Grand Parkway Infrastructure
SH 99 Grand Parkway Construction ProjectSegments H, I-1 & I-2
A TxDOT Project
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Grand Parkway Infrastructure (GPI) ?
Grand Parkway Infrastructure (GPI) is a joint venture between:
∙ Ferrovial Agroman US Corp.∙ Webber LLC∙ Granite Construction Inc.
Submitted a design-build bid to the Texas Department of Public Safety (TxDOT) for State Highway (SH) 99 Grand Parkway Segments H, I-1 & I-2 project.
GPI was awarded the contract in March 2017.
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
What is it?
The continuation of the construction of an 184-mile highway loop around the Greater Houston area.
SH 99 Grand ParkwaySegments H, I-1 & I-2
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
SH 99 Grand Parkway Segments H, I-1 & I-2
Fast Facts:
• Project cost: $894 Million• Represents 52.8 miles of the SH 99/Grand Pkwy loop• Nearly 270 million cubic feet of earth will be moved• Stretches from US 59/69 in New Caney (north) - to SH
146 in Baytown (south)• Chambers, Harris, Liberty, and Montgomery counties• Owned by the Texas Department of Transportation
(TxDOT)
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Project Benefits
The SH 99 Grand Parkway Segments H & I Construction Project will help:
• Improve mobility• Improve safety and reliability• Support business growth • Employ qualified subcontractors and
Disadvantaged Business Enterprise (DBE)subcontractors
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Project Scope Overview
SH 99 Grand Parkway Segments H, I-1 & I-2 are expected to be completed 2022.
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Project DescriptionSegment H
• Location: US 59 North/I-69 to US 90 • Length: 23.3 miles • Number of main lanes: 2 (1 each
direction) • Frontage roads: 2 discontinuous
frontage roads• Direct connector bridges: 0• Main lane bridges: 45• Frontage road bridges: 2• Ramp Bridges: 0• Turnarounds: 3• Tolling locations:
Main lanes: 2Ramps: 12
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Project Description Segment I-1
• Location: US 90 to IH-10 • Length: 14.7 miles • Number of main lanes: 2 (1 in each
direction) • Frontage roads: 2 discontinuous
frontage roads• Direct connector bridges: 0 • Main lane bridges: 25• Frontage road bridges: 0 • Ramp bridges: 2• Turnarounds: 4• Tolling locations:
Main lanes: 1Ramps: 8
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Project Description Segment I-2A
• Location: IH-10 southward to justeast of FM 1405
• Length: 8.7 miles • Number of main lanes: 4 (2 each
direction) • Frontage roads: 2 discontinuous
frontage roads• Direct connector bridges: 0 • Main lane bridges: 6• Frontage road bridges: 0 • Ramp bridges: 0 • Turnarounds: 3• Tolling locations:
Main lanes: 1Ramps: 2
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Project Description Segment I-2B
• Location: Just east of FM 1405westward to SH 146
• Length: 6.1 miles • Number of initial main lanes: 4 (2
each direction) • Frontage roads: 2 discontinuous
frontage roads• Direct connector bridges: 0 • Main lane bridges: 14• Frontage road bridges: 0 • Ramp bridges: 0 • Turnarounds: 5• Tolling locations:
Main lanes: 2
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
SAFETY – Our First Priority
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Safety Promise
Grand Parkway Infrastructures (GPI) is committed to providing its employees, subcontractors, vendors, visitors, and stakeholders within and around the work zone a safe work environment.
It is our policy to provide and maintain standards of safety, health and environment in accordance with Federal, State and Local Laws and Regulations.
Crew members are consistently trained on safety awareness through toolbox talks, inspections, planning, and any other means of education and enforcement.
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Disadvantaged Business Enterprise (DBE)
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
DBE Eligibility Requirements
• to assist the development of firms that can compete successfully in the marketplace• must be an independent business• three-year average gross receipts must not exceed $23.98 million for highway
construction firms and less for other work categories• personal net worth of the individuals cannot exceed $1.32 million
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Employment Opportunities
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Working with GPI
http://sh99grandpkwy.com/join-the-team/job-opportunities/
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Communicating with GPI
Grand Parkway Infrastructure
SH 99 Grand Parkway Segments H, I-1 & I-2 A TxDOT Project
Stay Informed
Please visit www.sh99grandpkwy.com for more information about the project. Or you can sign up for:
eAlerts: Lane closures and urgent traffic noticeseUpdates: Project information and news
Updates will also be available on:
Facebook – SH 99 Grand Pkwy
Twitter - @SH99GrandPkwy
Information Hotline: 877-553-7374
Email Address: [email protected]
Public Information Center:
Wachter Building
7560 FM 1960
Dayton, TX 77535
Monday-Friday: 7:30 a.m. to 5:00 p.m.
Saturday: 9:00 a.m. to 12:00 noon