Selected Work_Manon Eylenbosch
-
Upload
manon-eylenbosch -
Category
Documents
-
view
217 -
download
2
description
Transcript of Selected Work_Manon Eylenbosch
![Page 1: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/1.jpg)
![Page 2: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/2.jpg)
![Page 3: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/3.jpg)
MANON EYLENBOSCH SELECTED WORK 2010-2014
EUROPAMAISON DE LA SOLIDARITE
VELMCITE MODELE
ART SCHOOL SCALES OF REALITYTHE GREEN MARKET
PINNACLERIVERSIDE
BRUSSELS
INDIA
ACADEMIC
![Page 4: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/4.jpg)
EUROPA
![Page 5: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/5.jpg)
E U R O P A
The Europa project is part of the master plan designed by Christian de Portzamparc to restructure and densify Rue de la Loi. The 92 meters high tower is ideally located at the intersection of Rue de la Loi and Chaussée d’Etterbeek, in the heart of the European quarter. For six years, B2AI proposed various concepts and designs. The last version I worked on is an upgrade due to the lack of residential units. Therefore, we had to rethink the project to include both offices (22 floors) and residential (20 floors) into one volume instead of two separate entities. We also designed a new façade based on the previous study of fixed louvers. The building is now covered with a unique skin that unifies and protects it. Made of louvers that transforms and adapts along the façade, the skin gives a new dynamic to the tower.
Type: Office, residential and commercialStatus: PermitTeam: BURO II & ARCHI+IFloor area: 30.000m² offices, 9.000m² residential, 900m² commercialLocation: Brussels, BelgiumParticipated in: Volume researsh, study models, façade system, plans
BURO II & ARCHI+i
![Page 6: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/6.jpg)
Volume and façade study
![Page 7: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/7.jpg)
Sun protection
Transition
Unity
East façade
South façade
West façade
![Page 8: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/8.jpg)
BURO II & ARCHI+iBURO II & ARCHI+i
![Page 9: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/9.jpg)
MAISON DE LA SOLIDARITE
![Page 10: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/10.jpg)
BURO II & ARCHI+i
M A I S O N D E L A S O L I D A R I T E
This existing building from the sixties is situated on the Saint Jean Square, between the Grand-Place and the Place du Sablon in the center of Brussels. The purpose of this project is to completely renovate the building to improve the quality of the working environment. For instance, by maximizing natural light benefits, opening working spaces and installing technical requirements such as insolation and ventilation. After winning the contest, we needed to re-design some of the internal spaces and the façade. Designed to give the building the solar protection needed to be sustainable, the façade uses a fixed solar shading solution. This system gives the building a new identity while keeping the original sixties design and its harmony with the rest of the square. We have now introduce the permit and are preparing the execution phase.
Type: Office buildingStatus: PermitTeam: BURO II & ARCHI+I in temporary association with HENRI GARCIAFloor area: 15.364m²+6.123m²Location: Brussels, BelgiumParticipated in: Design conception to execution, façade system, plans and detail drawings
![Page 11: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/11.jpg)
New sustainable façade
SituationBurssels center
Urban contextSquare Saint Jean
Existing building1973
![Page 12: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/12.jpg)
Fixed louvers limitation of solar gains
BURO II & ARCHI+i
![Page 13: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/13.jpg)
NURSING HOME VELM
![Page 14: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/14.jpg)
N U R S I N G H O M E V E L M
This project, developed by Care for Life and designed by BUROII & ARCHI+I, aims to respond to the challenge presented by an ageing population. The project is divided in 3 phases. The first one is already completed and fully operational. I joined the project at the end of the second phase to control the construction site and for the design of the third phase.The project is situated in Velm’s countryside in the middle of appel tree plantations which gives to the residents a peaceful environment. With single rooms and fully equipped flats, the building is also totally accessible to wheel chairs.
