensor - Field Installed VCCX control point AI 3 AI:9V09320 Duct Mount C02 EBUS4 communicating sensor AI:29R37030 Building Pressure Sensor VCCX control point AI 5 AI:23

Supply Fan Control Signal 0-10VDC VCCX control point AO 1 AI:22Economizer VCCX control point AO 2 AI:30Building Pressure Control Signal VCCX control point AO 4 AI:24

R62330 Proof of Air Flow VCCX control point BI 1 BI:6Safety Shut Down VCCX control point BI 8 BI:26Supply Fan Configured Relay point BI:63Exhaust Fan Configured Relay Point BI:64

V61520 DIGITAL REFRIGERATION MODULER57800 Comp Discharge Temp A RSMD point TEMP1 AI:56R57800 Comp Discharge Temp B RSMD point TEMP2 AI:57V38391 Suction Pressure Sensor B RSMD point AI3 AI:54V38391 Suction Pressure Sensor A RSMD point AI1 AI:48V38410 Discharge Pressure Sensor A RSMD point HP-1 AI:50V38410 Discharge Pressure Sensor B RSMD point HP-2 AI:55

Modulated Condenser Signal B RSMD point AO2 AI:44Modulated Condenser Signal A RSMD point AO1 BI:Comp Status Input A RSMD point BIN1Comp Status Input B RSMD point BIN2 BI:79Emergency Shutdown RSMD point BIN4 BI:81,82Condenser Enable AB RSMD Fixed Relay point BI:78,BI:85Comp Enable A RSMD Fixed Relay point AI:46Comp Enable B RSMD Fixed Relay point BI:77,BI:84Condenser Enable B RSMD Fixed Relay point BI:86

V12100 MODULATING HOT GAS REHEAT MODULEReheat HGR Valve MHGRV-X AI:42

V12090 MODULATING GAS MODULEModGas Gas Valve Signal MODGAS-XModGas High Speed Enable MODGAS-X AI:43ModGas Low Speed Enable MODGAS-X

VCCX Components

Date Created/Modified: 2/7/2018 11:06:46 AM Using Ver 5.0.266.1 (OSN# 0123456) Date Printed: 2/7/2018 11:07:25 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 24: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

CLEARANCES

LOCATION

OUTSIDE AIR

20*

(BACK)

SUPPLY AIR

(FRONT)

LEFT SIDE

RIGHT SIDE

TOP UNOBSTRUCTED

6

60

6

*CLEARANCE IS MEASURED FROM

THE END OF THE OUTSIDE AIR

RAIN HOOD

FRONT VIEW

RIGHT SIDE VIEW

BACK VIEW

TOP VIEW

DETAIL A DETAIL B

SPECIAL RN SERIESC- CABINET HORIZONTAL AIR COOLED

ECONOMIZER WITH POWER EXHAUST ANDBOTTOM RETURN

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 25: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

MATERIAL:

TOLERANCES

FRAC.:

DEC.

ANG.

UNLESSOTHERWISESPECIFIED

+/- 1/32 < 48 INCHES+/- 1/16 > 48 INCHES

+/- 0.03 < 48 INCHES+/- 0.06 > 48 INCHES

+/- 1°

_

_

DWG BY:

CKD BY:

APPD BY:

DATE REV

REV BY ECN NUMBER DATE

DRAWING NUMBER

AAON INC.2425 S. YUKON TULSA, OKLAHOMA

SHEET /SQUARE FT. :

11

A

N/A

01/16/18 AN/A DT002869-001

kce-ac

catalog corner weight villa joseph marie 13t rnc

138.162

TOTAL WEIGHT = 3565 LBS.

C OF G

919 LBS.946 LBS.

838 LBS.862 LBS.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 26: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

RIGHT SIDE VIEW

TOP VIEW

RN SERIESC- CABINET KNOCKDOWN CURB HORIZONTAL

AIR COOLED~ 16 - 30 TON

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 27: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 28: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RN-011-3-0-EB09-3F9:A000-Q0B-DCE-AG0-0DEAHB2-00-0JB0000VB Tag: RTU# 4

Job Information Unit Information

Job Name: Approx. Op./Ship Weights: Job Number: Supply CFM/ESP: Site Altitude: Pre-Filter FV / Qty: Refrigerant Final Filter FV / Qty:

Outside CFM: Ambient Temperature: Return Temperature:

Villa Joseph Marie 1853 / 1853 lbs. (±5%)Job #14238 3600 / 1.5 in. wg.0 ft 259.20 fpm / 4R-410A 259.20 fpm / 4

100092 ºF DB / 74 ºF WB75 ºF DB / 62 ºF WB

Static Pressure External: Economizer: Evaporator: Heating: Filters Clean: Cabinet: Dirt Allowance Re-Heat Coil: Total:

1.50 in. wg. 0.14 in. wg.0.23 in. wg. 0.03 in. wg.0.23 in. wg. 0.09 in. wg.0.35 in. wg. 0.03 in. wg.

2.60 in. wg.

Cooling Section Heating SectionGross Net

Total Capacity: Sensible Capacity: Latent Capacity: Mixed Air Temp: Entering Air Temp: Lv Air Temp (Coil): Lv Air Temp (Unit) Digital Comp. Capacity Ratio: Supply Air Fan: SA Fan RPM / Width:

Evaporator Coil: Evaporator Face Velocity:

130.86 124.13 MBH101.28 94.55 MBH29.58 MBH79.72 ºF DB 65.66 ºF WB79.72 ºF DB 65.66 ºF WB53.16 ºF DB 53.00 ºF WB54.87 ºF DB 53.71 ºF WB100%1 x RN185 @ 2.37 BHP1736 / 4.099"

14.6 ft² / 6 Rows / 12 FPI246.9 fpm

PreHeat Type: Std (No Preheat)

Heating Type: Heating CFM: Total Capacity: OA Temp: RA Temp: Entering Air Temp: Leaving Air Temp: Input: Heater Qty: Consumption: Total Turndown Ratio:

Nat. Gas Heat3600156.0 MBH0.0 ºF DB / -1.0 ºF WB75.0 ºF DB / 62.0 ºF WB54.2 ºF DB / 49.8 ºF WB94.3 ºF DB / 65.1 ºF WB195.0 MBH1195.0 MBH3:1

Re-Heat Coil: Capacity: 65 MBH LA DB / WB: 70.00 ºF / 59.60 ºF RH: 55%

Rating Information

Cooling Capacity (MBH): 128.0 Cooling EER: 12.7 Cooling IEER: 15.4 Rated in accordance with AHRI 340/360

Application EER @ Op. Conditions: 11.0

Electrical Data Rating: Minimum Circuit Amp: Unit FLA: Maximum Overcurrent:

460/3/60 2826 35

Qty HP VAC Phase RPM FLA RLA Compressor 1: 1 460 3 8.1 Compressor 2: 1 460 3 7.8 Condenser Fans: 2 0.333 460 1 1110 2.8 Supply Fan: 1 3.00 460 3 1760 4.8 Combustion: 1 0.09 460 1 3010 0.7

Cabinet Sound Power Levels*

Octave Bands: 63 125 250 500 1000 2000 4000 8000 Discharge LW(dB): 87 84 89 84 76 73 71 65 Return LW(dB): 78 73 76 68 63 58 48 36 *Sound power levels are given for informational purposes only. The sound levels are not guaranteed.

Unit Rating

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:30:02 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 29: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

JOB INFORMATION: WHEEL SPECIFICATION: Job Name: Max RPM: Job Tag: Diameter x Qty: Rep Firm: CFM: Date: Tip Speed:

Inertia:

Villa Joseph Marie 2,200RTU# 4 18.5 in. x 1

360002/07/2018 8,408 FPM

3 WR²

OPERATING CONDITIONS: MOTOR SELECTION: Air Flow: Rated HP / Bypass: Static Pressure: Frame Size: Relief Dampers DP: Nominal RPM:

VAC/PH/HZ: TSP: Efficiency Site Altitude: Enclosure Type: TSP @ Sea Level: Max Inertial Load:

3,600 CFM 3 / No2.60 in. Wg. 182T0.00 in. Wg. 1760

460/3/602.60 in. Wg. Premium / 0.8950.00 Ft ODP2.60 in. Wg. 29 WR²

FAN PERFORMANCE: FAN SOUND POWER (Inlet/Outlet): RPM: Octave Band: (Re 10^-12 watts) BHP: 1 2 3 4 5 6 7 8 Efficiency: In/Out Velocity: Plenum Out Velocity: SOUND POWER A-Weighted: 88 / 88 dB

Max Duct SP with Blocked Airway: 3.2 in. Wg. @ 1736 rpm

17362.3762.3% 87 84 89 86 79 77 75 692057/2156 FPM 87 84 89 86 79 77 75 6960 FPM

RPMBHPSYSTEMEfficiencySP SurgeCFM Min

Supply Fan Model: RN185 @ 1736 RPM and 99% WidthDesign Conditions: 3600 CFM @ 2.60" SP

CFM x 100054321

SP

3

2

1

0

BH

P

5

4

3

2

1

0

60%

40%

20%

RPM: 1736

BHP: 2.37

EFFICIENCY: 62.30

18.5" STAR Plenum

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:30:02 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 30: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RN-011-3-0-EB09-3F9:A000-Q0B-DCE-AG0-0DEAHB2-00-0JB0000VB Tag: RTU# 4

Job Name: Villa Joseph Marie Unit Submittal For: Job Number: Job #14238 Unit Submittal Date: February 07, 2018

Base Option Description

R Series Roof Top Unit

N Generation Ninth Generation

011 Unit Size Eleven

3 Voltage 460V/3Ø/60Hz

0 Interior Protection Standard

E Refrigerant Style R-410A VCC - High Efficiency

B Unit Configuration Air-Cooled Cond. + 6 Row Evap. Coil

0 Coil Coating Standard

9 Cooling/Heat Pump Staging Modulating - 1 VCC + 1 On/Off Comp.

3 Heating Type Natural Gas Stainless Steel

F Heating Designation Heat F - 195 MBtuh

9 Heating Staging Modulating Gas - Temperature Control

Feature Option Description

A 1A. RA/OA Section Economizer

0 1B. RA/EA Blower Configuration Standard - None

0 1C. RA/EA Blower Standard - None

0 1D. RA/EA Blower Motor Standard - None

Q 2. OA Control CO2 Override + Fully Modulating Actuator - Enthalpy Limit

0 3. Heat Options Standard

B 4. Maintenance Options 115V Convenience Outlet - Factory Wired

D 5A. SA Blower Configuration 1 Blower + Premium Efficiency Motor + 1 VFD

C 5B. SA Blower 18.5'' Direct Drive Backward Curved Plenum

E 5C. SA Motor 3.0 hp - 1760 rpm

A 6A. Pre Filter Type 2" Pleated Pre Filter - 30% Eff

G 6B. Unit Filter Type 4" Pleated - 85% Eff - MERV 13

0 6C. Filter Options Standard

0 7. Refrigeration Control Standard - Adj Comp. Cooling Lock Out Through Unit Controls

D 8. Refrigeration Options Modulating Hot Gas Reheat

E 9. Refrigeration Accessories ECM Condenser Fan - Head Pressure Control

A 10. Power Options Non-fused Disconnect Power Switch - 100 Amps

H 11. Safety Options Remote Safety Shutdown Terminals

B 12. Controls Phase & Brown Out Protection

2 13. Special Controls VAV Single Zone Unit Controller - VAV Cool + CAV Heat

0 14A. Preheat Configuration Standard - None

0 14B. Preheat Sizing Standard - None

0 15. Glycol Percent Water or No WSHP

J 16. Interior Cabinet Options Compressor Sound Blankets

B 17. Exterior Cabinet Options Burglar Bars

0 18. Customer Code Standard

0 19. Code Options Standard - ETL U.S.A. Listing

0 20. Crating Standard

0 21. Water-Cooled Cond. Standard - None

V 22. Control Vendors WattMaster VCC-X Controls + Integrated BACnet MSTP

B 23. Type Standard - Includes AAON Gray Paint

Unit Submittal

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:30:02 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 31: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RN-011-3-0-EB09-3F9:A000-Q0B-DCE-AG0-0DEAHB2-00-0JB0000VB Tag: RTU# 4 Job Name: Villa Joseph Marie VCCX For: Job Number: Job #14238 VCCX Date: February 07, 2018

