Semi – annual Environmental Monitoring Report January – June 2018 October 2018 Loan 2772-UZB: Second CAREC-Corridor 2 Investment Project, Tranche 1 Prepared by the Republican Road Fund for Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. (Volume 3 : Pages 106-132)

Transcript of Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second...

Page 1: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Semi – annual Environmental Monitoring Report

January – June 2018 October 2018

Loan 2772-UZB: Second CAREC-Corridor 2 Investment Project, Tranche 1

Prepared by the Republican Road Fund for Asian Development Bank.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

(Volume 3 : Pages 106-132)

Page 2: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Semi-annual Environmental Monitoring Report _________________________________________________________________________

Project Number: Loan No. 2772-UZB Reporting period: January-June, 2018 Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB)

Prepared by: Timur Dadabaev, Republican Road Fund

Tashkent, Republic of Uzbekistan

Askar Abdurupov SAMBO Engineering Co. LTD:

Angren, Republic of Uzbekistan

For: The Asian Development Bank (ADB). Approved by: Nodir Khadzhimetov, Head of the Project Management Unit (PMU) of the RRF Signature: Date of submission: 19.10.2018

Page 3: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 106

Page 4: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 107

Page 5: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 108

Page 6: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 109

Page 7: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 110

Page 8: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 111

Page 9: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 112

ANNEX 2: Photos of site visits

PHOTO REPORT

SAMBO Engineering

for the first half of 2018

Page 10: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 113

B/P at km 109

Pre-treatment settler after washing the equipment of the B/P an

bodies of dump trucks and mixers.

Page 11: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 114

B/P at km 144

Before Now

A settler provided for pre-treatment of water after washing th

equipment of the B/P and bodies of dump trucks and mixers.

A settler is missing for pre-treatment of water after washing the

equipment of the B/P and bodies of dump trucks and mixers.

Page 12: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 115

B/P at km 152

Now

The settler has been cleaned of sludge

Before

The settler has been filled with sediment sludge

Page 13: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 116

B/P at km 175

The dismantling of B/P equipment is ongoing The leveling of the area at the site of dismantled equipment of the B

was performed, the remains of foundations, construction and

household garbage were removed. Fertile soil was brought.

Page 14: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 117

Construction camp at km 144

Before Now

Page 15: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 118

Builder’s camp at km 146.

Residential boxes Summer dining room

Page 16: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 119

Area of relocated builders’ camp at km 172.

Remains of foundations, construction and household garbage were removed.

Page 17: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 120

The area of the former builders' camp of the JSC Elektrtarmoqqurilish at km 185

The leveling of the area was performed, the remains of foundations, construction and household garbage were removed.

Page 18: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 121

The quarry of non-metallic materials in the riverbed of the Rezaksay river at km 185-

190.

The river bed is being leveled, bank protection works are ongoing.

Page 19: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 122

Sampling of air, water and measurement of noise and vibration level by specialists of

the Republican Sanitary and Epidemiological Service.

Sampling of water from the B/P settler at km 109. Sampling of air at the B/P at km 109.

Page 20: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 123

Sampling of air at the B/P at km 144. Sampling of water from the B/P settler at km 144.

Page 21: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 124

Joint inspections of the environmental situation at production facilities and at the site of reconstruction of the A-373 Tashkent-Osh road with representatives of the

Contractor and the Republican SES

Measuring the noise level on the road section. Checking the environmental status of the fuel depot.

Page 22: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 125

ADB missions

Page 23: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 126

ADB's mission dated 17.07.2018

The mission of ADB representatives dated 03.07.2018.

Page 24: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 127

Page 25: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 128

Page 26: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 129

Page 27: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]

11 December 2018 130

Page 28: Semi – annual Environmental Monitoring Report€¦ · Republic of Uzbekistan: Second CAREC-Corridor 2 Investment Project, Tranche 1 Funded by: the Asian Development Bank (ADB) ...

Report on Environmental Protection for the first half of 2018 [Title]