Environmental Consulting - ARCADIS (UK) Capability Statement - Property
Sherwood Group Consulting Profile and Capability
-
Upload
kitipan-kitbamroong -
Category
Documents
-
view
225 -
download
0
Transcript of Sherwood Group Consulting Profile and Capability
-
8/6/2019 Sherwood Group Consulting Profile and Capability
1/24
PTTEP
Millea Life
Unocal Thailand
Uncial Indonesia
SonyBehringer
RTZ
Coles Myer
Victorian Government
Reference sites significant
INFOR PM Projects
-
8/6/2019 Sherwood Group Consulting Profile and Capability
2/24
About us
-
8/6/2019 Sherwood Group Consulting Profile and Capability
3/24
Business Case . /
Requirementsy User Touch to enable collaborative
performance improvementy Access to KPI performancey
Update information and forecasty Get alerts on out of gauge issue
y Empower Business to allow users to makeown decisionsy To have locate and analysisy Make own reportsy Demonstrate trustworthy reliable datay Provide control over updates
y Change Environment to allow confidenceand growthy Consistent and security data warehousey Compliant Robust Systemsy Design for flexible growthy Able to be managed with out reliance on ITy Supported ongoing by vendors and consultant
-
8/6/2019 Sherwood Group Consulting Profile and Capability
4/24
4
A Design approach
Linked Top-Down / Bottom-Up Performance Process
Best Practice Design Approach
New & Recurring Revenues Expenditure Capital
Earnings, Cash Flow, Capital ReportingPerformance Metrics, Sales Distribution Operational KPIs
Sales and Channel Planning
Revenue Planning NewBusiness Renewals etc
Department CashExpenses Planning
Expense Allocation& Partner Recovery
Allocation
SOE Cash ExpensesClassification
Other Expenses &
Payment PlanningTax & Working Capital
Capital ProjectsDetail Planning
Capital Project &Reporting
Analysis
PerformancePlanning
DD&AReporting
Net CashExpenses & Analysis
-
8/6/2019 Sherwood Group Consulting Profile and Capability
5/24
Examples of PTTEP System
Documentation Index
-
8/6/2019 Sherwood Group Consulting Profile and Capability
6/24
Unocal Sizing Very large
y 150 users +
y
30
companies x 2 Gross and Net Partners withmixed currencies
y 65-70 Mixed partnerships & ownerships
y 10000 + projects dynamically added
y 45 year outlook with 5 years History at cutover
y Change management process mapping
y Build time 5 months / rollout 4-8 months
-
8/6/2019 Sherwood Group Consulting Profile and Capability
7/24
E.G. AS400 Infor PMIntegration Flow
Other DB
AS400Financials System
AccountBalances
INFORTranslated
Balances
StructureUpdate
AutomatedMatching &
updating
Transaction Detail
Trans &SumData
SummaryData
Detail transaction drillthrough inquiry
AccountStructure
s(Value
accounts
only)
MPCTranslated
AccountsStructures
Web & ExcelInterface for
Reporting andData entry
Linkedtransaction
drill throughreports
INFORInterfaceDataSources
UserStored
Spreadsheet Data
OpenLink
DataLoad
er
Structure
Loader
Flat
File
Structure
Sync
Validation newaccounts check
DataStructureTrans &
Sum Data
Infor PMData
Warehouse
e.g. Allocation, Data
Conversion
-
8/6/2019 Sherwood Group Consulting Profile and Capability
8/24
Fully Automated ETL Data
-
8/6/2019 Sherwood Group Consulting Profile and Capability
9/24
Design for all but implement in
stages and allow for growth
Architect is used to create and maintain the database structure, formulas, and security.