Hardware Included For VCCX Controller

Part # Included Parts Assigned Channel BACnet PointV87900 VCCX CONTROLLERV13050 OSA Temp/Hum Sensor EBUS2 communicating sensor AI:16,AI:17,AI:18,AI:19V09300 Space Digital Temp/Hum Sensor EBUS3 communicating sensor AI:12,AI:13R82890 Supply Temp Sensor - Field Installed VCCX control point AI 3 AI:9V09320 Duct Mount C02 EBUS4 communicating sensor AI:29

Supply Fan Control Signal 0-10VDC VCCX control point AO 1 AI:22Economizer VCCX control point AO 2 AI:30

R62330 Proof of Air Flow VCCX control point BI 1 BI:6Safety Shut Down VCCX control point BI 8 BI:26Supply Fan Configured Relay point BI:63

V61520 DIGITAL REFRIGERATION MODULER57800 Comp Discharge Temp A RSMD point TEMP1 AI:56V38391 Suction Pressure Sensor A RSMD point AI1 AI:48V38410 Discharge Pressure Sensor A RSMD point HP-1 AI:50V38410 Discharge Pressure Sensor B RSMD point HP-2 AI:55R63950 Modulated Condenser Signal B RSMD point AO2 AI:44R63950 Modulated Condenser Signal A RSMD point AO1 BI:

Comp Status Input A RSMD point BIN1Comp Status Input B RSMD point BIN2 BI:79Emergency Shutdown RSMD point BIN4 BI:81,82Condenser Enable AB RSMD Fixed Relay point BI:78,BI:85Comp Enable A RSMD Fixed Relay point AI:46Comp Enable B RSMD Fixed Relay point BI:77,BI:84Condenser Enable B RSMD Fixed Relay point BI:86

V12100 MODULATING HOT GAS REHEAT MODULEReheat HGR Valve MHGRV-X AI:42

V12090 MODULATING GAS MODULEModGas Gas Valve Signal MODGAS-XModGas High Speed Enable MODGAS-X AI:43ModGas Low Speed Enable MODGAS-X

VCCX Components

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:30:02 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 32: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:30:02 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 33: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:30:02 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 34: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 35: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 36: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RQ-003-3-V-EA09-319:A000-D0B-QKC-AG0-0DEA002-00-0JA0000VB Tag: RTU# 5

Job Information Unit Information

Job Name: Approx. Op./Ship Weights: Job Number: Supply CFM/ESP: Site Altitude: Pre-Filter FV / Qty: Refrigerant Final Filter FV / Qty:

Outside CFM: Ambient Temperature: Return Temperature:

Villa Joseph Marie 866 / 866 lbs. (±5%)Job #14238 1000 / 1.05 in. wg.0 ft 180.00 fpm / 2R-410A 180.00 fpm / 2

25095 ºF DB / 75 ºF WB75 ºF DB / 62 ºF WB

Static Pressure External: Economizer: Evaporator: Heating: Filters Clean: Cabinet: Dirt Allowance Total:

1.05 in. wg. 0.08 in. wg.0.09 in. wg. 0.12 in. wg.0.14 in. wg. 0.02 in. wg.0.35 in. wg. 1.87 in. wg.

Cooling Section Heating SectionGross Net

Total Capacity: Sensible Capacity: Latent Capacity: Mixed Air Temp: Entering Air Temp: Lv Air Temp (Coil): Lv Air Temp (Unit) Digital Comp. Capacity Ratio: Supply Air Fan: SA Fan RPM / Width:

Evaporator Coil: Evaporator Face Velocity:

39.14 37.23 MBH29.05 27.14 MBH10.09 MBH80.00 ºF DB 65.61 ºF WB80.00 ºF DB 65.61 ºF WB52.55 ºF DB 51.88 ºF WB54.30 ºF DB 52.62 ºF WB100%1 x RQ185D60-VFD @ 0.59 BHP1506 / 1.750"

5.3 ft² / 3 Rows / 14 FPI190.5 fpm

PreHeat Type: Std (No Preheat)

Heating Type: Heating CFM: Total Capacity: OA Temp: RA Temp: Entering Air Temp: Leaving Air Temp: Input: Heater Qty (Hi/Low): Consumption: Operation: Total Turndown Ratio:

Nat. Gas Heat100048.6 MBH0.0 DB / -1.0ºF WB75.0 ºF DB / 62.0 ºF WB56.3 ºF DB / 51.1 ºF WB101.2 ºF DB / 67.6 ºF WB60.0 MBH160.0 MBHN/A3.3:1

Re-Heat Coil: Capacity: 19 MBH LA DB / WB: 70.00 ºF / 58.84 ºF RH: 52%

Rating Information

Cooling Capacity (MBH): 40.5 Cooling SEER: 15.7 Cooling EER: 13.55 Rated in accordance with AHRI 210/240

Application EER @ Op. Conditions: 10.9

Electrical Data Rating: Minimum Circuit Amp: Unit FLA: Maximum Overcurrent:

460/3/60 1110 15

Qty HP VAC Phase RPM FLA RLA Compressor 1: 1 460 3 6.2 Condenser Fans: 1 0.333 230 1 1110 2.8 Supply Fan: 1 1.00 460 3 1760 2.1 Combustion: 1 0.09 460 1 3000 0.7

Cabinet Sound Power Levels*

Octave Bands: 63 125 250 500 1000 2000 4000 8000 Discharge LW(dB): 80 79 81 75 69 67 63 58 Return LW(dB): 77 76 72 64 62 58 49 42 *Sound power levels are given for informational purposes only. The sound levels are not guaranteed.

Unit Rating

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.261 (OSN# 0123456) Date Printed: 2/7/2018 10:30:31 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 37: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

JOB INFORMATION: WHEEL SPECIFICATION: Job Name: Max RPM: Job Tag: Diameter x Qty: Rep Firm: CFM: Date: Tip Speed:

Inertia:

Villa Joseph Marie 2,200RTU# 5 18.5 in. x 1

100002/07/2018 7,294 FPM02/07/2018 7,294 FPM

OPERATING CONDITIONS: MOTOR SELECTION: Air Flow: Rated HP / Bypass: Static Pressure: Frame Size: Relief Dampers DP: Nominal RPM:

VAC/PH/HZ: TSP: Efficiency Site Altitude: Enclosure Type: TSP @ Sea Level: Max Inertial Load:

1,000 CFM 1 / No1.87 in. Wg. 480.00 in. Wg. 1760

460/3/601.87 in. Wg. Standard / 0.7850.00 Ft ODP1.87 in. Wg. 15 WR²

FAN PERFORMANCE: FAN SOUND POWER (Inlet/Outlet): RPM: Octave Band: (Re 10^-12 watts) BHP: 1 2 3 4 5 6 7 8 Efficiency: In/Out Velocity: Plenum Out Velocity: SOUND POWER A-Weighted: 82 / 82 dB

Max Duct SP with Blocked Airway: 2.5 in. Wg. @ 1506 rpm

15060.5950.0% 80 79 81 77 72 70 67 62/ FPM 80 79 81 77 72 70 67 6217 FPM

RPMBHPSYSTEMEfficiencySP SurgeCFM Min

Supply Fan Model: RQ185D60-VFD @ 1506 RPM and 100% WidthDesign Conditions: 1000 CFM @ 1.87" SP

CFM x 100010

SP

2

1

0

BH

P

2

1

0

40%

20%

0%

RPM: 1506

BHP: 0.59

EFFICIENCY: 49.98

18.5" STAR Plenum

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.261 (OSN# 0123456) Date Printed: 2/7/2018 10:30:31 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 38: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RQ-003-3-V-EA09-319:A000-D0B-QKC-AG0-0DEA002-00-0JA0000VB Tag: RTU# 5

Job Name: Villa Joseph Marie Unit Submittal For: Job Number: Job #14238 Unit Submittal Date: February 07, 2018

Base Option Description

R Series Roof Top Unit

Q Generation Tenth Generation

003 Unit Size Three

3 Voltage 460V/3Ø/60Hz

V Interior Protection Vertical Discharge and Return

E Refrigerant Style R-410A Variable Capacity Scroll Compressor (VCC) - High Efficiency

A Unit Configuration Air-Cooled Cond. + Std Evap. Coil

0 Coil Coating Standard

9 Cooling/Heat Pump Staging Modulating - 1 Variable Capacity Compressor

3 Heating Type Natural Gas Stainless Steel

1 Heating Designation Heat 1 - 60 MBtuh

9 Heating Staging Modulating Gas - Temperature Control

Feature Option Description

A 1A. RA/OA Section Economizer

0 1B. RA/EA Blower Configuration Standard - None

0 1C. RA/EA Blower Standard - None

0 1D. RA/EA Blower Motor Standard - None

D 2. OA Control Fully Modulating Actuator - Enthalpy Limit

0 3. Heat Options Standard

B 4. Maintenance Options 115V Convenience Outlet - Factory Wired

Q 5A. SA Blower Configuration 1 Blower + Inverter Rated 3 Phase Motor + VFD

K 5B. SA Blower 19" Direct Drive Backward Curved Plenum - 60% Width

C 5C. SA Motor 1 HP 1750 rpm

A 6A. Pre Filter Type 2" Pleated Pre Filter - 30% Eff

G 6B. Unit Filter Type 4" Pleated - 85% Eff - MERV 13

0 6C. Filter Options Standard

0 7. Refrigeration Control Standard - Adj Comp. Cooling Lock Out Through Unit Controls

D 8. Refrigeration Options Modulating Hot Gas Reheat

E 9. Refrigeration Accessories ECM Condenser Fan - Head Pressure Control

A 10. Power Options Non-fused Disconnect Power Switch - 100 Amps

0 11. Safety Options Standard

0 12. Controls Standard

2 13. Special Controls VAV Single Zone Unit Controller - VAV Cool + CAV Heat

0 14A. Preheat Configuration Standard - None

0 14B. Preheat Sizing Standard - None

0 15. Glycol Percent Water or No WSHP

J 16. Interior Cabinet Options Compressor Sound Blankets

A 17. Exterior Cabinet Options Base Insulation

0 18. Customer Code Standard

0 19. Code Options Standard - ETL U.S.A. Listing

0 20. Crating Standard

0 21. Water-Cooled Cond. Standard - None

V 22. Control Vendors VCCX w/ BACnet MSTP

B 23. Type Standard - Includes AAON Gray Paint

Unit Submittal

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.261 (OSN# 0123456) Date Printed: 2/7/2018 10:30:31 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 39: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RQ-003-3-V-EA09-319:A000-D0B-QKC-AG0-0DEA002-00-0JA0000VB Tag: RTU# 5 Job Name: Villa Joseph Marie VCCX For: Job Number: Job #14238 VCCX Date: February 07, 2018

Hardware Included For VCCX Controller

Part # Included Parts Assigned Channel BACnet PointV87900 VCCX CONTROLLERV13050 OSA Temp/Hum Sensor EBUS2 communicating sensor AI:16,AI:17,AI:18,AI:19V09300 Space Digital Temp/Hum Sensor EBUS3 communicating sensor AI:12,AI:13R82890 Supply Temp Sensor - Field Installed VCCX control point AI 3 AI:9

Supply Fan Control Signal 0-10VDC VCCX control point AO 1 AI:22Economizer VCCX control point AO 2 AI:30

R62330 Proof of Air Flow VCCX control point BI 1 BI:6Safety Shut Down VCCX control point BI 8 BI:26Supply Fan Configured Relay point BI:63

