    8125 September 2012

    MonthlySubscriptions:[email protected]: http://www.cosco-shipyard.com/englishNew/COSCO SHIPYARD GROUP CO.,LTD.

    VOLUME

    Marketing:(86-21)58600111

    Mission stateMent To be a world leader in ship repair, conversion, new building and oshore marine engineering, we maintain trusting relationships with our

    customers, employers, and partners, yielding best returns or shareholders, society and environment. Depending on our talented engineers working alongside

    with an efcient project management team and a highly skilled workorce, we could guarantee to deliver the projects we undertake timely and proessionally.

    CoSCo Sipard deivered deepwaer

    semi-submersibe driig pafrm

    CoSCo Sipard paricipaes i 2012 Cia Ieraia Pae & Prducs Fair

    On September 26, 2012, the sixth-

    generation semi-submersible drilling

    platform ISLAND INNOVATOR was

    successfully delivered by COSCO Shipyard

    Group. Built for Norwegian shipowners,

    the multifunctional platform, detailed

    design, production design, procurement

    of equipment, system installation and

    commissioning of which are completed by

    COSCO Shipyard, represents the highest

    level of technology among products of

    the same type in the world.

    ISLAND INNOVATOR is another

    major breakthrough for COSCO Shipyard

    following the delivery of the world's

    first ultra-deep water cylinder drilling

    and storage platform. As the first

    platform in China to realize the one-

    stop solution (design, construction,

    commissioning and completion) in the

    eld of ultra-deepwater semi-submersible

    drilling platforms, ISLAND INNOVATOR

    contributes significantly to the marine

    equipment manufacturing industry in

    China.

    Designed and constructed in strict

    accordance with the relevant regulations

    of the North Sea Area in Norway,

    ISLAND INNOVATOR meets the relevant

    standards of Norsok, DNV, NMA, IMO,

    PSA, DSB, NCS and UKCS (N-Notation)

    as well as the NIPH standards regarding

    drinking water.

    ISLAND INNOVATOR has a total

    length of 104.5 meters, a molded width

    of 65 meters and a molded depth of

    36.86 meters. The total height of the

    platform reaches 103.8 meters. The

    design draft of the platform is 9.5 - 17.75

    meters with a maximum displacement of

    up to 38,000 tons, a maximum operating

    water depth of 1500 meters, a maximum

    vertical drilling depth of 8000 meters

    and a maximum variable deck load of

    4500 tons. The self-propelled speed

    is 10 knots. Equipped with advanced

    DP3 dynamic positioning and mooring

    positioning systems, with unmanned

    cabin design and centralized control of

    the operating room, the platform can

    hold 120 living units and is capable of

    working under adverse sea conditions (at

    a maximum wave height of 17.3 meters

    and a maximum wind speed of 51.5m/s).

    COSCO Shipyard has always been

    committed to the marine engineering

    equipment industry. By now it has already

    designed, built and delivered a number

    of high-end marine products, including

    the world's most advanced cylindrical

    ultra-deepwater drilling and storage

    platform "Hope" series, the world's first

    self-propelled multifunctional offshore

    jack-up platform "SUPER M2", the world's

    second-generation offshore wind power

    installation vessel "Adventure" series,

    the world's most advanced 105000DWT

    and 59000DWT shuttle tanker series with

    independent intellectual property rights.

    Moreover, the design and construction of

    the world's first conceptional octagonal

    drilling platform, the world's third-

    generation offshore wind installation

    vessel and jack-up drilling platform, the

    world's most advanced semi-submersible

    offshore service platform and offshore

    platform auxiliary vessels and other

    marine products are now in progress.

    COSCO Shipyard Group appears to be

    the marine engineering enterprise with

    the widest range of products in China.

    From September 15 to 17, the

    2012 China International Patent &

    Products Fair was held successfully

    at the Dalian World Expo Center.