INFOR PM
Strategic
KPI
Data
Strategic
KPI
Data
OperationalData
OperationalData
-
8/6/2019 Sherwood Group Consulting Profile and Capability
10/24
Millea Life Documentation
-
8/6/2019 Sherwood Group Consulting Profile and Capability
11/24
Size Small to Medium
Stage approach with users
trained
25-30 users
Single currency company
Budget and reporting only
Designed for expansion project andanalysis
Finance only for now incluidesallocations
Build 1.5 months immediate
reporting use Budget rollout august uses to compete
assisted by sherwood
-
8/6/2019 Sherwood Group Consulting Profile and Capability
12/24
Millea Life Insurance
(Thailand) PCLPerformance Management
System MLI-PMOperational User Manual
Prepared by Kanya Namsirikul (MLI)
&
Gordon Wood (Sherwood)
May 31 2009
This manual serves as a guide for operational use of the MLI-PM system using Infor PM
software The format and style is based on answering frequently asked questions.
-
8/6/2019 Sherwood Group Consulting Profile and Capability
13/24
All designed and, project managed by
Sherwood Group Consulting
Other Projects size and
complexity
-
8/6/2019 Sherwood Group Consulting Profile and Capability
14/24
Other Projects size and
complexity Sony Thailand Reports and budgets
Size large & complexity medium 3months I stage
Unocal Thailand - Plans reports & budgets Size Large and Complex high 6 & 4
months 2 stage
Unocal Indonesia - Plans reports & budgets
Investment Portfolio Mgt and production mgt Size very Large 6 moths x 3 over 3 stages
plus operational support contract
Ingram Micro Reporting Ops and Fin
Size large complexity medium 4 months
Behringer Plans Reporting budgets Ops &Fin Size Medium & complexity complex 4
months each over 2 stages
-
8/6/2019 Sherwood Group Consulting Profile and Capability
15/24
Thailand 3+3
Singapore 1 + 1
Australia 5
Other Partners (Malaysia 1
Taiwan1
UK 2 HK1)
Sherwood Group Consulting
Expertise
-
8/6/2019 Sherwood Group Consulting Profile and Capability
16/24
Our Team in ThailandCire
y Gordon Wood Project Coach PM
Key commitment semi F/Time)
y
Kitipan Kitbamroong BI Project Manager / BA
Key commitment full time
y Wichit Chuebupa BI Specialist Key
Commitment Semi F /Time
y NittiAkkaragulchai as needed System Integrator Consultant
Cover Technical Local
Other
Jimmy Harhadi as needed BI Specialist
Integration Consultant
cover Technical offshore
Chatchaya Chumsri ProjectAccount Manager
Cover (documentation)
-
8/6/2019 Sherwood Group Consulting Profile and Capability
17/24
-
8/6/2019 Sherwood Group Consulting Profile and Capability
18/24
-
8/6/2019 Sherwood Group Consulting Profile and Capability
19/24
-
8/6/2019 Sherwood Group Consulting Profile and Capability
20/24
-
8/6/2019 Sherwood Group Consulting Profile and Capability
21/24
-
8/6/2019 Sherwood Group Consulting Profile and Capability
22/24
-
8/6/2019 Sherwood Group Consulting Profile and Capability
23/24
Project Timeline Approach
Project Management
Plan
Definition of
deliverables
Design
Design prototyping
Sara testing piloting
Design sign off
Build
Data Interfaces and
Integration
Data warehouse set up
Business rules and
reports set up
Test
Input and Reports
History Loading/
Deploy
Performance tuning
UserAcceptance Test
Live
Rollout 1
Support level setup
Activity Month 1
Project awarded Kick off meeting
Design Sign Off
Complete UAT
Go Live
Test Run
Month 1 Month 1Month 1
-
8/6/2019 Sherwood Group Consulting Profile and Capability
24/24
Next Stepsy NDA signed
y Reports and source data flow specs detailed
y
Data warehouse specificationsy Process specification
y Pilot build (risk assessment
y Define scope
y Proposals submitted
Estimated to complete for review and propose
1 week
Initial Budget estimates: 100-120 man days
approx 2.5 million elapsed time 60 days
excludes support.