V61520 DIGITAL REFRIGERATION MODULER57800 Comp Discharge Temp A RSMD point TEMP1 AI:56V38391 Suction Pressure Sensor A RSMD point AI1 AI:48V38410 Discharge Pressure Sensor A RSMD point HP-1 AI:50R63950 Modulated Condenser Signal A RSMD point AO1 BI:

Comp Status Input A RSMD point BIN1Emergency Shutdown RSMD point BIN4 BI:81,82Condenser Enable AB RSMD Fixed Relay point BI:78,BI:85Comp Enable A RSMD Fixed Relay point AI:46

V12100 MODULATING HOT GAS REHEAT MODULEReheat HGR Valve MHGRV-X AI:42

VCCX Components

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.261 (OSN# 0123456) Date Printed: 2/7/2018 10:30:31 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 40: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.261 (OSN# 0123456) Date Printed: 2/7/2018 10:30:31 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 41: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.261 (OSN# 0123456) Date Printed: 2/7/2018 10:30:31 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 42: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 43: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 44: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RN-009-3-0-EB09-EHJ:A000-D0B-DCE-AG0-0D0AHBD-00-0JA0000VB Tag: RTU# 6

Job Information Unit Information

Job Name: Approx. Op./Ship Weights: Job Number: Supply CFM/ESP: Site Altitude: Pre-Filter FV / Qty: Refrigerant Final Filter FV / Qty:

Outside CFM: Ambient Temperature: Return Temperature:

Villa Joseph Marie 1773 / 1773 lbs. (±5%)Job #14238 3200 / 1.5 in. wg.0 ft 230.40 fpm / 4R-410A 230.40 fpm / 4

32092 ºF DB / 74 ºF WB75 ºF DB / 62 ºF WB

Static Pressure External: Economizer: Evaporator: Heating: Filters Clean: Cabinet: Dirt Allowance Re-Heat Coil: Total:

1.50 in. wg. 0.12 in. wg.0.18 in. wg. 0.09 in. wg.0.20 in. wg. 0.07 in. wg.0.35 in. wg. 0.02 in. wg.

2.53 in. wg.

Cooling Section Heating SectionGross Net

Total Capacity: Sensible Capacity: Latent Capacity: Mixed Air Temp: Entering Air Temp: Lv Air Temp (Coil): Lv Air Temp (Unit) Digital Comp. Capacity Ratio: Supply Air Fan: SA Fan RPM / Width:

Evaporator Coil: Evaporator Face Velocity:

103.17 97.39 MBH84.43 78.64 MBH18.74 MBH76.70 ºF DB 63.35 ºF WB76.70 ºF DB 63.35 ºF WB51.94 ºF DB 51.78 ºF WB53.59 ºF DB 52.48 ºF WB100%1 x RN185 @ 2.03 BHP1653 / 4.099"

14.6 ft² / 6 Rows / 12 FPI219.4 fpm

PreHeat Type: Std (No Preheat)

Heating Type: Heating CFM: Total Capacity: OA Temp: RA Temp: Entering Air Temp: Leaving Air Temp: Entering Water: Leaving Water: GPM / Head: Water Velocity: FA / RD / FPI / FV:

Hot Water Heat320073.8 MBH0.0 ºF DB / -1.0 ºF WB70.0 ºF DB / 58.0 ºF WB63.0 ºF DB / 54.0 ºF WB84.1 ºF DB / 61.8 ºF WB180.0 ºF154.7 ºF6 / 0.6 ft1.04 fps5.83 ft² / 1 / 8 / 548.6

Re-Heat Coil: Capacity: 62 MBH LA DB / WB: 69.84 ºF / 58.93 ºF RH: 52%

Rating Information

Cooling Capacity (MBH): 106.0 Cooling EER: 13.8 Cooling IEER: 16.8 Rated in accordance with AHRI 340/360

Application EER @ Op. Conditions: 11.2

Electrical Data Rating: Minimum Circuit Amp: Unit FLA: Maximum Overcurrent:

460/3/60 2321 30

Qty HP VAC Phase RPM FLA RLA Compressor 1: 1 460 3 7.8 Compressor 2: 1 460 3 6.2 Condenser Fans: 2 0.33 460 1 1080 1.1 Supply Fan: 1 3.00 460 3 1760 4.8

Cabinet Sound Power Levels*

Octave Bands: 63 125 250 500 1000 2000 4000 8000 Discharge LW(dB): 85 83 87 82 74 72 69 63 Return LW(dB): 76 72 74 67 61 57 46 34 *Sound power levels are given for informational purposes only. The sound levels are not guaranteed.

Unit Rating

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:31:20 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 45: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

JOB INFORMATION: WHEEL SPECIFICATION: Job Name: Max RPM: Job Tag: Diameter x Qty: Rep Firm: CFM: Date: Tip Speed:

Inertia:

Villa Joseph Marie 2,200RTU# 6 18.5 in. x 1

320002/07/2018 8,006 FPM

3 WR²

OPERATING CONDITIONS: MOTOR SELECTION: Air Flow: Rated HP / Bypass: Static Pressure: Frame Size: Relief Dampers DP: Nominal RPM:

VAC/PH/HZ: TSP: Efficiency Site Altitude: Enclosure Type: TSP @ Sea Level: Max Inertial Load:

3,200 CFM 3 / No2.53 in. Wg. 182T0.00 in. Wg. 1760

460/3/602.53 in. Wg. Premium / 0.8950.00 Ft ODP2.53 in. Wg. 29 WR²

FAN PERFORMANCE: FAN SOUND POWER (Inlet/Outlet): RPM: Octave Band: (Re 10^-12 watts) BHP: 1 2 3 4 5 6 7 8 Efficiency: In/Out Velocity: Plenum Out Velocity: SOUND POWER A-Weighted: 86 / 86 dB

Max Duct SP with Blocked Airway: 2.9 in. Wg. @ 1653 rpm

16532.0362.7% 85 83 87 84 77 76 73 671829/1916 FPM 85 83 87 84 77 76 73 6753 FPM

RPMBHPSYSTEMEfficiencySP SurgeCFM Min

Supply Fan Model: RN185 @ 1653 RPM and 99% WidthDesign Conditions: 3200 CFM @ 2.53" SP

CFM x 100054321

SP

2

1

0

BH

P

5

4

3

2

1

0

60%

40%

20%

RPM: 1653

BHP: 2.03

EFFICIENCY: 62.70

18.5" STAR Plenum

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:31:20 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 46: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RN-009-3-0-EB09-EHJ:A000-D0B-DCE-AG0-0D0AHBD-00-0JA0000VB Tag: RTU# 6 Job Name: Villa Joseph Marie Unit Submittal For: Job Number: Job #14238 Unit Submittal Date: February 07, 2018

Base Option Description

R Series Roof Top UnitN Generation Ninth Generation

009 Unit Size Nine3 Voltage 460V/3Ø/60Hz0 Interior Protection StandardE Refrigerant Style R-410A VCC - High EfficiencyB Unit Configuration Air-Cooled Cond. + 6 Row Evap. Coil0 Coil Coating Standard

9Cooling/Heat Pump Staging Modulating - 1 VCC + 1 On/Off Comp.

E Heating Type Hot Water Standard CoilH Heating Designation 1 Row CoilJ Heating Staging Half Serpentine 8 FPI

Feature Option Description

A 1A. RA/OA Section Economizer

0 1B.

RA/EA Blower Configuration Standard - None

0 1C. RA/EA Blower Standard - None0 1D. RA/EA Blower Motor Standard - NoneD 2. OA Control Fully Modulating Actuator - Enthalpy Limit0 3. Heat Options Standard

B 4.

Maintenance Options 115V Convenience Outlet - Factory Wired

D 5A.

SA Blower Configuration 1 Blower + Premium Efficiency Motor + 1 VFD

C 5B. SA Blower 18.5'' Direct Drive Backward Curved PlenumE 5C. SA Motor 3.0 hp - 1760 rpmA 6A. Pre Filter Type 2" Pleated Pre Filter - 30% EffG 6B. Unit Filter Type 4" Pleated - 85% Eff - MERV 130 6C. Filter Options Standard

0 7.

Refrigeration Control Standard - Adj Comp. Cooling Lock Out Through Unit Controls

D 8.

Refrigeration Options Modulating Hot Gas Reheat

A 9.

Refrigeration Accessories Non-fused Disconnect Power Switch - 100 Amps

H 10. Power Options Remote Safety Shutdown TerminalsB 11. Safety Options Phase & Brown Out ProtectionD 12. Controls VAV Unit Controller - VAV Cool + CV Heat0 13. Special Controls Standard - None

0 14A.

Preheat Configuration Standard - None

0 14B. Preheat Sizing Water or No WSHPJ 15. Glycol Percent Compressor Sound Blankets

A 16.

Interior Cabinet Options Base Insulation

0 17.

Exterior Cabinet Options Standard

Unit Submittal

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:31:20 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 47: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

0 18. Customer Code Standard - ETL U.S.A. Listing0 19. Code Options Standard0 20. Crating Standard - NoneV 21. Water-Cooled Cond. WattMaster VCC-X Controls + Integrated BACnet MSTPB 22. Control Vendors Standard - Includes AAON Gray PaintB 22. Control Vendors Standard - Includes AAON Gray Paint

Unit Submittal

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:31:20 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 48: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

2425 South Yukon Ave - Tulsa, Oklahoma 74107-2728 - Ph. (918) 583-2266 Fax (918) 583-6094AAONEcat32 Ver. 4.266 (SN: 5728272-)

1A

1B

1C

1D

2

3

4

5A

5B

5C 6A

6B

6C

7

8

9

10

11

12

13

14A

14B

15

16

17

18

19

20

21

22

23

RN-009-3-0-EB09-EHJ:A000-D0B-DCE-AG0-0D0AHBD-00-0JA0000VB Tag: RTU# 6 Job Name: Villa Joseph Marie VCCX For: Job Number: Job #14238 VCCX Date: February 07, 2018

Hardware Included For VCCX Controller

Part # Included Parts Assigned Channel BACnet PointV87900 VCCX CONTROLLERV13050 OSA Temp/Hum Sensor EBUS2 communicating sensor AI:16,AI:17,AI:18,AI:19V09300 Space Digital Temp/Hum Sensor EBUS3 communicating sensor AI:12,AI:13R82890 Supply Temp Sensor - Field Installed VCCX control point AI 3 AI:9R82890 Return Temp Sensor VCCX control point AI 4 AI:14P87100 Duct Static Pressure Sensor VCCX control point AI 8 AI:21

Supply Fan Control Signal 0-10VDC VCCX control point AO 1 AI:22Economizer VCCX control point AO 2 AI:30Modulated Heating (0-10VDC) VCCX control point AO 3 AI:35

R62330 Proof of Air Flow VCCX control point BI 1 BI:6Safety Shut Down VCCX control point BI 8 BI:26Supply Fan Configured Relay point BI:63Morning Warm-Up Configured Relay Point BI:64

V61520 DIGITAL REFRIGERATION MODULER57800 Comp Discharge Temp A RSMD point TEMP1 AI:56V38391 Suction Pressure Sensor A RSMD point AI1 AI:48

Comp Status Input A RSMD point BIN1Comp Status Input B RSMD point BIN2 BI:79Emergency Shutdown RSMD point BIN4 BI:81,82Comp Enable A RSMD Fixed Relay point AI:46Comp Enable B RSMD Fixed Relay point BI:77,BI:84

V12100 MODULATING HOT GAS REHEAT MODULEReheat HGR Valve MHGRV-X AI:42

VCCX Components

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:31:20 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 49: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:31:20 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 50: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:31:20 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 51: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Date Created/Modified: 2/7/2018 10:29:54 AM Using Ver 4.264 (OSN# 0123456) Date Printed: 2/7/2018 10:31:20 AM

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 52: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 53: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 54: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

UNIT

SPECIFICATIONS

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 55: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Specifications - RN Series Rooftop Units

Packaged Rooftop Units Tag: RTU-1, 2, 3, 4, 6

Part 1 - General

1.02 General Description

A. This section includes the design, controls and installation requirements for packaged rooftop units / outdoor air handling units.

