Senior Capstone Process

108
1 HWC Process 1

description

A book summarizing the process of how I arrived at my final design solution.

Transcript of Senior Capstone Process

Page 1: Senior Capstone Process

1

HWCProcess

1

Page 2: Senior Capstone Process

2

1

Page 3: Senior Capstone Process

3

The Harrison Wellness Center offers a holistic and all-natural approach

to preventing obesity and related diseases. Through a combination of

therapies, exercise, proper nutrition, community interaction, and exposure

to nature patients are given the knowledge, resources, and motivation

needed to live a healthier life.

1

Page 4: Senior Capstone Process

4

1

Page 5: Senior Capstone Process

5

Table of Contents

Summer Process

Summer Midterm

Summer Final

Schematic Design

Design Development

Reaching the End

Technical Drawings

07

21

27

35

47

67

73

Appendix 101

1

Page 6: Senior Capstone Process

6

2

Page 7: Senior Capstone Process

7

Summer Process

2

Page 8: Senior Capstone Process

8

t

Very early sketches of first ideas, thoughts, and design ideas before a building and site were even selected. Laying out the program in the most ideal way.

Initial Concept Sketches May-June 2012

Page 9: Senior Capstone Process

9

Initial space plans revolved around a circular plan. The entrance led to the locker rooms and behind that was the “serenity zone”. Therapy rooms and exercise studios then surrounded the serenity zone on all sides. The serenity zone was an early name for what later on became known as “the spine.” Even early on the idea of a running track through out the space was a driving force. Other early ideas included exercise studios with curved glass walls and blue painted walls. Another concept was to have the structure of the building

become sculptural tree like elements. This idea was later scratched since it was overly complicated and unnecessary, especially in an existing building. The idea of involved individual indoor roof gardens on top of exercise studios and other spaces came about very early on as well.

Page 10: Senior Capstone Process

10

t

Originally I planned to use the beautiful Mt. Airy Medical Campus. The grounds were stunning with a lake and several trees surrounding the enitre area. However, the building itself was not conducive for the program and the site was scraped in favor for the Harrison Public Library.

Site 1 Early July 2012

Page 11: Senior Capstone Process

11

Page 12: Senior Capstone Process

12

Assignment A: Design the Entire Project July 2012

After completing the program the first goal was to design the entire project in a weekend. By doing this it became evident that the Mt. Airy Medical Campus was not an appropriate site as it compromised many of the more important design goals.

First Plan (right)Assignment A (next page)

Page 13: Senior Capstone Process

13

Page 14: Senior Capstone Process

14

Assignment B: A Beautiful Plan July 2012

Changing shells to the Harrison Public Library proved to be the right move. It was much more flexible and had the high ceilings the program needed. However, working with the curves and complex shapes of the shell proved to be a real challenge. Resolving the shell’s issues and how to input the program into the building would be the focus for the rest of the quarter.

Early Spatial Diagram (right)Beautiful Plan and Section (below)

Page 15: Senior Capstone Process

15

Attempting to Understand the Shell July 2012

Various Sketches/Early Ideas (below)

Page 16: Senior Capstone Process

16

Before midterm a small group pinup occurred to get feedback from our classmates and hash out any issues before our next critique. Issues were beginning to be resolved, however were no where near a final solution.

Spatial Diagram in Plan (below)Presentation (next page)

Small Group Pinup July 2012

Page 17: Senior Capstone Process

17

Page 18: Senior Capstone Process

18

Finding a Solution August 2012

Various Process Sketches/Ideas (below)

Page 19: Senior Capstone Process

19

t

Page 20: Senior Capstone Process

20

4

Page 21: Senior Capstone Process

21

Summer Midterm

4

Page 22: Senior Capstone Process

22

By midterm the program was fine-tuned very nicely and the design goals were clear. However, the program was still having trouble responding to the building in section and therefore was not as strong as it could be in plan.

Cooking Demonstration Station (right)Perspective of entry area (below)Midterm Presentation (next page)

Midterm August 2012

Page 23: Senior Capstone Process

23

t

Page 24: Senior Capstone Process

24

Page 25: Senior Capstone Process

25

t

Page 26: Senior Capstone Process

26

5

Page 27: Senior Capstone Process

27

Summer Final

5

Page 28: Senior Capstone Process

28

By final the shell and program were finally coming together. The programming was finally fitting in and actually growing in response to the shell. A balcony space was created to take advantage of the high spots and nature had finally made it’s way inside.

Section through Therapy Room (right)Section through Spine of Building (below)Final Presentation (next page)

Final August 2012

Page 29: Senior Capstone Process

29

t

Page 30: Senior Capstone Process

30

Page 31: Senior Capstone Process

31

Page 32: Senior Capstone Process

32

t

Page 33: Senior Capstone Process

33

Model August 2012

An initial study model of the building made of black paper, acetate, and bas wood columns.

The model was placed over a print out of the plan to show the relationship of the shell to the new programmed plan.

It allowed for a better understanding of the spatial relationships throughout the building.

Page 34: Senior Capstone Process

34

6

Page 35: Senior Capstone Process

35

Schematic Design

6

Page 36: Senior Capstone Process

36

t

Four weeks into the semester and the design of the project has really changed. The spine of the building has been determined to be the area of further development. However, the program of the spine needs to be rethought and given the new trends in body weight training and inactive physiology one possibility is a fitness zone. Other possibilities include a lap pool, community zone, or peaceful walking place.

Optional Plans of Spine (right)Proposed Section (next page)

Process January 2013

Page 37: Senior Capstone Process

37

Given the length and linearity of the spine design decisions will be made to emphasize this. Tricks including lines of planters, reinforced by a row of ceiling fans create the feeling of an infinite and endless space. This idea was developed slightly past the sketching stage but was later scraped for other more important design features.

Designing Infinity January 2013

Page 38: Senior Capstone Process

38

Spaces were laid out based on level of privacy. Therapy was given the far ends of the wings since they required the most privacy. The spine was laid out based on when the spine might hold community events.

Planning Diagram (right)

Process January 2013

Page 39: Senior Capstone Process

39

t

Sketchy Perspective of what the spine could look like (left)

Process January 2013

Page 40: Senior Capstone Process

40

t

Four weeks into the semester and the design of the project has further changed. The spine of the building has been determined to be the area of further development and given the new trends in body weight training and inactive physiology the main programmatic feature of the spine is activity and fitness.

Plan of Spine (right)Site Plan (next page top)Section (next page bottom)

Schematic Design January 2013

Page 41: Senior Capstone Process

41

Page 42: Senior Capstone Process

42

t

Page 43: Senior Capstone Process

43

t Back of Spine (left)Entrance View (bottom left)Waiting (bottom right)

Page 44: Senior Capstone Process

44

t

Page 45: Senior Capstone Process

45

t Outside the Spine (left)View Outside from Balcony (below)

Page 46: Senior Capstone Process

46

7

Page 47: Senior Capstone Process

47

Design Development

7

Page 48: Senior Capstone Process

48

Walking away from schematic reviews I thought I wanted to focus on fitness in the spine. I thought the planter bed could be become an integrated exercise equipment storage device and the floor pattern would carry up onto the planter design. Also, each section of the floor would hold a different type of exercise.

Planter sketch (right)

Process February 2013

Page 49: Senior Capstone Process

49

t

My plan was to develop the experience of working out within HWC. I reworked the plan so that a client’s journey through the space would consist of a full workout with little back tracking. While some of these ideas have carried over to the program, after talking to Hank the focus shifted back towards nature and sustainability. I plan to return to these ideas, post design development review.

Planter sketch (right)

Process February 2013

Page 50: Senior Capstone Process

50

After schematic design some programmatic changes were made. The main clients of HWC changed and no longer include young healthy individuals and is solely focused on an obese clientèle.

Also, rather than a strict focus on the spine of the building it has shifted to include a section of all major spaces. This called for a new spatial plan strategy. Now the spaces are laid out by privacy need with the most private spaces located near the front of the building, the public functions in the spine, and the semi-public spaces near the rear of the building.

From there, each major space type (public, semi-public, private) was developed to include several strategies to introduce nature into the space. A design goal was also created in this design phase: to design a space that demonstrates sustainable initiatives that both activate the space as well as expose the user to the elements of nature.

Diagram of Program in Section (below)Diagram of Program in Plan (next page)

Design Development February 2013 1 Public Space

2 Nature Features

Semi-Public

4 Private

4 Main Entrance

Page 51: Senior Capstone Process

51N

Page 52: Senior Capstone Process

52

Spaces with no privacy needs and blend seamlessly with the exterior

Element of Nature: Wind

Sustainable Initiative: Cross Ventilation

Axon through Spine and Window Detail (below)Diagram Plan of Public Spaces (next page)

Public Spaces

Rotating Mechanismadjusts automatically throughout the day based on wind speed and direction

Mullions

Clerestory Windows

Wind enters from the southwest and exits on the opposite side at speeds averaging 9 mph

located on either side of the spine make this area a prime space for cross ventilation

Page 53: Senior Capstone Process

53

t

N

Page 54: Senior Capstone Process

54

t

SWNE

NReflected Ceiling Plan and Details

Page 55: Senior Capstone Process

55

t

Perspective of Spine

Page 56: Senior Capstone Process

56

Spaces that require acoustic and thermal control

Visual privacy is not a concern

Element of Nature: Heat/Solar

Sustainable Initiative: Power Generation

Floor Details (other page)Diagram of Spaces (above)

Semi-Public Spaces

Rubber Athletic Flooring Finish Floor with thermo-sensitive top coat

Power Lines Power generated by the compression of the blocks is fed down to the power lines and then to a battery located on site

Springs springs fitted beneath the floor allow it to compress when movement occurs on the floor

Crystal Blocks a process called piezoelectricity occurs when springs cause the crystal blocks to be squashed, producing small amounts of electrical current

1 Energy Generated by Floor

2 Energy Stored in Batteries

3 Energy Used to Power Fans

Page 57: Senior Capstone Process

57

t

N

Page 58: Senior Capstone Process

58

t

NSection Through Exercise Studio

Page 59: Senior Capstone Process

59

t

Perspective of Exercise Studio and Details

Page 60: Senior Capstone Process

60

Spaces are those that require acoustical, visual and thermal control

Element of Nature: Water

Sustainable Initiative: Water Collection

Section of Therapy Room and Detail of Wall Construction (other page)Diagram of Private Spaces (above)

Private Spaces

Metal Pipeallows water to flow from the wall out to the site in order to water the plants

LED Panel an LED panel is located between two glass panels in order to add therapeutic and relaxing colors onto the water

Glass Panel a piece of glass on either side forms the wall, creating an air space for the water to flow down, the trickling sounds adding to the relaxing, therapeutic environment

Collection Pond grey water and storm water collects from all over the roof here before filtering down through the wall

Page 61: Senior Capstone Process

61

t

N

Page 62: Senior Capstone Process

62

1 Gray Water from laundry, showers, and sinks collects on roof

2 Gray water mixes with rain water and moves to collection site

4 Water collects to either collection barrel located on site

3 Water moves down therapy wall where it light changes its color

5 Water is pumped to toilets where the gray water can be reused

Water Cycle Diagram

Page 63: Senior Capstone Process

63

t

Perspective of Therapy Room

Page 64: Senior Capstone Process

64

t

First Floor Plan

Page 65: Senior Capstone Process

65

t

Second Floor Plan

Page 66: Senior Capstone Process

66

8

Page 67: Senior Capstone Process

67

Reaching the End

8

Page 68: Senior Capstone Process

68

Page 69: Senior Capstone Process

69

After design development the focus shifted towards the look and feel of the space. With the space planning and major design concepts worked out it was now time to focus on not on the materiality of the space but the role that plantings and nature would play in the spine.

