sf7df8f+} ljZjljBfno w'lnv]n TSER (Skill Based Training ... · cu.m. 3 Earthwork in excavation in...

15
sf7df8f+} ljZjljBfno w'lnv]n TSER (Skill Based Training For Social & Economic Rehabilitation) Jbf/f ejg lgdf{0f sfo{sf] nfuL sf]6]zg cfJxfg ;DalGw ;"rgf o; sf7df8f+} ljZjljBfno w'lnv]n TSER (Skill Based Training For Social & Economic Rehabilitation Project Jbf/f ejg lgdf{0f sfo{sf nflu /fd]5fk l:yt dGyln g=kf= j8f g+ ! sf] s'8x/df lgdf{0f x'g] ;fd'bflos tflnd xnsf] nflu tkl;ndf pNn]v ul/P cg';f/sf n=O{ tof/ ul/ of] ;"rgf k|sf;zt ul/Psf] 5 . OR5's kmd{x?n] pNn]vLt n=O{ cg';f/ s] slt d"Nodf ug{ u/fpg ;Sg] xf], ;f] sf] lznalGb k|:tfj of] ;"rgf k|sflzt ePsf] ldltn] ^ lbg leq sfof{no v'nf /x]sf] sfof{no ;do leq cfOk'Ug] ul/ k|:tfj btf{ ug{ of] ;'rgf k|sflzt ul/Psf] 5 . /lhi6« f/ sf7df08f} ljZjljBfno ;+ks{ sf7df8f+} ljZjljBffno, w'lnv]n, sfe|] kf]= a=g+= ^@%) kmf]gM )!! ^^!#(( km\ofS;M )!! ^^!$$# E-mail: [email protected]

Transcript of sf7df8f+} ljZjljBfno w'lnv]n TSER (Skill Based Training ... · cu.m. 3 Earthwork in excavation in...

sf7df8f+} ljZjljBfno w'lnv]n TSER (Skill Based Training For Social & Economic

Rehabilitation) Jbf/f ejg lgdf{0f sfo{sf] nfuL sf]6]zg cfJxfg ;DalGw ;"rgf

o; sf7df8f+} ljZjljBfno w'lnv]n TSER (Skill Based Training For Social & Economic

Rehabilitation Project Jbf/f ejg lgdf{0f sfo{sf nflu /fd]5fk l:yt dGyln g=kf= j8f g+ ! sf]

s'8x/df lgdf{0f x'g] ;fd'bflos tflnd xnsf] nflu tkl;ndf pNn]v ul/P cg';f/sf n=O{ tof/ ul/ of]

;"rgf k|sf;zt ul/Psf] 5 . OR5's kmd{x?n] pNn]vLt n=O{ cg';f/ s] slt d"Nodf ug{ u/fpg ;Sg] xf], ;f]

sf] lznalGb k|:tfj of] ;"rgf k|sflzt ePsf] ldltn] ^ lbg leq sfof{no v'nf /x]sf] sfof{no ;do leq

cfOk'Ug] ul/ k|:tfj btf{ ug{ of] ;'rgf k|sflzt ul/Psf] 5 .

/lhi6« f/

sf7df08f} ljZjljBfno

;+ks{

sf7df8f+} ljZjljBffno, w'lnv]n, sfe|]

kf]= a=g+= ^@%)

kmf]gM )!! ^^!#((

km\ofS;M )!! ^^!$$#

E-mail: [email protected]

Bill of Quantity

Project : Construction of KUBIC community hall at Manthali,Ramechhap

S.N. Description of Work

Qty

Unit

Rate Rs.

Quantity

Remarks

in figure

in Words

A General works

1 site clearence before and after construction with surface

dressing

1.00 LS

B EARTH WORKS

2

Earthwork in excavation to develop the site before starting

the construction work using the dozer and other means of

equipment alo by the labourer if required as per instuction

all complete

50.00

cu.m.