1.03 Quality Assurance

A. Packaged air-cooled condenser units shall be certified in accordance with ANSI/AHRI Standard 340/360 performance rating of commercial and industrial unitary air-conditioning and heat pump equipment.

B. Unit shall be certified in accordance with UL Standard 1995/CSA C22.2 No. 236, Safety Standard for Heating and Cooling Equipment.

C. Unit and refrigeration system shall comply with ASHRAE 15, Safety Standard for Mechanical Refrigeration.

D. Unit shall be certified in accordance with ANSI Z21.47b/CSA 2.3b and ANSI Z83.8/CSA 2.6, Safety Standard Gas-Fired Furnaces.

E. Unit Energy Efficiency Ratio (EER) shall be equal to or greater that prescribed by ASHRAE 90.1, Energy Efficient Design of New Buildings except Low-Rise Residential Buildings.

F. Unit shall be safety certified by ETL and ETL US listed. Unit nameplate shall include the ETL/ETL Canada label.

G. Unit shall be approved for use in and outside High Velocity Hurricane Zones (HVHZ) by the Florida Building Code (FL# 15031), when using the required steel rooftop curb and attachment methods. Maximum allowable lateral wind pressure is +100psf/-100psf. Maximum allowable uplift is +50psf/-50psf. Positive and negative required design pressures calculated for use with this system shall be determined by others on a job specific basis, in accordance with the governing code. Site specific pressures shall be less than or equal to the listed positive or negative allowable lateral wind design pressure and allowable uplift values for the product.

1.04 Submittals

A. Product Data: Literature shall be provided that indicates dimensions, operating and shipping weights, capacities, ratings, fan performance, filter information, factory supplied accessories, electrical characteristics and connection requirements. Installation, Operation, and Maintenance manual with startup requirements shall be

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 56: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

provided.

B. Shop Drawings: Unit drawings shall be provided that indicate assembly, unit dimensions, construction details, clearances and connection details. Computer generated fan curves for each fan shall be submitted with specificdesign operation point noted. Wiring diagram shall be provided with details for both power and control systems and differentiate between factory installed and field installed wiring.

1.05 Delivery, Storage, and Handling

A. Unit shall be shipped with doors screwed shut and outside air hood closed to prevent damage during transport and thereafter while in storage awaiting installation.

B. Follow Installation, Operation, and Maintenance manual instructions for rigging, moving, and unloading the unit at its final location.

C. Unit shall be stored in a clean, dry place protected from construction traffic in accordance with the Installation, Operation, and Maintenance manual.

1.06 Warranty

A. Manufacturer shall provide a limited “parts only” warranty for a period of 12 months from the date of equipment startup or 18 months from the date of original equipment shipment from the factory, whichever is less. Warranty shall cover material and workmanship that prove defective, within the specified warranty period, provided manufacturer’s written instructions for Installation, Operation, and maintenance have been followed. Warranty excludes parts associated with routine maintenance, such as belts and filters.

Part 2 - Products

2.02 Rooftop Units

A. General Description

1. Packaged rooftop unit shall include compressors, evaporator coils, filters, supply fans, dampers, air-cooled condenser coils, condenser fans, reheat coil, gas heaters, hot water coils, exhaust fans, and unit controls.

2. Unit shall be factory assembled and tested including leak testing of the DX coils, leak testing of the hot water coils, pressure testing of the refrigeration circuit, and run testing of the completed unit. Run test report shall be supplied with the unit in the service compartment’s literature pocket.

3. Unit shall have decals and tags to indicate lifting and rigging, service areas and caution areas for safety and to assist service personnel.

4. Unit components shall be labeled, including pipe stub outs, refrigeration system components and electrical and controls components.

5. Estimated sound power levels (dB) shall be shown on the unit ratings sheet.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 57: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

6. Installation, Operation, and Maintenance manual shall be supplied within the unit.

7. Laminated color-coded wiring diagram shall match factory installed wiring and shall be affixed to the interior of the control compartment’s hinged access door.

8. Unit nameplate shall be provided in two locations on the unit, affixed to the exterior of the unit and affixed to the interior of the control compartment’s hinged access door.

B. Construction

1. All cabinet walls, access doors, and roof shall be fabricated of double wall, impact resistant, rigid polyurethane foam panels.

2. Unit insulation shall have a minimum thermal resistance R-value of 13. Foam insulation shall have a minimum density of 2 pounds/cubic foot and shall be tested in accordance with ASTM D1929-11 for a minimum flash ignition temperature of 610°F.

3. Unit construction shall be double wall with G90 galvanized steel on both sides and a thermal break. Double wall construction with a thermal break prevents moisture accumulation on the insulation, provides a cleanable interior, prevents heat transfer through the panel, and prevents exterior condensation on the panel.

4. Unit shall be designed to reduce air leakage and infiltration through the cabinet. Cabinet leakage shall not exceed 1% of total airflow when tested at 3 times the minimum external static pressure provided in AHRI Standard 340/360. Panel deflection shall not exceed L/240 ratio at 125% of design static pressure, at a maximum 8 inches of positive or negative static pressure, to reduce air leakage. Deflection shall be measured at the midpoint of the panel height and width. Continuous sealing shall be included between panels and between access doors and openings to reduce air leakage. Piping and electrical conduit through cabinet panels shall include sealing to reduce air leakage.

5. Roof of the air tunnel shall be sloped to provide complete drainage. Cabinet shall have rain break overhangs above access doors.

6. Access to filters, dampers, cooling coils, reheat coil, heaters, exhaust fans, compressors, and electrical and controls components shall be through hinged access doors with quarter turn, zinc cast, lockable handles. Full length stainless steel piano hinges shall be included on the doors.

7. Exterior paint finish shall be capable of withstanding at least 2,500 hours, with no visible corrosive effects, when tested in a salt spray and fog atmosphere in accordance with ASTM B 117-95 test procedure.

8. Units with cooling coils shall include double sloped 304 stainless steel drain pans.

9. Unit shall be provided with base discharge and return air openings. All openings through the base pan of the unit shall have upturned flanges of at least 1/2 inch in

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 58: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

height around the opening. – RTU-4, 6 only

10. Unit shall be provided with horizontal discharge and vertical base return air openings. All openings through the base pan of the unit shall have upturned flanges of at least 1/2 inch in height around the opening. RTU-1, 2, 3 only

11. Unit shall include lifting lugs on the top of the unit.

12. Unit base pan shall be provided with 1/2 inch thick foam insulation.

C. Electrical

1. Unit shall be provided with factory installed and factory wired, non-fused disconnect switch.

2. Unit shall be provided with a factory installed and factory wired 115V, 12 amp GFI outlet disconnect switch in the unit control panel.

3. Unit shall be provided with phase and brown out protection which shuts down all motors in the unit if the electrical phases are more than 10% out of balance on voltage, the voltage is more than 10% under design voltage or on phase reversal.

D. Supply Fans

1. Unit shall include direct drive, unhoused, backward curved, plenum supply fans.

2. Blowers and motors shall be dynamically balance and mounted on rubber isolators.

3. Motors shall be premium efficiency ODP with ball bearings rated for 200,000 hours service with external lubrication points.

4. Variable frequency drives shall be factory wired and mounted in the unit. Fan motors shall be premium efficiency.

E. Exhaust Fans – RTU-1, 2, 3 only

1. Exhaust dampers shall be sized for 100% relief.

2. Fans and motors shall be dynamically balanced.

3. Motors shall be premium efficiency ODP with ball bearings rated for 200,000 hours service with external lubrication points.

4. Access to exhaust fans shall be through double wall, hinged access doors with quarter turn lockable handles.

5. Unit shall include belt driven, unhoused, backward curved, plenum exhaust fans.

6. Variable frequency drives shall be factory wired and mounted in the unit. Fan motors shall be premium efficiency.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 59: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

F. Cooling Coils

1. Evaporator Coils

a. Coils shall be designed for use with R-410A refrigerant and constructed of copper tubes with aluminum fins mechanically bonded to the tubes and galvanized steel end casings. Fin design shall be sine wave rippled.

b. Coils shall have interlaced circuitry and shall be standard capacity.

c. Coils shall have interlaced circuitry and shall be 6 row high capacity.

d. Coils shall be hydrogen or helium leak tested.

e. Coils shall be furnished with factory installed expansion valves.

G. Refrigeration System

1. Unit shall be factory charged with R-410A refrigerant.

2. Compressors shall be scroll type with thermal overload protection and carry a 5 year non-prorated warranty, from the date of original equipment shipment from the factory.

3. Compressors shall be mounted in an isolated service compartment which can be accessed without affecting unit operation. Lockable hinged compressor access doors shall be fabricated of double wall, rigid polyurethane foam injected panels to prevent the transmission of noise outside the cabinet.

4. Compressors shall be isolated from the base pan with the compressor manufacturer’s recommended rubber vibration isolators, to reduce any transmission of noise from the compressors into the building area.

5. Each refrigeration circuit shall be equipped with expansion valve type refrigerant flow control.

6. Each refrigeration circuit shall be equipped with automatic reset low pressure and manual reset high pressure refrigerant safety controls, Schrader type service fittings on both the high pressure and low pressure sides and a factory installed replaceable core liquid line filter driers.

7. Unit shall include a variable capacity scroll compressor on the lead refrigeration circuit which shall be capable of modulation from 10-100% of its capacity.

8. Unit shall include factory provided and installed compressor sound jackets on all compressors.

9. Lead refrigeration circuit shall be provided with hot gas reheat coil, modulating valves, electronic controller, supply air temperature sensor and a control signal terminal which allow the unit to have a dehumidification mode of operation, which includes supply air temperature control to prevent supply air temperature swings

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 60: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

and overcooling of the space.

H. Condensers

1. Air-Cooled Condenser

a. Condenser fans shall be a vertical discharge, axial flow, direct drive fans.

b. Coils shall be designed for use with R-410A refrigerant. Coils shall be multi-pass and fabricated from aluminum microchannel tubes.

c. Coils shall be designed for a minimum of 10°F of refrigerant sub-cooling.

d. Coils shall be hydrogen or helium leak tested.

e. Condenser fans shall be high efficiency electrically commutated motor driven with factory installed head pressure control module. Condenser airflow shall continuously modulate based on head pressure and cooling operation shall be allowed down to 35°F with adjustable compressor lockout.

f. Condenser fans shall be VFD driven variable speed for condenser head pressure control. Factory provided and factory programmed VFDs shall continuously modulate the fan air flow to maintain head pressure at acceptable levels. Cooling operation shall be allowed down to 35°F with adjustable compressor lockout.

I. Gas Heating

1. Stainless steel heat exchanger furnace shall carry a 25 year non-prorated warranty, from the date of original equipment shipment from the factory.

2. Gas furnace shall consist of stainless steel heat exchangers with multiple concavities, an induced draft blower and an electronic pressure switch to lockout the gas valve until the combustion chamber is purged and combustion airflow is established.

3. Furnace shall include a gas ignition system consisting of an electronic igniter to a pilot system, which will be continuous when the heater is operating, but will shut off the pilot when heating is not required.

4. Unit shall include a single gas connection and have gas supply piping entrances in the unit base for through-the-curb gas piping and in the outside cabinet wall for across the roof gas piping.

5. Modulating Natural Gas Furnace shall be equipped with modulating gas valves, adjustable speed combustion blowers, stainless steel tubular heat exchangers, and electronic controller. Combustion blowers and gas valves shall be capable of modulation. Electronic controller includes a factory wired, field installed supply air temperature sensor. Sensor shall be field installed in the supply air ductwork. Supply air temperature setpoint shall be adjustable on the electronic controller within the controls. Gas heater shall be capable of capacity turndown ratio as

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 61: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

shown on the unit rating sheet.

