SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY AND MATLAB PROGRAM A Project Presented to the faculty of the Department of Electrical and Electronic Engineering California State University, Sacramento Submitted in partial satisfaction of the requirements for the degree of MASTER OF SCIENCE in Electrical and Electronic Engineering by Steve Ghadiri Majid Hosseini FALL 2013

Transcript of SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

Page 1: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY

AND MATLAB PROGRAM

A Project

Presented to the faculty of the Department of Electrical and Electronic Engineering

California State University, Sacramento

Submitted in partial satisfaction of

the requirements for the degree of

MASTER OF SCIENCE

in

Electrical and Electronic Engineering

by

Steve Ghadiri

Majid Hosseini

FALL

2013

Page 2: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

ii

© 2013

Steve Ghadiri

Majid Hosseini

ALL RIGHTS RESERVED

Page 3: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

iii

SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY

AND MATLAB PROGRAM

A Project

by

Steve Ghadiri

Majid Hosseini

Approved by:

_________________________________, Committee Chair

Turan Gönen, Ph.D.

_________________________________, Second Reader

Salah Yousif, Ph.D.

_________________________

Date

Page 4: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

iv

Student: Steve Ghadiri

Majid Hosseini

I certify that these students have met the requirements for format contained in the

University format manual, and that this project is suitable for shelving in the Library

and credit is to be awarded for the Project.

_________________________________, Graduate Coordinator

Preetham B. Kumar, Ph.D.

_________________________

Date

Department of Electrical and Electronic Engineering

Page 5: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

v

ACKNOWLEDGMENTS

The authors would like to acknowledge Dr. Turan Gonen, Professor of Electrical

Engineering at California State University, Sacramento, for his guidance, supervision,

patience, and care in recommending and evaluating this project in the area of Power

Engineering at California State University, Sacramento.

The authors are also appreciative of Dr. Salah Yousif, Professor of Electrical Engineering

at California State University, Sacramento, for his excellent instruction in the area of

Power Engineering at California State University, Sacramento, as well as being a reader

of this project.

The author would also like to acknowledge Dr. Preetham Kumar, Graduate Coordinator,

and Professor of Electrical Engineering at California State University, Sacramento, for his

guidance and direction in completion of this project.

Page 6: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

vi

Abstract

of

SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY

AND MATLAB PROGRAM

by

Steve Ghadiri

Majid Hosseini

The goal of many utilities is to provide an economically balanced energy delivery

system that will provide customers with safe, reliable, and efficient means of power while

not subjecting them to over-designs with unjustifiable cost. In achieving that goal, the

utility company must rely on system designers to optimize several key parts of their

delivery system. The distribution system secondary, e.g., is one of these subsystems, and

therefore, it can pose optimization type challenge for the distribution system designers.

Arriving at optimal solutions, serves the best interests of the utility and the long-term

objectives of the customers and ratepayers.

In this paper, the authors analyze many alternative intelligent choices when considering a

simplified distribution system selection and show, thru the formulation and Matlab

computer programming, how a simple optimization technique can arrive at a standard

selection of the system components. Total Annual Cost (TAC) is the reviewed concept,

Page 7: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

vii

and essentially, it reduces to a sum of initial capital investment, maintenance, and

operating costs including the costs of system losses. The optimization process is pivotal

in minimization of the TAC. Customer loadings are a key part of this selection and have

been considered in the program formulation, as well. Matlab program provides the ease

in selection of the components and speed in calculation performance to arrive at a most

feasible answer among optimized choices. Voltage drop is the constraint in this

optimization process, which is usually limited by the utility company’s requirement.

_________________________________, Committee Chair

Turan Gönen, Ph.D.

_________________________

Date

Page 8: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

viii

DEDICATION

We dedicate this paper to our family for supporting and inspiring us in this journey.

Page 9: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

ix

TABLE OF CONTENTS

Page

Acknowledgement ...............................................................................................................v

Dedication ....................................................................................................................... viii

List of Tables ......................................................................................................................x

List of Figures ................................................................................................................... xi

Chapter

1. INTRODUCTION ..........................................................................................................1

2. DISTRIBUTION SYSTEM DESCRIPTION .................................................................5

2.1 Distribution System Design Requirement ..............................................................5

2.2 Distribution System Planning Methodology ........................................................7

3. LITERATURE REVIEW .............................................................................................10

3.1 Design Criteria .....................................................................................................10

3.2 Components of Secondary Distribution System .................................................15

3.3 Voltage and Load Criteria ...................................................................................16

3.4 Main Factors ........................................................................................................17

3.5 Changing Paradigm of the Power Distribution System .......................................19

4. OPTIMIZATION METHODOLOGY ..........................................................................24

5. ECONOMIC ESTIMATION AND ANALYSIS .........................................................43

6. NUMERICAL RESULTS ...........................................................................................49

7. CONCLUSIONS ..........................................................................................................64

Appendix A: Matlab Optimization Program for Secondary Distribution System ............68

Appendix B: Instruction for Matlab TAC Program in Distribution System ....................79

Appendix C: Secondary Distribution System Voltage Drop Program ............................83

Appendix D: Distribution System Component Information Background ........................91

Bibliography .....................................................................................................................96

Page 10: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

x

LIST OF TABLES

Table Page

4.1 Load Data for Book Example 6.1 ...............................................................................39

6.1 Summary of the Runs .................................................................................................53

Page 11: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

xi

LIST OF FIGURES

Figures Page

1.1 One Line Diagram of Typical Primary Distribution Feeders .......................................2

3.1 Radial-type Primary Feeders .......................................................................................11

3.2 One Line Diagram of a Typical Distribution System .................................................14

4.1 Flow Chart of Safigianni’s Optimization Process ......................................................25

4.2 Matlab Program Flow Chart .......................................................................................30

4.3 One Line Diagram of Multiple Primary System for JHC ...........................................32

4.4 Typical Residential Area Lot Layout and Service Arrangement ................................33

4.5 Illustration of a Typical Residential Secondary Pattern ..............................................33

5.1 Current Transformer Cost ............................................................................................45

5.2 Historic Cost of Transformers ....................................................................................45

5.3 Current Cable Cost .......................................................................................................47

5.4 Historic Cable Cost ......................................................................................................48

6.1 Transformer Cost Fit into Third Order Model ............................................................51

6.2 Cable Cost Fit into Second Order Model ....................................................................52

6.3 Cable Cost For Different Sizes ...................................................................................52

Page 12: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

1

Chapter 1

INTRODUCTION

1. Introduction

The power distribution systems, which carry electric energy to even far-flung

customers utilizing the most appropriate voltage level, are divided into primary and

secondary. The part of the electric utility system, which is between the distribution

substation and the distribution transformers, is the primary feeders or primary

distribution feeders. The secondary power distribution systems include step-down

distribution transformers, secondary circuits, consumer services, and meters to measure

the consumer energy consumption. They are single-phase when they serve residential

customers and three-phase when they serve industrial or commercial customers.