3

Earthwork in excavation in hard/boulder mix soils in

foundation including 10m hauling distance and 1.5 m. lift

all complete.

13.68

cu.m.

4

Earth filling in 150 mm thick layer, watering, ramming

including supply of filling materials within 10 m distance

all complete.

15.41

cu.m.

C STONE WORKS

-

5 Dry stone soling in foundation and floor including sand

filling in joints, leveling, watering etc. all complete.

1.27

cu.m.

D BRICK WORKS

-

6

Good quality local chimney made Brickwork in 1:4 C/S

mortar up to ground floor in perfect line level finishe

including wetting the bricks, racking the joints and curing

the work for at least 7 days all complete.

25.43

cu.m.

E P.C.C. & R.C.C. WORKS

-

7

Plain cement Concrete (PCC) in 1:3:6 ratio for

foundations, flooring and walls with approved quality of

cement and sand and crushed stone aggregate including

mixing, laying, curing etc all complete in approval of site

engineer.

1.70

cu.m.

8

Plain cement Concrete (PCC) in 1:2:4 ratio for

foundations, flooring and walls with approved quality of

cement and sand and crushed stone aggregate including

mixing, laying, curing etc all complete in approval of site

engineer.

1.28

cu.m.

9

Plain cement Concrete (PCC) for RCC works (1:1.5:3) for

sill/lintels/stitch band with approved quality of cement and

sand and crushed stone aggregate including mixing, laying,

curing etc all complete in approval of site engineer.

3.61

cu.m.

10

Reinforcement bar of fe 415/500 grade including

straightening, cleaning, cutting, binding & fixing in

position with annealed tying binding wire as per drawing,

design & instruction all complete.

0.30

mt

11

Formwork, shuttering, centering with plywood with pipe

for necessary propping, scaffolding, staging, supporting

inclusive of wedging and cutting holes for utilization till

the support if fully unyielding net.

26.29

sqm

F FLOORING & FINISHING WORKS

-

12

12.5mm thick cement sand plaster in (1:4) ratio on wall of

good finish including racking the joint, wetting of surfaces

& curing the work all complete.

143.20

sqm

13

3 mm thick cement sand punning (1:1) on floor, skriting,

dado etc, including mixing laying and rubbing with steel

trowel to a hard, smooth and shining surface and curing all

complete.

25.69

sqm

G DOOR & WINDOWS

-

14

Well-seasoned salwood chaukhats for fixed/openable

door/windows with good finish of approved quality

including fixing in position with necessary M.S. hold fasts

as per drawing and instruction all complete.

0.18

cu.m.

15

Supplying and fitting Readymade Teak wood Doors,

(Seasoned and Poisoned treated, one side teak and other

side water proof ply fitting) with all necessary hardware all

complete.

3.67

sqm

16

Making and fitting fixing 38 x75mm sal wood Glazed

window shutter with 5mm Glass all necessary hardware

fitting all complete.

3.31

sqm

H PAINTING WORKS

-

17

Coloring with two coat washable distemper paint with one

coat primer to give uniform coloring after rendering the

surface all complete.

74.97

sqm

18

2 coats of readymade enamel paint of approved color over

1 coats of primer Painting over properly sanded wooden

surface all complete

5.70

sqm

19

2 coats of weather coat (Apex) paint of approved color with

one coat primer Painting over properly cleaned surface all

complete

68.23

sqm

I METAL WORKS

-

20

Supplying,fabricating,fitting of 3x20mm size M.S. grill

with red oxide paint as per design and instruction all

complete.

3.31

sq.m

L ROOFING WORKS

-

21 C.G.I. Works

-

(i) 0.41mm thick C.G.I. sheet cover

54.05 Sq.m

(ii) 0.5 mm thick C.G.I. plane sheet ridge cover

7.55 rm

(iii) 0.5 mm thick C.G.I. plane sheet in gabble portion

11.16 sq.m

-

22 Wood works in roof using locally available woods

0.28 cu.m

TOTAL OF CIVIL WORKS