SECTION E WATER CONNECTIONS (continued) PAGE DRAWING … · SECTION E WATER CONNECTIONS (continued)...
Transcript of SECTION E WATER CONNECTIONS (continued) PAGE DRAWING … · SECTION E WATER CONNECTIONS (continued)...
Section E Drg List - Set E1 & Set E2.doc
SECTION E WATER CONNECTIONS (continued) PAGE DRAWING NO. TITLE SET E2 E11 94 – 0042 – 02B Tapping into Charged Mains (Wet Tappings) Laying Details for DN50 PE Water
Connections off Existing Mains up to DN375 E12 2007 – 00679 Rev 3 DN20 Dual Check Water Meter Assemblies for Installation on Inlet Risers Having Loose
Jumper Valves E13 2007 – 00680 Rev 4 DN20 Dual Check Water Meter Assemblies for Installation on Inlet Risers Having Ball
Valves E14 2007 – 00737 Rev 1 DN25 Water Meter Assemblies Installation Details (Elster Above Ground Meters) E15 2007 – 00738 Rev 1 DN32 Water Meter Assemblies Installation Details (Elster Above Ground Meters) E16 2007 – 00739 Rev 1 DN40 Water Meter Assemblies Installation Details (Elster Above Ground Meters) E17 2009 – 0085 Rev 4 DN50 Water Meter Assemblies Installation Details From 2007 (Flowstar M
Above Ground Meters) E18 91 – 0085 – 01F DN80, DN100 and DN150 Water Connections Layout and Fittings Schedule
for Above Ground Turbine Flow Water Meter E19 2005 – 01172A DN80, DN100, DN150 and DN200 Water Connections Layout and Fittings
Schedule for Above Ground Mag Flow Water Meters E20 99 – 0145 – 01C DN25 and DN40 Water Meter Connections – Manifold Assembly for DN20
Meters E21 2006 – 00466 Rev 1 PE Water Connections Below Ground Meter Installation DN20 Water
Meters E22 2007 – 02999 Rev 1 DN50 Manifold Assembly DN25 Meters (for Industrial/Commercial
installations only) E23 2009 – 30411-01 Rev 3 Drinking Water to Recycled Water Temporary Connection Pipe Layout E24 2009 – 30412-01 Rev 2 Drinking Water to Recycled Water Temporary Connection Location
l= {¿u
E17
For Drg reference -
see Section t lndex 5A Woter Responsibility (onsumer Responsibilily
-lTo (onsumer
l00mm MIN
DN5O \^/ATER l.4ETER ASSEMBLY
IÏEI,I DESCRIPTION
1 lntel Pipework DN50 Vrlqter Meter
2 Meler
J 0uttet Pipework DN50 l./oter Helerl. Pipework Supporl
STOTK NO.
t,710 - ll? 1
1730-1J12
NO.RE(lD. (OHl,lTNTS
Flowstor M DN50 meter.
Bolted lo flonges.
IÏTM t)ES(RIPTION
Extention Pipe 500mm long x 50 nomo so BSP It x so BsP Fr
Loose Rinq Joint FBE (ooledB
,0l. 50mm Woter Meler
sT0cK N0.
t 730-1ló9
6ó80 -0ó81
N0.Rt0D.
I
I
IOMMENÏS
(omplete with gosket,
nuts ond bolls.DN50 \,,/ATtR METER ASSEMBLY - |\4ATERIALS LIST
ITEM ] - INDIVIDUAL IOMPONINTS
IÏEM DE5(RIPÏION 5I0(K N0. N0.RE0D.
L7J0-1221 1
t il0-1170 1
COM11ENÏS
(omplete with gosket,
nuls ond bolts.
Screwed Ftonge FBE (ooted
50 nom x 2" BSP
Extenlion Prpe 250mm long x 50 nom
50 BSP Mt x 50 BSP l\4l
0nty products tisled in the colologue"Aulhorised ltems for !{oter Reliculotion Systems"
{Authorised Fittings Listl SHALL be used.ITTM 5 - INDIVIDUAL (OI,1PONENTS N0ït
ST0(K N0. refers to SA t¡Joter stork number for thol fitting.
Lcnglh dclcrnined on site.
Duot (heck ond Volve sel
3
REV¡SIONST
Ig
illú
i!
