• Fire suppression system for East Complex
• Existing fire pump replacement under separate Board item
• Backup power generator
• Uninterrupted water flow
• Ensure fire system resiliency
• Safer environment for Port tenants, staff, and visitors
LOCATION
EAST COMPLEX
FIRE PUMP
ADMIN BUILDING
1. Valley Power Systems North, Inc. $187,180.25West Sacramento
2. Holt California $354,250.00Salida, CA
3. Generac (GSA Pricing) Could not provide required equipment
Waukesha, WI
PRICING
Port staff proposes that the Port pay for this project with funds as follows:
Capital Budget FY 2020-2021 Principal Projects: Firefighting System with Backup Power
FEMA Grant 75%: 2019-PU-00447 $140,385.19 Port match 25%: $46,795.06
If authorization is given, the project shall be completed within 16 weeksafter the order is placed.
FINANCING & COMPLETION TIME
A. Authorize the Port Director to purchase a Blue Star 400 kw mobile Tier IV diesel generator from Valley Power Systems North, Inc. for $187,180.25.
RECOMMENDATION
Shed 8 Fire Pump
March 1, 2021
HISTORY
Previous Board approval October 19, 2020
Vendor unable to provide equipment
Second quote moved to first position
PROJECT OVERVIEW
• Existing fire pump outdated
• Fire suppression system for East Complex
• Water pump and backup power generator
• Uninterrupted water flow
Demolish existing
fire pump
Repair concrete
New fire pump and electrical
service
LOCATION
EAST COMPLEX
FIRE PUMP
ADMIN BUILDING
PROCUREMENT & FINANCING
SIMPLIFIED ACQUISITION THRESHOLDThomas & Associates, Novato, CA: $466,520
Capital Budget FY 2020-2021 Principal Projects: Firefighting System with Backup Power
FEMA Grant 75%: 2019-PU-00447 $349,890
Port match 25%: $116,630
COMPLETION TIME: 4 – 5 MONTHS
A. Authorize the Port Director to purchase an emergencybackup fire system from Patterson Pump Company in careof Thomas & Associates for $466,520.