J. Heating Coils – RTU-6 only

1. Hot Water Heating Coils

a. Coils shall be certified in accordance with AHRI Standard 410 and be hydrogen or helium leak tested.

b. Coils shall be constructed of copper tubes with aluminum fins mechanically bonded to the tubes and galvanized steel end casings. Fin design shall be sine wave rippled.

c. Coils shall be one row, half serpentine circuitry, and 8 fins per inch.

d. Coils shall be located in the reheat position downstream of the cooling coil.

e. Control valves shall be field supplied and field installed.

K. Filters

1. Unit shall include 4 inch thick, pleated panel filters with an ASHRAE MERV rating of 13, upstream of the cooling coil. Unit shall also include 2 inch thick, pleated panel pre filters with an ASHRAE MERV rating of 8, upstream of the 4 inch standard filters.

L. Outside Air/Economizer

1. Unit shall include 0-100% economizer consisting of a motor operated outside air damper and return air damper assembly constructed of extruded aluminum, hollow core, airfoil blades with rubber edge seals and aluminum end seals. Damper blades shall be gear driven and designed to have no more than 20 cfm of leakage per sq ft. at 4 in. w.g. air pressure differential across the damper. Low leakage dampers shall be Class 2 AMCA certified, in accordance with AMCA Standard 511. Damper assembly shall be controlled by spring return enthalpy activated fully modulating actuator. Unit shall include outside air opening bird screen, outside air hood, and barometric relief dampers.

2. Economizer shall be furnished with return air CO2 override. – RTU-1, 2, 3, 4

M. Controls

1. Factory Installed and Factory Provided Controller

a. Unit controller shall be capable of controlling all features and options of the unit. Controller shall be factory installed in the unit controls compartment and factory tested. Controller shall be capable of stand alone operation with unit configuration, setpoint adjustment, sensor status viewing, unit alarm viewing, and occupancy scheduling available without dependence on a building management system.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 62: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

b. Controller shall have an onboard clock and calendar functions that allow for occupancy scheduling.

c. Controller shall include non-volatile memory to retain all programmed values without the use of a battery, in the event of a power failure.

d. Variable Air Volume Controller – RTU-6 only

1. Unit shall utilize a variable capacity compressor system and a variable speed supply fan system to modulate cooling and airflow as required to meet space temperature cooling loads and to save operating energy. Supply fan speed shall modulate based on supply air duct static pressure. Cooling capacity shall modulate based on supply air temperature.

2. With modulating hot gas reheat, unit shall modulate cooling and hot gas reheat as efficiently as possible, to meet space humidity loads and prevent supply air temperature swings and overcooling of the space.

3. Unit shall modulate heating with constant airflow to meet space temperature heating loads. Modulating heating capacity shall modulate based on supply air temperature.

e. Single Zone VAV Controller – RTU-1, 2, 3, 4

1. Unit shall utilize a variable capacity compressor system and a variable speed fan system to modulate the cooling and airflow as required in meeting the space temperature needs and to save unit operating energy. Unit fan speed shall modulate based on space temperature, not supply air pressure.

2. Units ordered with modulating gas, shall be capable of modulating fan speed in both the heating and cooling mode.

3. With modulating hot gas reheat, unit shall modulate cooling and hot gas reheat as efficiently as possible, to meet space humidity loads and prevent supply air temperature swings and overcooling of the space.

4. Unit shall be provided with supply air temperature control. Mixing boxes and bypass ducts shall not be required for operation as a single zone VAV system.

f. Unit configuration, setpoint adjustment, sensor status viewing, unit alarm viewing, and occupancy scheduling shall be accomplished with connection to interface module with LCD screen and input keypad, interface module with touch screen, or with connection to PC with free configuration software. Controller shall be capable of connection with other factory installed and factory provided unit controllers with individual unit configuration, setpoint adjustment, sensor status viewing, and occupancy scheduling available from a single unit. Connection between unit controllers shall be with a modular cable. Controller

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 63: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

shall be capable of communicating and integrating with a LonWorks or BACnet network.

N. Accessories

1. Unit shall be provided with a safety shutdown terminal block for field installation of a smoke detector which shuts off the unit's control circuit.

2.03 Curbs

A. Curbs shall to be fully gasketed between the curb top and unit bottom with the curb providing full perimeter support, cross structure support and air seal for the unit. Curb gasket shall be furnished within the control compartment of the rooftop unit to be mounted on the curb immediately before mounting of the rooftop unit.

B. Roof curb shall be 14” high with duct support rails shall be factory furnished in one piece with 1” spring isolation rails installed on the curb. Curb shall ship in one piece.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 64: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Specifications - RQ Series Rooftop Unit

Packaged Rooftop Unit Tag: RTU-5 Part 1 - General

1.02 General Description

A. This section includes the design, controls and installation requirements for packaged rooftop units/heat pumps/outdoor air handling units.

1.03 Quality Assurance A. Packaged air-cooled condenser units shall be certified in accordance with

ANSI/AHRI Standard 340/360 performance rating of commercial and industrial unitary air-conditioning and heat pump equipment.

B. Unit shall be certified in accordance with UL Standard 1995/CSA C22.2 No. 236, Safety Standard for Heating and Cooling Equipment.

C. Unit and refrigeration system shall comply with ASHRAE 15, Safety Standard for Mechanical Refrigeration.

D. Unit shall be certified in accordance with ANSI Z21.47b/CSA 2.3b and ANSI Z83.8/CSA 2.6, Safety Standard Gas-Fired Furnaces.

E. Unit Seasonal Energy Efficiency Ratio (SEER) shall be equal to or greater that prescribed by ASHRAE 90.1, Energy Efficient Design of New Buildings except Low-Rise Residential Buildings.

F. Unit shall be safety certified by ETL and ETL US listed. Unit nameplate shall include the ETL/ETL Canada label.

G. Unit shall be approved for use in and outside High Velocity Hurricane Zones (HVHZ) by the Florida Building Code (FL# 15031), when using the required steel rooftop curb and attachment methods. Maximum allowable lateral wind pressure is +100psf/-100psf. Maximum allowable uplift is +50psf/-50psf. Positive and negative required design pressures calculated for use with this system shall be determined by others on a job specific basis, in accordance with the governing code. Site specific pressures shall be less than or equal to the listed positive or negative allowable lateral wind design pressure and allowable uplift values for the product.

1.04 Submittals A. Product Data: Literature shall be provided that indicates dimensions, operating and

shipping weights, capacities, ratings, fan performance, filter information, factory supplied accessories, electrical characteristics and connection requirements. Installation, Operation and Maintenance manual with startup requirements shall be provided.

B. Shop Drawings: Unit drawings shall be provided that indicate assembly, unit

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 65: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

dimensions, construction details, clearances and connection details. Computer generated fan curves for each fan shall be submitted with specific design operation point noted. Wiring diagram shall be provided with details for both power and control systems and differentiate between factory installed and field installed wiring.

1.05 Delivery, Storage, and Handling A. Unit shall be shipped with doors bolted shut and outside air hood closed to prevent

damage during transport and thereafter while in storage awaiting installation.

B. Follow Installation, Operation and Maintenance manual instructions for rigging, moving, and unloading the unit at its final location.

C. Unit shall be stored in a clean, dry place protected from construction traffic in accordance with the Installation, Operation and Maintenance manual.

1.06 Warranty A. Manufacturer shall provide a limited “parts only” warranty for a period of 24 months

from the date of original equipment shipment from the factory. Warranty shall cover material and workmanship that prove defective, within the specified warranty period, provided manufacturer’s written instructions for installation, operation and maintenance have been followed. Warranty excludes parts associated with routine maintenance, such as belts and air filters.

1.07 Startup Repair Program A. Manufacturer shall provide startup repair for a period of 12 months from the date of

original equipment shipment from the factory. Program shall cover labor for materials and workmanship that prove defective, within the specified warranty period, provided manufacturer’s written instructions for installation, operation and maintenance have been followed. Program excludes labor associated with routine maintenance, such as belt and air filter replacement.

Part 2 – Products

2.02 Rooftop Units A. General Description

1. Packaged rooftop unit shall include compressor, evaporator coil, filters, supply fan, dampers, air-cooled condenser coils, condenser fan, reheat coil, gas heater, and unit controls.

2. Unit shall be factory assembled and tested including leak testing of the DX coils, pressure testing of the refrigeration circuit, and run testing of the completed unit. Run test report shall be supplied with the unit in the service compartment’s literature pocket.

3. Unit shall have decals and tags to indicate lifting and rigging, service areas and caution areas for safety and to assist service personnel.

4. Unit components shall be labeled, including refrigeration system components and

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 66: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

electrical and controls components.

5. Estimated sound power levels (dB) shall be shown on the unit ratings sheet.

6. Installation, Operation and Maintenance manual shall be supplied within the unit.

7. Laminated color-coded wiring diagram shall match factory installed wiring and shall be affixed to the interior of the control compartment’s hinged access door.

8. Unit nameplate shall be provided in two locations on the unit, affixed to the exterior of the unit and affixed to the interior of the control compartment’s hinged access door.

B. Construction

1. All cabinet walls, access doors, and roof shall be fabricated of double wall, impact resistant, rigid polyurethane foam panels.

2. Unit insulation shall have a minimum thermal resistance R-value of 13. Foam insulation shall have a minimum density of 2 pounds/cubic foot and shall be tested in accordance with ASTM D-1929 for a minimum flash ignition temperature of 610°F.

3. Unit construction shall be double wall with G90 galvanized steel on both sides and a thermal break. Double wall construction with a thermal break prevents moisture accumulation on the insulation, provides a cleanable interior, prevents heat transfer through the panel, and prevents exterior condensation on the panel.

4. [RTU# 5] Unit shall be designed to reduce air leakage and infiltration through the cabinet. Cabinet leakage shall not exceed 1% of total airflow when tested at 3 times the minimum external static pressure provided in AHRI Standard 210/240.Panel deflection shall not exceed L/240 ratio at 125% of design static pressure, at a maximum 8 inches of positive or negative static pressure, to reduce air leakage. Deflection shall be measured at the midpoint of the panel height and width. Continuous sealing shall be included between panels and between access doors and openings to reduce air leakage. Piping and electrical conduit through cabinet panels shall include sealing to reduce air leakage.

5. Roof of the air tunnel shall be sloped to provide complete drainage. Cabinet shall have rain break overhangs above access doors.

6. Access to filters, dampers, cooling coil, reheat coil, heater, compressor, and electrical and controls components shall be through hinged access doors with quarter turn, lockable handles. Full length stainless steel piano hinges shall be included on the doors.

7. Exterior paint finish shall be capable of withstanding at least 2,500 hours, with no visible corrosive effects, when tested in a salt spray and fog atmosphere in accordance with ASTM B 117-95 test procedure.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 67: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

8. Units shall include double sloped 304 stainless steel drain pans.

9. Unit shall be provided with through the base vertical discharge and return air openings. All openings through the unit shall have upturned flanges of at least 1/2 inch around the opening.

10. Unit shall include lifting lugs on the top of the unit.

11. Unit base pan shall be provided with 1/2 inch thick foam insulation.

C. Electrical

1. Unit shall be provided with factory installed and factory wired, non-fused disconnect switch.

2. Unit shall be provided with a factory installed and factory wired 115V, 12 amp GFI outlet disconnect switch in the unit control panel.

D. Supply Fans

1. Unit shall include direct drive, unhoused, backward curved, plenum supply fans.

2. Blowers and motors shall be dynamically balanced.

3. Motor shall be inverter rated efficiency ODP with ball bearings rated for 200,000 hours service with external lubrication points.

4. Variable frequency drive shall be factory wired and mounted in the unit. Fan motor shall be inverter rated efficiency.

E. Cooling Coils

1. Evaporator Coils

a. Coils shall be designed for use with R-410A refrigerant and constructed of copper tubes with aluminum fins mechanically bonded to the tubes and aluminum end casings. Fin design shall be sine wave rippled.

b. Coil shall be standard capacity

c. Coils shall be helium hydrogen or helium leak tested.

d. Coils shall be furnished with factory installed electronic expansion valves.