The most commonly used secondary power systems are the radial systems. The

general requirements from a secondary power distribution system are that it gives

customers as stable a voltage as possible, operate safely and effectively at the minimum

possible cost and is well balanced. One line diagram of a typical primary distribution

feeder is shown in Figure 1.1 below, as depicted from standard Handbook for electrical

Engineers [3].

Page 13: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

2

Figure 1.1 One-line diagram of typical primary distribution feeders.

Source: (From Fink, D.G., and H. W. Beaty, Standard Handbook for Electrical Engineers,

11th

edition, McGraw-Hill, New York, 1978. With permission.)

Page 14: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

3

Unfortunately, the reliability of service continuity of the radial primary feeders is

low. A fault occurrence at any location on the radial primary feeder causes a power

outage for every consumer on the feeder unless the fault can be isolated from the source

by a disconnecting device such as a fuse, sectionalizer, disconnect switch, or recloser.

Additionally, the operation and planning of electric power systems involve even a long

list of challenging activities, many of which are directly or indirectly related with the

optimization of certain objective functions [13].

The complex algorithms can be obtained from the cited references, which have

been developed in order to examine whether a radial secondary power distribution system

fulfills several criterions. Conductor tapering, network conductors having sufficient

thermal short-circuit strength, power flow in each network segment less than the thermal

of the conductor used there, acceptable percent voltage drop from the distribution

transformer (source node) up to any one of the ends of the network, and adequate fault

current to operate the network protection are essential part of this criteria [4].

While we acknowledge those methodologies and we ideally wish to create those

features in a comprehensive software program, we are somewhat limited to essential

math functions in our Matlab program, and therefore, we recognize that we have no way

of implementing all of them in our Matlab program. Use of power flow programs can

perhaps facilitate their implementation caption.

Page 15: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

4

Switching mechanisms and over current protections are usually associated with

the type of configurations and they do not necessarily follow exactly into an optimization

program. Additionally, the cost of the over-current protection does not always vary

linearly with the size of the system. For simplicity, they have been put aside here as an

economical or fault current constraint in our program [6].

Safigianni has shown the methodology behind an elaborate optimization program

[4] and [5]. In her program, each stage is analyzed for the constraints by examination. If

the result of the above examination is that any of the previously mentioned technical

constraints is not satisfied, the program which implements the algorithm suggests a

number of alternative solutions concerning transformer changes or conductor

replacement combinations or both of them, in order to optimize technically the system

operation. This number depends on the load distribution and the conductor types and

sizes, which are available for the network construction. Finally, the program estimates

economically the alternative technically acceptable solutions and selects the most

economical one. The algorithm of Safigianni is an improvement and extension of the

algorithm used in her first reference and it is using more constraints, a load flow analysis

method to calculate the currents, voltages, economic data, and functions to estimate the

resulting technical solutions, which make final results more accurate and reliable.

Ultimately, a capable optimization method could expand to power flow modeling of a

portion of network.

Page 16: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

5

Chapter 2

DISTRIBUTION SYSTEM DESCRIPTION

2.1 Distribution System Design Requirement

Secondary power distribution systems are used to deliver power to consumers in

residential or commercial businesses. We cannot imagine living without efficient

constant source of power. The best distribution system is one that will supply adequate

power to present and future loads safely and cost effectively. Distribution design

engineers choose the best distribution system, when they have considered all the design

parts, installation, and the cost. Design needs to be safe, effective, and reliable. Then, at

the same time, it needs to be not necessarily cheap, but cost effective.

In order to design the best distribution system, the system design engineer must

have information concerning the loads and knowledge of the various types of distribution

systems that are applicable. The various categories of buildings have many specific

design challenges, but certain basic principles are common to all. Such principles, if

followed, will provide a soundly executed design.

Understanding of the entire component in the power distribution system and their

functions are essential for implementing a proper design. The components in such a

system are power distribution transformers, primary and secondary conductors, and

power poles. For choosing the right component in this system, the most important

Page 17: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

6

information is how consumer uses this power. Most important piece of information is the

amount of load that consumer will use considering present load and future load given the

load value will constantly change both within a day and over time. The future load

increase also needs to be considered because the system will not be cost effective if the

system need to be replace in 1, 2, or even 10 years.

In this paper, we report on the creation of a Matlab program for a simplified

residential block, which is illustrative of city development, and it explores a secondary

distribution system design that supply an area block with 24 loads. A reasonable load

demand could be input for each consumer. The demand assumption relies on average

monthly electrical usage for the area with some extra spare capacity (20 percent) for

safety before reaching the threshold and of course some extra room for future usage. The

program calculates the total annualized cost for the design and then this cost is optimized

with transformers, primary system enhancements, service laterals, and service drop

secondary conductors. The service is size optimized (or sub-optimized) based on

optimized cost and number of pertaining constraints. After the entire initial components’

selection, the program calculates the voltage drop to ascertain, if it is in an acceptable

range and if it is not, the design needs to be changed. Conductors can be overhead or

underground. In case of overhead conductor, the cost of poles and other component will

add to the overall layout cost, and for underground distribution, the cost of trenching,

conduits, and pull boxes will have to be added which usually are substantially more.

Page 18: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

7

2.2 Distribution System Planning Methodology

The costs and reliability of power distribution systems are beginning to receive as

much attention as those of power generation and transmission systems. Modern planning

of these large-scale and complicated systems relies heavily on computers and

mathematical optimization tools [12].

Especially, in the developing countries where the growing power demand

provides needs for substantial expansion of power distribution systems, the long-term

benefit brought by using computerized optimization tools are tremendous, as compared

to widely practiced ad hoc methods involving only local computation.

The goal of modern power distribution system planning is to satisfy the growing

and changing system load demand during the planning period and within operational

constraints, economically, reliably and safely, by making optimized decisions on the

following: voltage levels of the distribution network; locations, sizes, servicing areas,

loads and building or expanding schedules of the substations; routes, conductor types,

loads and building schedules of the sub-transmission lines and feeders; other important

issues such as the types and locations of switching devices, load voltage levels, network

configuration, and load reliability levels, etc. The optimization problem is usually very

complicated, considering the scale of the system and the existence of many interrelated

factors.

Page 19: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

8

The new approach for the systemized optimization of power distribution systems

is presented in Yifan Tang’s paper [12]. In Yifan’s paper the distribution system

reliability is modeled in the optimization objective function via outage costs and costs of

switching devices, along with the nonlinear costs of investment, maintenance and energy

losses of both the substations and the feeders. The optimization model establishes a

multi-stage, mixed-integer and nonlinear function, which is solved by a network-flow

programming algorithm. A multi-stage interlacing strategy and a nonlinearity iteration

method are also designed by him.