Type: ResidentialStatus: Phase 2 – completed, Phase 3 - designTeam: BURO II & ARCHI+IFloor area: Phase 2 - 5.840m², Phase 3 – 4.560m²Location: Velm Sint Truiden, BelgiumParticipated in: Receipt of phase 2, permit plans of phase 3
![Page 15: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/15.jpg)
Master plan integration in the site
Appel tree region
![Page 16: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/16.jpg)
Phase 03Design
Phase 02Construction site
Phase 01In use
![Page 17: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/17.jpg)
CITE MODELE
![Page 18: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/18.jpg)
C I T E M O D E L E
“This project includes everything from urban planning all the way through to project completion for 1.029 modernist apartment units. The site was a modernist icon in the 1960′s, it was created for the World’s Fair in 1958. It was inspired by the idea of people being completely surrounded by nature, and living in a garden.” – B2AI
The current project is composed of a complete renovation in multiple phases and the construction of two new buildings. I was mainly involved in the last phase of the construction part. The goal was to integrate the new buildings in the existing situation by using the same façade material used for the renovation of the older buildings.
Type: Social housingStatus: Phase 3 – construction of new buildings completed 2014Team: BURO II & ARCHI+IFloor area: 7650m²Location: Brussels, BelgiumParticipated in: Receipt of the new construction
BURO II & ARCHI+i
![Page 19: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/19.jpg)
Existing Building Renovated building Inauguration of the new building
![Page 20: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/20.jpg)
PINNACLE
![Page 21: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/21.jpg)
P I N N A C L E
This project, located in Goregaon (Mumbai) is designed by architect Sanjay Puri. The building is a luxurious residential tower of 31 floors containing apartments and duplexes of 3 and 4 bedrooms. Moreover, its Y-shaped design provides natural light and ventilation. I joined the project at its second phase. My team’s mission was to monitor the construction progress.
Type: ResidentialStatus: Phase 1 – completed, Phase 2 – ongoingTeam: KalpataruLocation: Goregaon, Mumbai, IndiaParticipated in: Construction supervision
KALPATARU
![Page 22: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/22.jpg)
Construction of the main tower
Construction of the club house
Foundation of the secoundary tower
![Page 23: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/23.jpg)
RIVERSIDE
![Page 24: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/24.jpg)
R I V E R S I D E
This project is located in Panvel (nearby Mumbai) and surrounded by a river and a mountain. Its natural environment provides quiet and peace to the place. The 14 towers are arranged in order to offer a view to every apartment. I joined the project when the construction site had already begun. My team’s mission was to monitor the construction progress.
Type: ResidentialStatus: Consturction siteTeam: KalpataruLocation: Panvel, Maharashtra, IndiaParticipated in: Construction supervision
KALPATARU
![Page 25: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/25.jpg)
KALPATARU
Master plan Building plan Apartement layout
![Page 26: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/26.jpg)
ART SCHOOL
![Page 27: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/27.jpg)
A R T S C H O O L
The school is composed of different major functions implemented on the site so as to blend in with the natural slope and create separate outdoor areas such as playgrounds, performance spaces and bleachers. As a passive building, the school is made of a concrete beam structure and covered with a skin insulated with wood and profile glass U-shaped. The glass can be transparent, frosted or opal to allow the natural light, but protect the building from excessive sunlight.
Type: High SchoolTeam: Manon EylenboschLocation: Tubize-Clabecq, BelgiumYear: 2012 graduation project
![Page 28: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/28.jpg)
Integration
Green space
Functions
Acces
Circulation
Sustainability
![Page 29: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/29.jpg)
Integration
Green space
Functions
Acces
Circulation
Sustainability
Sport hall
Art studio
boarding school
theater
Classroom
![Page 30: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/30.jpg)
SCALES OF REALITY
![Page 31: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/31.jpg)
S C A L E S O F R E A L I T Y
Positioned at the beginning of the plot, the building marks the entrance of the neighbourhood by creating a visual appeal. The Building’s double ground floor is devoted to commercial activities to respond to the status of the road. Meanwhile the upper floors are reserved for housing. The building is composed of different types of accommodation to allow a mix of types of family and a modulation in its façade. The apartments are arranged to create varied views and their superposition can generate terraces for each unit. The building is composed of a hard concrete center for its stability to the winds. The façades are composed of wooden prefabricated panels to facilitate execution.