In order to try some designs out quick perspectives were done in colored pencil to try ideas out

Sketchy Perspective of Spine that will later be translated to final design of the space (right)

Design Aesthetic March 2013

Page 70: Senior Capstone Process

70

t

Page 71: Senior Capstone Process

71

Before coming to a final solution a more diagrammatic approach was taken to figuring out the look and feel. Colored planes represented general colors rather than actual materials. This sketch lead to the final solution found on the previous page.

Another major concern after design development was establishing the user journey and how could interior plantings shape this experience. Many iterations were drawn up showing how planters could be placed as well as where various activities are occurring. The final design ended up being a variation of the top sketch.

Sketchy Perspective of Spine (right)Planter Iteration 1 (top left)Planter Iteration 2 (bottom left)

Trial and Error March 2013

Page 72: Senior Capstone Process

72

9

Page 73: Senior Capstone Process

73

Technical Drawings

9

Page 74: Senior Capstone Process

74

OPE

NO

FFIC

E12

02

ROO

M N

AME

ROO

M N

UMBE

R

DOO

R NU

MBE

R

A8211

2

3

4

ELEV

ATIO

N NU

MBE

R

SHEE

T NU

MBE

R O

F EL

EVAT

ION

INTE

RIO

REL

EVAT

ION

REFE

RENC

E

SCAL

E: 1

-1/2

"=1'-

0"DE

TAIL

205

A51212

SECT

ION

REFE

RENC

E

SHEE

T NU

MBE

R O

F SE

CTIO

N

SECT

ION

NUM

BER

DETA

IL R

EFER

ENCE

SHEE

T NU

MBE

R O

F DE

TAIL

DETA

IL N

UMBE

R

A A

1 1

FLO

OR

OPE

NING

COLU

MN

CENT

ERLI

NE

EXIS

TING

CO

LUM

N CE

NTER

LINE

LEAD

ER L

INE

FIRE

ASS

EMBL

Y RA

TING

/HO

URS)

OR

SMO

KE P

ARTI

TIO

N RE

QUI

REM

ENTS

2ASP b

PART

ITIO

NTY

PEPA

RTIT

ION

CONF

IGUR

ATIO

N

PART

ITIO

N W

ALL

MO

DIFI

CATI

ON

PART

ITIO

N TA

G

NORT

H AR

ROW

DRAW

ING

NOTE

2

FLUO

RESC

ENT

LIG

HT F

IXTU

RE (N

IGHT

LIG

HT)

NL

FLUO

RESC

ENT

LIG

HT F

IXTU

RE (E

MER

GEN

CY)

FLUO

RESC

ENT

LIG

HT F

IXTU

RE (I

N AC

P CE

ILIN

G)

FLUO

RESC

ENT

LIG

HT F

IXTU

RE (I

N A

HARD

CEI

LING

)

EEX

IT L

IGHT

/ EM

ERG

ENCY

EXI

T LI

GHT

SUPP

LY A

IR D

IFFU

SER

RETU

RN A

IR G

RILL

E

SLO

T DI

FFUS

ER

A8213

A8213

TITL

EMAR

K

205

204

203

THIS

IS A

NO

TE

OFF

ICE

205

OFF

ICE

204

OFF

ICE

2033A

a3A

a61A

a

A5115

OPP.

12

A

1'-6"

12'-0"

4'-0"

11'-0"

1'-6"

30'-0"

9'-6"

10'-0"

7'-6"

13'-0"

9'-0"4'-0"

1.DI

MEN

SIO

NS A

RE T

O C

OM

MO

N RE

FERE

NCE

OF

EXTE

RIO

R FA

CE, O

R TO

COLU

MNS

LIN

ES.

2.SL

ASHE

S HA

VE B

EEN

USED

IN L

IEU

OF

ARRO

WHE

ADS,

DO

TS M

AY B

E US

ED IN

VERY

TIG

HT C

OND

ITIO

NS.

3.DI

MEN

SIO

NS T

O A

CTUA

L SI

ZE (1

/8" A

CC.).

DIM

ENSI

ONS

ARE

TO

ONE

SID

E O

FW

ALL

ONL

Y, P

ARTI

TIO

N TY

PE W

ILL

INDI

CATE

WAL

L TH

ICKN

ESS.

4.W

HERE

SPA

CES

PERM

ITS,

DIM

ENSI

ONS

LIN

ES E

XTEN

DED

THRU

ENT

IRE

PLAN

.5.

CONT

RACT

OR

SHAL

L CH

ECK

AND

VERI

FY A

LL D

IMEN

SIO

NS A

ND IM

MED

IATE

LYRE

PORT

ANY

DIS

CREP

ANCI

ES T

O T

HE A

RCHI

TECT

.6.

IN C

ASE

OF

DISC

REPA

NCIE

S BE

TWEE

N SC

ALE

DIM

ENSI

ONS

AND

FIG

URES

, THE

FIG

URES

GO

VERN

.7.

LARG

E SC

ALE

DRAW

ING

S G

OVE

RN O

VER

SMAL

L SC

ALE

DRAW

ING

S.

A8213

A8111

2

CONC

RETE

CONC

RETE

MAS

ONR

Y

REIN

FORC

ING

BAR

S

EART

H

FACE

BRI

CK

FACE

BRI

CK W

/ CO

NCRE

TE M

ASO

NRY

BACK

-UP

STO

NE

STRU

CTUR

AL C

LAY

TILE

OR

RIG

ID IN

SULA

TIO

N

CONT

INUO

US W

OO

D BL

OCK

ING

NON-

CONT

INUO

US W

OO

D BL

OCK

ING

OR

SHIM

FINI

SH W

OO

D

PLYW

OO

D

GRA

NULA

R FI

LL

INSU

LATI

ON

- BLA

NKET

INSU

LATI

ON

- RIG

ID

MET

AL-T

YPE

INDI

CATE

D O

N DR

AWIN

G D

ETAI

L

GYP

SUM

BO

ARD

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

3/8

" = 1

'-0"

3/28/2013 2:19:04 PM

AS

ARC

HIT

ECTU

RAL

STAN

DAR

DS 13

000.

00Is

sue

Dat

eEE

MEE

M

A ALAL

UMIN

UM

C CGL

CLEA

R G

LASS

CJCO

NTRO

L JO

INT

CCE

NTER

LIN

ECL

GCE

ILIN

GCO

NCCO

NCRE

TECO

NTCO

NTIN

UOUS

CPT

CARP

ETCT

CERA

MIC

TIL

ECT

GCL

EAR

TEM

PERE

D G

LASS

CUH

CABI

NET

UNIT

HEA

TER

D DFDR

INKI

NG F

OUN

TAIN

DNDO

WN

E EEA

STEA

EACH

E/F

EACH

FAC

EEL

ELEV

ATIO

NEL

ECEL

ECTR

ICEL

EVEL

EVAT

OR

EQEQ

UAL

EXP

EXPO

SED

EXST

EXIS

TING

F FEFI

RE E

XTIN

GUI

SHER

FEB

FIRE

EXT

ING

UISH

ER A

ND

WAL

L BR

ACKE

TFE

CFI

RE E

XTIN

GUI

SHER

CA

BINE

TFF

&E"F

URNI

TURE

, FIX

TURE

S AN

D EQ

UIPM

ENT"

FHFI

RE H

YDRA

NTFG

LFR

OST

ED G

LASS

G GL

GLA

SSG

YP B

DG

YPSU

M B

OAR

D

H HHI

GH

HBHO

SE B

IBHD

WHA

RDW

ARE

HMHO

LLO

W M

ETAL

HRHO

URHT

HEIG

HTHV

AC"H

EATI

NG, V

ENTI

LATI

NG &

AI

RCO

NDIT

IONI

NG

I IDIN

SIDE

DIA

MET

ERIN

VIN

VERT

M MAX

MAX

IMUM

MIN

"MIN

IMUM

, MIN

UTES

"

ARCH

ITEC

TURA

L AB

BREV

IATI

ONS

N NNO

RTH

NIC

NOT

IN C

ONT

RACT

NO. o

r #NU

MBE

RNO

MNO

MIN

ALNR

CNO

ISE

REDU

CTIO

N CO

EFFI

CIEN

T

O OC

ON

CENT

ERO

DO

UTSI

DE D

IAM

ETER

OFC

IO

WNE

R FU

RNIS

HED

and

CONT

RACT

OR

INST

ALLE

DO

GL

OBS

CURE

GLA

SSO

PPO

PPO

SITE

HAN

D

P %PE

RCEN

TPL

AMPL

ASTI

C LA

MIN

ATE

± or

+/-P

LUS

OR

MIN

USPT

PAIN

TPW

GPO

LISH

ED W

IRE

GLA

SS

Q QT

QUA

RRY

TILE

R RRU

BBER

FLO

ORI

NGRB

RESI

LIEN

T BA

SERC

BRE

SILI

ENT

COVE

BAS

ERD

ROO

F DR

AIN

REFR

REFR

IGER

ATO

RRE

QD

REQ

UIRE

D

S SSO

UTH

SCW

SOLI

D CO

RE W

OO

DSF

SQUA

RE F

EET

SIM

SIM

ILAR

SPSP

ACES

STC

SOUN

D TR

ANSM

ISSI

ON

COEF

FICI

ENT

T TTR

EAD

T/TO

P O

FTS

TUBE

STE

ELTY

PTY

PICA

L

U UCUN

DERC

OUN

TER

UNO

UNLE

SS N

OTE

D O

THER

WIS

E

W W"W

EST,

WID

E, W

ATER

"W

/W

ITH

WB

WO

OD

BASE

WD

WO

OD

W/O

WIT

HOUT

SYM

BOLS

MAT

ERIA

LS

DIM

ENSI

ONI

NG N

OTE

S

No.

Des

crip

tion

Dat

e

Page 75: Senior Capstone Process

75

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

3/28/2013 2:15:28 PM

TS

TITL

E SH

EET 13

000.