F. Refrigeration System

1. Unit shall be factory charged with R-410A refrigerant.

2. Compressors shall be scroll type with thermal overload protection and carry a 5 year non-prorated warranty, from the date of original equipment shipment from the factory.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 68: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

3. Compressors shall be mounted in an isolated service compartment which can be accessed without affecting unit operation. Lockable hinged compressor access doors shall be fabricated of double wall, rigid polyurethane foam injected panels to prevent the transmission of noise outside the cabinet.

4. Compressors shall be isolated from the base pan with the compressor manufacturer’s recommended rubber vibration isolators, to reduce any transmission of noise from the compressors into the building area.

5. Each refrigeration circuit shall be equipped with thermostatic expansion valve type refrigerant flow control.

6. Each refrigeration circuit shall be equipped with automatic reset low pressure and manual reset high pressure refrigerant safety controls, Schrader type service fittings on both the high pressure and low pressure sides and a factory installed replaceable core liquid line filter driers.

7. Unit shall include a variable capacity scroll compressor on the refrigeration circuit which shall be capable of modulation from 10-100% of its capacity.

8. Unit shall include factory provided and installed compressor sound jackets on all compressors.

9. Refrigeration circuit shall be provided with hot gas reheat coil, modulating valves, electronic controller, supply air temperature sensor and a control signal terminal which allow the unit to have a dehumidification mode of operation, which includes supply air temperature control to prevent supply air temperature swings and overcooling of the space.

G. Condensers

1. Air-Cooled Condenser

a. Condenser fans shall be a vertical discharge, axial flow, direct drive fans.

b. Coils shall be designed for use with R-410A refrigerant.

c. Condenser coils shall be multi-pass and fabricated from aluminum microchannel tubes.

d. Coils shall be designed for a minimum of 10°F of refrigerant sub-cooling.

e. Coils shall be hydrogen or helium leak tested.

f. Condenser fans shall be high efficiency electrically commutated motor driven with factory installed head pressure control module. Condenser airflow shall continuously modulate based on head pressure and cooling operation shall be allowed down to 35°F with adjustable compressor lockout.

H. Gas Heating

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 69: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

1. Stainless steel heat exchanger furnace shall carry a 25 year non-prorated warranty, from the date of original equipment shipment from the factory.

2. Gas furnace shall consist of stainless steel heat exchangers with multiple concavities, an induced draft blower and an electronic pressure switch to lockout the gas valve until the combustion chamber is purged and combustion airflow is established.

3. Furnace shall include a gas ignition system consisting of an electronic igniter to a pilot system, which will be continuous when the heater is operating, but will shut off the pilot when heating is not required.

4. Unit shall include a single gas connection and have gas supply piping entrances in the unit base for through-the-curb gas piping and in the outside cabinet wall for across the roof gas piping.

5. Modulating Natural Gas Furnace shall be equipped with modulating gas valves, adjustable speed combustion blowers, stainless steel tubular heat exchangers, and electronic controller. Combustion blowers and gas valves shall be capable of modulation. Electronic controller includes a factory wired, field installed supply air temperature sensor. Sensor shall be field installed in the supply air ductwork. Supply air temperature setpoint shall be adjustable on the electronic controller within the controls. Gas heater shall be capable of capacity turndown ratio as shown on the unit rating sheet.

I. Filters

1. Unit shall include 4 inch thick, pleated panel filters with an ASHRAE MERV rating of 13, upstream of the cooling coil. Unit shall also include 2 inch thick, pleated panel pre filters with an ASHRAE MERV rating of 8, upstream of the 4 inch standard filters.

J. Outside Air/Economizer

1. Unit shall include 0-100% economizer consisting of a motor operated outside air damper and return air damper assembly constructed of extruded aluminum, hollow core, airfoil blades with rubber edge seals and aluminum end seals. Damper blades shall be gear driven and designed to have no more than 15 CFM of leakage per sq. ft. of damper area when subjected to 2 inches w.g. air pressure differential across the damper. Unit shall include outside air opening bird screen, outside air hood with rain lip and barometric relief dampers.

2. Damper assembly shall be controlled by spring return enthalpy activated fully modulating actuator.

K. Controls

1. Factory Installed and Factory Provided Controller

a. Unit controller shall be capable of controlling all features and options of the

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 70: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

unit. Controller shall be factory installed in the unit controls compartment and factory tested.

b. Controller shall be capable of stand alone operation with unit configuration, setpoint adjustment, sensor status viewing, unit alarm viewing, and occupancy scheduling available without dependence on a building management system.

c. Controller shall have an onboard clock and calendar functions that allow for occupancy scheduling.

d. Controller shall include non-volatile memory to retain all programmed values without the use of a battery, in the event of a power failure.

e. Single Zone VAV Controller

1. Unit shall utilize a variable capacity compressor system and a variable speed fan system to modulate the cooling and airflow as required in meeting the space temperature needs and to save unit operating energy. Unit fan speed shall modulate based on space temperature, not supply air pressure.

2. Units ordered with modulating gas, shall be capable of modulating fan speed in both the heating and cooling mode.

3. With modulating hot gas reheat, unit shall modulate cooling and hot gas reheat as efficiently as possible, to meet space humidity loads and prevent supply air temperature swings and overcooling of the space.

4. Unit shall be provided with supply air temperature control. Mixing boxes and bypass ducts shall not be required for operation as a single zone VAV system.

f. Unit configuration, setpoint adjustment, sensor status viewing, unit alarm viewing, and occupancy scheduling shall be accomplished with connection to interface module with LCD screen and input keypad, interface module with touch screen, or with connection to PC with free configuration software. Controller shall be capable of connection with other factory installed and factory provided unit controllers with individual unit configuration, setpoint adjustment, sensor status viewing, and occupancy scheduling available from a single unit. Connection between unit controllers shall be with a modular cable. Controller shall be capable of communicating and integrating with a LonWorks or BACnet network.

2.03 Curbs A. Curbs shall to be fully gasketed between the curb top and unit bottom with the curb

providing full perimeter support, cross structure support and air seal for the unit. Curb gasket shall be furnished within the control compartment of the rooftop unit to be mounted on the curb immediately before mounting of the rooftop unit.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 71: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

B. Roof curb shall be 14” high with duct support rails shall be factory furnished. Curb shall ship in one piece with 1” spring vibration rails installed.

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 72: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

UNIT

CONTROLS

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 73: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: AAON-OE338-26B-VCCX2 -1A.doc Page 1 of 1

Description The VCCX2 Controller (Orion Part No. OE338-26B-VCCX2; AAON Part No. V87900) is designed with 8 analog inputs, 4 analog outputs, 8 binary inputs, and 8 relay outputs.

The VCCX2 Controller has an on-board BACnet® port for connection to a BACnet® MS/TP network. There are also 2 E-BUS Expansion Ports which allow the connection of communi-cating sensors and future E-BUS Modules via modular cable assemblies. The VCCX2 Controller contains a 2 x 8 LCD character display and 4 buttons that allow for status and alarm display as well as BACnet® configuration.

The VCCX2 Controller provides for Constant Volume, VAV, Make-Up Air, and Single Zone VAV applications. Single Zone VAV applications can be configured for VAV Cooling and either CAV or VAV Heating.

Mounting The VCCX2 Controller is housed in a plastic enclosure. It is designed to be mounted by using the 3 mounting holes in the enclosure base. The VCCX2 Controller needs to be installed in an environment which can maintain a temperature range between -30°F and 150°F not to exceed 90% RH levels (Non-Condensing). It is important to mount the controller in a location that is free from extreme high or low temperatures, moisture, dust, and dirt. Be careful not to damage the electronic components when mounting the controller.

Technical Data OE338-26B-VCCX2 VCCX2 Controller

Operating Power 24 VAC Power Consumption 15 VA MaximumOperating Temp -30F to 150F Operating Humidity 90% RH Non-Condensing

Communications WattMaster Communications E-BUS

BACnet MS/TP

Weight 1 lb.

Inputs 8 Analog Inputs8 Binary Inputs

Outputs 4 Analog Outputs8 Relay Outputs

Three Year Warranty WattMaster reserves the right to change specifications without notice

M

ENTER

UP

DOWN

ALARM

MENU

RELAY CONTACTRATING IS 1 AMPMAX @ 24 VAC

RS-485 COMMLOOP. WIRE“R” TO “R”,“T” TO “T”“SHLD” TO “SHLD”

24 VAC POWER

ONLY

WARNING!

POLARITY

MUST BE

OBSERVED

OR THE

CONTROLLER

WILL BE

DAMAGED

www.aaon.com www.orioncontrols.com

VCCX2 CONTROLLER

Orion No.: OE338-26B-VCCX2AAON No.: V87900

BINARY INPUTS

BI1 = PROOF OF AIRFLOWBI2

BI3

BI5

BI6

AI1

AI2

AI3

AI4

AI5

A 6

= DIRTY FILTER= HOOD ON/OFF= REMOTE OCCUPIED= REMOTE COOLING= REMOTE HEATING= REMOTE DEHUMIDIFICATION= EMERGENCY SHUTDOWN

= SPACE TEMPERATURE= SPACE SLIDE OFFSET= SUPPLY AIR TEMPERATURE= RETURN AIR TEMPERATURE= BUILDING PRESSURE= SUPPLY AIR TEMP RESET= OUTDOOR AIR TEMPERATURE= NOT CONNECTED USE DUCT

STATIC CONNECTOR

BI4

BI7

BI8

I

AI7

AI8

ANALOG INPUTS

WattMasterOverlay

#S 000079Rev.: 1AW

DUALE-BUS

+2

4V

AC

GN

D

MAIN FAN

RELAY 2

RELAY 3

RELAY 4

RELAY 5

RELAY 6

RELAY 7

RELAY 8

RELAYCOMMON

MAIN SUPPLY FAN VFD =ECONOMIZER ACTUATOR =

MODULATING HEATING =EXHAUST FAN VFD =

AO1

AO2

AO3

AO4

BACNET –

BACNET SHIELD

BACNET +

= T

= SH

= R

DUCTSTATIC

7.958.388.38

0.2130. 2.752.75

6.046

4.104.10

0.700.701.50

8.38

OE338-26B-VCCX2 VCCX2 Controller

Tim Wenrich
Typewritten Text
Factory Installed
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 74: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: AAON-OE370-26-RSMD-1F.doc Page 1 of 1

Description The OE370-26-RSMD Refrigerant System Module for Digital Compressors (RSMD) can monitor and control up to two com-pressors and condensers. The compres-sors can be in either a tandem or non-tandem configuration. The module is de-signed for R410-A refrigerant. The RSMD Module is connected to the VCC-X Controller (Orion Part No. OE338-26B-VCCX; AAON Part No. V42430) or VCCX2 Controller (Orion Part No. OE338-26B-VCCX2; AAON Part No. V87900). Up to 2 RSMD Modules can be connect-ed, depending on the size of the system.

Features The RSMD Module provides the following features:

• Modulates the Compressors to satisfy the Suction Coil (Saturated) Temperature. The Suction Coil (Saturated) Tem-perature Setpoint is reset by the VCC-X/VCCX2 Controller to maintain the Supply Air Temperature during Cooling mode. During Dehumidification mode, it controls the Compressors to the Suction (Saturation) Temperature Setpoint.

• In Heating mode, the RSMD modulates and stages the compressors to maintain a given Supply Air Temperature Setpoint.

• Modulates the Condenser Fan or Valve to maintain the Head Pressure Setpoint.

• Provides alarms and safeties for the Compressor and Condenser operation.

• Allows connection of the Modular Service Tool SD to the module when required communication wire is run to the VCC-X/VCCX2 Controller.

• Provides a 2 x 8 LCD character display and 4 buttons that allow for status of system operation, system setpoints, system configurations, sensors, and alarms, and to change the module’s address, if necessary.

Mounting The RSMD Module is housed in a plastic enclosure. It is designed to be mounted by using the 3 mounting holes in the enclosure base. It is important to mount the module in a location that is free from extreme high or low temperatures, moisture, dust, and dirt. Be careful not to damage the electronic components when mounting the module.

