Session 16 Iso Product Realization Clause 7 Changed2
Transcript of Session 16 Iso Product Realization Clause 7 Changed2
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 1/16
TOTALTOTAL
QUALITY QUALITY
MANAGEMENTMANAGEMENT
By:By:
Zahid HussainZahid HussainMS-Total Quality ManagementMS-Total Quality Management
IRCA Lead Auditor ISO 9001-2000IRCA Lead Auditor ISO 9001-2000
IRCA Lead Auditor ISO 14001-2004IRCA Lead Auditor ISO 14001-2004
B.Sc Engineering (Chemical)B.Sc Engineering (Chemical)
PCBA–UCPPCBA–UCP
SESSION – 17
(ISO-clause 7)
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 2/16
C U S TO MERS C
U S T
O M E R S
Quality Management
System
5.Management
Responsibility
7. Product
Realization
6. Resource
Management
8. Measurement
Analysis and
Improvement
Requirements
S a t i s f a c t i o n
Continual Improvement of
the Quality Management System
ConsumptionProduct
verv ew oISO9001:2000
ISO 9001 Model
KEY Value AddedActivities
Model of a Process BasedQuality Management System
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 3/16
Provision of
resources
Human
resources
Infrastructures
Workenvironment
6 ResourceManagement
General
requirements
Documentation
Requirements
Planning
Customer
related
processes
Design &
development
Purchasing
Production &
service
provision
Management
Commitment
Customer focus
Quality policy
Planning
Responsibility,
authority &
communication
Management
Reviews
5 ManagementResponsibility 8Measurement
Analysis &
improvement
System Requirements / Structure of theSystem Requirements / Structure of the
StandardStandard
4 QualityManagement
System
7 ProductRealization
General
Monitoring &
measurement
Control of NCP
Analysis of data
Improvements
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 4/16
7. Product Realization7.1 Planning of product realizationThe organization shall plan and develop the
processes needed for product realization.Planning of product realization shall be consistentwith the requirements of the other processes of the quality management system
In planning product realization, the organizationshall determine the following, as appropriate:a) quality objectives and requirements for the product;b) the need to establish processes, documents, and provideresources specific to the product;
c) required verification, validation, monitoring, inspectionand test activities specific to the product and the criteriafor product acceptance;d) records needed to provide evidence that the realizationprocesses and resulting product meet requirements
e). The output of this planning shall be in a form suitablefor the organization's method of operations.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 5/16
7. Product Realization
7.2 Customer-related processes7.2 Customer-related processes 7.2.1 Determination of 7.2.1 Determination of requirements related toreq
uirements related to
product
product
7.2.27.2.2 Review of requirementsReview of req
uirements related to productrelated to product 7.2.3 Customer7.2.3 Customer communicationcommunication
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 6/16
7. Product Realization
7.2 Customer-related processes7.2.1 Determination of requirementsrelated to the productThe organization shall determine
a) requirements specified by the customer,including the requirements for delivery and post-delivery activities,b) requirements not stated by the customer butnecessary for specified or intended use, whereknown,c) statutory and regulatory requirements relatedto the product, andd) any additional requirements determined by the
organization.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 7/16
7. Product Realization
7.2.2 Review of requirements related tothe productThe organization shall review the requirementsrelated to the product. This review shall be
conducted prior to the organization's commitmentto supply a product to the customer (e.g.submission of tenders, acceptance of contracts ororders, acceptance of changes to contracts ororders) and shall ensure that
a) product requirements are defined,b) contract or order requirements differing fromthose previously expressed are resolved, andc) the organization has the ability to meet the
defined requirements.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 8/16
7. Product Realization
Records of the results of the review and actionsarising from the review shall be maintained (see4.2.4).
Where the customer provides no documentedstatement of requirement, the customerrequirements shall beconfirmed by the organization before acceptance.
