![Page 1: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/1.jpg)
Sellwood Replacement Bridge Perched Box Caisson
Design & Construction
…a cofferdam alternative
![Page 2: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/2.jpg)
Sellwood Replacement Bridge
![Page 3: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/3.jpg)
Project Information
• Location: Portland, Oregon• Budget: $307.5 Million• Three span steel deck arch (Design by TYLin)• Contractor: Slayden/Sundt, A Joint Venture
![Page 4: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/4.jpg)
Perched Box CaissonElevated cofferdam constructed above water thenlowered down using hydraulic jacks. A voided baseslab sleeves over foundation shafts as the box issubmerged and secured using anchoring collars toseal and resist vertical forces.
![Page 5: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/5.jpg)
Why?
![Page 6: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/6.jpg)
Key Constraints
• Alluvial gravel with numerous cobbles and boulders up to 5 feet in diameter
• Long sheet pile length • Scour up to 65 feet (CH2M Hill estimate)• Stay-in-place falsework not to exceed 35ft2
relative to stream flow • In-water work restricted to July 1st - Oct 31st
![Page 7: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/7.jpg)
Design Development
![Page 8: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/8.jpg)
Buried Pier - Option 1 Typical Cofferdam
Constructability Limitations• 90ft sheet piles driven into
cobbles & boulders. • In-water work
NOT CONSTRUCTIBLE Conclusion:
![Page 9: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/9.jpg)
Elevated Pier - Option 2A Above Grade Seal
Constructability Limitations• Abandoned concrete seal
exceeds permit allowance• Removal of concrete seal
not reasonable.
NOT ALLOWEDConclusion:
![Page 10: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/10.jpg)
Elevated Pier - Option 2BCofferdam with Shored Pier
Constructability Limitations• Piles driveability issues. • Limited removal access of
heavy falsework shoring. • Mid depth concrete seal
could negatively influence the structural behavior of the permanent foundations (i.e. Seismic Response)
NOT RECOMMENDED Conclusion:
![Page 11: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/11.jpg)
Elevated Pier - Option 2CPerched Box Caisson
Constructability Limitations• Fabrication Intensive• Requires “Birds Mouth”
Forms
SELECTED OPTIONConclusion:
Area ≤ 35ft2
![Page 12: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/12.jpg)
Construction Sequence
1,2,3,4,5
![Page 13: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/13.jpg)
Drive Pile
Use pile template when driving
![Page 14: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/14.jpg)
Construct Drilling Reaction Frame
![Page 15: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/15.jpg)
Install Drilled Shafts
Pile to support oscillator lateral and vertical extraction forces
![Page 16: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/16.jpg)
Disassemble Reaction Frame
Use steel crossbeams to form Box Caisson base slab
![Page 17: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/17.jpg)
Pour Elevated Base Slab
![Page 18: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/18.jpg)
Construct Wales, Walls & Topping Slab
![Page 19: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/19.jpg)
Construct Bird Mouth Forms
![Page 20: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/20.jpg)
Construct Jack-Down Frame
Reuse steel beams from drilling reaction frame
![Page 21: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/21.jpg)
Lower Assembly (Jack-down)
Total Weight = 1,016,000 lbs
![Page 22: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/22.jpg)
Install Tie-down Collars
Anchor tie-down collars and seal to shaft casing
![Page 23: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/23.jpg)
Dewater, Remove Frame, Cut-off Casing
Resist buoyant uplift force
![Page 24: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/24.jpg)
Pour Bottom Lift of Pier
Support pier concrete weight
![Page 25: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/25.jpg)
Pour Upper Pier and Angel Wings
![Page 26: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/26.jpg)
Disassemble Walls, Slab to Remain
![Page 27: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/27.jpg)
Analysis & Design
1+1=2
![Page 28: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/28.jpg)
Analysis & Design Steps
• LUSAS 3D Finite Element Analysis Software• Check loading for:
– Oscillator drilling forces– Base slab pour– Jack-down distribution– Bouyant uplift – Pier concrete weight
![Page 29: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/29.jpg)
Voided Slab Design
![Page 30: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/30.jpg)
Construction Photos
![Page 31: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/31.jpg)
Inside Box Prior to Jack-down
![Page 32: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/32.jpg)
Tie-Down Collar
Design
Fabrication
![Page 33: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/33.jpg)
…or Flying Saucer
![Page 34: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/34.jpg)
Aerial View
![Page 35: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/35.jpg)
Elevated Position
![Page 36: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/36.jpg)
Jack-down Frame
High Tension Rods
(8) Cylinder Jacks
![Page 37: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/37.jpg)
EFCO Pier Forms
![Page 38: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/38.jpg)
High Water
![Page 39: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/39.jpg)
Completed Pier
![Page 40: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/40.jpg)
Time-Lapse Video
November 2013 – February 2014
![Page 41: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/41.jpg)
![Page 42: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/42.jpg)
Contractor Feedback
![Page 43: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/43.jpg)
Construction Benefits
• Quantities saved:
• Reduced environmental liability • Easy access for materials
Structure Steel Concrete Dredging
Traditional Cofferdam 1,170 Tons 6,130 yd3 13,100 yd3
Perched Box Caisson 390 Tons 380 yd3 0 yd3
Savings 780 Tons 5,750 yd3 13,100 yd3
![Page 44: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/44.jpg)
Additional Benefits
• Easier permitting with lower total pile count. Reused 3800LF temporary pile.
• No tremie concrete = no contaminated water. Dewater directly back into river.
• Construction schedule not limited to in-water work restrictions.
![Page 45: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/45.jpg)
Challenges and Lessons Learned
• Synchronizing jacks to maintain slab tolerance during Jack-down was difficult.
• Creating a water-tight seal at the sheet to concrete interface was costly and time consuming.
• Joints at birds mouth forms to sheet pile are difficult to achieve water-tightness.
![Page 46: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/46.jpg)
Suggestions for Improvements
• Negotiate larger allowable stay-in-place falsework• Avoid birds mouth forms when possible• Improve sealing methods prior to jack-down• Improve control during jack-down• Increase pumping rate during dewatering• Modify tie-down collar to reduce underwater
construction• More robust pile for shaft drilling
![Page 47: Sellwood Replacement Bridge Perched Box Caisson · Elevated cofferdam constructed above water then lowered down using hydraulic jacks. A voided base slab sleeves over foundation shafts](https://reader031.fdocuments.net/reader031/viewer/2022011806/5bdd579309d3f2d8568c995a/html5/thumbnails/47.jpg)