10A250V

AC

~5A

30VD

C

SA

VD

E

G5Q

-1A4

OM

RO

N

DC

12V

CH

INA

Technical Data OE370-26-RSMD Refrigerant System Module for Digital Compressors

Operating Power 24 VAC Power Consumption 18 VA MaximumOperating Temp -30F to 150F Operating Humidity 90% RH Non-Condensing

Communications E-BUS Weight 8 oz.

Three Year Warranty WattMaster reserves the right to change specifications without notice

OE370-26-RSMDRefrigerant System Module

Tim Wenrich
Typewritten Text
Factory Installed
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 75: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: AAON-OE377-26-00059-MHGRV-X-1A.doc

Description The OE377-26-00059 MHGRV-X Con-troller (AAON part number V12100) is designed to control a Modulating Hot Gas Reheat Valve to maintain a de-sired Supply Air Temperature during Dehumidification. The controller can be used as a stand-alone controller or it can be connected to and used in conjunction with the AAON Factory Packaged HVAC unit controller. The MHGRV-X controller is connected to the HVAC unit controller via a modular expansion cable and corresponding connectors on the controllers.

Features The MHGRV-X provides the following features.

Can Be Operated as a Stand-Alone Controller or Integrated with the HVAC Unit Controller

Provides for Supply Air Tem-

perature Setpoint Reset When Required

Second Stage Reheat Capabil-

ity When Using 2 Hot Gas Re-heat Valves

Control of Reheat Solenoid

Valve to Provide Coil Flushing for Positive Refrigerant Oil Return

Contains a 2 x 8 LCD character display and 4 buttons that allow for status display, setpoint changes, and

configuration changes.

Mounting It is important to mount the controller in a location that is free from extreme high or low temperatures, moisture, dust and dirt. The MHGRV-X Controller is housed in a plastic enclosure. It is designed to be mounted by using the 3 mounting holes in the enclosure base. It is important to mount the module in a location that is free from extreme high or low temperatures, moisture, dust, and dirt. Be careful not to damage the electronic components when mounting the module.

Technical Data OE377-26-00059 MHGRV-X ControllerOperating Power 24 VAC Power Consumption 12 VA MaximumOperating Temp -30F to 150F Operating Humidity 90% RH Non-Condensing

Communications E-BUS Weight 1 lb.Three Year Warranty WattMaster reserves the right to change specifications without notice

REHEAT EN

HEAT OVRD

COOL OVRD

STATUSALARMCOMMPOWER

SERIAL #

MADE IN USA

YS102466 REV 1WATTMASTER CONTROLS

FAN

COMP

VALVE

AUXRESET IN

AUX IN

SAT

GND

GND

CONDENSOR DRIVE

REHEAT DRIVE

OPENING

GREEN

WHITE

BLACK

GREEN

RED

SAT OPTIONSNORMALMODGASMODGASx

TB1

P1

C23

C1

D8

LC

P2

R2

TB2

TB3

TB4

10uF

18221002

R1

WHITE

BLACK

RED

OPENING

COMMON

J3

.01uF

5.00

0.20

5.63

5.87

5.44

2.72

2.050.67

4.10

1.49" DEPTH

OE377-26-00059 MHGRV-X Controller

Tim Wenrich
Typewritten Text
Factory Installed
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 76: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: AAON-OE377-26-00058-MODGASX-1A.doc Page 1 of 1

Description The OE377-26-00058 MODGAS-X Controller (AAON Part No. V12090) is designed to modulate up to (2) gas valves to maintain a desired Discharge Air Temperature. It also controls the speed of the induced draft fan to maintain proper com-bustion in the heat exchanger. The controller can be used as a stand-alone unit or be connected to the AAON HVAC unit controller as an expansion board.

Features The MODGAS-X Controller pro-vides the following features.

Supply Air Temperature Sensor Input

HEAT EN Input (24VAC)

Discharge Air Temperature Reset Signal Input (0-10VDC)

Fan Enable (Relay Output) Auxiliary Output (Relay Output)

Low Speed Fan Control (Relay Output)

Gas Valve Analog Output (0-20 VDC)

Contains a 2 x 8 LCD character display and 4 buttons that allow for status display, setpoint changes, and configuration changes.

When used in a stand-alone application (not connected to an AAON HVAC unit controller board), the MODGAS-X Controller will modulate the gas valve to maintain the DISCHARGE setpoint set in the LCD display. The MODGAS-X Controller is activated by a 24VAC signal to the HEAT EN input. Mounting It is important to mount the controller in a location that is free from extreme high or low temperatures, moisture, dust and dirt. The MODGAS-X Controller is housed in a plastic enclosure. It is designed to be mounted by using the 3 mounting holes in the enclosure base. The Heat Sink must be fastened with sheet metal screws to a sheet metal surface. It is important to mount the module in a location that is free from extreme high or low tempera-tures, moisture, dust, and dirt. Be careful not to damage the electronic components when mounting the module.

COMMON

VALV

E

GND

VOUT

GAS

CONTROLS

MADE IN USA

YS102378 REV 1WATTMASTER

SE

RIA

L#

POWER

COMM

ALARM

STATUS

HEAT EN

RLY1

RLY2

RLY3

RLY4

AUX BIN

GND

RESET IN

SAT

AUX AIN

GND

GND

OPTIONS12

R42

R39

J3

U1

D1

C18

D12

D14

R5

R19

R22

R26

R30

TB5

TB1V1

R7

R2C2

TB2

TB4

U210D210

C211

C210

R210

R

RR

C212L210

R

.1uF

.01uF

1962

2803

1212

6042

1502

10201002

2211

.47uF

22uF

3.3uF

2211

2211

2211

5.73

2.62

2.05

4.100.57

0.20

5.00 5.63

5.24

1.68

1.20

0.2505

1.49" DEPTH

Technical Data OE377-26-00058 MODGAS-X ControllerOperating Power 24 VAC Power Consumption 18 VA MaximumOperating Temp -30F to 150F Operating Humidity 90% RH Non-Condensing

Communications E-BUS Weight 1 lb.Three Year Warranty WattMaster reserves the right to change specifications without notice

OE377-26-00058 MODGAS-X Controller

Tim Wenrich
Typewritten Text
Factory Installed
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 77: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: ORION-OE217-02-03-EBUS-DRS-1B.doc Page 1 of 1

Description The OE217 series of Touch Screen E-BUS Digital Room Sensors are used to sense Space Temperature only or Space Temperature & Space Humidity. The OE217-02 model is the Space Temperature Sensor only model and can be used with the VCCX2 Controller, VCC-X Controller or VCB-X Controller and the VAV/Zone Controller. The OE217-03 is a combination Space Temperature & Space Humidity Sensor model and can only be used with the VCCX2, VCC-X or VCB-X Controller. Besides sensing Temperature & Humidity, the E-BUS Digital Room Sensors also provide these other useful features:

• User Friendly Graphical LCD Display with LED Backlight

• Display the Current Space and Outdoor Air Temperature

• Display the Current Space Humidity and Outdoor Air Relative Humidity (OE217-03 Model Only)

• Display the current Zone Setpoint Temperature

• Equipped With Push Buttons for Changing the Zone Setpoint Temperature

• Equipped With an Override Button for Forcing the VAV/Zone Controller or VCB-X Controller into Occupied Operation from Unoccupied Operation

• Provides graphics to indicate the mode of operation

• Provides LEDs to indicate Schedule Override, Button Push, and Alarms

Both sensors connect to the controllers using E-BUS cables of multiple lengths connected between the controller and the sensor. The E-BUS cables should not run in conduit with other AC line voltage wiring or with any conductors carrying highly inductive loads.

Mounting The Digital Room Sensor is designed to be mounted to a vertical, 2” x 4” electrical box recessed in the wall. If the wall cannot be penetrated, a plastic surface mount box such as those made by WiremoldTM, may be used to mount the sensor to the wall surface. The Sensor is mounted by removing the front cover and fastening the housing base to the electrical box using the supplied (2) 6/32” x 1” machine screws. The E-BUS cable is then plugged into the E-BUS connector located on the circuit board that is mounted on the cover. The cover is then placed onto the housing base and the Allen Screw on the bottom of the base is adjusted to hold the cover in place. An additional cover plate is provided in case the sheet rock cut-out is too large to be covered by the regular back plate.

Technical Data OE217-02 & OE217-03 E-BUS Digital Room Sensor

Sensor Element Type III Thermistor 10k ohm@ 77 F Digital Sensing Device

Display 112 x 64 Monochrome Graphical LCD w/LED Backlight

Sensor Reading Range

40F to 120FRH = 0-100%

Connection E-BUS

Ambient Temperature Limits

-40F to 180F Weight 3.2 oz.

Accuracy RH +/-2%, Temp +/- .5F

Three Year Warranty WattMaster reserves the right to change specifications without notice

OE217-02 & OE217-03 E-BUS Digital Room Sensors

Tim Wenrich
Typewritten Text
Field Installed
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 78: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

FILENAME

DATE: B. CREWS

DESCRIPTION:PAGE

DRAWN BY:

Duct Temperature Sensor1

JOB NAME

07/13/15

G-DUCSENS1.CDR

OE230 & OE231

Duct Temperature Sensors

OE230 (6" Probe) & OE231 (12" Probe)

Mounting Plate

Gasket

Adhesive Backed Drill GuideMounting Template

11-1/2" (OE231)

5-1/2" (OE230) Mounting Plate

4.0"

3/4"

1/4" Hex Head Sheet Metal Screws

ThreadTogether

Duct Work

Drill 3/8” Hole In Ductwork For Probe

Leads Are Non-polarized.Butt Splice Leads To 24 GaugeWire Minimum. Connect LeadsTo "Analog In" And "Ground"At Controller.

Notes:

1.)All Wiring To Be In Accordance WithLocal And National Electrical CodesAnd Specifications.

Temperature Sensor Resistance/Voltage Chart

Temp Resistance* Voltage

F Ohms @ Input*-10.............93333........4.620-5...............80531........4.5500...............69822........4.4745...............60552........4.390

10..............52500........4.29715..............45902........4.20020..............40147........4.09525..............35165........3.98230..............30805........3.86235..............27140........3.73740..............23874........3.605

Temp Resistance* Voltage

F Ohms @ Input*�

45..............21094........3.47050..............18655........3.33052..............17799........3.27554..............16956........3.21756..............16164........3.16058..............15385........3.10060..............14681........3.04262..............14014........2.98564..............13382........2.92766..............12758........2.86768..............12191........2.810

Temp Resistance* Voltage

F Ohms @ Input*�

69..............11906 ........2.78070..............11652 ........2.75271..............11379 ........2.72272..............11136 ........2.69573..............10878........2.66574..............10625........2.63575..............10398........2.60776..............10158........2.57078..............9711 ..........2.52080..............9302..........2.46582..............8893..........2.407

Temp Resistance* Voltage

F Ohms @ Input*84..............8514..........2.35286..............8153..........2.29788..............7805..........2.24290..............7472..........2.18795..............6716..........2.055100............6047..........1.927105............5453..........1.805110 ............4923..........1.687115 ............4449..........1.575120............4030..........1.469

125............3656..........1.369

*Chart Notes:

1. Use the resistance column to check the thermistor sensor while disconnected from the controllers (not powered).

2. Use the voltage column to check sensors while connected to powered controllers. Read voltage with meter set on DC volts.Place the "-"(minus) lead on GND terminal and the "+"(plus) lead on the sensor input terminal being investigated. If the voltageis above 5.08 VDC, the sensor or wiring is "open." If the voltage is less than 0.05 VDC, the sensor or wiring is shorted.

The Duct Sensor Is Used For Sensing SupplyOr Return Air Temperatures. Location Of TheSensors Is Very Important In Order To ObtainAccurate Temperature Readings. TheFollowing Recommendations Should BeFollowed:

When Used As A Supply Air Sensor TheSensor Should Be Mounted In The Supply AirDuct As Close To The HVAC Unit As PossibleAnd Upstream Of The Bypass Damper (IfUsed) For Best Results. For Best Accuracy,Apply Insulation On The Outside Of TheDuctwork Over The Sensor. This Will HelpThermal Gradients From Affecting The Sensor.