Where product requirements are changed, theorganization shall ensure that relevantdocuments are amended and that relevantpersonnel are made aware of the changed
requirements.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 9/16
7. Product Realization
7.2.3 Customer communicationThe organization shall determine and implementeffective arrangements for communicating withcustomers in relation to
a) product information,b) enquiries, contracts or order handling,including amendments, andc) customer feedback, including customercomplaints.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 10/16
7.3 Design and Development7.3 Design and Development
7.3.1 D & D
Planning
7.3.2 D & D
Input
Plan & Control the D.D of product.
Planning of D D Stages, Review, verification &
validation appropriate to D D , Stages
Responsibilities & Authorities for D.D, Interface
between different groups involved in D D
to ensure the effective communication and clear assignment of responsibility. Update planning
output
Determination & Recording of Input related to
product requirement.Functional and performance requirement,
Applicable statutory and regulatory requirement,
Info derived from previous similar design, Other
requirements essential for D.& D.Input shall be reviewed, complete , unambiguous
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 11/16
7.3 Design and Development7.3 Design and Development
7.3.3 D & D
Output
7.3.4 D & D
Review
In a form to Verify the D D input and approve.Shall meet the input requirement for D & D.
Provide appropriate information for purchasing
production & for service provision. Contain or
reference product acceptance criteria, Specifythe characteristics of product essential for safe
and proper use.
To evaluate the ability of the results of D & D tomeet requirements , To identify any problem
and propose necessary actions., Concerned
Functions participate, Record of review along
with necessary action is maintain.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 12/16
7.3 Design and Development7.3 Design and Development
7.3.5 D & D
Verification
7.3.6 D & D
Validation
To ensure that D & D outputs have met the D & D
inputs requirement. Perform verification in
accordance with planned arrangements. Records
of verification results and action taken
maintained.
To ensure that under planned arrangements,
product is capable of meeting the requirementsfor specified application and intended use.
Where applicable the validation shall be
completed prior to delivery. Record of validation
and necessary actions maintained.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 13/16
7.3 Design and Development7.3 Design and Development
7.3.7. Control
of D & D
Changes
Identify the D & D changes and maintain therecord. Changes are reviewed, verified, and
Validated and approved before implementation.
Review of D & D changes includes evaluation of
effect of changes on parts and products already
delivered. Results of review of changes & action
taken are maintained
7.5.1 Control
of production
and Service
provision.
Plan and carry out production & service
provision under controlled condition ( Productinfo, W I, Suitable equipment, use of monitoring ,
measuring devices, Implementation of monitoring
and measurement, implementation of all activities
related with release, delivery and post delivery
actives.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 14/16
7.5 Production and Service Provision7.5 Production and Service Provision
7.5.2 Validationof processes
for production
and Service
provision.
To demonstrate the ability of these processesto achieve planned results. Define criteria for
review and approval of these processes.
Approval of Equipment and qualification of
personnel, Use QSP, records. Revalidation
If required.
7.5.3
Identification
and traceability
Identify the product by suitable means
throughout the product realization. Identify
the product status w.r.t. monitoring and
measurement requirements Where traceability
is requirement , the organization shall control
and record the unique identification of the
product.
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 15/16
7.5 Production and Service Provision7.5 Production and Service Provision
The organization shall preserve the conformity of product
during internal processing and delivery to the intendeddestination.The preservation shall include , identification, handling,packing, storage and protection. Preservation is alsoapplied to constituent parts of a product.
7.5.4
Customer Property
The organization shall exercise care with customer propertywhile it is under the organization control or being used byorganization.The organization shall Identify, verify, protect and safeguardcustomer property provided for use or incorporate into the proIf any customer property is lost, damaged or otherwise found tbe unsuitable for use, this shall be reported to the customerand record maintained.Customer property can be intellectual property.
7.5.5
Preservation of Product
8/7/2019 Session 16 Iso Product Realization Clause 7 Changed2
http://slidepdf.com/reader/full/session-16-iso-product-realization-clause-7-changed2 16/16
QUESTIONQUESTIONSS