00Is

sue

Dat

eEE

MEE

M

DR

AWIN

G IN

DEX

Shee

tN

umbe

rSh

eet N

ame

TSTI

TLE

SHEE

TAS

ARC

HIT

ECTU

RAL

STA

ND

ARD

SD

201

FIR

ST F

LOO

R D

EMO

LITI

ON

PLA

NA2

01FI

RST

FLO

OR

AR

CH

ITEC

TUR

AL P

LAN

A202

LIFE

SAF

ETY

& EG

RES

S PL

ANA3

01EN

LAR

GED

FR

AGM

ENT

ARC

HIT

ECTU

RAL

PLA

NA4

01IN

TER

IOR

SEC

TIO

NS

A402

INTE

RIO

R S

ECTI

ON

SA5

01PA

RTI

TIO

N T

YPE

GEN

ERAL

NO

TES

/ TYP

ES 1

& 2

DET

AILS

A502

PAR

TITI

ON

TYP

E 3

GLA

SS P

ARTI

TIO

NA5

03PA

RTI

TIO

N T

YPE

4 W

OO

D W

ALL

A504

PAR

TITI

ON

TYP

E 5

WAT

ER W

ALL

A601

RO

OM

& F

IXTU

RE

SCH

EDU

LEA6

02D

OO

R S

CH

EDU

LE &

DET

AILS

A603

FIN

ISH

SC

EHD

ULE

& L

EGEN

DA7

00C

EILI

NG

DET

AILS

A701

FRAG

MEN

T R

EFLE

CTE

D C

EILI

NG

PLA

NA7

02FR

AGM

ENT

REF

LEC

TED

CEI

LIN

G P

LAN

- U

PPER

LEVE

LA7

03R

EFLE

CTE

D C

EILI

ING

PLA

N -

DES

IGN

FEA

TUR

ESA8

01IN

TER

IOR

DET

AILS

A901

FIR

ST F

LOO

R F

INIS

H F

LOO

R P

LAN

A902

FIR

ST F

LOO

R F

UR

NIT

UR

E PL

ANE2

01FI

RST

FLO

OR

ELE

CTR

ICAL

PLA

NE7

01FI

RST

FLO

OR

SW

ITC

HIN

G P

LAN

L200

PLAN

TIN

G P

LAN

HARR

ISON

WEL

LNES

S CE

NTER

123 P

ROJE

CT A

DDRE

SS R

OAD,

CIN

CINN

ATI, O

H 45

202

PROJ

ECT

SCOP

E, R

ENOV

ATIO

N AN

D NE

W C

ONST

RUCT

ION

PROJ

ECT

RELE

ASE:

BID

& C

ONST

RUCT

ION

SET

DESI

GN F

IRM

ERIN

ELI

ZABE

TH D

ESIG

N72

9 ED

GEC

LIFF

ST.

COVI

NGTO

N, K

Y 41

014

v 31

2.23

1.87

61

LAND

SCAP

E CO

NSUL

TANT

GARD

ENS

GALO

RE12

3 FL

OW

ER R

D.CI

NCIN

NATI

, OH

4520

2v

555.

555.

5555

LOCA

TION

MAP

DRAW

INGS

INDE

X

No.

Des

crip

tion

Dat

e

Page 76: Senior Capstone Process

76

3

D

D

D

D

D

D

2

6'-8" 157.00

°

D1D1

D1

D1

D1

D1

D2

D2

D3D3

D4

D4

D4

DEM

OLI

TIO

N G

ENER

AL N

OTE

S1.

RE

MO

VE A

LL E

XISI

TNG

VIN

YL W

ALL

COVE

RING

/NA

ILS

/ WAL

L PR

OTE

CTIO

N /

MO

LLY

BOLT

S /

SIG

NAG

E RE

SIDY

/ ET

C. F

ROM

EXI

STIN

G W

ALLS

TO

REM

AIN.

PAT

CH A

ND R

EPAI

R FO

R PA

INTI

NG.

2.DE

MO

ALL

EXI

STIN

G F

LOO

R FI

NISH

ES, B

ASE,

ADHE

SIVE

, AND

ASS

OCI

ATED

.

3.DE

MO

ALL

EXI

STIN

G A

COUS

ITC

CEIL

ING

TIL

E.

DEM

O P

LAN

LEG

END

PART

ITIO

N TO

REM

AIN

REM

OVE

PAR

TITI

ON

COLU

MN

TO R

EMAI

N

DOO

R A

ND F

RAM

E TO

REM

AIN

REM

OVE

DO

OR

AND

FRA

ME

DEM

OLI

TON

KEYN

OTE

SD1

RE

MO

VE A

LL E

XIST

ING

CAS

EWO

RK.

D2RE

MO

VE A

LL E

XIST

ING

CAS

EWO

RK. R

EMO

VE S

INK

AND

CAP

PLUM

BING

BEL

OW

FLO

OR.

D3EX

ISIT

ING

MEC

HANI

CAL

ROO

M E

QUI

PMEN

T TO

REM

AIN

AS IS

AND

PRO

PER

PRO

CTEC

TIO

N SU

PPLI

EDDU

RING

CO

NSTR

UCTI

ON

D4EX

ISTI

NG W

ALLS

TO

BE

DEM

OLI

SHED

. NEW

CUR

TAIN

WAL

LS T

O B

E SP

ECIF

IED

AND

DETA

ILED

INAR

CHIT

ECT'

S SC

OPE

OF

WO

RK.

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:14:48 PM

D20

1

FIR

ST F

LOO

RD

EMO

LITI

ON

PLAN

1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/16"

= 1

'-0"

D2011

FIR

ST F

LOO

R D

EMO

LITI

ON

PLA

N

No.

Des

crip

tion

Dat

e

Page 77: Senior Capstone Process

77

UP

BREA

KRO

OM 70

MAL

ELO

CKER

ROOM 64

FEM

ALE

LOCK

ERRO

OM 62

BODY

WEI

GHT

TRAI

NING

STUD

IO61

EXER

CISE

STUD

IO51

EXER

CISE

STUD

IO53

EXER

CISE

STUD

IO55

THER

APY

ROOM 52

THER

APY

ROOM 43

THER

APY

ROOM 41

THER

APY

ROOM 31

WAI

TING

40

RECE

PTIO

N30

CLAS

SROO

M65

CORR

IDOR

50

CORR

IDOR

60

LOBB

Y10

STAI

R63

LAUN

DRY

80

MEC

HANI

CAL

/ DAT

A90

SPIN

E20

JUIC

EBA

R /

COOK

NGDE

MOS

22

15'-0

"21

.38°

20.62

°RE

SEAR

CH21

21.30

°

20.70

°10

.00°

9'-01/4"

11'-8"3'-0 3/4" 6'-0 3/4"

19'-9

"

5'-43

/8"

5'-0"

22'-1

01/2"

10'-0"

1b

1b

1b

1a

1a

1b

1b

1b

1b

3

3

33

33

33

3

33

3

3

9080

70

64

62

61B

65

61A

20

31

4143

52

51

5355

22A

22B

50

10B

10A

A3011

Sim

42'-0"

57'-35/8"21'-7

3/4"

16'-1 1/2"

ALIG

N

A1A1

A1

83'-

0"23

'-0"

15'-0"

23'-10 1/2"

24'-0

"

ALIGN

2'-8

"

8'-5 1

/2"

7'-1"

12'-0

"

3'-10

1/2"

2'-11

"

7'-7 1

/2"

EQEQ

9'-0"

6'-11 1/8"

7'-51/4

"

5'-0"

5'-0"

5'-0"

9' -6"

7' - 6

"

FLO

OR

PLAN

GEN

ERAL

NOTE

S1.

REFE

R TO

SHE

ET A

401

FOR

PART

ITIO

NTY

PES

2.

DOO

R FR

AMES

SHA

LL B

E 6"

FRO

M F

ACE

OF

WAL

L TO

BAC

KSID

E O

F FR

AME

UNLE

SS O

THER

WIS

E NO

TED.

3.CE

NTER

LINE

OF

NEW

PAR

TITI

ONS

TO

ALIG

N W

ITH

CENT

ERLI

NE O

F CO

LUM

NS

FLO

OR

PLAN

KEY

NO

TES

A1BL

OCK

ING

BEH

IND

WAL

L FO

RTE

LEVI

SIO

N. C

OO

RDIN

ATE

LOCA

TIO

NW

ITH

CONT

RACT

OR.

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:10:56 PM

A201

FIR

ST F

LOO

RAR

CH

ITEC

TUR

ALPL

AN

1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/16"

= 1

'-0"

A2011

FIR

ST F

LOO

R A

RC

HIT

ECTU

RA

L PL

AN

No.

Des

crip

tion

Dat

e

Page 78: Senior Capstone Process

78

UP

3

D

D

D

D

D

D

2

BREA

KRO

OM 70

MAL

ELO

CKER

ROOM 64

FEM

ALE

LOCK

ERRO

OM 62

BODY

WEI

GHT

TRAI

NING

STUD

IO61

EXER

CISE

STUD

IO51

EXER

CISE

STUD

IO53

EXER

CISE

STUD

IO55

THER

APY

ROOM 52

THER

APY

ROOM 43

THER

APY

ROOM 41

THER

APY

ROOM 31

WAI

TING

40

RECE

PTIO

N30

CLAS

SROO

M65

CORR

IDOR

50

CORR

IDOR

60

LOBB

Y10

STAI

R63

LAUN

DRY

80

MEC

HANI

CAL

/ DAT

A90

SPIN

E20

JUIC

EBA

R /

COOK

NGDE

MOS

22

RESE

ARCH

21

FEC

FEC

FEC

FEC

FEC

LIFE

SAF

ETY

& EG

RESS

GEN

ERAL

NO

TES

1.BU

ILDI

NG W

ILL

BE F

ITTE

D O

UT W

ITH

SPRI

NKLE

RS

2.

REFE

R TO

SHE

ET A

701

THRO

UGH

A703

FOR

SPRI

NKLE

R, E

XIT

SIG

N, A

ND F

IRE

ALAR

M/S

MO

KE D

ETEC

TOR

LOCA

TIO

NS

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:11:06 PM

A202

LIFE

SAF

ETY

&EG

RES

S PL

AN 1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/16"

= 1

'-0"

A2021

FIR

ST F

LOO

R L

IFE

SAFE

TY &

EG

RES

S PL

AN

No.