AUlHoRlzt0
/6 raf SAI.'ATER SUPPLY CONSTRU(TION }4ANUAL
PA6E E17
t)NsO I.JATER I.IETER ASSE]'IBLIES
II{SÏALLATION OETAILS FRO},I 2OO7
|FL0I¡JSTAR l'l ABOVE 6R0UND I'iETERSI
A]trrlu
lrRtv f)ATE DRN OESCRIPTION rPPRV'f)
srGilÂIURt {l t)Ätt
l.EB>e¡-¡--r{0r r0 s(Attt tó.r¡.09 (r0 Pfi ff.ARR^ilGtIÍIII
l t0.il.09 (l0 0r.urt sIRArÍR mHovtoIhis drorino is lhe o¡ooe¡h of lhef^ sd,lx ruilirí^r\!/ vArtn (oßPoß^ro¡ond sholl nol be (opied or mod¡f¡ed
in nn¡l n¡ in sh¡lo eilhn¡¡l n¡¡lhn¡irnlinn2009- 0085 -01
Yfm llliln slffl
PRIIII I{AIIT
2 tu0.0t y6 srür iltitRs Anfll)t0NIÏI{ORK INFRASTRU(TURE STANDARÍ)Stt.0ú.0? UG fnsr Aulll(nÍo 6sll
o=(,L/l
I DO NOT STALT PAPTR PRINI
SA WATER PIPEWORK FITTINGS _ SA WATER RESPONSIBILITY PRIVATE PIPEWORK FITTINGS _ INSTALLED TONTRAITOR PROPTRTY OV\/NER
ISOLATIN6 VALVE - RESILIENT
BE USED. BUTTERFLY VALVESACTIVAÏED IF USID.
SEATED VALVESSHALL BE 6EAR
TO
ISOLATING VALVESSYSTEM SHALL BE
AND BACKFLOW
_t
-u-tsEoz.ÕoH-!J
SUPPORTED
MEÏER SUPPORT BOLTED TO FLAN6ES.
TONFIGURATION ON INSTALL.
FLLl¿J
-J
t-Ir.fæ
THRUST BLOCK
THRUST BLOCK FLANGED PIPEWORK
SHALL BE USED.DN8O, DNlOO AND DN15O METER ASSEMBLY
ONLY PRODUTTS LISTED IN THE TATALOGUE,,AUTHORISED
ITEMS FOR WATER RETITULATION SYSTEMS"(AUTHORISED FITTINGS LIST) SHALL BE USED.
NOTE S.
1. INSTALLATIONS IN TRAFFICABLE AREAS SHALLHAVE PROTEiTION POSTS INSTALLED.
2. THRUST BLOIKS SHALL BE INSTALLED ON INLET
AND OUTLET BENDS - SEE SECTION E INDEX FOR
DRG REFIREN(E.
3. TURBINE FLOW WATER METERS SHALL BE
INSTALLED IN COMPLIANCI WITH MANUFAITURIR'SINS TRUC TIONS.
L. 30Omm MINIMUM FROM cROUND T0 THE UNDERSIDE
0F STRAINER 0R BAtKFL0\^/ DEVIiE WHIIH EVER
IS TLOSESTLENGTH TO BE DETERMINED ON SITE.
THIS DRAWIN6 SUPERSEDES DRG 91-0085-01
PRIVATE
C ONNEC TION
SA WATER PIPEWORK FITTINGS SCHEDULE WITH SA WATER STOCK NUMBERSITEM DTSTRIP TION DNSO STOtK No. DN 1OO ST0(K No. DN15O ST0tK No.
1 9O' BEND FLANGE,/FLAN6E ø80 t.730 -09 62 Ø too 47i0-09ó3 ø 1s0 4730-09ó42 EXTENSION PIPE FLANGE,ZFLANGE * * x Ø80 * x Øt00 * x Øt50
3WAFER TYPE BUTTERFLY VALVE - CEAR A(TUATOF
OPER A T EDØ80 Ø too Ø|so
l. 9O' BEND FLAN6E,/FLANGE Ø80 L7 30 -09 62 ø 1oo 4730-0963 Ø tso 4730-09ó4
5 EXTENSION PIPE FLAN6E/FLANGE 800xØ 80 1000 x ø 100 1500 x ø 150
6 TURBINE FLOW WATIR METER Øao Ø 100 ø 1so
1 EXTINSION PIPE FLANGED 100xø 80 500 x Ø loo 750 x ø 150
6ASKET - lmm INSERTI0N RUBBER GASKET Øao 5330-0212 Ø too 5330-0213 Ø tso 5330-0214
REVTST0NS 0rsíged DB( r99r
SAWaterI'TATER SUPPLY C0NSTRU(T|0N MANUAL
PA6E E18
0il80, DNt00,0t{150, D}t200 I{ATER c0t{}trcTt0Ns
LAYOUT & FIÏTINGS SCHEOULE FOR
ABOVE GROUNO TURBIIIE FLOb' }'ATER ITIETERS
A3Revi: on
FRtv f)ATI DRN 0ts(RrPIr0r{
fhorn r{6 199l
Rrvicrcd 0B( 1991Shrrl tlrnbcr 0t
rril¡ uúnrg rr rtr( PrvpËr rt ur ilrË
\!/ wAItR (onPoRATonond sholl nol ùr (ofied o¡ nodilied
in oorl m in úroþ rilhoul oulhoriralion.