    COSCO Shipyard Group participated

    in the Fair as a key enterprise in the

    eld of ship and marine engineering.

    At th e ex hi bi ti on , CO SC O

    Shipyard demonstrated typical

    products, scientic and technological

    innovation projects and 114 patent-

    protected research findings from

    recent years. During the exhibition,

    State Intellectual Property Office

    (SIPO) Commissioner Tian Lipu,

    vice governor of Liaoning Province,

    Teng Weiping, and local authorities

    of the province of Dalian visited

    the COSCO Shipyard booth and

    received a report on the status of

    development in the eld of ship and

    marine engineering, scientific and

    technological innovations and patent

    declaration. Mr. Tian Lipu spoke

    highly of the rapid development of

    COSCO Shipyards achievements in

    marine engineering, scientific and

    technological innovations and patent

    declaration and wished COSCO

    Shipyard further success in obtaining

    more scientific and technological

    innovations and patents in the

    future.

    The exhibition, jointly hosted by

    the State Intellectual Property Ofce

    (SIPO), the China Trade Promotion

    Committee and the Government

    of Liaoning Province, aims at

    furthering the implementation

    of intellectual property strategy,

    promoting the commercialization

    and industrialization of patented

    t echno l og y and suppo r t i n g

    the development of high-tech

    products with intellectual property

    r ights, which can accelerate

    the transformation of economic

    development and ultimately realize

    the goal of building an innovative

    country.

    World's most advanced semi-submersible accommodation andservice platform steeling cutting

    On September 6,

    the construction of the

    worlds most advanced

    s e m i - s u b m e r s i b l e

    accommodat ion and

    service platform N511,

    d es i g ned and bu i l t

    by COSCO (Nantong)

    Shipyard for COTEMAR,

    s t a r t e d i n C O S C O

    Nantong Shipyard.

    N511 adopts the

    OCEAN 500 mode l

    provided by GUSTO MSC.

    The detailed design,

    p roduc t i on d es i g n ,

    equipment procurement,

    construction, installation

    and commissioning of

    the p latform wi l l be

    completed by COSCO

    Shipyard. The platform

    is 95 metres in length

    and 67 metres in width.

    The total height of the

    platform approaches 60

    metres.. The platform

    has a design draft of

    8.6 to 20 metres with a

    maximum displacement

    of up to 33,300 tonnes.

    The platform is equipped

    with the world's most

    advanced DP3 dynamic

    positioning system and

    8-point anchor mooring

    positioning system.

    T h e p l a t f o r m

    can accommodate a

    maximum of 990 people;

    the dining hall can hold

    up to 300 people and

    can also be used as

    an emergency shelter.

    On the platform there

    are a total of 230 living

    spaces with windows.

    The platform meets the

    relevant standards and

    requirements of IMO,

    Resolution A468 (XII),

    DNV, ILO and UKCS

    as we l l as ABS and

    the U.S. Coast Guard

    requirements.

    At the steel cutting

    ceremony, the senior

    leadership of COTEMAR

    and the general manager

    o f COSCO Nan tong

    Shipyard Mr. Ni Tao jointly

    launched the project. The

    steel cutting ceremony

    saw the presence of

    representatives from

    COTEMAR, DNV, the

    Commercial Headquarters

    of COSCO Shipyard Group

    and the construction

    team.

  • 7/28/2019 Semi-submersible Drilling Platform

    2/4

    Newbuilding2

    On September 14, COSCO Zhoushan Shipyard held a delivery signing ceremony for N202, the

    57,000DWT bulk carriers being built for the Far Eastern Group following the delivery of N196, built

    for Greece company Leros on Sep. 10, and N195 on Sep. 11. Thus the yard realized delivery of 3

    ships within 5 days.

    57,000DWTBULK CARRIER

    Three days ve ships deliveryOn August 30, the 57,000DWT bulk carriers being built for ER Company at

    COSCO Guangdong Shipyard successfully nished four-day sea trails and returned

    to the yard.

