Boiler Construction, Pressure

Parts & Drum Internals

Page 2: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 2/21

Mittwoch, 4. September

2013

Fußzeilentext 2

Objectives and other details of modules

Duration – 75 minutes

Training aids

Power point Presentations

Reading Material

Objective

 At the end of the session par ticipants wi ll be able to :

Describe essential parts of boi ler and their functions

List out design cri teria of various pressure parts and furnace, materialof construction

Detail out of steam separation principles drum and its funct ion

contraction details of boiler drum

Distinguish between boilers for subcri tical and supercritical units

Page 3: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 3/21

Boiler Construction

9/4/2013 Steag O&M Company 3

Page 4: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 4/21

Pressure Parts arrangement

9/4/2013 Steag O&M Company 4

Page 5: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 5/21

Furnace design aspects

9/4/2013 Steag O&M Company 5

This closeness in size reflects the fact that acoal-fired unit has to be designed to preventexcessive slagging, whereas an oil-fired unit has

to take into account, as a primary sizing factor,its furnace tube-wall integrity

Page 6: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 6/21

Furnace Design Considerations

9/4/2013 Steag O&M Company 6

Important design considerations for the proper sizing of the furnace include

Net-heat-input-to-plan-area (NHI/PA) release rate. As the rank of coal decreases, furnacesincrease in plan area and vertical height from the top fuel nozzle to the furnace arch.The NHI/PAs range from (1.6 x 109 J/hr-929 cm2) for severe slagging coals,through (2.2 x 109 J/hr-929 cm2) for low slagging coals

Distance from the upper fuel nozzle level to the furnace exit. Sufficient furnace dimensions,

including adequate height between the top row of burners and the furnace exit, must beused to obtain the proper retention time for the combustion.

Furnace exit gas temperature (FEGT). Sufficient waterwall heat transfer surface is necessaryto allow sufficient cooling of the combustion gas so that the fly ash is solidified before itenters the first pendant tube bank.

This will minimize deposition and fouling of the pendant tube banks.

The velocity of the flue gas must not exceed specified limits in order to control erosion fromthe ash in the coal. Depending on the ash analysis and quantity, the velocity is generallylimited to (18.3 to 21.3 m/s).

Page 7: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 7/21

Furnace Sizing

9/4/2013 Steag O&M Company 7

Page 8: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 8/21

500MW construction details

9/4/2013 8

Page 9: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 9/21

Boiler materials Consideration

9/4/2013 Steag O&M Company 9

The primary consideration in material choice is a function of expected tube temperatureof operation.

Economizers and water wall sections are usually constructed with a mild or mediumcarbon steel, whereas

low alloy ferritic steels are used for most super heater and re heater sections,with austenitic stainless steels specified for the highest-temperature circuits or corrosionperformance.

Alloys for use as boiler tube materials in the United States are identified by an ASMEdesignation (SA-xxx) or an essentially equivalent

Page 10: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 10/21

Materials for Boiler 

9/4/2013 Steag O&M Company 10

Page 11: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 11/21

Boiler drum and steam separation

9/4/2013 Steag O&M Company 11

Page 12: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 12/21

Steam Generation

9/4/2013 Steag O&M Company 12

Page 13: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 13/21

Steam Generation

9/4/2013 Steag O&M Company 13

Page 14: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 14/21

Steam Separation

9/4/2013 Steag O&M Company 14

Page 15: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 15/21

Boiler steam water schemes

9/4/2013 Steag O&M Company 15

Page 16: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 16/21

Heat Transfer in a pipe

9/4/2013 Steag O&M Company 16

Page 17: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 17/21

Common Circulation systems

9/4/2013 Steag O&M Company 17

Page 18: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 18/21

Boiler Drum and internals

9/4/2013 Steag O&M Company 18

Page 19: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 19/21

Drum design cri teria

9/4/2013 Steag O&M Company 19

Page 20: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 20/21

Steam Drum

9/4/2013 Steag O&M Company 20

Page 21: Session 1 module 2 - Boiler Construction.pdf

8/17/2019 Session 1 module 2 - Boiler Construction.pdf

http://slidepdf.com/reader/full/session-1-module-2-boiler-constructionpdf 21/21

Steam Drum and separators

9/4/2013 Steag O&M Company 21