It is noteworthy to mention that the investment and maintenance costs of the

substations and the feeders are fixed costs (zero-order), while their operational costs are

variable costs squarely depending on their loads (second-order) [16], making the

objective function inherently nonlinear.

The need to seriously consider reliability in terms of capital costs in distribution system

planning is being recognized, as emphasized recently by an IEEE task force on

distribution reliability modeling and applications [17]. Unfortunately, few papers had

extensively tackled this problem [18] and [19]. Most of methodology by Yifan Tang is

based on the original Dr. Gonen’s work on Optimal Multi-Stage Planning of Power

System [21], and Pseudo-Dynamic Planning of Dr. Ramirez-Rosado and Gonen [22].

Page 20: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

9

In this paper, of course for simplicity reasons we do not model reliability in our

simple secondary distribution optimization solution, however, when a designer is

considering the primary distribution design or a large portion of a city, one needs to

account for it. Usually selection of the switching configurations and degrees of

redundancy provide a certain level of reliability. Reliability inherently reflects into the

overall objective function via outage costs and costs of switching devices, along with the

present value of the costs of investment, maintenance and energy losses for both the

substations and the feeders.

Page 21: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

10

Chapter 3

LITERATURE REVIEW

3.1 Design Criteria

Problem formulation and definition is important to arrive at a correct optimized

value in a multi- variable equation. There are various yet interrelated factors affecting the

selection of a primary-feeder rating [1]. Examples are:

1. Nature of the load connected

2. The load density of the area served

3. The growth rate of the load

4. The need for providing spare capacity for emergency operations

5. The type and cost of circuit construction employed

6. The design and capacity of the substation involved

7. The type of regulating equipment used

8. The quality of service required

9. The continuity of service required

There are many methods to design the distribution system and we will not concern

ourselves to discuss the other methods in detail here. However, we chose a radial type

primary feeder with uniform loading for the simplicity and ease of developing established

methodology into a Matlab optimization program. The simplest and the lowest cost, and

Page 22: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

11

hence, the most common form of the primary feeder is the radial-type primary feeder as

shown in Figure 3.1, as shown below.

Figure 3.1 Radial-type Primary Feeders

Source: Electric Power Distribution System Engineering by Gonen [1]

Page 23: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

12

The main primary feeder branches into various primary laterals, which in turn

separate into several sub-laterals to serve all the distribution transformers. Generally, the

main feeder and sub feeders are three-phase three-or four-wire circuits and laterals are

three or single-phase. The current magnitude is the greatest in the circuit conductors that

leave the substation. The current magnitude continually lessens out toward the end of the

feeder as laterals and sub-laterals are branched off the feeder, tapering down. Usually, as

the expected current value reduces in the service lateral, the size of feeder conductors

reduces in the design. However, the permissible voltage regulation may restrict any

feeder size reduction, since the thermal capacity of the feeder is also a consideration.

The reasons for making a secondary power distribution system radial are the low

investment cost, the simplicity of the protection circuits, and the easy control of the

power method convenient for radial networks. In this project, we analyzed and

concentrated on the three important components of the secondary distribution system.

These components are distribution transformers, primary electrical conductors, and

secondary electrical conductors. Focus of this paper will be cost effectiveness of the

design and optimizing this cost. Cost, reliability, and life of the component will be

discussed and these components will be analyzed and chosen mainly based on load

demands and voltage drops. Electrical companies are facing very challenging situation,

not only the energy price for the consumer need to be reasonably affordable and

comparative in value, but the electric supply system also need to be reliable and

Page 24: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

13

available constantly. In addition, the electric utility needs to be adapting to the change in

load demand continuously.

In the older neighborhood, the secondary distribution system is aging and need to

be replaced. The cost of components, installation and labor, and maintenance compared

to fifty years ago is significantly more, and with all the new technology that consumers

use, the demand tends to be significantly higher, also. The design should be efficient and

cost effective otherwise it will cost the utility company a lot of money and that extra cost

will pass on to the consumer, and consequently, the price of electricity will go up.

The operational objectives of a power grid are to provide continuous quality service at an

acceptable voltage and frequency with adequate security, reliability, and an acceptable

impact upon the environment—without damage to power grid equipment—all at a

minimum cost. In Figure 3.2, the direction of arrows indicates the priority in which the

objectives are implemented.

Page 25: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

14

Figure 3.2 One-line diagram of a typical distribution system

Source: Electric Power Distribution System Engineering by Dr. Gonen

Page 26: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

15

Quality service that is environmentally acceptable, secure, and reliable, and

entails minimum cost is the main objective in power grid operations. However, during the

emergency conditions, the system may be operated without regard for the economy and

environmental restriction such as the use of high polluting energy source, instead

concentrating on the security and reliability of the service for energy users, while

maintaining power grid stability. [7]

The term continuous service means “secure and reliable service.” The term

secure, as it is used here, means that upon occurrence of a contingency, the power grid

could recover to its original state and supply the same quality electric power energy as

before. Later definitions have been added to signify the innovative technologies in the

smart grid arena, such as resiliency, and self- healing characteristics.

3.2 Components of Secondary Distribution System

In the design of secondary distribution system, three essential components are

distribution transformers, primary conductors, and secondary conductors. Load demand,

voltage drop, and voltage fluctuation should be considered and examined for sizing the

components because of their effect on both transformers and conductors. Overhead or

underground cables will be discussed in brief in this paper since most likely the

underground installation requires the trenching and conduit, and therefore, it will be

substantially more expensive than the overhead’s cost of the poles and reinforcements.

Page 27: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

16

3.3 Voltage and Load Criteria

The present and future electrical needs of the consumers must be anticipated by

utility companies and system should be planned accordingly. An electric load defines the

rate at which the supply system is required to do work [24]. The unit of power

measurement is Watt and electric power is the rate at which electric circuit performs

work. The electric load power consumption is measured by kilowatt-hour, which the

amount of work (1000watt) is done over the period of an hour. The amount of energy per

unit time, which should be supplied by the utility, is load. (This is the total energy

consumers are using or need in worst-case scenario to run all their electrical equipment

such as lights, appliances, motors, etc. This load can be changed depending on time of the

day or year. Planning an efficient design requires that a good forecast of load

characteristics to be developed. It is very important that the utility can meet this

maximum load demand. This maximum load demand is usually determined after review

of a residential neighborhood over a year. The total power consumption (household load)

for each residential unit is determined, or at least estimated. Then, the total power for that

area is calculated. The utility can develop their plan for the size of components when they

arrive at the load calculations.