Type: ResidentialTeam: Manon EylenboschLocation: Liège, BelgiumYear: 2012, housing studio
![Page 32: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/32.jpg)
Building layout Apartment layout
![Page 33: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/33.jpg)
Construction details
![Page 34: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/34.jpg)
GREEN MARKET
![Page 35: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/35.jpg)
T H E G R E E N M A R K E T
The purpose of this project was to use the space along the railway by building a park for walking and recreation while keeping the existing vegetable gardens. The park is connected to a covered market. This market creates a link between the ‘cage aux ours‘ and the morning market along the canal, where it will be supplied. The covered area can be used as a space for sport as well as a place for shows. Furthermore, the park hosts panels for taggers to express their art. These panels separate and secure the park from the railway.
Type: Public equipementTeam: Céline Bongiovanni, Manon Eylenbocsh, Sarah LobetLocation: Schaerbeek, BrusselsYear: 2010, urbanism studio
![Page 36: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/36.jpg)
Bridge to the market hall
Railway
Park and market hall
![Page 37: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/37.jpg)
February 2014 - ...Junior Execution Architect in BURO II & ARCHI+I office, Brussels, Belgium, http://www.b2ai.com/Follow up of construction site, residential and office projectsMarch 2013 – February 2014Junior Designer Architectural in BURO II & ARCHI+I office, Brussels, Belgium, http://www.b2ai.com/Competition, residential projects, offices buildings, residence for elderly people feasibility studies, renovation.September - December 2012Internship at Kalpataru, Mumbai, India, http://www.kalpataru.com/High rise residential projects and urban planning
August 2011Internship at L’Espace Architect, Brussels, Belgium, http://www.espacearchitectes.be/
April 2011Inernship at La Bardane Landscape Studio, Corroy-le-Grand, Belgium Urban landscape, garden design and 3D visualizationDecember 2010Internship at the AAUM Atelier d’Architecture et d’Urbanisme de Malève, Belgium, http://www.aaum.be/
August 2009Internship in the architecture department of the Saint Pierre hospital, Brussels, Belgium
2010-2012Master degree in architecture, UCL LOCI, Brussels BelgiumGraduation project: A school for artThesis topic: Sustainable renovation trough the function of a building, practical case on the Children Museum of Brussels
2007-2010Bachelor degree in architecture, ISA Saint Luc Bruxelles, Brussels BelgiumGraduation project : housings in Brussels
2006-2007 Senior year of High School, Plymouth Withmarsh, Pennsylvania, USAForeign Exchange Program 12 months
2000-2006High school diploma, College Saint Etienne les Hayeffes Mont St Guibert, BelgiumMajored in science and art
PROFESSIONAL EXPERIENCE
EDUCATION
MANON EYLENBOSCH_CV
![Page 38: Selected Work_Manon Eylenbosch](https://reader034.fdocuments.net/reader034/viewer/2022042904/568c56dc1a28ab4916c83e4f/html5/thumbnails/38.jpg)
CAD AutoCad, Revit, ArchiCAD, Sketch UpVisualization V-RayGraphic Design Adobe Creative SuiteProficient in PC and MAC operating systems
French - Native speakerEnglish - Full professional proficiencyDutch - Elementary proficiencyItalian - Elementary proficiency
Field Hockey (2013-2014)Synchronized swimming (2004-2012)Voluntary For «the missionaries of charity of mother Teresa”, Calcutta, India (December 2012)Voluntary for “les nuits musicales de Beloeil” (2011)Voluntary for the non-profit organization “Vacances pour tous” (2009-2012)Voluntary for the non-profit organization “Asmae” (2010)Chief scout (2007-2010)
PhotographyUkuleleScrapbooking
COMPUTER SKILlS
LANGUAGES
EXTRACURICULUM
INITERETS
AVAILABLE FROM JANUARY 2015Please visite www.manoneylenbosch.com for more details