    Zhongxing Sea-Land Engineering receives NDT certifcationfor marine engineering (DNV)

    Recently, Zhongxing Sea-Lands

    testing department in Nantong

    received DNV certification for non-

    dest ruc t i ve test ing (NDT) fo r

    marine engineering, which became

    another major enhancement in its

    qualification following the National

    Laboratory Accreditation Certificate

    received earlier this year.

    Ai mi ng at cr ea ti ng a wo rl d-

    class detection brand and seizing

    t h e h i g h - e n d m a r i n e n o n -

    destructive testing market, relying

    on the rapidly developing marine

    equipment manufacturing business

    of COSCO Shipyard, in recent years

    Zhongxing Sea-Land is vigorously

    strengthening its construction of

    marine non-destructive testing

    personnel and actively seeking third-

    party certification. Today Zhongxing

    Sea-Land has already become a

    specialized testing organization

    with the largest number of NDT

    personnel in China, lead ing in

    technology, services and professional

    qualications.

    DNV i s a wo r l d - r enowned

    Classication Society and certication

    body. The achievement of DNV

    approval implies that Zhongxing Sea-

    Land is capable of participation in

    international competition.

    CoSCo (hK) Idusr & tradehdigs G.M. visis CoSCoSipard Grup

    On September 18, the

    general manager of COSCO(HK) I ndu s t r y & T rade

    Holdings Limited, Leng Ping,

    accompanied by the general

    manager of COSCO Network

    (Beijing), Yu Chunlai, deputy

    general manager of COSCO

    Network (Beijing), Qian Wei,

    and four other staff members,

    paid a visit to COSCO Shipyard

    Group. The Party Secretary of

    COSCO Shipyard Group, Ma

    Zhihong, warmly received Mr.

    Leng Ping and his party.

    At the meeti ng, Mr. Ma

    Zhihong gave a detailed

    introduction to Mr. Leng Pingregarding COSCO Shipyards

    d eve l opmen t i n r e cen t

    years: the Group insists on

    scientic development, keeps

    deepening the transition of

    products and has gradually

    f o r m e d a d i v e r s i f i e d

    industrial pattern consisting

    of ship repair, ship building

    and marine engineering.

    Representatives from COSCO

    Shipyard Groups Planning

    Department and Information

    Cent re emphas i zed theoptimistic development trend

    of marine engineering and

    the application of information

    technology in the Group.

    Mr. Leng Ping said that the

    diversied industrial structural

    deve lopment o f COSCO

    Shipyard can be witnessed

    by all. Especially in recent

    years, the construction and

    delivery of a series of high-

    end marine engineering

    p roduc t s r e f l e c t ed t h e

    advanced technology and

    R&D capabilities of COSCO

    Shipyard and have greatlyenhanced the worldwide

    brand awareness of the

    Group. Additionally, both

    sides also discussed how

    to make good use of their

    market resources to seek

    further bilateral cooperation in

    ship repair, ship new building,

    information technology and

    other aspects, hoping to

    maximize mutual support and

    development.

    Recently, COSCO Guangdong

    Shipyard repaired a ship named JIAHE,

    owned by Ta-Ho Maritime Corporation.

    This is the first time that Ta-HoMaritime Corporation and COSCO

    shipyard Corporation have co-operated

    on a project.

    At the time the repai r work on

    JI AHE was com ple ted, and the

    owners representative, Mr. Ma

    JianXun, was interviewed.

    Mr. Ma was deeply impressed

    by the security and management of

    the yard as well as the responsibility

    and professionalism of the yards

    management team.

    He sa i d , The 20 d ay s o f working here, your shipyards living

    arrangements are very careful,

    especially on transport. He thought

    highly of our business service, and

    summed his impressions up in one

    phrase; Take good care of .

    When talking about any advice

    he could give on our shipyards

    management, Mr. Ma honestly said,

    COSCO Guangdong Shipyard pay

    close attention to security and

    management, various aspects were

    done very well.