Des

crip

tion

Dat

e

Page 79: Senior Capstone Process

79

1A4

01

FEM

ALE

LOCK

ERRO

OM 62

BODY

WEI

GHT

TRAI

NING

STUD

IO61

THER

APY

ROOM 31

RECE

PTIO

N30

LOBB

Y10

SPIN

E20

JUIC

EBA

R /

COOK

NGDE

MOS

22

57'-

0"

42'-

0"

RESE

ARCH

21

2'-0"

16' - 0"

18' - 8"

32'- 6"

34' -

10"

7'-0"

38.00°

5'-10"

30'- 0"

64.20°

118.4

6'-4 1

/2"

3'-5 1

/4"

20'-0"

3'-3 1/2"

21'-11/4

"

5'-01

/2"15'

-4"

7'-4 1/4"

9'-81/2

"

8'-1"

2'-1"

9'-93/4

"

7'-95/8

"

14'-3 1/2"

9'-41/2

"

19'-3"

ALIG

N

18' - 6

"

17'-1"

2'-91/2

"

17'-1"

2'-61/8

"

2'-6 1/2"

1

1

2 2

4

4

4

4

1b

4

4

4

4

61A

20

31

22A

22B

10B

10A

5

1A5

04

Sim

1A5

03

Sim

A503

2

4'-0"

4'-4"

24'-6"

2'-6"

9'-0"

6'-0"

3'-0"

1'-2"

8'-9"

2A4

01

2A5

02

Sim

A502

1

1A4

02

2A4

02

FLO

OR

PLAN

GEN

ERAL

NO

TES

1.RE

FER

TO S

HEET

A40

1 FO

R PA

RTIT

ION

TYPE

S

2.

DOO

R FR

AMES

SHA

LL B

E 6"

FRO

M F

ACE

OF

WAL

L TO

BAC

KSID

E O

F FR

AME

UNLE

SS O

THER

WIS

E NO

TED.

3.CE

NTER

LINE

OF

NEW

PAR

TITI

ONS

TO

ALI

GN

WIT

H CE

NTER

LINE

OF

COLU

MNS

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:11:18 PM

A301

ENLA

RG

EDFR

AGM

ENT

ARC

HIT

ECTU

RAL

PLAN

1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/8" =

1'-0

"A3

011EN

LARG

ED F

RAG

MEN

T AR

CHIT

ECTU

RAL

PLAN

No.

Des

crip

tion

Dat

e

Page 80: Senior Capstone Process

80

A5032

Sim

P-1

P-1

P-1

P-1

P-1

P-1

WD-

1W

D-1

WD-

1

WD-

1W

D-1

WD-

1W

D-1

WD-

1

WD-

1W

D-1

P-1

14'-0"3'-6"

AIR

SUPP

LYDI

FFUS

ERA7001

GL-2

14'-0"

3'-0"

A8011

10'-0"

WD-

1

WD-

1

WD-

1

WD-

1W

D-1

3'-6"

4A8

01

Sim

GL-

2

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:11:28 PM

A401

INTE

RIO

RSE

CTI

ON

S 1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/16"

= 1

'-0"

A4011

LON

GIT

UD

INA

L SE

CTI

ON

TH

RO

UG

H F

RA

GM

ENT

SCAL

E: 1

/4" =

1'-0

"A4

012TR

ANS

VERS

E SE

CTIO

N TH

ROU

GH

FRAG

MEN

T

No.

Des

crip

tion

Dat

e

Page 81: Senior Capstone Process

81

A8012

10'-0"

14'-0"

3'-0"2'-2"2'-2"2'-8"

2' - 8"

5'-4"

3'-6"

22'-2

"

P-3

WD-

1

P-1

WD-

1

WD-

1

P-1

GL-

1P-

3

WD-

1

WD-

1

WD-

1

A7006

PT-2

RP-1

P-3

WD-

1

3'-0"

P-3

A7005

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

1/4

" = 1

'-0"

3/28/2013 2:11:39 PM

A402

INTE

RIO

RSE

CTI

ON

S 1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/4" =

1'-0

"A4

021D

epen

dent

on

Gre

en R

oof S

ectio

n

SCAL

E: 1

/4" =

1'-0

"A4

022D

epen

dent

(2) o

n G

reen

Roo

f Sec

tion

No.

Des

crip

tion

Dat

e

Page 82: Senior Capstone Process

82

PART

ITIO

N TY

PE -

NO M

ODI

FICA

TIO

N

THER

MAL

INSU

LATI

ON

BATT

S:PR

OVI

DE A

ND IN

STAL

L TH

ERM

ALIN

SULA

TIO

N BA

TTS

AT S

TUD

PART

ITIO

NS.

ACO

USTI

C IN

SULA

TIO

N:PR

OVI

DE A

ND IN

STAL

L AC

OUS

TIC

INSU

LATI

ON

ACO

USTI

C SE

ALAN

T AT

HEA

D AN

DSI

LL &

ACO

USTI

C SE

ALAN

T AR

OUN

DAL

L PE

NETR

ATIO

NS.

a b TYPI

CAL

END

COND

ITIO

N DE

TAIL

S:

NO F

ASTE

NERS

PART

ITIO

N TY

PEPE

R PL

AN

FLO

OR

SLAB

MET

AL D

ECK

PART

ITIO

N PE

RPEN

DICU

LAR

TO D

ECKI

NG

SCAL

E: 1

-1/2

"=1'-

0"BA

SE D

ETAI

LA4

01TY

PSC

ALE:

1-1

/2"=

1'-0"

HEAD

DET

AIL

A401

TYP

2"

UNO3/4" TYP

PART

ITIO

N TY

PEPE

R PL

ANCO

NTIN

UOUS

BRI

DGIN

G

STEE

L CL

IPAN

GLE

ATTA

CHM

ENT

FAST

ENER

S(2

) EA.

SIDE

FIRE

STO

P SE

ALAN

T @

FIR

ERA

TED

PART

ITIO

NSAC

OUS

TICA

L SE

ALAN

T @

ACO

USTI

CAL

PART

ITIO

NS

FIRE

SAFI

NG @

RAT

EDPA

RTIT

IONS

ACO

USTI

CAL

INSU

LATI

ON

@AC

OUS

TICA

L PA

RTIT

IONS

CONT

INUO

US D

EEP

LEG

DEF

LECT

ION

TOP

TRAC

K

CONT

INUO

US3

5/8"

MET

AL T

RACK

FIRE

STO

P SE

ALAN

T @

FIR

E RA

TED

PART

ITIO

NSAC

OUS

TICA

L SE

ALAN

T @

ACO

USTI

CAL

PART

ITIO

NSO

MIT

@ N

ON-

RATE

D PA

RTIT

IONS

GEN

ERAL

NO

TES:

THE

PART

ITIO

N TY

PE D

ESIG

NATI

ON

INCL

UDES

THE

PART

ITIO

N FI

RE R

ATIN

G O

R SM

OKE

PAR

TITI

ON

REQ

UIRE

MEN

T (W

HERE

APP

LICA

BLE)

, A P

ARTI

TIO

NCO

NFIG

URAT

ION,

AND

PAR

TITI

ON

WAL

L M

ODI

FIER

S(W

HERE

APP

LICA

BLE)

PART

ITIO

NTY

PE

FIRE

ASS

EMBL

Y (H

OUR

S)O

R SM

OKE

PAR

TITI

ON

REQ

UIRE

MEN

TPA

RTIT

ION

CONF

IGUR

ATIO

N

PART

ITIO

N W

ALL

MO

DIFI

CATI

ON

PART

ITIO

N TY

PE IN

DICA

TORS

ARE

NO

TED

ON

FLO

OR

PLAN

S. S

EE L

IFE

SAFE

TY P

LANS

OR

FLO

OR

PLAN

S FO

RLO

CATI

ON

AND

EXTE

NT O

R LI

MIT

S O

F FI

RE A

ND S

MO

KERA

TED

PART

ITIO

NS.

PART

ITIO

N TY

PE N

UMBE

RS A

RE N

OT

SEQ

UENT

IAL

AND

CERT

AIN

NUM

BERS

MAY

NO

T BE

USE

D.

ALL

PART

ITIO

N TY

PE D

ETAI

LS A

RE P

LAN

VIEW

, UNL

ESS

NOTE

D O

THER

WIS

E.

B. C. D.A.

2ASP b

PART

ITIO

N W

ALL

MO

DIFI

CATI

ONS

:PA

RTIT

ION

TYPE

KEY

:

STAN

DARD

4 7

/8" W

ALL

MET

AL S

TUD

CONS

TRUC

TIO

NW

ITH

GYP

BD

ON

BOTH

SID

ES1

STAN

DARD

3" W

ALL

MET

AL S

TUD

CONS

TRUC

TIO

NW

ITH

GYP

BD

ON

ONE

SID

E2

GLA

SS P

ARTI

TIO

N W

ALL,

REF

ER T

O S

HEET

A40

23

WO

OD

SLAT

WAL

L SY

STEM

, REF

ER T

O S

HEET

A40

34

WAT

ER W

ALL

SYST

EM, R

EFER

TO

SHE

ET A

405

5

PART

ITIO

N CO

NFIG

URAT

ION:

A501

TYP

A501

TYP

5/8"

GYP

BD

SCHE

DULE

D CE

ILIN

G

BRAC

ING

IF R

EQUI

RED

STRU

CTUR

E

FLO

OR

PART

ITIO

N TO

UND

ERSI

DE O

F ST

RUCT

URE

NO F

ASTE

NERS

PART

ITIO

N TY

PEPE

R PL

AN

FLO

OR

SLAB

MET

AL D

ECK

PART

ITIO

N PE

RPEN

DICU

LAR

TO D

ECKI

NG

SCAL

E: 1

-1/2

"=1'-

0"BA

SE D

ETAI

LA4

01TY

PSC

ALE:

1-1

/2"=

1'-0"

HEAD

DET

AIL

A401

TYP

2" PART

ITIO

N TY

PEPE

R PL

ANCO

NTIN

UOUS

BRI

DGIN

G

STEE

L CL

IPAN

GLE

ATTA

CHM

ENT

FAST

ENER

S(2

) EA.

SIDE

FIRE

STO

P SE

ALAN

T @

FIR

ERA

TED

PART

ITIO

NSAC

OUS

TICA

L SE

ALAN

T @

ACO

USTI

CAL

PART

ITIO

NS

FIRE

SAFI

NG @

RAT

EDPA

RTIT

IONS

ACO

USTI

CAL

INSU

LATI

ON

@AC

OUS

TICA

L PA

RTIT

IONS

CONT

INUO

US D

EEP

LEG

DEF

LECT

ION

TOP

TRAC

K

CONT

INUO

US3

5/8"

MET

AL T

RACK

FIRE

STO

P SE

ALAN

T @

FIR

E RA

TED

PART

ITIO

NSAC

OUS

TICA

L SE

ALAN

T @

ACO

USTI

CAL

PART

ITIO

NSO

MIT

@ N

ON-

RATE

D PA

RTIT

IONS

A501

TYP

A501

TYP

5/8"

GYP

BD

SCHE

DULE

D CE

ILIN

G

BRAC

ING

IF R

EQUI

RED

STRU

CTUR

E

FLO

OR

PART

ITIO

N TO

UND

ERSI

DE O

F ST

RUCT

URE

11

2PA

RTIT

ION

CONF

IGUR

ATIO

N:TY

PICA

L EN

D CO

NDIT

ION

DETA

ILS:

2

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

1 1

/2" =

1'-0

"

3/28/2013 2:17:25 PM

A501

PAR

TITI

ON

TYP

EG

ENER

AL N

OTE

S /

TYPE

S 1

& 2

DET

AILS

1300

0.00

Issu

e D

ate

EEM

EEM

No.

