Services Area Highlights and Priorities. APNIC 26, Christchurch Sanjaya. Overview. Resource Services Member Services Project & Systems Services Software Engineering Network and Operations Research & Development Security. Resource Services (as of 31 Jul 08). No of /8 allocated. - PowerPoint PPT Presentation

Transcript of Services Area Highlights and Priorities

Page 1: Services Area Highlights and Priorities

Services AreaHighlights and Priorities

APNIC 26, ChristchurchSanjaya

1

Page 2: Services Area Highlights and Priorities

Overview

• Resource Services• Member Services• Project & Systems Services• Software Engineering• Network and Operations• Research & Development• Security

2

Page 3: Services Area Highlights and Priorities

Resource Services (as of 31 Jul 08)

3

00.5

11.5

22.5

33.5

44.5

2004 2005 2006 2007 2008

IPv4

0

2,000

4,000

6,000

8,000

10,000

2004 2005 2006 2007 2008

IPv6

0

100

200

300

400

500

600

700

2004 2005 2006 2007 2008

ASN

No of /8 allocated No of /32 allocated

0

10

20

30

40

50

60

70

2004 2005 2006 2007 2008

IPv6

No of allocations

Page 4: Services Area Highlights and Priorities

Large request escalation

• Increasing large IPv4 requests for 3G, xDSL, private to public IP conversion.

• The escalation procedure uses the following rules:

• Total escalations: 109• Response time from managers is one to three working

days.• Procedure is reviewed from time to time.

Size Review by>= /19 Peer hostmasters

>= /17 Resource Services Manager

>= /15 Senior Review Team

Page 5: Services Area Highlights and Priorities

Member Services

7

APNIC members as of 19 Aug 08

NIR members Mar - July 2008

Total:1,107

Total: 1,107

Page 6: Services Area Highlights and Priorities

MyAPNIC v2 beta

• Public availability September 2008• Main features

– Allow a simpler user/password authentication in addition to X.509 certificate

• While maintaining secured access to high privileged functions such as voting and resource certification

– Resource Certification functions• Activate/deactivate service• Collection management (RFC3779 cert issuing)• ROA (route origin authorization) generation

8

Page 7: Services Area Highlights and Priorities

Project and Systems Services

• 1st half 2008– Finance reporting systems integration– Email ticketing system upgrade– Event management system improvements.– MyAPNIC v2 beta installation

• 2nd half 2008– IPv6 enhancements to resource management

system– Improvements to resource request processing

9

Page 8: Services Area Highlights and Priorities

Software Engineering

• 1st half 2008– MyAPNIC v2 development– Faster on-site registration for events (barcodes,

labels)– IPv6 resource management system enhancements

• 2nd half 2008– MyAPNIC user experience improvements– Streamlined resource request via MyAPNIC– Resource Certification: end customer certification

in MyAPNIC

10

Page 9: Services Area Highlights and Priorities

Network & Operations

• 1st half 2008– Resource Certification infrastructure– Better redundancy of public servers/services

(web, whois, DNS)– Reverse DNS web services available to NIR

• 2nd half 2008– Improved internet connectivity for the

Secretariat– Registry database resilience– DNSSEC prototype

11

Page 10: Services Area Highlights and Priorities

Research & Development

• 1st half 2008– Participated in DITL 2008 (March)

• 50TB of data fed into OARC/CAIDA from HK,JP, AU DNS

– Resource Certification design, test and standards work

• 8 drafts in IETF SIDR WG• 2Q deliverable: MyAPNIC hosted services

– Deployed RIPE-NCC Test Traffic Measurement (TTM) node

• Providing public NTP stratum-1 time service

12

Page 11: Services Area Highlights and Priorities

Research & Development

• 2nd half 2008– Improved time, measurement services in

region• Collaboration with RIPE-NCC (TTM project)

– Continuing R&D inputs for strategic planning• Analysis of resource consumption, DNS, routing

– Continuing work on Resource Certification• Further service developments, transfer processes

13

Page 12: Services Area Highlights and Priorities

Security

• 1st half 2008– Improvements on APNIC physical security by

implementing a CCTV system• 2nd half 2008

– Implementing the new Certification Authority system

– Implementing the new APNIC authentication and authorisation model across multiple systems