    At the end of the interview, Mr.

    Ma emphasized his wish for further

    cooperation with the yard.

    ER Cmpa n341 Sea rias

    Matson executives visit COSCO NantongOn September 12, the Chairman of

    the Board of Directors of U.S. company

    Matson, Mr. Walter Dods, presidentand CEO of said company, Mr. Matt

    Cox, accompanied by the deputy

    general manager of the Commercial

    Headquarters of COSCO Shipyard

    Group, Xing Chendong, paid a visit to

    COSCO Nantong Shipyard.

    Matsons vessel Mahimahi is

    currently under repair in COSCO

    Nantong Shipyard. It is the fifth timethe vessel has visited COSCO (Nantong)

    Shipyard for repair and maintenance.

    Mahimahi is also the 30th ship Matson

    has repaired or converted in COSCO

    Shipyard Group. At the welcoming

    ceremony, the general manager of

    COSCO (Nantong) Shipyard, Ni Tao,

    expressed his sincere thanks to Matson

    for providing many opportunities forcooperation in the past 11 years. Mr.

    Matt Cox also expressed his gratitude

    and appreciation for the high-quality

    repair and conversion services provided

    by COSCO (Nantong) Shipyard over the

    years.

  • 7/28/2019 Semi-submersible Drilling Platform

    3/4

    Offshore 3

    CoSCo Daia Sipard esabises anew model of FPSO design modications

    In the process of converting

    the 6th FPSO for MODEC,

    COSCO (Dalian) Shipyard, also

    building upon its experience,

    has taken a bo ld s tep to

    integrate advanced concepts

    of shipbuilding design into its

    conversion service model, thus

    forming a new model for FPSO

    conversion services. The new

    model utilizes three-dimensionalmodeling and unitization design

    at its core to further enhance the

    technical strength of the yards

    FPSO conversion abili ty.

    The Technology Centre of

    COSCO (Dalian) Shipyard is

    now able to apply 3D modeling

    software to its marine conversion

    projects. The modeling of the

    modified structure of the hull

    was realized with the help of

    the software which serves as

    an integrated design platform

    to promote inter-professional

    communication, interference

    checking and optimizing the

    integration of block fabrication.The full application of the

    software significantly improves

    des ign qua l i t y and order

    accuracy, while also making

    piping and accessories margins

    much more controllable.

    CoSCo Sipard esabises offsre Divisi

    On September 3, 2012, the

    Offshore Division of COSCO

    Shipyard Group was officially

    established after extensive

    and in-depth research and

    preparation.

    At the foundin g meet ing ,

    the party secretary of COSCO

    Shipyard Group, Ma Zhihong,

    announced the establishment

    of the Offshore Division and

    appointed the leadership team.

    General Manager of COSCO

    Shipyard Group Wang Yuhang

    made an important speech,

    further clarifying the main

    funct ions o f the Of fshore

    Division: a) the planning and

    developing of the offshore

    business; b) technolog ical

    innovation associated with

    offshore construction; c) the

    development and promotion

    o f o f f sho re managemen t

    systems; d) the introduction and

    cultivation of offshore technology

    professionals. Mr. Wang Yuhang

    pointed out that, as the nancial

    crisis deepens its impact on the

    world economy, the ship repair

    & building market continues to

    slump; whether COSCO Shipyard

    Group can survive the severe

    situation and prosper is likely to

    be prominently determined by

    the development of the Offshore

    Division. The establishment of the

    Offshore Division is a milestone

    for the company and is entrusted

    with the important mission of

    making COSCO Shipyard Group

    one of the key enterprises in the

    eld of offshore manufacturing in

    China by 2015.

