Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th...
-
Upload
philip-pearson -
Category
Documents
-
view
218 -
download
0
Transcript of Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th...
![Page 1: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/1.jpg)
Session 1: Progress and Status of Implementation and Standardisation
CASCADE & RFG
ASAS-TN2 5th WorkshopToulouse17 September 2007
Jörg Steinleitner
CASCADE Infrastructure WP Leader, EUROCONTROL
European Organisation for the Safety of Air Navigation
![Page 2: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/2.jpg)
Overview
CASCADE Programme: Scope, Implementation Policy, Worldwide Co-ordination
CASCADE Validation: Status: ADS-B out & ADS-B in, Pioneer Airlines, Monitoring
Requirements Focus Group: Within CASCADE, Status, Planning
Timeline: Standardisation, Certification, Rulemaking
![Page 3: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/3.jpg)
CASCADE Programme
![Page 4: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/4.jpg)
CASCADE Scope
Ground Surveillance Applications (ADS-B-out)
ADS-B Receiver
In a non-radar environment In a radar environment On the airport surface Airborne Derived Data
Airborne Surveillance Applications (ADS-B-in & TIS-B) Situational awareness on the surface Airborne situational awareness Visual separation on approach In Trail Procedure
20082008
20112011
![Page 5: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/5.jpg)
The Bigger Picture
2015
IR based implementation
in wider areas
upgraded equipage
voluntary implementation
in pocket areas
certified existing equipage
![Page 6: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/6.jpg)
The ADS-B Implementation Policy
![Page 7: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/7.jpg)
ADS-B in other ContinentsWorldwide Co-ordination
![Page 8: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/8.jpg)
CASCADE Validation
![Page 9: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/9.jpg)
First “ADS-B out” Implementation Sites
• LVNL (Netherlands) implements ADS-B NRA with WAM (2009 in N. Sea)
• LFV Sweden implements
•ADS-B NRA (2008, Kiruna)
•ADS-B RAD (2009, Ostgota)
• 7 ANSPs (CRISTAL MED:Cyprus, France, Greece, Italy, Malta, Portugal, Turkey) validate ADS-B NRA & RAD towards implementation decision by 2008
• DFS has included ADS-B (and WAM) in its SUR Strategy
•Target date is 2015
![Page 10: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/10.jpg)
ADS-B-in: Emerging implementation
CRISTAL ATSAW (simulations of ATSA VSA, SURF, AIRB) to be completed in Oct 2007
CRISTAL ITP (simulations and trial in N. Atlantic) ongoing
CRISTAL Germany (TIS-B feasibility for ATSAW) ongoing
CRISTAL Sweden (ATSAW trials for GA) completed:
Implementation by 2009 (Ostgota)
Certification target date: 2009
![Page 11: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/11.jpg)
ADS-B Implementation Roadmap
2007 2008 2009 2010 2011
ADS-B-NRA Pre-ops Validation Implementation
ADS-B-RADATSAW-VSAATSAW-ITP
Initial Validation Pre-ops Validation Implementation
ADS-B-APTADS-B-ADD
ATSAW-AIRBATSAW-SURF
Initial Validation Pre-ops Validation Implementation
NRA: In Non-Radar AirspaceRAD: In Radar AirspaceVSA: Visual Separation on ApproachITP: In Trail Procedure
APT or SURF: On the Airport SurfaceADD: Aircraft Derived Data for ground toolsAIRB: During flight operations
![Page 12: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/12.jpg)
ADS-B Pioneer Airline ProjectTarget: “ADS-B out” Certification
17 Airlines - 400 Aircraft – 500.000+ flights/year
![Page 13: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/13.jpg)
Pioneer Airline ProjectMonitoring & Certification
Airworthiness Approval
AvionicsVendors
Airframers
Airlines
CASCADE Avionics
Design
Statistical
Evidence
Possibly supporting means of compliance demonstration
(in-flight statistics)
Primary means of compliance demonstration(design assurance, tests)
![Page 14: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/14.jpg)
Timeline