Not only the load demand fluctuates hourly, daily, monthly and yearly, but it also

can increase and grow over time due to technology changes. Also of importance is

estimating how the load may grow over time and at what rate [25]. Usually the new

technology brings newer energy efficient devices that should decrease the load demand.

Page 28: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

17

However, since we are using more devices the load demand is still higher. In particular,

we can refer to the air conditioning loading, the most variable and disproportionally

dominant component of bus load, which has brought to older neighborhoods that were

not designed or built with it in the designer’s mind [26]. Another example, is super screen

televisions that consume increasingly more watts than their older smaller predecessors. It

is necessary for utility companies to re-evaluate the existing distribution system

frequently to make sure the size of existing component are adequate for the increased

loads. Furthermore, one can step in future and explore the frustration felt by homeowners

when they may encounter difficulty in charging their electric vehicles all simultaneously,

and finding that the neighborhood distribution circuit to be inadequate [10].

3.4 Main Factors

Utility companies consider two factors for load demands when designing a

secondary distribution system. These two factors are Diversity factor and Coincident

factor. The diversity factor is ratio of sum of the individual demands of the individual

loads to maximum demand of the entire system [25]. Maximum individual demand for

each customer does not occur at the same time and if all maximum individual demands

are added, the result will be much higher than the maximum load of the system. If there

was no diversity of the maximum load timing for each customer, then there would be a

need for very large system capacity. Hence, the diversity factor is an important economic

consideration for electric utilities when designing distribution system [24]. Diversity

factor is usually equal to or greater than unity.

Page 29: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

18

The coincident factor, the reciprocal of diversity factor, is often preferred because

it is a way to describe load characteristics using a value that is usually less than unity

[25]. This factor is used to calculate secondary voltage drops.

One of the most critical components of the distribution system is transformers.

When a transformer breaks and fails, it is noticeable to customers and whole

neighborhood. It is hard to replace overhead transformer in timely manner and it is hard

to service them. “Hot Spot Area”, or the highest temperature in the winding Area, is the

most important factor relating to the loading capacity and aging of an oil-paper-installed

distribution transformer. Hot spot temperature and data for life span of transformers are

unknown and because of this lack of information transformers are often overrated.

However, due to possible over-loading situation in the face of unavailable monitoring

techniques, it is still possible that hot-spot temperatures can rise to undesirable levels

[27].

In order to maintain transformer ageing within desirable limits, the goal is to keep

the maximum hot –spot and top oil temperatures and the current load under allowed

limits [28]. The following limits are given in [29]. Hot-spot temperature can range

between 120C and 160C and top oil temperature can be between 105C and 115C.

Transformers current rating can exceed its typical rating for a short duration by 30 to 100

percent. Distribution Transformers are usually designed for peak efficiency at or near

Page 30: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

19

average power level. However, their actual efficiency is dependent upon their loading

schedule [30].

3.5 Changing Paradigm of the Power Distribution Systems

Over the last twenty years, renewable energy sources have been attracting great

attention due to the cost increase, limited reserves, and adverse environmental impact of

fossil fuels. In the meantime, technological advancements, cost reduction, and

governmental incentives have made some renewable energy sources more competitive in

the market. Among them, wind energy is one of the fastest growing renewable energy

sources. [11]

Solar technology is also developing fast and has much to offer despite the

currently high costs. However, to make a significant contribution to bulk electricity

generation, a major technology and cost reduction is required. Thin film PV has the

potential to deliver cheaper electricity. Currently, commercial interest centers around

thin film nano-crystalline hybrid cells and the hetero junction cells based on copper

indium di-selenide and cadmium telluride. Both of the latter provide reasonably stable

efficiencies and are expected to benefit from improved manufacturing techniques. There

is currently a flurry of investment activity in these technologies that includes

manufacturing on to glass, and metal and polymer foils. Industry experts confidently

expect that the new mass production technologies will deliver cells capable of generating

Page 31: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

20

electricity competitively with conventional forms and nuclear perhaps within the next 10

years. [2]

Future grid developments undoubtedly will have to accommodate for the

integration of renewable energies in the transmission and distribution grid. Due to rapid

development of renewable energies and their integration into the grid, the grid codes in

many countries have been updated to address the issues related to renewable energy

power generation. Differences in various grid codes also stem from regional and

geographical conditions, usually based on the experience of operating the power system,

acquired by the utility. However, their ultimate goal is to ensure safe, reliable, and

economic operation of power system. The main elements in the grid codes include fault

ride through requirements, active / reactive power control, frequency / voltage regulation,

power quality, and system protection. [9]

Power systems have developed over the years to supply a varying demand from a

centralized generation sourced from fossil and nuclear fuels, There seems to be a

universal agreement that by the end of this century the majority of our electrical energy

will be supplied from Renewable Energy (RE) sources. Unfortunately, due to the small

sizes of these generators, they cannot connect to the transmission system because of the

high cost of high voltage transformers and switchgears. In addition, the transmission

system is often a long way away as the geographical location of the generator is

constrained by the geographical availability of the resource. Small generators must

Page 32: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

21

therefore connect to the distribution network. Such generation is known as distributed or

dispersed generation. [2]

In traditional power systems power invariably flows from the large centralized

power stations, which connect to the EHV network down through the HV and LV

systems to distribute power to consumers. In power system with the distributed

generation, power may travel from point to point within the distribution system. This

unusual flow pattern has some serious implications in the effective operation and

protection of the distributed network [35].

It may be concluded that present power systems will gradually have to evolve and

adapt so that, in the far future, a managed demand will be supplied from distributed,

mostly variable, RE generation. This transformation will be aided by the liberal use of

power electronic interfaces capable of maximizing the effectiveness of RE sources,

controlling power flows, and ensuring reliability of supply.

Additionally, other changing technology changes are affecting the utility planning

process. Today, e.g., we have more than 3,300 plug-in vehicles on San Diego roads, and

the numbers could grow quickly. However, the challenge for operating utility is not

necessarily the number, as much as it is when the vehicles charge. The utility’s goal is to

make sure the vehicles are grid integrated, which means that the majority of charging will

happen at times of day when the grid has an abundance of energy, and not at times when

Page 33: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

22

energy is scarce. With this kind of integration, charging costs and emissions will be lower

due to more efficient use of the grid and our generation resources, which will help the

utility customers to realize the many benefits of these environmentally friendly vehicles.

This concept of effective integration is vital because of the charging capability of each

vehicle. Right now most of these vehicles can charge at a rate of about 3 to 7 kilowatts,

and some models just entering the market are capable of charging at up to 20 kilowatts or

more [14].