    On September 7, COSCO (Qidong) Marine and

    the East China Sea Rescue Bureau signed a strategic

    cooperation memorandum for maritime emergency

    support services in Shanghai. The president of COSCO

    Shipyard Group, Wang Yuhang, and the commissioner

    of the East China Sea Rescue Bureau of the Ministry

    of Transportation and Communications, Lu Dingliang,

    attended the signing ceremony.

    In recent years, a number of large-scale marine

    projects constructed by COSCO Qidong Marine, such

    as Hope-1, Hope-2 and GM4000, have seen strong

    support from the East China Sea Rescue Bureau of

    the Ministry of Transportation and Communications

    during the sea trials. The two sides have established

    a good cooperative relationship. Based on the signed

    Memorandum, the two sides will carry out moreextensive cooperation in ensuring safety in the process

    of towing and sea trials of marine equipment, as well

    as in other related research areas.

    At the signing ceremony, the president of COSCO

    Shipyard Group, Wang Yuhang, expressed sincere

    gratitude for the East China Sea Rescue Bureaus

    strong support in the development of COSCO

    Shipyards offshore business. He pointed out that

    the East China Sea Rescue Bureau is not only awitness and participant in the development of COSCO

    Shipyards offshore business, but also a supporter. Mr.

    Wang Yuhang hoped that the two sides further expand

    their field of cooperation, enhance the depth and

    breadth of cooperation and succeed in making great

    contribution to mutual development.

    COSCO Guangdong First Tender Barge steel cut

    COSCO Qidong Marine and the East China SeaRescue Bureau signing ceremony

    On September 20, a steel cutting ceremony was

    held for the rst drilling tender ship Edrill-1(N490), to

    be built by COSCO Guangdong Shipyard for Energy

    Drilling.

    For this project, the first tender barge built for

    Energy Drilling, COSCO Guangdong is responsible fordetail design, production design and all the equipment

    procurement as well as equipment system installation

    and commission. The ship is 100M in length, 30M

    in width, has accommodation for 170 staff and

    can operate at a depth of 20-200M . The project is

    required to meet the IMO Noise Levels on Board Ships

    and MODU Codes, as well as ABS class requirements.

    A total of 200 people , includ ing representati ves

    from Energy Drilling and ABS, leaders from COSCO

    Shipyard Commercial Headquarters and members of

    the construction team, co-witnessed the moment.

    Aer marie prjec icuded i e 2012 naia Ke new Prduc Pa

    On August 17, the ultra-large

    offshore wind turbine installationplatform project, developed by

    COSCO (Nantong) Shipyard, was

    included in the 2012 National Key

    New Project Plan. This is the second

    COSCO Shipyard project to enter

    the National Key New Project Plan

    following the D-P3 deepwater drillship

    with dynamic positioning system,Initiated by the Ministry of Science

    and Technology of China, the National

    Key New Product Plan is designed to

    encourage independent innovation,

    promote the development of new

    products and the transformation

    and industrialization of technological

    achievements through policy guidanceand nancial support. The ultra-large

    offshore wind turbine installation

    platform is a synthesis of ship and

    offshore platform, carrying out

    multiple functions such as offshore

    wind turbine transport, heavy lifting

    and dynamic positioning.

    Today COSCO (Nantong)Shipyard has acquired the capability

    to undertake the engineering,

    procurement and construction (EPC)

    of such specialized marine vessels

    and has already entered into the

    implementation phase. The previous

    2 second-generation ultra-large

    offshore wind turbine installationvessels, designed, built and delivered

    by COSCO (Nantong) Shipyard, have

    achieved the full satisfaction of their

    owners, while two others are under

    construction and will be delivered

    soon.

    n418 & n419mves sm

    On September 1, the offshore

    p latform N418 successfu l ly

    undocked at the COSCO Qidong

    Base after completion of the EL

    0-24.5M main hull. Following

    that, the EL 24.5-36.5M large

    block erection will be carried out

    as planned.

    On Sep t ember 3 , N419

    successfully completed erection,

    towing and docking as planned.

