Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

22
Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director

Transcript of Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Page 1: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Shoals Marine LabWind Turbine Construction, June 2007

William E. BemisKingsbury Director

Page 2: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Parts for the tower arrived in the evening of June 21.

Page 3: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

We transferred tower components to the barge.

Page 4: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

We barged them to the high tide pier for unloading.

Page 5: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Ross Hansen is sitting on the counterweight.

Page 6: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Kevin Carpenter on the tower during initial construction.

Page 7: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.
Page 8: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Frank, Kevin and Mike installing the stop for the mast.

Page 9: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Bob Pechie describes how to install it.

Page 10: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

View of the SML campus from the top of the tower.

Page 11: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.
Page 12: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

The first part of the mast is installed on its pivots.

Page 13: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

First section of mast being installed.

Page 14: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Second section of mast and counterweight.

Page 15: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Third section of mast being installed.

Page 16: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.
Page 17: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.
Page 18: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.
Page 19: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.
Page 20: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Generating electricity on day one: June 29, 2007.

Page 21: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

Generating electricity on day one: June 29, 2007.

And that is not all…

Page 22: Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.

SML’s Engineering Interns installing solar panels: July 2007.