Another technique the utility company has in their tool box of solutions is the

Conservation Voltage Reduction (CVR) [15]. CVR is a proven technology for reducing

energy and peak demand. By more fully utilizing existing distribution automation

equipment, smart grid technologies, and communicating with meters and switchable

devices, capital purchases can be avoided or delayed. In addition, CVR has the potential

to be Energy Efficiency (EE) resource by helping utilities maximize returns while

meeting EE goals. Today, technologies exist to change the CVR operating paradigm.

Pilot projects based on smart grid technologies and real-time operating systems show

energy savings and demand reductions of 3% are possible. In fact, the Pacific Northwest

National Laboratory (PNNL) estimated total CVR energy savings in the US alone to be

6,500 MWs or 56,940,000 MWh—or the equivalent of Grand Coulee Dam operating at

nameplate capacity for a year [15]. Pilot projects, funded in part with stimulus dollars, are

uncovering promising results: Voltage regulation has been a critical part of power system

operation since Thomas Edison first lit electric lights over Menlo Park on New Year's

Page 34: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

23

Eve in 1880. For many years, electric utility companies initiated load reductions during

critical peak load periods by reducing voltages delivered to air conditioners, home

appliances and industrial machinery.

CVR can be accomplished through a variety of conventional technologies (tap-

changing transformers, line drop compensators, generator excitation controls, voltage

regulators, line switchable capacitor banks, static VAR compensators, circuit

reconfiguration, and load control) enhanced with microprocessor controls and

communication packages.

The challenge quickly becomes defining specific control schemes, monitoring points,

sensor technologies, protocols, triggering mechanisms, etc. Energy is saved by

maintaining voltages close to lower thresholds without going below them. If the priority

is to regulate end-user voltages, energy consumption is reduced, saving dollars for the

end-user. If losses are to be minimized, feeder volts and VARs are regulated, reducing

energy, releasing line capacity and saving dollars for the utility company.

Page 35: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

24

Chapter 4

OPTIMIZATION METHODOLOGY

The dynamic programming technique should be used to optimize the objective

function of power distribution system planning. In its simplest sense, dynamic

programming can be thought of as an attempt to break large, complex problems into a

series of smaller problems that are easier to solve separately.

There are number of decision stages in the dynamic programming at each stage

and there are several alternate courses of action with each stage. The decision generated

by stage one, acts as conditions of the problem for stage two and so on. In other words, at

each of the several stages there is a choice of decisions and the decisions, initially taken

affect the choice of subsequent decisions. The various rules of decision making can be

established after considering the effects of each decision (separately) and the optimum

policy for further decisions. The basis of dynamic programming is to select the best

amongst the final possible alternative decisions. This process is then repeated, ignoring

all those alternatives which do not lead to selected best (optimum). The best sequence of

decisions can thus be defined, by repeating the above process. Safigianni’s paper [4] has

shown remarkably that the full optimization process depends on optimization of a full

multi-objective function. Please refer to the flow chart of the optimization process as

shown below.

Page 36: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

25

Figure 4.1 Flow Chart of Safigianni’s Optimization Process

Role of optimization undoubtedly can be broad and comprehensive, or narrow and

specific. For example based on the pioneering earlier works cited by Dr. Gonen, a

Nigerian team took it one step further by the use of integer programming technique.

Page 37: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

26

(Alternatively, and more comprehensively, one may look at the distribution system sizing

to include the reliability of the distribution system as well [13]. Depending on the choice,

these many other considerations may do enter into the algorithm formulation. Ultimately,

distribution engineers need to present a dynamic approach towards the sustainability of

power distribution system using a comprehensive application. The cost of energy losses,

substation cost, feeder cost, and outage cost can be developed using dynamic

programming technique and a three stage iterative solution with the aim to optimize the

outage costs. For example, the three stages of optimization could be carried out to

determine, the number of substation sites and exact location, the feeder routes and the

load flow in the network, and the outage cost to cover system node reliability evaluation.

In our paper, we implemented a method for minimizing Total Annual Cost (TAC)

of installing and operating the secondary portion of a three-wire single-phase distribution

system in a residential area, as has been elaborated in Dr. Gonen’s Distribution Book.

This can be applied to underground or overhead distribution. Similarly, one can apply

the optimization techniques to sectors of the power system, ignoring the reliability

aspects for the moment (since integer programming is beyond our current solution to the

problem). We have formulated and written a MATLAB program for the calculation and

we obtained the near optimized results, by using computer math power for speed and

accuracy in selecting the most economically justified alternative in a simple residential

radial distribution section.

Page 38: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

27

The numerical tabulated example run results in chapter 6 are the testimony to this

endeavor. A few of these MATLAB computer calculations have been compared with

hand formulated calculation, for verification purpose. Results match very well for all

practical purposes.

The constraint in the program is the degree of voltage drop that system

encounters.

The distribution system design engineer must of course take the optimum design size

calculated and assure the utility with confidence that load is not going to affect the

system voltage severely. Sometimes, the design requires upsizing the secondary

conductors and occasionally in the existing systems, re-conductoring with bigger size

wires will be needed. The aim of the re-conductoring process is the satisfaction of the

voltage drop criterion or the protective devices condition, or both of them. Every

combination of conductor replacements, which satisfies the above conditions, is a

solution to the problem. Theoretically, there are many solutions for a given network but

only a few of them are technically acceptable. Our implementation of the Matlab

program depended on making some assumptions. The technically acceptable solutions

satisfy the given constraints below:

1. A conductor of a bigger size but of the same type must always replace one span

conductor. (There are three conductor types: overhead bare lines, underground

cables and overhead twisted cables).

Page 39: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

28

2. New type conductors must replace old type conductors, which are no longer in

use (e.g. XLPE cables replace paper insulated cables).

3. Because of the big replacement cost, the underground cables are the last solution

in the reconductoring process and they are replaced if nothing else can be done.

Obviously, our approach has to contain simplicity to be programmed with the help of

computer program. (Dr. Gonen has added the costs of a uniform residential distribution

system in his Distribution book.) It entails dividing the costs into installation costs and

operating costs of the distribution system, annualized over the asset life. (It is important

to use asset life annualized since different modifications may have different life and it

provides a uniform basis for our comparison). We then take a partial differential

derivative with respect to each variable, size of the transformer, cross section area of

service lateral, and cross area of the Service Drop. Equating each of these equations to

zero will yield us the computationally optimal value. However, this value does not

necessarily yield to a standard size of transformer or wire, per se. Therefore, we have

created a logic ladder where the program ascertains the sizes against the input given

values and automatically progresses to the next size. When the transformer is chosen,

then the next wire SL will be selected, and then finally SD size will be determined by the

program. We have provided the voltage drop as a major constraint where the value

obtained will be tested with a logic statement for being over five (5) percent of the value

Page 40: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

29

allowed in distribution voltage drop. A sample of the Optimization Program is provided

in Appendix A.