    This towing and docking made a

    new launching record by semi-

    submersible barge as its weight

    reached more than 12000 tonnes.

    Aft er docking, EL 13.4-24. 5M

    main hull and 6 main block lifting

    will be the next step.

  • 7/28/2019 Semi-submersible Drilling Platform

    4/4

    Ship Repair & Conversion4

    Bus frsafe rusig cmpei

    overcme bad weaer esure dck perid scedues

    our parer as is ur frieds

    Saisfacr repairs GEnMAR DEFIAnCE i CoSCo Zusa

    On Sep .2nd 2012, M/T

    GENMAR DEFIANCE left the pier

    slowly. Its departure marked thesuccessful completion of repairs

    to the subject vessel as well as

    the third vessel delivered to the

    owner successfully earlier this

    year.

    GENMAR DEFIANCE belongs

    to General Maritime Management

    (Portugal) Ltd, who operates 16

    tankers all over the world. Since2006, when the first vessel, M/

    T Genmar Ajax, from General

    maritime entered our yard for

    routine inspection and repair, we

    began to establish a relationship

    with this client.

    In 2012, on the basis of

    mutual trust and understanding,

    our loyal cl ients awarded aseries of vessel repairs to our

    yard. In return, we selected the

    best ship repair team for them.

    From the initial meeting after

    the superintendents arrival, we

    perused the repair specification

    and compiled a detailed repair

    plan. Every ve days we reviewed

    the projects and adjusted the plancontinually. Finally, we got upmost

    recognition from the owners

    side, specically for the Electrical

    Department. The owner issued a

    warm appreciation letter for the

    excellent job done.

    At the end of August the repai r

    team of COSCO Shanghai efciently andeffectively accomplished repair works for

    the reefer ship Waves. Furthermore, the

    total repair period was shortened by 3

    days compared to our original contracted

    repair period. The owner of MV Waves

    was very glad to keep their previous

    promise of "US$ 3000 per day for every

    single day in advance". Such a practice is

    a very rare phenomenon in the current

    bad market conditions. At the beginning

    of August the contract was signed with

    this reefer owner with a promise that we

    could nish their entire repair within a 21-

    day working period. However, after the

    initial inspections, the owner found the

    scope of steel inserts and renewals hadsignificantly increased by 30%.. More

    seriously all the newly identified work

    was located in water ballast tanks and oil

    tanks which are covered by a thick layer

    of insulation, plywood and gratings.

    The first step after completion of

    inspections, was to arrange to retain

    the 100 tonnes of fuel oil in each center

    oil tank that the owner wanted to keep

    during the repair

    .The owner has been a long-term

    cooperator with COSCO Shanghai, and

    they are very strict on repair period,

    quality and workmanship. They never

    negotiate with the shipyard about

    the working period: not even for this

    contract. Their attending superintendent

    even asserted his belief that this project

    is a mission impossible. To relieve the

    huge pressure on the shipyard, this

    owner even promised a bonus clause to

    yard which they have never done before.

    But the COSCO (Shanghai) Shipyard

    repair team has become famous for its

    ability to achieve impossible missions

    and it combined all the available resource

    in the yard to respond to the owner's

    impulse to support our motive. They

    made a devil of a repair plan: workers

    were divided into 3 shifts to work day

    and night, the QC stayed onboard to

    make sure the jobs were done correctly

    the rst time, and the safety supervisors

    monitored the work on a 24 hour basis.

    Relying on our excellent cooperation we

    nally completed all the repairs 3 days in

    advance. This great achievement reects

    our great courage and conviction.

    Recently, COSCO Zhoushan simultaneously

    received three letters of appreciation from

    COSCO Container Lines, COSCO Bulk Carrier

    and GENERAL MARITIME MANAGEMENT

    (PORTUGAL) in which they all expressed theirappreciation for the shipyards consideration

    for customers.