Supply Air

Return Air

When Used As A Return Air Sensor TheSensor Should Be Mounted In The Return AirDuct As Close To The HVAC Unit As PossibleAnd Upstream Of The Bypass Damper (IfUsed) For Best Results. For Best Accuracy,Apply Insulation On The Outside Of TheDuctwork Over The Sensor. This Will HelpThermal Gradients From Affecting The Sensor.

See The Systems Installation And OperationManual For Other Design Considerations AndRecommendations Regarding DuctTemperature Sensor Location.

Caution!

Technical Specifications

Sensor Element: Type III Thermistor 10k ohm @ 77ºF

Accuracy: � 0.4º F between 40º F to 95º F

Range: -30º F to 150º F

Tim Wenrich
Line
Tim Wenrich
Typewritten Text
Field Installed
Tim Wenrich
Line
Tim Wenrich
Line
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 79: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: Orion-OE265-15-EBUS-Horiz-OA-RH-Sensor-01B Page 1 of 1

Description The OE265-15 E-BUS Horizontal Outdoor Air Temperature and Humidity is a combination Outdoor Air Temperature and Outdoor Air Humidity sensor that connects to the VCC-X or VCB-X Controller using an EBC E-BUS modular cable. This sensor is used when both Outdoor Air Temperature and Humidity are needed for the VCC-X or VCB-X Controller to do Wetbulb or Dewpoint Economizer Control. It is also used if the VCC-X or VCB-X Controller is used in a Make Up Air application to initiate dehumidification based on an Outdoor Air Dewpoint Setpoint.

Mounting A 10 foot EBC E-BUS cable (provided) plugs into the E-BUS Outdoor Air Temperature and Humidity Sensor's attached 3 foot cable and then attaches to an E-BUS Expansion port on the VCC-X or VCB-X Controller or into another available E-BUS Expansion port. The sensor should be mounted in the upright position as shown in an area that is protected from the elements and direct sunlight. CAUTION: Be sure to mount the E-BUS Outdoor Air Temperature & Humidity Sensor in an area that is not exposed to direct sunlight. The shaded area under the HVAC unit rain hood is normally a good location. Unused conduit opening(s) must have closure plugs installed and must be coated with sealing compound to provide a rain-tight seal. Water can damage the sensor.

43213M

4.91

2.34

4.18

2.82

2.35 3.29

36.00 APPROX.

E-BUS CONNECTORFEMALE END

SENSING TUBE

FILTER

HINGED COVER

EBC-10F "WATTMASTER EBUS" "WATTMASTER EBUS" EBC-10F

43

21

3M

43

21

3M

120.00 APPROX.

E-BUS CONNECTOR EXTENSION CABLE WITH MALE ENDS PROVIDED WITH SENSOR

Technical Data OE265-15 E-BUS Horizontal Outdoor Air Temperature and Humidity Sensor

Sensor Element Digital Capacitive Sensing Device

Accuracy RH +/-2%, Temp +/- .5F

Sensor Reading Range

-40F to 185FRH = 0-100%

Connection E-BUS

Ambient Tempera-ture Limits

-40F to 185F Weight 2.3 oz.

Three Year Warranty WattMaster reserves the right to change specifications without notice

OE265-15 – E-BUS Horizontal Outdoor Air Temperature and Humidity Sensor

Tim Wenrich
Typewritten Text
Factory Installed
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 80: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: ORION-OE258-6-BuildingPressureSensor-1B.doc Page 1 of 1

DescriptionThe OE258 Building Static Pressure Sen-sor is used to sense building pressure inapplications where monitoring of thebuilding static pressure is required to in-sure the building maintains the proper airpressurization.

The OE258 Building Pressure Sensorcase is molded from fire retardant glassfilled polyester. The sensor utilizes a ten-sioned stainless steel diaphragm and in-sulated stainless steel electrode. Thisarrangement allows up to 10 PSI over-pressure without damage to the unit. Thesensor provides a 0.0 to 5.0 VDC outputin response to a –0.25 to +0.25 inch WCpressure differential. Accuracy is ± 1% offull scale of the sensor.

For easy wiring the OE258 Building StaticPressure Sensor has (3) 6-32 screw ter-minal wiring connectors. The sensor has(2) ¼” barbed fittings provided for theconnection of tubing to the high and lowpressure ports.

The OE258 Static Pressure Sensor isdesigned to be mounted to a flat surfaceby means of the (2) 0.156 diameter holesprovided in the sensor casing. For accu-rate readings the sensor must bemounted in a vertical position.

Technical Data OE258 - Building StaticPressure Sensor

Operating PressureRange

-0.25” WC to +0.25” WCPressure Differential

Power InputSignal Output

9-30 VDC0 to 5 VDC

Operating Temp 0°F to 150°F Hysteresis ± 0.1% of full scaleCircuit 3 Wire Non-repeatability ± 0.05% of full scaleAccuracy ± 1% of full scale Weight 3 ounces

Three Year Warranty WattMaster reserves the right to change specifications without notice

HIGH

MODEL 265

LOW

- + +

+

1.89

0.95

3.162.74 setra

0.95

1.64

0.156 DIA. HOLETYP. 2 PL.

����������� ������������ ���

Tim Wenrich
Typewritten Text
RTU-1, 2, 3 only
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 81: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: AAON-OE256-07-EBUS-DUCT-CO2-1B.doc Page 1 of 1

Description The E-BUS Duct Mounted E-BUS CO2 Sensor with Remote Pickup (Orion Part No. OE256-07; AAON Part No. V09320) is used in conjunction with the VCB-X Controller (Orion Part No. OE335-23-VCB-X; AAON Part No. V04740) to monitor and control Return Air CO2 levels in the building environment. Some typical applications are:

Demand Control Ventilation

Controlling ventilation in a building where the occupancy varies frequently

Controlling ventilation based on CO2 levels to ensure excess outdoor air is not causing energy waste

To ensure good air distribution throughout building zones

The OE256-07 is used for monitoring duct CO2 levels and is designed for permanent mounting in the Return Air duct. It utilizes an aspiration box to accurately capture CO2 levels in the duct. It con-nects to the VCB-X by using an E-BUS cable with E-BUS connectors.

The OE256-07 CO2 Sensor uses non-dispersive infrared (NDIR) technology and has a measure-ment range of 0-2000 ppm.

Mounting The OE256-07 CO2 Sensor is housed in an aspira-tion box. A conduit clamp is provided to help seal the opening where the sensor cabling penetrates the aspiration box housing. The sensor has a Jack E-BUS connector for connecting it to the provided EBC E-BUS cable. The EBC E-BUS Cable con-nects to the VCB-X Controller or E-BUS Hub or Adapter Board and then to the VCB-X Controller. The sensor and aspiration box assembly is mounted and secured to the ductwork with the (2) supplied sheet metal screws. The remote pickup tube assembly is mounted separately to the duct-work by first cutting a 11/4” diameter hole in the ductwork wall. The remote pickup tube is then in-serted into the hole. The remote pickup tube is then secured to the ductwork by inserting (2) supplied sheet metal screws through the (2) mounting holes in the remote pickup tube mounting plate and securing the remote pickup tube assembly by screwing it to the ductwork using a manual or powered screw driver to tighten the screws. Using the supplied 10 ft. long tub-ing, connect the remote pickup tube to the aspiration box assembly, cutting the tubing to fit.

43213M

E-BUS CONNECTORFEMALE END

SENSOR HOUSING

HINGED COVER

BRASS BARBFITTINGS FOR0.170 I.D. TUBING

BRASS BARBFITTINGS FOR0.170 I.D. TUBING

EBC-10F "WATTMASTER EBUS" "WATTMASTER EBUS" EBC-10F

43

21

3M

43

21

3M

120.00” APPROX.

120.00” APPROX.

E-BUS CONNECTOR EXTENSION CABLE WITH MALE ENDS (PROVIDED WITH SENSOR)

0.170 I.D. TUBING (PROVIDED WITH SENSOR)FIRE RATED

CO2 PICKUP TUBE (PROVIDED WITH SENSOR)

CO2 SENSOR, HOUSING AND CABLE ASSEMBLY

5.00

"

3.31"

4.12"

2.55”

13.0

0"A

PP

RO

X.

8.25"0.55”

4.06

"

2.81”

Technical Data OE256-07 E-BUS Duct Mounted CO2 Sensor with Remote Pickup

Input Power 12-34 VDC Power Consumption 30 mW Maximum Average1.25 W Peak Power

Operating Temperature 14 to 122F Operating Humidity 5-95% RH Non-CondensingSample Method Flow-Through

50-100 ml/minMeasurement Range 0 to 2000 ppm

Sensitivity <20 ppm Resolution 1 ppmAccuracy 50 ppm @ 1000 ppm or

2% measured valueCommunications E-BUS

One Year Warranty WattMaster reserves the right to change specifications without notice

OE256-07 E-BUS Duct Mounted CO2 Sensor with Remote Pickup

Tim Wenrich
Typewritten Text
Field Installed - RTU-1, 2, 3, 4
Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units
Page 82: Shop Drawing/ Submittal Revie* Factory start up requires a minimum of 3 weeks notice prior to schedule. *Pre-start up checklists must be submitted with request to schedule a date.

Form: ORION-OE391-12-ModularServiceToolSD-1C.doc Page 1 of 1

Description The OE391-12 Modular Service Tool SD is a system interface that provides a direct link to enable the system operator to view the status, configure, and adjust the setpoints of the following Orion controllers:

VCC-X Controller VCM-X Series Controller VCM-X E-BUS Series Controller VCB-X Controller RNE Controller SA E-BUS Controller VCM Controller VAV/CAV Controller MUA II Controller VAV/Zone Controller MiniLink PD

The OE391-12 Modular Service Tool SD is housed in a black plastic enclosure. The display area is covered with a clear plastic bezel for protection of the display screen. The Modular Service Tool SD has a four line by 20 character display panel with adjustable contrast control and a 27 key membrane keypad for data selection and entry. All keypad operations are simple and straight forward, utilizing non-cryptic plain English language messages. Menu-driven programming allows for easy setup and operation without the need for specialized training. The OE391-12 Modular Service Tool SD is supplied with a programmable 4 Gigabyte SD memory card, with (4) AA 1.5 V batteries, a wall mount a DC power supply, a mini-Din communication cable, and an E-BUS communication cable. The mini-Din cable allows you to connect the Modular Service Tool to any Orion controller which has a mini-Din connector socket for programming, monitoring, and troubleshooting purposes. The Modular Service Tool is also equipped with an EBC E-BUS port and an RS-485 three conductor terminal block port. The E-BUS port and included E-BUS cable are used for updating E-BUS Module software. The RS-485 port is used for hard-wiring to older controllers that do not have a mini-DIN connector socket. The Modular Service Tool SD is designed to be carried by the system installer or service technician. Its rugged plastic housing provides superior protection for the electronic components housed inside. The Modular Service Tool SD is a top quality service tool that will stand up to the demands of the typical job site for many years.

Technical Data OE391-12 Modular Service Tool SDPower (4) AA (1.5V) Batteries

Supplied Display 4 Line by 20 Character

Power Switch Membrane Switch Network Connection RS-485Operating Temp 10F to 149F Protocol HSI Open Protocol Token PassingOperating Humidity

90% RH Non-Condensing Color Black

Keypad 27 Key Membrane Style Communications RS-485 9600 or 57,600 BaudSD Memory Card Programmable 4 Gigabyte Connections RS-485 and EBC E-BUS Ports3 Year Warranty WattMaster reserves the right to change specifications without notice

OE391-12 Modular Service Tool SD

Justin
Text Box
NB ROGERS, INC SUBMITTAL 1708-003 SPEC SECTION 237435 Packaged Roof-top Units