Furthermore, we have completed this constraint as a separate Matlab program by

itself where students can input different distribution problem input data and verify the

voltage drop within a sector of a secondary radial configuration. A sample of this

program is shown in Appendix C.

Of course the extent of introducing a multi objective function with the introduction

of reliability parameters, maintenance, protection systems, etc. into our study is beyond

the concept of this master’s project, given the wealth of information topics that were

collected for these authors,. What we had to reduce, however, was the essential parts of a

secondary system that we could grapple with and could introduce it with our simple

Matlab programming. The following page flow chart Figure 4.1 shows the concept of

our work from the adapted flow chart as shown by Safigianni’s paper [4].

Page 41: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

30

Choose Next Standard

Available Transformer

Size

Calculate Load

Provide a Safe

Reserve Margin

For Future Growth

Print the Optimal

Combinations that met the

Criteria

Is the Chosen Standard

Size Cost Optimal?

Comments ?

Requested

Calculate Optimum

Transformer Size

and Distribution Wires

Block dimensions are asked

via queries Input to the

Program

Standard Lateral Distribution

configuration is assumed

Calculate Optimum and then

Choose Standard Available

Service Lateral Size

Calculate Optimum and then

Choose standard Service

Drop available Size

Is the Voltage

Regulation too high?

Calculate the Voltage Drop

Constraint to see Feasibility

Read the Input Data

Obtain the second order

polynomials and obtain

the derivative equations

Formulate Criteria

Yes

No

Yes

No

MATLAB PROGRAM FLOW CHART

Figure 4.2 Matlab Program Flow Chart

Source Provided by Authors

Page 42: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

31

We recognize, of course, that the primary and secondary systems can be simple

or complex as well. Figure 4.3 below shows an extensive primary system. Typically, in

the residential developments, one block of residential area consists of two pole mounted

distribution transformers, which feed twelve houses. This design determines the optimal

size for transformers, primary conductors, and secondary conductors. The optimization

process requires meeting a certain condition and perhaps holding some assumptions as

well to do it properly.

In this project, we constructed and analyzed the Total Annual Cost (TAC) of

initial procurement, installation, and operating cost of secondary distribution system and

provided a Matlab computer program to solve for optimum commercially available size

of transformer and wires. We also elaborated on the calculation method to minimize TAC

and approximately optimize the system the way that will be most efficient. Furthermore,

we illustrated thru the program that this minimized design satisfies the voltage drop

constraint, and therefore, the voltage dip will not exceed the tolerance criteria.

Page 43: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

32

Figure 4.3 One Line Diagram of Multiple Primary System for John Hancock Center

Source: (From Fink, D.G., and H. W. Beaty, Standard Handbook for Electrical Engineers,

11th

edition, McGraw-Hill, New York, 1978. With permission.)

The Following Figure 4.4 shows one section of secondary distribution system

which has two transformers, and each is feeding 12 customers (loads). This system is in a

straight line design and is expected to have width ‘d’ which makes each section of

secondary line (SL) length ‘2d’. If a secondary line is not used every four customer will

have one transformer.

Page 44: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

33

Figure 4.4 Typical Residential Area Lot Layout and Service Arrangement

Source: Electric Power Distribution System Engineering, by Dr. Gonen

In this system over head cable or underground cable can be used. If over head

cable is used, then the transformers are pole mounted and if the underground cable is

used, the transformers are grade-mounted on a concrete slab. The SL and the SD can be

either open-wire or triplex cable construction.

SD

Illustration of a Typical Pattern

SD

SDSDSD

SD

SD

SD

SD SD

SDSD

ST

Pole or underground pad-mounted

submersible transformer

Alley or Near Lot Line

Pedestal or hand hole

(on pole or underground)

Figure 4.5 Illustration of a Typical Residential Secondary Pattern

Source By Authors

Page 45: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

34

The following parameters are used in our calculations:

ST=transformer capacity, continuously rated kVA

Iexc=per unit exciting current (based on ST)

PT, Fe=Transformer core loss at rated voltage and rated frequency, kW

PT, Cu=transformer copper loss at rated kVA load, kW

ASL and ASD=conductor area, kcmil

P=conductor resistivity, (Ω- cmil)/ft

The following assumptions are made to make the calculation easier and possible:

1. All services are single-phase, three-wire, 120/240V

2. All three wire circuits have perfectly balanced loading

3. The system is energized at all the time 8760 hours per year

4. The annual loss factor is calculated by Fls=0.3*Fld+j0.7*Fld^2

5. All loads have the same power factor (constant)

The total cost depends on number of transformer, type and size of conductors,

distance and other parameters, which for simplicity and calculation purposes we will

make some assumption in our calculation. For calculation of the TAC we need to

know the followings:

1. Annual installed cost of transformer and associated protective equipment(ICT)

2. Annual installed cost of triplex aluminum SL cable (ICSL)

3. Annual installed cost of triplex aluminum SD cable (ICSD)

4. Annual installed cost of pole and hardware on it (ICPH)

Page 46: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

35

5. Annual operation cost of transformer exciting current (OCexc)

6. Annual operating cost of transformer due to iron losses (OCT, Fe)

7. Annual operating of transformer due to copper losses (OCT, Cu)

8. Annual operating cost of copper loss in a unit length of SL (secondary

line)(OCSL)

9. Annual operating cost of copper loss in a unit length of SD (Service

Drop)(OCSD)

TAC formula has three main variables: Transformer Capacity, Conductor Area of

SL (ASL), and Conductor Area of SD (ASD). For minimizing the ATC, we will take

three partial derivatives and set each derivative to zero.

However, this optimized number is not necessarily a practical one by any means.

Since the sizes of materials are usually given in discrete values, we must choose the

next size Up or Down, depending on the choice. Here is where our logic selection

ladder automatically chooses the next commercial available size, subject to the

voltage constraint.

MATLAB programs are written for the calculation and getting the result faster

and more accurately. Towards the end of this assignment, we will have some

examples to test our MATLAB program and compare the result in MATLAB with

hand calculation.

Page 47: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

36

1. ICT which is the annual installed cost of distribution transformer and associated

protective devices is calculated by following formula

ICT = (2000 + 58.08 x ST) x i $/transformer

ST is transformer rated kVA and is between 15kVA and 100kVA

2. ICSL is annual installed cost of triplex aluminum SL cable is calculated by

following formula:

ICSL = (480+ 36 x ASL) x i $/1000ft

ASL is conductor Area in kcmil. This cost is for 1000 ft of cable, which is 3000

ft conductor.