fkoYing iluùtr
91-0095-01ln¡lhlr Dol.
t )0/l1t09 (r0 nü.Ët sIRAtr{R R${0vt0. r{olt ¿ A00tD
t 29/06t07 r,G mttf vAtvt. r{ÌtR SuPP0RI t ntil[ sIRAiltR A00t0
1 500
SA WATER RESPONSIBILITY PRIVATE
50mm WATER ASSEMBLY
><
=EEoo¡o
DRTNKTNG WATER (FLANGED)0100mm RECYCLED IVAïER
-
(FLANGED)
NOTES
qrq
ffit. Alt cm Pffitw(, r^Rtc v l,tiE At{¡ Ftatcts
tl{DfiGRüñD T0 8E PnRU-Anfl TAPE ffirPPgl T0 l0ûnn
A80E CRott{D tÂ/E- (nFn T.S 29)
2. 3flhm llt{lllult FROI GRq,ilD T0 IHE tiDtRSlDE tr SIRAT{ER
m RPZ V L\,t frt(}t EIER tS CtoStST.
OIAfr{ IÆ9{ CAGT DEÍAILS :
. DilE{SilS - gmr X 2000u X glXH.
. tRAllt T0 E GALV lûnn SIE PPt"
. $t^rt{ ttsH T0 BE Fo¡cilG GRADE G tV SÌE-
. PRO\,IDE Í)OIß-E GAIES ü{ TRO{T û{LY -tAfi GAIE T0 8E lOüh X gmr.
. PRoìrDt BRACilC AS REqnÐ.
. Rotr T0 8t lfr{cÐ Fm AfrEss T0 Assaß_y N0 PPEü0RK
. SilIO,f LOOOIG FACIJTY FM MO{T GATES AI{D
Hil{GÐ ROf TO tr PROVII)E)
. I x CS|J2E6 L0O( T0 tr PR0VIÐ BY SA ïAIER
(x 100()
PAtr r{0. 825 f)RAHirG 2üt9-301r1-0r RFUCTS mArilG 96-üA¡-0rA
- INSTALLED BY OTHERS
z=ooo,
CHAIN MESH CAGT - REFER CTIAIN MESH
CAGE DETAILS BELOW
CHAIN MESH CAGE - REFER CHAIN MESH
CAGE DETAILS BELOW.
FOR PIPEWORK LOCATON REFER 2009-30412-01
zoorÐ
(E24)
SA WATTR PIPEWORK FITTING SCHEDULE WITH SA WATER STOCK No
50mm OUTLET RISER 4730-1+27ISOLATING BALL VALVE LEFT IN FULL OPEN POSIÏON AND HANDLE REMOVED
L00SE RING JOINT FOR 50mm VúATER METER
FLOSTAR M DNsO METER
EXÏENSION PIPE _ 50 BSP ML X 50 BSP FL
SCREWED FLANGE T0 BE FBE COATED 50nom x 50BSP COMPLEÏE WITH GASKET, NUTS AND BOLTS4730-1224ISOLATING VALVE _ RESILIENT SEATED VALVES TO BE USED BUTÏERFLY VALVES TO BE GEARED ACTIVATED IF USED
LINE STRAINER
R.P,Z. VALVE MINIMUM 300mm CLTARANCE MUST BE OBTAINED
EXïENS|ON PIPE - 50 BSP ML x 50 BSP ML LENGTH TO SUIT
MARIC VALVE - No. 50 F & F PART No, 50FF8N7342EXTENSION PIPE - 500mm LONG x 50nom 50 BSP ML x 50 BSP FL 4730-1 369
ttfAÏER SUPPLY CONSTRUCTION MANUAL
PAGE E23DRINKING WATER TO RECYCLTD WATER
ÏEMPORY CONNECÏONPIPE LAYOUT
DESCRIPTION
ond sholl not be cooied or modified 2009-3041 1 -01NETWORK INFRASTRUCruRE STANDARDS
o,Oo;qc\,1
I
âL¡J
=u-)U)
l1z4
CHAIN MESH CAGE - REFER CHAIN MESH CAGE
DETAILS BELOW.