Des

crip

tion

Dat

e

Page 83: Senior Capstone Process

83

4'-0"

4'-0"

3" A

LUM

INUM

MUL

LIO

N,VE

NEER

ED IN

WD-

1

3/4"

CLE

AR T

EMPE

RED

GLA

SS

2A5

02

Sim

A5023

8'-0"2'-0"4'-0"

14'-0"

GYP

BD

SOFF

IT

STRU

CTUR

E

SCHE

DULE

D CE

ILIN

G

3/4"

CLE

AR T

EMPE

RED

GLA

SS

FLO

OR

3/4"

SAW

CUT

EXS

T CO

NCRE

TE F

LOO

R

A5024

Sim

3" A

LUM

INUM

MUL

LIO

N, V

ENEE

RED

IN W

D-1

A5025

Sim

GYP

BD

SOFF

IT

1/8"

3/4"

CLE

ARTE

MPE

RED

GLA

SS

SILI

CON

SEAL

ANT

3/4"

CLE

AR T

EMPE

RED

GLA

SS

SAW

CUT

EXS

TCO

NCRE

TE F

LOO

R

RUBB

ER N

EOPR

ENE

GAS

KET

SILI

CONE

SEA

LANT

3 1/4"

3 3/4"

3/4"

CLE

AR T

EMPE

RED

GLA

SS

5/8"

GYP

BD

ALUM

INUM

CHA

NEL

FLUS

HW

ITH

FINI

SH F

ACE

OF

CEIL

ING

2x4

WO

OD

STUD

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:11:59 PM

A502

PAR

TITI

ON

TYP

E 3

GLA

SS P

ARTI

TIO

N

1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/4" =

1'-0

"A5

021G

LASS

WA

LL (T

YPE

3) E

LEVA

TIO

N

SCAL

E: 3

/4" =

1'-0

"A5

022G

LASS

WA

LL (T

YPE

3) S

ECTI

ON

SCAL

E: 1

1/2

" = 1

'-0"

A5023

GLA

SS P

ANEL

JO

INER

Y DE

TAIL

SCAL

E: 1

1/2

" = 1

'-0"

A5024

GLA

SS W

ALL

BASE

DET

AIL

SCAL

E: 1

1/2

" = 1

'-0"

A5025

GLA

SS W

ALL

CEL

ING

DET

AIL

No.

Des

crip

tion

Dat

e

Page 84: Senior Capstone Process

84

STRU

CTUR

E

SCHE

DULE

D CE

ILIN

G

2X6

WO

OD

PLAN

KS, W

D-1

FIXE

D PO

SITI

ON

FLO

OR

2X6

WO

OD

PLAN

KS, W

D-1

MO

VEAB

LE

CLO

SED

POSI

TIO

NO

PEN

POSI

TIO

N

A5035

Sim

STRU

CTUR

ALCO

LUM

N

2X6

WO

OD

SLAT

S, W

D-1

1A5

03

Sim

A5033

14'-0"A5

034

COLU

MN

2" W

IDE

WO

OD

SHIM

ATTA

CHED

TO

CO

LUM

N

2x6

WO

OD

SLAT

ATTA

CHED

TO

WO

OD

SHIM

COLU

MN

2" T

HICK

MET

AL T

RACK

BOLT

ED T

O C

OLU

MN

2x6

WO

OD

SLAT

ATTA

CHED

TO

WO

OD

SHIM

ROLL

ER T

RACK

WHE

EL A

TTAC

HED

TO 2

x6W

OO

D SH

IMCO

NNEC

TS M

ETAL

TRAC

K AN

D W

OO

DSL

ATS,

ALL

OW

ING

THE

UNIT

TO

MO

VE A

S O

NE MET

AL T

RACK

SAW

CUT

EXS

TCO

NCRE

TE F

LOO

R

3 1/4"

5"

1/2"

WO

OD

SHIM

BEND

ING

MEC

HANI

SM

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:12:15 PM

A503

PAR

TITI

ON

TYP

E 4

WO

OD

WAL

L 1300

0.00

Issu

e D

ate

Aut

hor

EEM

SCAL

E: 3

/4" =

1'-0

"A5

031W

OO

D S

LAT

WA

LL (T

YPE

4) S

ECTI

ON

SCAL

E: 1

/4" =

1'-0

"A5

032W

ood

Slat

Wal

l (TY

PE 3

) ELE

VATI

ON

(Ope

n Po

sitio

n)

SCAL

E: 1

1/2

" = 1

'-0"

A5033

FIXE

D W

OO

D S

LAT

ATTA

CHM

ENT

DETA

IL

SCAL

E: 1

1/2

" = 1

'-0"

A5034

MO

VEAB

LE W

ALL

ATTA

CHM

ENT

DETA

IL

SCAL

E: 1

1/2

" = 1

'-0"

A5035

WO

OD

SLAT

WAL

L BA

SE D

ETAI

L

No.

Des

crip

tion

Dat

e

Page 85: Senior Capstone Process

85

STRU

CTUR

E

SCHE

DULE

D CE

ILIN

G

FLO

OR

A5042

Sim

3" D

IA.

MET

AL P

IPE

1/2"

CLE

AR T

EMPE

RPED

GLA

SS

2-SI

DED

LED

PANE

L

A5044

Sim

A5043

Sim

WAT

ER C

ATCH

BAS

IN

FILT

ER

3" D

IA. M

ETAL

PIP

E

DRAI

N CO

VER

WAT

ER P

ROO

FSE

ALAN

T

1/2"

CLE

ARTE

MPE

RED

GLA

SS

FLO

OR

SLAB1/

2" C

LEAR

TEM

PERE

D G

LASS

5 1/2"

1/2"

1 3/4"

1 1/8"

1 3/4"

1/2"

.08

CLEA

R AC

RYLI

C PA

NEL

DOUB

LE S

IDED

LED

PANE

L

1 1

/8" D

OUB

LE S

IDED

LED

PAN

EL

1/2"

CLE

AR T

EMPE

RED

GLA

SS

CHAR

COAL

FILT

RATI

ON

SYST

EM

WAT

ERPR

OO

F SE

ALAN

TTO

CO

VER

ALL

EDG

ESAN

D SE

AMS

PLAS

TIC

CATC

H BA

SIN

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:12:24 PM

A504

PAR

TITI

ON

TYP

E 5

WAT

ER W

ALL 13

000.

00Is

sue

Dat

eEE

MEE

M

SCAL

E: 3

/4" =

1'-0

"A5

041W

ATE

R W

ALL

(TYP

E 5)

SEC

TIO

NSC

ALE:

1 1

/2" =

1'-0

"A5

042W

ATER

WAL

L BA

SE D

ETAI

L

SCAL

E: 1

1/2

" = 1

'-0"

A5043

WAT

ER W

ALL

CONS

TRUC

TIO

N DE

TAIL

SCAL

E: 1

1/2

" = 1

'-0"

A5044

WAT

ER W

ALL

TOP

DETA

IL

No.

Des

crip

tion

Dat

e

Page 86: Senior Capstone Process

86

FIXT

URE

LEG

END

SYM

BOL

TYPE

MAN

UFAC

TURE

RPR

ODUC

TVO

LTAG

E

RECE

SSED

CAN

LIG

HTCO

OPT

ERLI

GHT

ING

COUN

TSI

ZE

6" D

IA.

LAM

P

120

VHA

LO 4

94P0

6LE

D23

7

WAL

LW

ASHE

RCO

OPE

RLI

GHT

ING

6" D

IA.

120

VHA

LO49

5WW

06LE

D37

LINE

ARBO

XCO

OPE

RLI

GHT

ING

1' x

4'12

0 V

FSR

CONF

INEM

ENT

LED

2

STRI

PLI

GHT

ING

COO

PER

LIG

HTIN

G3"

x 6

'12

0 V

NEO

RAY

STR

AIG

HT&

NARR

OW

LED

9

DOUB

LESI

DED

LED

LIG

HT B

OX

LED

LIG

HT P

ANEL

SIM

PLYT

HIN

51" x

157

"12

VDO

UBLE

SID

EDLE

D LI

GHT

BO

XST

ANDA

RD

LED

???

COLO

R

3000

K

RGB

COLO

RCH

ANG

ING

3000

K

3000

K

3000

K

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

12"

= 1

'-0"

3/28/2013 2:12:32 PM

A601

RO

OM

& F

IXTU

RE

SCH

EDU

LE

1300

0.00

Issu

e D

ate

EEM

EEM

RO

OM

AR

EA S

CH

EDU

LELe

vel

Num

ber

Nam

eD

epar

tmen

tO

ccup

ancy

Occ

upan

tAr

ea

Leve

l 1Le

vel 1

10LO

BBY

-14

1 SF

Leve

l 120

SPIN

E-

993

SFLe

vel 1

21R

ESEA

RC

HN

UTR

ITIO

N/

EDU

CAT

ION

1051

SF

Leve

l 122

JUIC

E BA

R /

CO

OKN

GD

EMO

S

NU

TRIT

ION

/ED

UC

ATIO

N58

5 SF

Leve

l 130

REC

EPTI

ON

-15

6 SF

Leve

l 131

THER

APY

RO

OM

THER

APY

296

SF

Leve

l 140

WAI

TIN

GTH

ERAP

Y11

55 S

FLe

vel 1

41TH

ERAP

YR

OO

MTH

ERAP

Y21

2 SF

Leve

l 143

THER

APY

RO

OM

THER

APY

241

SF

Leve

l 150

CO

RR

IDO

R-

1312

SF

Leve

l 151

EXER

CIS

EST

UD

IOFI

TNES

S61

4 SF

Leve

l 152

THER

APY

RO

OM

THER

APY

214

SF

Leve

l 153

EXER

CIS

EST

UD

IOFI

TNES

S53

0 SF

Leve

l 155

EXER

CIS

EST

UD

IOFI

TNES

S54

4 SF

Leve

l 160

CO

RR

IDO

R-

1105

SF

Leve

l 161

BOD

YW

EIG

HT

TRAI

NIN

GST

UD

IO

FITN

ESS

1199

SF

Leve

l 162

FEM

ALE

LOC

KER

RO

OM

FITN

ESS

949

SF

Leve

l 163

STAI

R-

118

SFLe

vel 1

64M

ALE

LOC

KER

RO

OM

FITN

ESS

730

SF

Leve

l 165

CLA

SSR

OO

MN

UTR

ITIO

N/

EDU

CAT

ION

922

SF

Leve

l 170

BREA

KR

OO

MBA

CK

OF

HO

USE

STAF

F54

3 SF

Leve

l 180

LAU

ND

RY

BAC

K O

FH

OU

SEST

AFF

573

SF

Leve

l 190

MEC

HAN

ICA

L / D

ATA

BAC

K O

FH

OU

SEST

AFF

361

SF

No.