3. ICSD is annual installed cost of triplex aluminum SD cable is calculated by

following formula

ICSL= (480+36 x ASD) x i $/1000ft

ASD is conductor Area in kcmil.

The ICSD and ICSL are alike since in this example the same kind of conductor

will be used for both SL and SD

4. ICPH is the annual installed cost of pole and hardware on it.

ICPH =1280 x i $/pole

Page 48: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

37

5. OCexe is the annual operating cost of transformer exciting current

OCexe = Iexc x ST x ICcap x i $/transformer

ICcap is total installed cost of primary-voltage shunt capacitor = $5.00 /kvar

Iexc is the average value of the transformer exciting current base on ST = 0.015

pu

6. OCTFe is annual operating cost of transformer due to core (iron) losses.

OCTFe = (ICsys x i + 8760 x ECoff) x PTFe $/transformer

ICsys is the average investment cost of power system upstream toward the

generator from distribution transformer = $2,800/kVA

ECoff is incremental cost of electric energy (off-peak) = $ 0.015/kWh

PTFe is the annual transformer core loss kW = 0.004 x ST

7. OCTCu is the annual operation cost of transformer due to copper losses

OCTCu = (ICsys x i +8760 x Econ x FLS) (Smax/ST)^2 x PTCU $/transformer

ECon is the incremental cost (on-peak) = $0.02 /kWh

Smax is the annual maximum kVA demand on transformer

PTCu is the transformer copper loss, kW at rated kVA

PTCu = 0.073 + 0.00905 x ST

FLS is the annual loss factor

8. OCSLCu is the annual operating cost of copper loss in unit length of SL

OCSLCu = (ICsys x i +8760 x ECon x FLS) x PSLCu

Page 49: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

38

PSLCu is the power loss in unit of SL at the time of annual peak load due to

copper losses kW

PSLCu is an R x I^2, and it must be related to conductor area ASL with R =

pL/ASL

9. OCSDCu is the annual operating cost of copper loss in unit length of SD

OCSDCu = (ICsys x i +8760 x Econ x FLS) x PSDCu

PSLCu is the power loss in unit of SD at the time of annual peak load due to

copper losses kW

PSDCu is an R x I^2, and it must be related to conductor area ASL with R =

pL/ASD

To find the equation for TAC, the above nine formulas need to be added together.

When these formulas are added together (and with some assumption), TAC equation will

be reduced to a function of three design variables,

TAC = f (ST, ASD, ASL)

It has to be noted that many parameter, such as the fixed charge rate i, transformer core

and copper losses, installed cost of poles and lines are contained in constant coefficients

A to H in TAC function.

TAC = A+ B/ST^2 + C/ST + D x ST + E x ASD + F/ASD + G x ASL + H/ASL

Page 50: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

39

After substituting the fixed parameter (approximate assumption) we will have;

TAC = (6.048*ASD) + (4.32*ASL) + (14.9522*ST) + 374.536*L1*(L1/ASD) +

2141.28*L4*(L4/ASL) + (6589.33*(L12/ST)*(L12/ST)) + (816.9*L12*(L12/ST)) +

1306.24;

L1= Max load for 1 costumer

L4= Max load for 4 customers

La12= Max load for 12 customers

From Table (4.1), Class 2, we have:

L1=10, L4=6, and La12= 4.4

TABLE 4.1

Load Data for Book Example 6.1,

Source: Electric Power Distribution System Engineering Book, by Dr. Gonen

Page 51: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

40

Basically, if above loads and the dimensions of SL and SD cable and the size of

transformer are known, TAC for secondary distribution system can be calculated.

For example if 39 kVA transformer with ASL of 205 kcmil and ASD of 85.4 kcmil are

used with above loads the TAC = $4595 /block

And if 50 kVA transformer with ASL of211.6 kcmil and ASD of 105.5 kcmil are used

with above loads the TAC = $4693 /block

And if 50 kVA transformer with ASL of250 kcmil and ASD of 133.1 kcmil are used

with above loads, the TAC = $4896 /block

Minimizing TAC

For minimizing TAC, since TAC is a function of three variable, using TAC

equation and taking three partial derivatives will set each derivative equal to zero and it

follows;

d(TAC) / d(ST) = 0

d(TAC) / d(ASL) = 0

d(TAC) / d(ASD) = 0

The result of above equations that are used henceforth merely serve as indicators

of the region that contains the minimum TAC achievable with standard commercial

equipment size. The problem is further continued by computing TAC for the standard

commercial sizes of equipment nearest to the results of above equations.

Page 52: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

41

There are additional criteria which must be met in the total design of the

distribution system, whether or not minimum TAC is realized. The further

criteria involve quality of utility service. Minimum TAC designs may be

encountered which will violate one or more of the commonly used criteria:

1. A minimum allowable steady-state voltage at the most remote service

entrance may have been set by law, public utility commission order, or

company policy.

2. A maximum allowable motor-starting voltage dip at the most remote service

entrance similarly may have been established.

3. Ordinarily the ampacity of no section of SLs or SDs should be exceeded by the

designer.

4. The maximum allowable distribution transformer loading, in per unit of

the transformer continuous rating should not be exceeded, by the designer.

Matlab Programs

There are two Matlab program written for TAC. An extra third Matlab program is

also provided to calculate voltage drop in a secondary system.

The first one is called Optimize-TAC.Rev24 (Appendix A) and it minimizes TAC

by asking for loads as inputs. It then calculates the optimized sizes for ST, ASL and

ASD, and it finally determines the optimized TAC. In this program not only the

Page 53: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

42

optimized sizes of equipment and TAC are calculated, but also, the standard size and

TAC for standard size equipment will be picked by the program.

The second one (Appendix B) calculates the TAC by asking the three loads and

sizes of ST (in kVA), ASL (in kcmil) and ASD (in kcmil), as inputs. It is called TAC-

total and it is basically serving as a calculator for arriving at TAC value.

The third program (Appendix C) is provided as a courtesy in addition to the other

matlab programs so the future students can calculate or analyze a typical secondary

system voltage drop. This program is called OnlyVoltageDrop and it queries for the size

of transformer, SL, and SD and it then calculates the voltage drop total and by element.

Voltage drop is an independent constraint set to alter program calculation in the

Optimize-TAC program. However, we felt it will be useful to provide it also

independently as a calculator.

Copies of each program and program instructions are also attached for your

review (in Appendices). Furthermore, the computer program flow diagram was also

provided in Chapter 3.

Page 54: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

43

Chapter 5

ECONOMIC ESTIMATION AND ANALYSIS

We began our master’s project, of course, with the understanding that we will be

solving the Secondary Distribution System Optimization problem with the help of

computer provided Matlab programming and using a simplified radial distribution as an

example. In doing so, we had to gather a more current set of data, which we also verified

by a utility company recent purchases for a close approximation and validity of material

and labor costs. Similarly, we obtained in place unit cost of these material and equipment

with National Construction Estimator (NCE) tabulated book index to arrive at the Total

Annualized Cost function.