FoR PTPEWoRK ARRANGEMENT REFER 2009-30411-01 (E23)æffi++PIPEI1IORK TO BE PLACED CENTRALLY IN CAGEE
FOOLO
OLr)L.)
BOUNDRY
É.l¿lf-
-Õl4JJC)
c)l¡JÉEEo0
T
É.H
=(Jz>l
=É,ôEEo|r)
NOÏES
ALL COPPER PIPEIVORK, MARIC VALIE AND FLANGES UNDERGROUND TOBE PTTROLAIUM TAPE YIRAPPED T0 l00mm AB0VE GROUND LflEl.(REFER T.S. 2s)W.IEN RECYCI.ED IVATER IS AVAILABI.T AI.I BRANCTI PIPEIIORK AND CAGEIS TO BE REMOIED. ISOLATON AT THE MAIN IS TO BE EITHER -
SHUT DOìTÌ'I MAINS AND RIMOIE THE ISOLAIION VALIES ANDASSOCIA1EO CIIAMBERS AT BOTH THE DRINKING WATER MAIN AND THERECYCI..ED IYAÏER MAINS. INSERT A BLANK FLANGE ON THE BRANCHAND 'Is AND REINSTATED THE ROAD TO THE REQIJIRES STANDARD(sEE PAGE 83 & 84)
SHUT DOVIN MAINS AND REMOIE THE ISOLANON VALIES ANDASSOCIATEO C1IAMBERS AT BO'IH THE DRINKING IYATER MAIN AND THERECYCI.TD WATER MAINS. RECONNECT THE DRINKING IYAIER MAIN ANDÏHE RECYCI..ED MAIN AND REINSTATED 'IHE ROAO TO THE REQUIRES
STANDARD (SEE PAGE 83 A 84)
50mm |VATER ASSTMBLY
NKIN
CHAIN MESH CAGE DETAILS :* DIMENSIONS - 900h X 2000w X 900d.* FRAME T0 BE GALV ,l0mm STEEL PIPE.+ CHAIN MESH TO BE FENCING GRADE GALV STEEL.* PROMDE DOUBI.T GAÏES ON FRO\¡T O'¡LY -
EACH GAÏE TO BE gOOh X lOOOh.* PROVIDE BRACING AS REQUIRED.* ROOF TO BE HINGED FOR ACCESS TO ASSEMBLY
AND PIPEWORK+ SINGI.E LOCKING FACILITY FOR FROiIT GATES
AND HINGED ROOF TO BE PROVIDED* 1 x CS13288 LæK T0 BE PROVIDED BY
sA WATER (X LoCK)ORa
DRINKING WATER SUPPLY
RECYCI.ED IIIA'IER SUPPLY
ORARY CONNECTION
REVI SI ON S IE 25.0E.09
SAWaterWAÏER SUPPLY CONSTRUCTON MANUAL
PAGE E24 A3 2ìEV DAÏE DRN DESCRIPTION \PPRYI
)RAM{ crD Jr.0E.09
lÈYtÈttÈ I r. uAtLI,l)Ût)ôtt-
IPINT NÂUF
DRINKING WAÏER TO RECYCLED t/l,ATER
ÏEMPORY CONNECTON LOCATON
NOT TO SCAI..E
tfil5 urur[tu t5 tftë u]uuHtY ot lftËSOIJÎH AUSTRÁUAI'I
V IYATER cORPORAIIONond sholl not be cooied or modifìed
in n¡¡l æ ia uh¡la -¡+l^^',+ ^,,rh^.i'^+!-2009-3041 2-01
lÎrR ñrffi SIIET
NIA2 æ.10.10 C.IaD. GAÏE LOfiIT{G ilOIES AIÐTD ,l/á
NETWORK INFRASTRUCruRE STANDARDSI J0.r1.09 CID ISSUTD FM RflJCATIO{