Des

crip

tion

Dat

e

Page 87: Senior Capstone Process

87

10'-0"

VARI

ES A

6'-0"

10'-0"

BFU

LL H

EIG

HTG

LASS

DO

OR

FULL

HEI

GHT

SLI

DING

GLA

SS D

OO

R

CST

ANDA

RD D

OO

R

3'-0"

7'-0"

3'-0"

DST

ORE

FRO

NTG

LASS

DO

OR

VARI

ES

VARIES

10'-0"

3'-0" 1

6'-0"

10'-0"

2SI

DEW

OO

D FR

AME

DOUB

LE S

IDE

WO

OD

FRAM

E

3AL

L SI

DES

WO

OD

FRAM

E

3'-0"

4ST

ORE

FRO

NT F

RAM

E

VARI

ES

VARIES

3"3"

3"3"

3"3"

7'-3"

OPE

NO

PEN

OPE

NO

PEN

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

1/4

" = 1

'-0"

3/28/2013 2:12:38 PM

A602

DO

OR

SC

HED

ULE

& D

ETAI

LS

1300

0.00

Issu

e D

ate

EEM

EEM

DO

OR

SC

HED

ULE

DO

OR

MAR

KDO

OR

LOCA

TIO

N

DOO

R IN

FORM

ATIO

NFR

AME

INFO

RMAT

ION

HARD

WAR

ESE

TCO

MM

ENTS

SIZE

STYL

EM

ATER

IAL

TYPE

MAT

ERIA

LDE

TAIL

SW

IDTH

HEI

GHT

JAM

BHE

ADO

THER

10A

LOBB

Y6'

- 2

1/4"

7' -

10 3

/4"

EXST

EXST

EXST

EXST

(non

e)10

BLO

BBY

8' -

7 17

/32"

6' -

10 3

/4"

EXST

EXST

EXST

EXST

(non

e)20

SPIN

E4'

- 0"

10' -

0"

AFG

L1

WD

(non

e)22

AJU

ICE

BAR

/ C

OO

KNG

DEM

OS

3' -

9 1/

2"8'

- 0"

DC

TG4

AL(n

one)

22B

JUIC

E BA

R /

CO

OKN

G D

EMO

S3'

- 9

1/2"

8' -

0"D

CTG

4AL

(non

e)31

THER

APY

RO

OM

3' -

0"10

' - 0

"A

FGL

1W

D(n

one)

41TH

ERAP

Y R

OO

M3'

- 0"

10' -

0"

AFG

L1

WD

(non

e)43

THER

APY

RO

OM

3' -

0"10

' - 0

"A

FGL

1W

D(n

one)

50C

OR

RID

OR

3' -

9 1/

2"7'

- 10

3/4

"D

CTG

4AL

(non

e)51

EXER

CIS

E ST

UD

IO6'

- 0"

10' -

0"

BFG

L2

WD

(non

e)52

THER

APY

RO

OM

3' -

0"10

' - 0

"A

FGL

1W

D(n

one)

53EX

ERC

ISE

STU

DIO

6' -

0"10

' - 0

"B

FGL

2W

D(n

one)

55EX

ERC

ISE

STU

DIO

6' -

0"10

' - 0

"B

FGL

2W

D(n

one)

61A

BOD

Y W

EIG

HT

TRAI

NIN

G S

TUD

IO6'

- 0"

10' -

0"

BFG

L2

WD

(non

e)61

BBO

DY

WEI

GH

T TR

AIN

ING

STU

DIO

6' -

0"10

' - 0

"B

FGL

2W

D(n

one)

62FE

MAL

E LO

CKE

R R

OO

M3'

- 0"

10' -

0"

AFG

L1

WD

(non

e)64

MAL

E LO

CKE

R R

OO

M3'

- 0"

10' -

0"

AFG

L1

WD

(non

e)65

CLA

SSR

OO

M6'

- 0"

10' -

0"

BFG

L2

WD

(non

e)70

BREA

K R

OO

M6'

- 0"

10' -

0"

BFG

L2

WD

(non

e)71

LAU

ND

RY

6' -

0"7'

- 0"

EXST

EXST

EXST

EXST

(non

e)75

MEC

HAN

ICAL

/ D

ATA

6' -

0"7'

- 0"

EXST

EXST

EXST

EXST

(non

e)77

MEC

HAN

ICAL

/ D

ATA

10' -

0"

10' -

0"

EXST

EXST

EXST

EXST

(non

e)80

LAU

ND

RY

3' -

0"7'

- 0"

CW

D3

WD

(non

e)90

MEC

HAN

ICAL

/ D

ATA

3' -

0"7'

- 0"

CW

D3

WD

(non

e)

SCAL

E: 1

/4" =

1'-0

"A6

021D

OO

R T

YPES

SCAL

E: 1

/4" =

1'-0

"A6

022FR

AME

TYPE

S

No.

Des

crip

tion

Dat

e

Page 88: Senior Capstone Process

88

FINI

SH L

EGEN

D

FLOO

R FI

NISH

ESCP

T-1

CODE

TYPE

MAN

UFAC

TURE

RST

YLE/

PATT

ERN

COM

MEN

TS

CARP

ET T

ILE

PORC

ELIN

ETI

LEPT

-1

INTE

RFAC

ECO

LLEC

TION

: URB

AN R

ETRE

ATST

YLE:

127

12CO

LOR:

100

641

SIZE

: 50c

m x

50c

mIN

STAL

L: Q

UART

ER T

URN

CRO

SSVI

LLE

TILE

STYL

E: S

HADE

S AV

241

HON

COLO

R: F

ROST

FINI

SH: H

ONE

DSI

ZE: 1

2" x

24"

INST

ALL:

MO

NOLI

THIC

RUBB

ERFL

OO

RING

R-1

NORA

COLL

ECTI

ON: N

ORA

PLAN

STYL

E: E

NVIR

ONC

ARE

COLO

R: L

ACE

VINE

294

5TH

ICKN

ESS:

3m

mSI

ZE: S

HEET

, 4' x

39'

SC GT-

1

USE

CORR

ESPO

NDIN

GHE

AT W

ELD

ROD,

COLO

R 29

45

SEAL

EDCO

NCRE

TE

EPO

XYG

ROUT

LATI

CRET

EST

YLE:

Spe

ctra

LOCK

PRO

Gro

utCO

LOR:

BRI

GHT

WHI

TE 4

4TH

ICKN

ESS:

1/8

"

WAL

L FI

NISH

ESP-

1PA

INT

(NEU

TRAL

)SH

ERW

INW

ILLI

AMS

COLO

R: S

W71

03 W

HITE

TAIL

E

P-2

PAIN

T(G

REEN

)SH

ERW

INW

ILLI

AMS

COLO

R: S

W77

26 L

EMO

N VE

RBEN

A

P-3

PAIN

T (M

ED)

SHER

WIN

WIL

LIAM

SCO

LOR:

SW

6126

NAV

AJO

WHI

TE

GL-

1G

LASS

GLA

SPRO

STYL

E: G

LAS-

PRO

CG

COLO

R: S

EA S

ALT

THIC

KNES

S: 1

/2"

RUBB

ERFL

OO

RING

R-2

TO M

ARKE

TCO

LLEC

TION

: ATM

OSP

HERE

STYL

E: B

OUN

CECO

LOR:

SO

DA F

OUN

TAIN

TM

113

THIC

KNES

S: 6

mm

SIZE

: 38"

x 3

8"

MIS

C. / C

ASEW

ORK

FINI

SHES

PL-1

PLAS

TIC

LAM

INAT

EW

ILSO

NART

STYL

E: W

INDS

OR

MAH

AGAN

Y 70

39FI

NISH

: 78

SS-1

SOLI

DSU

RFAC

ECO

RIAN

STYL

E: V

ENAR

O W

HITE

THIC

KNES

S: 1

/2"

WD-

1W

OO

DST

AINE

D TO

MAT

CH W

ILSO

NART

WIN

DSO

R M

AHAG

ANY

7039

P-3

PAIN

T(C

EILI

NG)

ICI/G

LIDD

ENCO

LOR:

CEI

LING

WHI

TE

RP-1

RESI

N PA

NEL

3FO

RMST

YLE:

VAR

IA E

CO-R

ESIN

COLO

R: H

IGH-

RES

IMAG

ERY

BLAD

ESLA

YOUT

: LAN

DSCA

PETH

ICKN

ESS:

1/2

"

RB-1

RUBB

ERBA

SEJO

HNSO

NITE

STYL

E: R

EVEA

LCO

LOR:

WHI

TE P

EARL

77

HEIG

HT: 4

"PT

B-1

PORC

ELIN

ETI

LE B

ASE

CRO

SSVI

LLE

STYL

E: S

HADE

SCO

LOR:

FRO

STFI

NISH

: HO

NED

HEIG

HT: 6

" X 2

4" B

ASE

PORC

ELIN

ETI

LEPT

-2CR

OSS

VILL

E TI

LEST

YLE:

SHA

DES

AV24

1 HO

NCO

LOR:

FRO

STFI

NISH

: HO

NED

SIZE

: 6" x

24"

INST

ALL:

MO

NOLI

THIC

COVE

BO

TTO

M T

OM

EET

WIT

H FL

OO

RTI

LE

GL-

2G

LASS

-ST

YLE:

CLE

AR T

EMPE

RED

GLA

SSTH

ICKN

ESS:

1/2

"

PL-2

PLAS

TIC

LAM

INAT

EW

ILSO

NART

STYL

E: W

HITE

157

0FI

NISH

: 60

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

12"

= 1

'-0"

3/28/2013 2:12:47 PM

A603

FIN

ISH

SC

EHD

ULE

& LE

GEN

D

1300

0.00

Issu

e D

ate

EEM

EEM

ROO

M F

INIS

H SC

HEDU

LERO

OM

NO

.RO

OM

NAM

EFL

OO

RBA

SEW

ALLS

CEI

LIN

GC

OM

MEN

TSN

ORT

HSO

UTH

EAST

WES

T10

LOBB

YPT

-1R

B-1

P-1

P-1

P-1

P-1

EXST

20SP

INE

PT-1

, R-2

RB-

1*

**

*W

DC

-1,

EXST

* SEE

FIN

ISH

FLO

OR

PLA

N&

ELEV

ATIO

NS

21R

ESEA

RC

HPT

-1*

**

*W

DC

-1,

EXST

22JU

ICE

BAR

/ C

OO

KNG

DEM

OS

PT-1

**

**

EXST

* SEE

FIN

ISH

FLO

OR

PLA

N&

ELEV

ATIO

NS

30R

ECEP

TIO

NC

PT-1

RB-

1P-

2W

D-1

P-2

P-4

31TH

ERAP

Y R

OO

MC

PT-1

RB-

1R

P-1

WD

-1P-

1*

P-4

* WAT

ER W

ALL

40W

AITI

NG

CPT

-1R

B-1

P-2

P-2

P-2

WD

-1P-

441

THER

APY

RO

OM

CPT

-1R

B-1

P-1

*R

P-1

WD

-1P-

4* W

ATER

WAL

L43

THER

APY

RO

OM

CPT

-1R

B-1

P-1

*R

P-1

RP-

1P-

4* W

ATER

WAL

L50

CO

RR

IDO

RPT

-1*,P

-1P-

1P-

1P-

4* W

ATER

WAL

L51

EXER

CIS

E ST

UD

IOR

-1R

B-1

P-1

P-3

WD

-1W

DC

-252

THER

APY

RO

OM

CPT

-1R

B-1

P-1

*P-

1R

P-1

P-4

* WAT

ER W

ALL

53EX

ERC

ISE

STU

DIO

R-1

RB-

1P-

1P-

3P-

3W

DC

-255

EXER

CIS

E ST

UD

IOR

-1R

B-1

P-1

P-1

P-3

WD

C-2

60C

OR

RID

OR

PT-1

RB-

1P-

1P-

1P-

1P-

461

BOD

Y W

EIG

HT

TRAI

NIN

G S

TUD

IOR

-1R

B-1

P-3

WD

-1P-

1W

DC

-2

62FE

MAL

E LO

CKE

RR

OO

MPT

-1PT

B-1

P-1,

PT-2

P-1.

