Shear Test Assembly update. 3-9-07. Design of Pull Fixture history. Single shear through bolt approach abandoned due to potential bending effects entering into test. Double shear (two tapped joints) adopted. - PowerPoint PPT Presentation

Transcript of Shear Test Assembly update

Page 1: Shear Test Assembly update

Shear Test Assembly update

3-9-07

Page 2: Shear Test Assembly update

Design of Pull Fixture history

• Single shear through bolt approach abandoned due to potential bending effects entering into test.

• Double shear (two tapped joints) adopted.• Design calls for two tapped joints to be

assembled into test fixture in a prototypic manner using all washers, bushings and frictional coatings used in the real assembly (140-190-2).

Page 3: Shear Test Assembly update

Use 4-post MTS testing Machine in 4508

50 Kip Loadcell (50 kip max load)

Linear Alignment coupler (provided by Rick) [1.5-12 threaded internal and external]

LVDT Rack (LVDT’s are 0.25 in max range)

McMaster Carr tank [18” X 12” x 18”: 18 gauge) [3763K131]

2” Styrofoam enclosure either purchase or assemble panels with RTB.

Tank base – 4.5 OD (2” ID) conflats and bellows

Linear Alignment coupler

Threaded Adaptor to go from grip to linear alignment coupler

Page 4: Shear Test Assembly update

Machine Specs

• Max loading on machine in current configuration with loadcell, Grips, spherical bearings is 50 Kips.

• This allows a maximum load of 25,000 lbs/joint in double shear.

• Machine Maximum loading is 110 Kips.

Page 5: Shear Test Assembly update

Testing of Joint

• Static– 1. Compression preload of 68,000 lbs on

NCSX Bolts. (25 pulls)– 2. Compressed preload of 25,000 lbs on

NCSX bolts. (25 pulls)– 3. no preload on joint (25 pulls)

• Cyclic loading on joint will be performed at 0.5 Hz to 100,000 cycles for case 1 and 2. (approx 55 hrs each of testing to get this) Thermal Float switch for LN2 being developed.

Page 6: Shear Test Assembly update

Cryo Containment for tank

4.5 OD half nipple401004 (Clearance)  REF# 250-1

MDC Bellows400005 (clearance) REF# 250-X2.00” Bellows ID

Blank CF flange 110018 (through) REF# F450000

welded

1.5” pull rod stainless steel

Female Adaptor

1.5”- 12 1.5”-12

insulation

18 gauge SS can

All items shown on this page have been received

Page 7: Shear Test Assembly update

Fabrication Status of Load-train

• All parts for tank-cryo system (including tank, insulation, bellows conflats etc) have been ordered and have arrived

• Pull rods have been ordered should be received by this week.

• Couplings, adapters, pull rods to be machined within two weeks.

• LVDT’s (0.25” max range) to be ordered this week.

• DWG’s of the pull specimen that PPPL will be assembling will be complete by 3-12-07.

Page 8: Shear Test Assembly update

Layout of Pull Fixture

140-190-2 bolt Assembly (2X)

Alignment between bottom and top pull rods must be maintained.

1.5 -12 threaded

1.5 -12 threaded

Bottom plate can be made at ORNL if needed

Four ¾”bolts (2 per side) with slightly oversized holes in bottom plate to allow for alignment.

Tapped for ¾”-10 bolts

1.375 – 6 Class 3 tapped holes

Page 9: Shear Test Assembly update

LVDT locations

Pull Fixture iso view

Page 10: Shear Test Assembly update

Quick FEA Model

Model has bonded interfaces at Model has bonded interfaces at all connections. No slipping or all connections. No slipping or slidingsliding

G10 bushings and middle shim.

Model is locked at one end of rod.

50,000 lbs applied to one end of rod

Page 11: Shear Test Assembly update

Global Deflection (scaled)

Page 12: Shear Test Assembly update

Bolt assembly Deflection (obviously scaled)

Page 13: Shear Test Assembly update

Quick Check; How much length to dissipate LN2 in a 1.5” rod in room air.

Tb = 77K, x = 0

Kss = 14 W/m-K, L→∞, D = 1.5”

Air: T= 25 C h = 15 W/m^2K

2/12/1

4

kD

h

kA

hPmwhere

eTTTT

c

mxb

LN2

Infinitely long rod

Temperature profile of rod exiting cryostat

-196

-152

-108

-64

-20

24

0 2 4 6 8 10 12 14 16

Location along rod (in)

Tem

p (

C)

Need 6 inches before hitting the MTS machine