Shale Tech 2011 Presents Global focus
-
Upload
gene-citrone-jr -
Category
Documents
-
view
217 -
download
0
Transcript of Shale Tech 2011 Presents Global focus
-
7/30/2019 Shale Tech 2011 Presents Global focus
1/26
-
7/30/2019 Shale Tech 2011 Presents Global focus
2/26
PerformanceStep
Change:
NewApproachtoBakkenField
Development
HaniIbrahim,SmithBits,ASchlumbergerCompany
ValentinVisinescu,
M
ISWACO,
A
Schlumberger
Company
-
7/30/2019 Shale Tech 2011 Presents Global focus
3/26
Agenda
BackgroundInformation
TraditionalApproach
NewApproach
Results
-
7/30/2019 Shale Tech 2011 Presents Global focus
4/26
BackgroundInformation
BakkenShaleisahugeFieldspanningacross2
statesand
over
to
Canada
Extractioncostandcomplexityhampered
activity MultipleSwellPackersrunoncompletion
necessitategaugedwellboreandfreeofdebris
-
7/30/2019 Shale Tech 2011 Presents Global focus
5/26
AreaMap
-
7/30/2019 Shale Tech 2011 Presents Global focus
6/26
Lithology
-
7/30/2019 Shale Tech 2011 Presents Global focus
7/26
TypicalWell
Schematic
-
7/30/2019 Shale Tech 2011 Presents Global focus
8/26
Typical
Wellbore
Design
-
7/30/2019 Shale Tech 2011 Presents Global focus
9/26
TraditionalApproach
Eachcomponentinthedrillingstringis
handledseparately
Effectonotherelementsinthedrillstringis
oftenignoredornotconsidered
-
7/30/2019 Shale Tech 2011 Presents Global focus
10/26
NewApproach
Holisticapproachwhereeverycomponentin
thedrilling
environment
is
vetted
for
the
purposeandexaminedinrelationtoallother
componentsorwellborecondition.
Proprietarysoftwaresimulatedrilling
environmentandcorrectplacementto
minimizeShock
&
Vibrations
and
provide
best
Drillingenvironment.
-
7/30/2019 Shale Tech 2011 Presents Global focus
11/26
OptimizationFlowProcess
SELECTCANDIDATE
Well/ClientPROPOSE
PROCESS&PRICINGto
SelectedClientESTABLISH KPIs
WithCustomerASSIGN
OPTIMIZATIONTEAM
COLLECTDATA&BenchmarkOffsetwells
MODELWELLWellPath,BHAs,Fluids,Hydraulics,
Etc.
EXECUTE
PLAN
FINALIZEPLANReviewwithClient
ReviewLogistics
POSTWELLANALYSIS
-
7/30/2019 Shale Tech 2011 Presents Global focus
12/26
OffsetWellGeologicalAnalysis
-
7/30/2019 Shale Tech 2011 Presents Global focus
13/26
-
7/30/2019 Shale Tech 2011 Presents Global focus
14/26
ProprietaryBHA
Modeling
Software
-
7/30/2019 Shale Tech 2011 Presents Global focus
15/26
ProprietaryHydraulics
Modeling
Software
Hole Cleaning
Time (hr)
HoleCle
aningIndex
0 20 40 60 80 100
0
0.25
0.50
0.75
1.00
Pump Pressure
Time hr
PumpPressure(psi)
0 20 40 60 80 100
2200
2400
2600
2800
Rotary Speed
Time (hr)
RotarySpeed(rpm)
0 20 40 60 80 100
0
20
40
60
80
Min and Max ECD Profiles
ECD (lb/gal)
Depth(1000ft)
9.76 9.84 9.92 10.00
2.00
4.25
6.50
8.75
11.00
ECD @TD
Time hr
ECD@TD
(lb/gal)
0 20 40 60 80 100
9.84
9.92
10.00
ROP
Time (hr)
ROP(ft/hr)
0 20 40 60 80 100
0
8
16
24
ECD @Shoe
Time (hr)
ECD@S
hoe(lb/gal)
0 20 40 60 80 100
9.76
9.80
9.84
9.88
9.92
Flow Rate
Time hr
FlowRate(gal/min)
0 20 40 60 80 100
480
500
520
540
560
Schedule
Time (hr)
Operation
0 20 40 60 80 100
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Drilling
Sliding
Circulating
9.625
8.921
8.750
GeometryMD/TVD Csg OD/ID(ft) (in)
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
Depth(ft)
Operation: Circulating @ 83.00 hrRotary Speed: 60 rpm
Penetration Rate: 0 ft/hrFlow Rate: 550 gal/min
MD: XXXXX ftTVD: XXXXX ft
Bit Size: 8.75 inDate: XX/XX/XXXX
Operator: Shale Gas OperatorWell Name: Well #1
Location: Williams County, NDCountry: USA
VIRTUAL HYDRAULICS*
RHECON*1995-2011 M-I L.L.C. *Mark of M-I L.L.C.
-
7/30/2019 Shale Tech 2011 Presents Global focus
16/26
ProprietaryHydraulicsModelingSoftware
-
7/30/2019 Shale Tech 2011 Presents Global focus
17/26
OperationMonitoring
Wellismonitored24/7byspecialized
personneltoprovideguidanceand
recommendationsthroughoutthedrillingoperation
Compliance
to
the
suggested
parameters
is
electronicallymonitored
LessonsLearntcapturedandappliedina
ContinuousImprovement
(CI)
cycle.
-
7/30/2019 Shale Tech 2011 Presents Global focus
18/26
Parameters&WellMonitoring
-
7/30/2019 Shale Tech 2011 Presents Global focus
19/26
ParametersComplianceResults
Compliance > 90%
Compliance > 90%
-
7/30/2019 Shale Tech 2011 Presents Global focus
20/26
0
5000
10000
15000
20000
25000
0 5 10 15 20 25 30 35
Planned
Actual
-
7/30/2019 Shale Tech 2011 Presents Global focus
21/26
Optimization
Cycle
for
Continuous
Improvements
-
7/30/2019 Shale Tech 2011 Presents Global focus
22/26
RESULTS
HolisticOptimization
-
7/30/2019 Shale Tech 2011 Presents Global focus
23/26
-
7/30/2019 Shale Tech 2011 Presents Global focus
24/26
-
7/30/2019 Shale Tech 2011 Presents Global focus
25/26
-
7/30/2019 Shale Tech 2011 Presents Global focus
26/26
QUESTIONS
Questions