GL-

1P-

1,PT

-2P-

1P-

4

63ST

AIR

R-1

P-3

P-3

P-3

P-3

P-4

64M

ALE

LOC

KER

RO

OM

PT-1

PTB-

1P-

1,PT

-2P-

1,PT

-2P-

1P-

1, G

L-1

P-4

65C

LASS

RO

OM

R-1

RB-

1P-

1P-

3P-

1W

DC

-270

BREA

K R

OO

MC

PT-1

RB-

1P-

2P-

1P-

1P-

1P-

480

LAU

ND

RY

SCR

B-1

P-1

P-1

P-1

P-1

P-4

90M

ECH

ANIC

AL /

DAT

ASC

RB-

1P-

1P-

1P-

1P-

1P-

4

No.

Des

crip

tion

Dat

e

Page 89: Senior Capstone Process

89

PERF

ORA

TED

ALUM

INUM

MET

ALPA

NEL,

VEN

EERE

D IN

WD-

1

6"

6"

1'-8"

1'-8"

0'-0

1/8"

0'-0

1/4"

0'-01/2

"

1/2"

1"1 1

/2"

ALUM

INUM

MET

AL P

IPE

EXST

GYP

BD

CEIL

ING

7"7"

7"7"

ALUM

INUM

MET

AL P

IPE

WIN

D CE

ILIN

G S

YSTE

MA7

003A7004

EXIS

TING

RO

OF

STRU

CTUR

E

1" M

ETAL

PIP

ECO

NNEC

TING

TO

CEIL

ING

PERF

ORA

TED

MET

AL P

ANEL

1" M

ETAL

PIP

E W

ELDE

DTO

ANO

THER

PIP

EW

HICH

CO

NNEC

TS T

HERO

WS

AND

COLU

MNS

TOG

ETHE

R

A7007

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:12:54 PM

A700

CEI

LIN

G D

ETAI

LS

1300

0.00

Issu

e D

ate

EEM

EEM

No.

Des

crip

tion

Dat

e

SCAL

E: 1

1/2

" = 1

'-0"

A7002

PLA

N C

ALL

OU

T O

F W

IND

CEI

LIN

G F

EATU

RE

SCAL

E: 1

" = 1

'-0"

A7001

SEC

TIO

N C

ALL

OU

T O

F W

IND

CEI

LIN

G F

EATU

RE

SCAL

E: 3

" = 1

'-0"

A7003

CO

NST

RU

CTI

ON

DET

AIL

OF

WIN

D C

EILI

NG

FEA

TUR

ESC

ALE:

3" =

1'-0

"A7

004TO

P D

ETA

IL O

F W

IND

CEI

LIN

G F

EATU

RE

SCAL

E: 1

1/2

" = 1

'-0"

A7005

CEI

LIN

G B

UB

BLE

DET

AIL

NOT

ACCU

RATE

- STI

LLNE

EDS

TO B

E DR

AWN

NOT

ACCU

RATE

- STI

LLNE

EDS

TO B

E DR

AWN

NOT

ACCU

RATE

- STI

LLNE

EDS

TO B

E DR

AWN

SCAL

E: 1

" = 1

'-0"

A7006

SEC

TIO

N C

ALL

OU

T O

F W

OO

D S

LAT

CEI

LIN

GSC

ALE:

1 1

/2" =

1'-0

"A7

007D

ETA

IL O

F SL

AT

CEI

LIN

G

NOT

ACCU

RATE

- STI

LLNE

EDS

TO B

E DR

AWN

Page 90: Senior Capstone Process

90

3'-0"

3'-0"

3'-0"

3'-0"

6'-0"

10' -

0"

10' -

0"

10' -

0"

10' -

0"

10' -

0"

EQEQ

EQ

EQ

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-2"

14'-6 1/2"

3'-0"

3'-0"

3'-0"

14' -

0"

14' -

0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

VARI

ES

VARI

ES

5'-6"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

5'-2"

5'-1"

5'-2"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"

REFL

ECTE

D CE

ILIN

G P

LAN

GEN

ERAL

NO

TES

1.

REFE

R TO

SHE

ET A

601

& SP

ECIF

ICAT

ION

NOTE

BOO

K FO

R LI

GHT

FIX

TURE

SCHE

DULE

2.

ALL

EXIS

TING

EXP

OSE

D CE

ILIN

G B

EAM

S TO

BE

PAIN

TED

P-4

3.AL

L SO

FFIT

S TO

BE

PAIN

TED

P-1

UNLE

SS O

THER

WIS

E NO

TED

4.RE

FER

TO S

HEET

A70

0 FO

R CE

ILIN

G D

ETAI

LS

5.LI

GHT

ING

LAY

OUT

S FO

R RE

FERE

NCE

ONL

Y, F

INAL

LAY

OUT

BY

LIG

HTIN

GCO

NSUL

TANT

REFL

ECTE

D CE

ILIN

G P

LAN

LEG

END

G

YP B

OAR

D CE

ILIN

G

RECE

SSED

CAN

LIG

HT

WAL

L W

ASHE

R

FLO

URES

CENT

LIG

HT F

IXTU

RE

SPRI

NKLE

R

SMO

KE D

ETEC

TOR

SUPP

LY A

IR D

IFFU

SER

RETU

RN A

IR G

RILL

E

EXIT

SIG

N

SD

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:13:07 PM

A701

FRAG

MEN

TR

EFLE

CTE

DC

EILI

NG

PLA

N 1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/8" =

1'-0

"A7

011FI

RST

FLO

OR

REF

LEC

TED

CEI

LIN

G P

LAN

No.

Des

crip

tion

Dat

e

Page 91: Senior Capstone Process

91

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

REFL

ECTE

D CE

ILIN

G P

LAN

GEN

ERAL

NO

TES

1.

REFE

R TO

SHE

ET A

601

& SP

ECIF

ICAT

ION

NOTE

BOO

K FO

R LI

GHT

FIX

TURE

SCHE

DULE

2.

ALL

EXIS

TING

EXP

OSE

D CE

ILIN

G B

EAM

S TO

BE

PAIN

TED

P-4

3.AL

L SO

FFIT

S TO

BE

PAIN

TED

P-1

UNLE

SS O

THER

WIS

E NO

TED

4.RE

FER

TO S

HEET

A70

0 FO

R CE

ILIN

G D

ETAI

LS

5.LI

GHT

ING

LAY

OUT

S FO

R RE

FERE

NCE

ONL

Y, F

INAL

LAY

OUT

BY

LIG

HTIN

GCO

NSUL

TANT

REFL

ECTE

D CE

ILIN

G P

LAN

LEG

END

G

YP B

OAR

D CE

ILIN

G

RECE

SSED

CAN

LIG

HT

WAL

L W

ASHE

R

FLO

URES

CENT

LIG

HT F

IXTU

RE

SPRI

NKLE

R

SMO

KE D

ETEC

TOR

SUPP

LY A

IR D

IFFU

SER

RETU

RN A

IR G

RILL

E

EXIT

SIG

N

SD

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:13:22 PM

A702

FRAG

MEN

TR

EFLE

CTE

DC

EILI

NG

PLA

N -

UPP

ER L

EVEL 13

000.

00Is

sue

Dat

eEE

MEE

M

SCAL

E: 1

/8" =

1'-0

"A7

021FI

RST

FLO

OR

REF

LEC

TED

CEI

LIN

G P

LAN

No.

Des

crip

tion

Dat

e

Page 92: Senior Capstone Process

92

20' -

0"

0.78° TYP

16'-1

1/2"

6'-27/8

"

65'-31/4

"

3'-31/2"

PARALLEL

PARA

LLEL

2'-9 1/4"

PARA

LLEL

2"

35'-0"

A7002

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

1/8

" = 1

'-0"

3/28/2013 2:13:37 PM

A703

REF

LEC

TED

CEI

LIIN

G P

LAN

-D

ESIG

NFE

ATU

RES

1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/8" =

1'-0

"A7

031FI

RST

FLO

OR

REF

LEC

TED

CEI

LIN

G P

LAN

No.

Des

crip

tion

Dat

e

Page 93: Senior Capstone Process

93

1'-0" 8"

2'-7 1

/4"

2"

WO

OD

FRAM

EST

AINE

D W

D-1

2"2'-

3 1/4"

SAW

CUT

EXS

T CO

NCRE

TE F

LOO

R

WAT

ERPR

OO

F M

EMBR

ANE

SOIL

UP

TO N

ECES

SARY

PLAN

TING

DEP

TH

FINI

SH F

LOO

RCR

YSTA

L BL

OCK

S

SPRI

NGS

POW

ER L

INES

FINI

SH F

ACE,

PL-

2

PL-1

ALL

SHEL

F FI

NISH

FAC

ES T

O B

E PL

-1

SSM

-1

FINI

SH F

ACE,

PL-

2

ALL

SHEL

F FI

NISH

FACE

S TO

BE

PL-1

PL-1 PL

-1PL

-1

1/4"

GL-

2

3'-0"

2" 9" 1" 10 1/2" 1" 9" 2"

3/4"

BUL

LNO

SE

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

1 1

/2" =

1'-0

"

3/28/2013 2:13:50 PM

A801

INTE

RIO

RD

ETAI

LS

1300

0.00

Issu

e D

ate

Aut

hor

Che

cker

SCAL

E: 1

1/2

" = 1

'-0"

A8011

PLAN

TER

DETA

ILSC

ALE:

1 1

/2" =

1'-0

"A8

012FL

OO

R PO

WER

GEN

ERAT

ION

SYST

EM

SCAL

E: 1

1/2

" = 1

'-0"

A8013

PT-1

TO

CPT

-1 T

RA

NSI

TIO

N D

ETA

IL

NOT

ACCU

RATE

- STI

LLNE

EDS

TO B

E DR

AWN

No.