D3: 1st PioneersCertified
EASA AMCJAA NPAED-126 EASA NPA
NPA: Notice of Proposed AmendmentAMC: Acceptable Means of Compliance
Comments Deadline: 7 Sep
2006 2007 2008Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
D1: high-levelfleet info
D2: detailedfleet info
Certification Application
“ADS-B Certification Workshop”
21+22 Nov in Palma
(hosted by Air Europa)
![Page 15: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/15.jpg)
Requirements Focus Group
![Page 16: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/16.jpg)
High-level RFG Planning
Dec 06 Apr 07 Aug 07 Dec 07 Apr 08 Aug 08 Dec 08 Apr 09 Aug 09
ADS-B-NRA (ED-126, DO-303)Enhanced ATS in Non-Radar Areas
TBD:• ASPA-S&M Enhanced Sequencing & Merging Operations (advanced as background task – feasibility check in Jan 08)• ADS-B-ADD – Aircraft Derived Data for Ground Tools
ADS-B-RADATSA-ITPATSA-VSAADS-B-RAD: Enhanced ATS in Radar Areas
ATSA-ITP: In-trail Procedure in Oceanic AirspaceATSA-VSA: Enhanced Visual Separation on Approach
ADS-B-APTATSA-AIRBATSA-SURFATSA-APT: Airport Surface Surveillance
ATSA-AIRB: Enhanced TSA During Flight OperationsATSA-SURF: Enhanced TSA on the Airport Surface
![Page 17: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/17.jpg)
Application StatusADS-B-RAD, ATSA-VSA & ATSA-ITP
OSEDs are “frozen”: Apart from ATSA-VSA “enhanced procedure”
Assessments are concluding: Safety (incl. surveillance risk modelling), Performance & Interoperability
SPR/INTEROP document Integration to commence Critical step to facilitate wider review
Target dates for EUROCAE/RTCA approval: ATSA-ITP – April 2008 ATSA-VSA – April 2008 (tbc) ADS-B-RAD – July 2008
![Page 18: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/18.jpg)
RFG – 2007/2008 Meetings
Week of 15 October 2007 (Europe, Toulouse)
Week of 21 January 2008 (USA, Melbourne)
Week of 07 April 2008 (Europe, Brussels)
![Page 19: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/19.jpg)
Overall Timeline:Standardisation, Certification & Rulemaking
![Page 20: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/20.jpg)
Overall Timeline:Standardisation, Certification & Rulemaking Overall Timeline:
Standardisation, Certification & SES Rulemaking
RFG SPR/INTEROP
RAD,VSA, ITP
APT, other ?AIRB, SURF
FAATSO C166A
>20152008 2009 2010 2011 2012<2007
Implementation
EC SES IRRulemaking
EUROCAE/RTCA1090 ES Transponder MOPS
NRA
EASA/FAA(E)TSO-166x
Towards Joint Transponder TSO
EASA‘RFG’ AMC
ED102/DO260DO260A
EASANRA AMC EASA/FAA
Rulemaking
Initial Implementations – Pioneer Phase
existingavionics
ADS-B out Mandate
avionicsupgrade
SPI IRMoC
ED102ADO260A+
Towards Joint MOPS
INTEROPValidation
ADS-B in (voluntary)
![Page 21: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/21.jpg)
Summary
“ADS-B” out rulemaking on its way
World-wide co-ordination
ADS-B Pioneer Airlines & Monitoring Projects …
… ED102/DO260 certification for early deployment
RFG key to rulemaking baseline
![Page 22: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/22.jpg)
Thanks
![Page 23: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/23.jpg)
Backup
![Page 24: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/24.jpg)
Scope of ADS-B Airborne Monitoring 1090 ES “ADS-B out“
Extended Squitter
BDS 0,5BDS 0,8
(BDS 0.9)(BDS 6,1)(BDS 6,5)
TransponderControl Panel
Callsign SPI-ES
GNSS
PositionHPL
HFOMVelocity
BarometricAltimeter
FL
Mode STransponder24-bit addressNUC-NIC/NAC
Consistency(Mode A/C/S)
Consistency(Performance)
Correctness
PerformanceAnalysis
(incl. latency)
ALL:“counting” statistics
![Page 25: Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.](https://reader035.fdocuments.net/reader035/viewer/2022062408/56649eda5503460f94be9e24/html5/thumbnails/25.jpg)
RFG within the CASCADE Context
ASA/GSASPR-INTEROP
Simulations, Trials &
Monitoring
Procedures
ATC ManualAircrew Manual
Ground Infrastructure
Avionics
SystemStandards
PreliminarySafety Case
EASA & JAARegulation
Airworthiness Approval
Operational Approval
EC SESRegulation