    In their letters, the customers said that

    they admired COSCO Zhoushan for its

    efficient performance in labour allocation,

    health and safety measures, sense of

    responsibility and overall high standards.

    Customers also pointed out that COSCO

    Zhoushan not only completed the work

    before the planned departure date, but

    also completed the repair work safely and

    efficiently and with high quality. COSCO

    Zhoushan once again showed their spirit.

    Since August, COSCO (Zhoushan shipyard)

    experienced typhoon conditions four times.

    Facing such harsh weather conditionsincluding typhoon and continuous high

    temperatures, repair staff actively contacted

    shipowners to optimize their repair schemes.

    At the same time, they worked very hard

    against the clock during spells of good

    weather to ensure the vessels were able to

    sail on time. What they did won the owners

    trust and praise.

    In addition, Japan's NYK, Bangladesh

    Brave Royal Shipping and Jia Xin International

    Shipping also sent e-mails to express their

    appreciation for the work and effort on

    strict accident prevention and control before

    typhoon and rapid recovery of production

    after the typhoon: eventually completing the

    repair mission in the harsh conditions to a

    high standard.

    This year, COSCO Zhoushan has focused

    on core customers in actively improving

    their attention to detail; such as carrying

    out a series of work specifically to improve

    customer satisfaction. For the rst half of the

    year, the commercial department and ship-

    repair department focused on customers care

    and satisfaction, following the philosophy of

    Group General Manager Wang Yuhangs "Four

    Combinations".

    In the process of production organization,

    COSCO Zhoushan prioritized the transfer

    of personnel working on other ships to the

    critical worksites to ensure deadlines were

    met and also successfully directed personnel

    to another ship which required importantguarantee work to be completed.

    In order to bet ter commun icate

    with customers, all the staff of COSCO

    Zhoushan participated in focused customer

    maintenance activities. Firstly, the Project

    Manager and SRM actively do the daily work

    of communication and on-site maintenance

    with the clients. Secondly, for important

    projects and customers, COSCO Zhoushan

    now host weekly meetings for directors and

    repair managers in which customer feedback

    can be immediately collected and acted upon.

    Faced with extremely hot weather, COSCO

    Zhoushan arranged some flexibility into its

    operating hours. In one example, COSCO

    Zhoushan borrowed a construction teamfrom another plant to boost productivity

    where needed. In another example, the yard

    improved the construction environment as

    much as possible by arranging shade nets

    above the main deck and using a technique

    of locating ice behind fans to improve staff

    working conditions. During the typhoon

    season, the team made full use of daytime

    working to maximize production prior to

    arrival of the typhoon, and supervisors and

    foremen in charge operated separately, but in

    a coordinated way, which provided the best

    possible guarantee of production continuity

    for our customers.

    COSCO Lianyungang Shipyard

    has successfully completed the

    repairs for three consecutive

    vesse l s f r om ATLANTSKA

    PLOVIDBA D.D. Both sides have

    cooperated very closely and

    successfully from the moment

    of arrival of the rst vessel to be

    repaired in our yard.

    The Imperial arrived in the

    yard for repair after deviating

    from Guangdong. ATLANTSKA

    PLOVIDBA D.D. is one of our

    loyal clients and so the yard

    also arranged a strong ship-

    repair team and more labor and

    facilities on board. The owners

    representative Mr. Pace was very

    satisfied with the yards ship

    repair team.

    The major repair work on the

    vessel included; normal minor

    hull repairs, sandblasting and

    painting of seven cargo holds,

    combination boiler repair, E/

    R heater exchanger repair, oil

    tank clean and other routine

    mechan ica l and e lec t r i ca l

    maintenance jobs.

    On September 7th, 2012, the

    captioned vessel sailed smoothly

    f rom COSCO L ianyungang

    Shipyard. COSCO Lianyungang

    shipyards repair quality and

    service level is excellent. This

    time the work was also completed

    in accordance with the schedule,

    said Mr. Pace, with a smile.