Des

crip

tion

Dat

e

SCAL

E: 1

1/2

" = 1

'-0"

A8014

JUIC

E B

AR

SEC

TIO

N

Page 94: Senior Capstone Process

94

UPUP

A503

2

BREA

KRO

OM 70M

ALE

LOCK

ERRO

OM 64

FEM

ALE

LOCK

ERRO

OM 62

BODY

WEI

GHT

TRAI

NING

STUD

IO61

EXER

CISE

STUD

IO51

EXER

CISE

STUD

IO53

EXER

CISE

STUD

IO55

THER

APY

ROOM 52

THER

APY

ROOM 43

THER

APY

ROOM 41

THER

APY

ROOM 31

WAI

TING

40

RECE

PTIO

N30

CLAS

SROO

M65

CORR

IDOR

50

CORR

IDOR

60

LOBB

Y10

STAI

R63

LAUN

DRY

80

MEC

HANI

CAL

/ DAT

A90

SPIN

E20

JUIC

EBA

R /

COOK

NGDE

MOS

22

RESE

ARCH

21

ALIGN

RP-1

P-3

RP-1

RP-1

RP-1

RP-1

P-3

P-3

P-3

P-3

P-3

P-3

P-3

P-2

PT-2 PT

-2

P-3

PT-2

PT-2

A502

1

A8013

FINI

SH F

LOO

R PL

ANG

ENER

AL N

OTE

S1.

RE

FER

TO S

HEET

L20

0 FO

R PL

ANT

LAYO

UT A

ND S

PECI

FICA

TIO

NS

2.

ALL

WAL

LS T

O B

E PA

INTE

D P-

1 UN

LESS

OTH

ERW

ISE

NOTE

D

3.RE

FER

TO S

HEET

A60

3 FO

R FI

NISH

LEG

END

AND

SCHE

DULE

4.VE

RIFY

THA

T SU

B-FL

OO

RING

ISSM

OO

TH, L

EVEL

, AND

FRE

E FR

OM

DEFE

CTS

THAT

CO

ULD

AFFE

CTIN

STAL

LATI

ON.

DO

NO

T PR

OCE

ED W

ITH

WO

RK U

NTIL

DEF

ECTS

HAV

E BE

ENCO

RREC

TED.

5.AL

L M

ATER

IALS

TO

BE

INST

ALLE

D PE

RM

ANUF

ACTU

RER'

S IN

STRU

CTIO

NS.

REFE

RENC

E SP

ECIF

ICAT

IONS

NOTE

BOO

K FO

R IN

STAL

LATI

ON

GUI

DELI

NES.

6.CO

NTRA

CTO

R RE

SPO

NSIB

LE F

OR

PRO

PER

TRAN

SITI

ON

STRI

PS A

TCE

NTER

LINE

OF

DOO

R TH

RESH

OLD

OR

AS IN

DICA

TED

ON

THE

FINI

SH P

LAN.

COLO

R TO

BE

SELE

CTED

BY

DESI

GNE

R.

7.

ALL

COLU

MNS

TO

BE

VENE

ERED

IN W

D-1

FINI

SH P

LAN

LEG

END

PT-1

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:14:07 PM

A901

FIR

ST F

LOO

RFI

NIS

H F

LOO

RPL

AN

1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/16"

= 1

'-0"

A9011

FIR

ST F

LOO

R A

RC

HIT

ECTU

RA

L PL

AN

No.

Des

crip

tion

Dat

e

Page 95: Senior Capstone Process

95

UP

3

D

D

D

D

D

D

2

BREA

KRO

OM 70

MAL

ELO

CKER

ROOM 64

FEM

ALE

LOCK

ERRO

OM 62

BODY

WEI

GHT

TRAI

NING

STUD

IO61

EXER

CISE

STUD

IO51

EXER

CISE

STUD

IO53

EXER

CISE

STUD

IO55

THER

APY

ROOM 52

THER

APY

ROOM 43

THER

APY

ROOM 41

THER

APY

ROOM 31

WAI

TING

40

RECE

PTIO

N30

CLAS

SROO

M65

CORR

IDOR

50

CORR

IDOR

60

LOBB

Y10

STAI

R63

LAUN

DRY

80

MEC

HANI

CAL

/ DAT

A90

SPIN

E20

JUIC

EBA

R /

COOK

NGDE

MOS

22

RESE

ARCH

21

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

1/1

6" =

1'-0

"

3/28/2013 2:14:28 PM

A902

FIR

ST F

LOO

RFU

RN

ITU

RE

PLAN

1300

0.00

Issu

e D

ate

EEM

EEM

SCAL

E: 1

/16"

= 1

'-0"

A9021

FIR

ST F

LOO

R F

UR

NIT

UR

E PL

AN

No.

Des

crip

tion

Dat

e

Page 96: Senior Capstone Process

96

POW

ER A

ND D

ATA

PLAN

GEN

ERAL

NO

TES

1.

THIS

SHE

ET IS

FO

R IN

TENT

ONL

Y. F

INAL

LAY

OUT

TO

BE

DETE

RMIN

ED B

YEL

ECTR

ICAL

ENG

INEE

R.

POW

ER A

ND D

ATA

PLAN

LEG

END

DI

MM

ER S

WIT

CH

THRE

E W

AY S

WIT

CH

FLO

OR

OUT

LET

WAL

L O

UTLE

T

S D S 3

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

As

indi

cate

d

3/28/2013 2:14:56 PM

E201

FIR

ST F

LOO

REL

ECTR

ICAL

PLA

N

1300

0.00

Issu

e D

ate

EEM

EEM

No.

Des

crip

tion

Dat

e

SCAL

E: 1

/8" =

1'-0

"E2

011PO

WER

AN

D DA

TA F

IRST

FLO

OR

PLA

N

Page 97: Senior Capstone Process

97

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

1/8

" = 1

'-0"

3/28/2013 2:15:08 PM

E701

FIR

ST F

LOO

RSW

ITC

HIN

G P

LAN

1300

0.00

Issu

e D

ate

Aut

hor

Che

cker

No.

Des

crip

tion

Dat

e

SCAL

E: 1

/8" =

1'-0

"E7

011SW

ITC

HIN

G P

LAN

FIR

ST F

LOO

R L

OW

ER P

LAN

Page 98: Senior Capstone Process

98

Scal

e

Proj

ect n

umbe

r

Dat

e

Dra

wn

by

Che

cked

byHar

rison

Wel

lnes

sC

ente

r10

398

New

Hav

en R

oad

Har

rison

, Ohi

o 45

030

Erin

Mac

Lenn

anEr

in E

lizab

eth

Des

ign

729

Edge

cliff

St.

Cov

ingt

on, K

Y 41

014

(312

) 231

-876

1w

ww

.gbb

n.co

m

3/28/2013 2:15:21 PM

L200

PLAN

TIN

G P

LAN

1300

0.00

Issu

e D

ate

EEM

EEM

PRO

VIDE

D BY

LAN

DSCA

PECO

NSUL

TANT

No.

Des

crip

tion

Dat

e

Page 99: Senior Capstone Process

99

Page 100: Senior Capstone Process

100

10

Page 101: Senior Capstone Process

101

Appendix

1 Material Palette Evolution2 Bibliography

10

Page 102: Senior Capstone Process

102

Fall Quarter Materials Palette

10

12

13

14

15

11

Page 103: Senior Capstone Process

103

Schematic Design Materials Palette

10

16

17

18

19

20

21

22

23

24 25

26

27

Page 104: Senior Capstone Process

104

Design Development Materials Palette

10

11

12

141521

22

19

25

26

27

28

29

Page 105: Senior Capstone Process

105

Final Materials Palette

14

11

25

19

10

30

31

32

Page 106: Senior Capstone Process

106

Image Index

1. http://www.flickr.com/photos/21654792@N03/4145203398/2. http://www.ewallpapers.eu/w_show/green-leaf-close-up-1440-900-6955.jpg3. http://hawaiidermatology.com/beautiful/beautiful-patterns-in-nature-from-national-geographic-64-photos-.htm4. http://klsbear.wordpress.com/2010/09/03/patterns-in-nature/5. http://media.kickstatic.com/kickapps/images/63278/photos/PHOTO_16004529_63278_37980819_ap.jpg6. http://www.a-gc.com/close-up-nature-flowers-white-flowers-19160/7. http://onesmallstitch.wordpress.com/2011/04/25/patterns-in-nature/8. http://www.etsy.com/listing/93126860/saffron-yellow-flower-5-x-7-macro9. http://treasurefield.tumblr.com/post/16801147923/elinka-natures-pattern-by-brian-pflanz10. http://www.tomkt.com/atmosphere/acolor1/acolor1.html11. http://www.3-form.com/highres/image_gallery/blades/12. http://www.formica.com/en/home/dna.aspx?color=369913. http://www.lgviaterausa.com/productLines/16/87/viatera-international14. http://gh-design.net/images/objects/wtw_001.jpg15. http://users.tkk.fi/~mliukka/textures/Floor_Stone.jpg16. http://www.glas-pro.com/color_toolbox.php?category=69&current=3117. http://www.glas-pro.com/color_toolbox.php?category=69&current=3118. http://www.glas-pro.com/color_toolbox.php?category=69&current=3119. http://www.glas-pro.com/color_toolbox.php?category=69&current=3120. http://www.wilsonartcontract.com/samples/product-detail/16-laminate/160-fusion-maple-7909/21. http://www.glas-pro.com/color_toolbox.php?category=69&current=3122. http://www.glas-pro.com/color_toolbox.php?category=69&current=3123. http://www.glas-pro.com/color_toolbox.php?category=69&current=3124. http://www.polygonblog.com/wp-content/uploads/2010/04/concrete-texture-high-resolution.jpg25. https://www.interfaceflor.com/Default.aspx?ProductNumber=12712100641&Section=2&Sub=1&Ter=326. http://www.nora.com/us/products/flooring/noraplan/product/environcare/art-1462-1/2930/27. http://www.nora.com/us/products/flooring/noraplan/product/environcare/art-1462-1/2931/28. http://www.crossvilleinc.com/contract/products/porcelain_stone/shades_by_crossville/av244_hon-mist_honed29. http://www.laminart.com/us/products-samples/java-342.html30. http://www.formica.com/en/home/dna.aspx?color=775931. http://www.crossvilleinc.com/contract/products/porcelain_stone/shades_by_crossville/av244_hon-frost_honed32. http://www.nora.com/us/products/flooring/noraplan/product/environcare/art-1462-1/2945/

Page 107: Senior Capstone Process

107

Page 108: Senior Capstone Process

108

t