Consequently, several other factors, such as the cost of electricity, capacitors, and

transformers had to be revised upward from the figures initially shown in Dr. Gonen’s

Distribution System book about three decades earlier. We wanted to compare the

efficiency of the transformers to earlier values, as it was not clear to us if significant

technological advances have been made in this area. We then provided several linear

regressions of Matlab algorithms to be able to categorize choices and result in the final

determined values in our Optimization Program.

Cost analyzes have been discussed in this paper. The Two Matlab programs that

have been provided work out the TAC cost if the input data file is provide in the Matlab

Page 55: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

44

folder. The OptimizeTAC program will figure out the best combination of elements when

optimized for their size and subject to the voltage constraints and its TAC cost, as shown

in Appendix A. This optimization program provides the near optimized cost for the

components. It will further reflect the annualized cost for the given design parameters of

our distribution system.

We have surveyed the L.E Means and National Construction Estimator books to

obtain more recent cost data. The cost figures reported are for the mineral insulated

aluminum conductors with the steel cores. We had to provide the linear regression

function for the obtained data to make sure it would be in that window of 4 to 8 times

cost escalation that we had arrived at before. The data is shown in the input Excel sheet

that the program reads from.

Additionally, we contacted SMUD for transformers and capacitors data, and we

obtained their more recent purchases. We have performed linear regression functions on

these data as well, to arrive at the best-fit cost for the given size. Across the board, we

observed the typical economical values have increased between 4 to 8 times of

preliminary Westinghouse number reported by Dr. Gonen in his Distribution book

example, page 299. (Refer to Transformer cost in Figure 5.1 and 5.2, shown below

retrospectively.)

Page 56: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

45

Figure 5.1 Current Transformers Cost

Source Provided by NCE

Figure 5.2 Historic Cost of Transformers

Source Provided by NCE

0

2000

4000

6000

8000

10000

12000

14000

10 15 25 37.5 50 75 100 167

Cost

($

)

Transformer in kVA

Current Cost vs. Transformer kVA

0

200

400

600

800

1000

1200

1400

1600

10 15 25 37.5 50 75 100 167

Cost

($

)

Transformer in kVA

Historic Cost vs. Transformer KVA

Page 57: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

46

Surprisingly, capacitor mass production technology has managed to provide

relatively lower cost despite the inflation. SMUD purchases reflect cost to be about three

to four times the original indicated values. Similarly, the utilities markup for on-peak and

off-peak energy generation has been relatively contained due to the competition in a

heavily regulated electric market. We suspect that markup to be between three to four

times what originally assumed in the reference.

Given the approximation that cost of material and labor have at least risen four to

six percent a year, Every 12 to 14 years it will be twice the cost. Carrying that

methodology forward 36 years, one can reasonably expect the material and prices to have

increased by a factor of 6 to 8 times more than original reported in the Distribution Book

Since these data were originally taken from the late seventies references, it translate into

4 to 8 times the original estimates. In fact, current cost of transformers and wires support

this assertion, and furthermore, the two graphs we have provided above and below

(Figures 5.3 and 5.4) sustain this assertion.

Page 58: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

47

Figure 5.3 Current Cable Cost

Source Provided by NCE

0

2000

4000

6000

8000

10000

12000

41.74 52.74 66.36 83.69 105.6 133.1 167.8 211.6 250

Cost

($

)

kcmil

Current Cable Cost vs. kcmil

Page 59: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

48

Figure 5.4 Historic Cable Cost

Source Provided by NCE

0

200

400

600

800

1000

1200

1400

1600

41.74 52.74 66.36 83.69 105.6 133.1 167.8 211.6 250

Cost

($

)

kcmil

Historic Cable Cost vs. kcmil

Page 60: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

49

Chapter 6

NUMERICAL RESULTS

Many low voltage distribution networks in the United States are typically a 12 kV

primary 120/ 240 secondary system, and in the residential areas they are usually served

by single-phase distribution circuit, as shown in Figure 4.5.

We performed linear regression data fit into a third order polynomial function based on

the transformer cost data we had obtained from the utility company (SMUD in this case)

and also the typical construction cost reporting (Means). The data from transformers cost

was fit perfectly into a third order polynomial, per earlier book citation [1]. The total

variations never exceeded more than about 2 to 4 percent from the data, and that is

practically the error margin in the survey in the first place. The conductor data were also

consecutively fit into the second order polynomial, as well. Matlab command Polyfit was

extremely powerful to help fit data into other polynomial orders. The results are shown in

Figures 6.1 and 6.2.

The data provided below along with the Figures are the testimony for this data

match:

Page 61: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

50

Single-Phase Residential Distribution Transformers

No Total

Size Rated

Load Load Cu Z Mat. Labor OH Total Volt Z Actual

I @ Loss Losses Loss (%) $ $ $ $ Base Ohms X

208

V

10 48.1 28.5 176 148 1.900 1100 455 325 1880 240 9.480 0.109

15 72.1 31.9 265 233 1.900 1500 605 445 2550 240 6.325 0.073

25 120.2 53.6 344 290 2.200 2050 730 545 3325 240 4.393 0.051

37.5 180.3 71 462 391 1.800 2650 910 715 4275 240 2.396 0.028

50 240.4 90.1 566 476 1.800 3150 1050 800 5000 240 1.797 0.021

75 360.6 130.5 694 564 2.300 4175 1125 950 6250 240 1.531 0.018

100 480.8 185 864 679 2.000 5747 995 1011 7753 240 0.998 0.012

167 802.9 500 2100 1600 2.100 9000 1125 1513 11638 240 0.628 0.007

Page 62: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

51

Figure 6.1 Transformer Cost Fit Into Third Order Model

Source Provided by NCE

Distribution Aluminum Wires in Triplex arrangement for Residential Sectors

(Values given are for 1000 ft length)

Wire

Wire No. Rating Resis

Mat. Labor Indirect Total Area

Size

I (A) R Z X IZ I2R $ $ & OH $ $ kcmils

#6

DC AC

26.24

#4 1 140 0.4 0.52 0.3323

2130 1660 1000 4790 41.74

#3 2 155 0.32 0.41 0.2563

2310 1740 1080 5130 52.74

#2 3 185 0.25 0.32 0.1997

2520 1820 1150 5490 66.36

#1 4 210 0.2 0.27 0.1814

2890 1820 1150 5860 83.69

#1/0 5 240 0.16 0.21 0.136

3200 1920 1230 6350 105.6

#2/0 6 275 0.12 0.17 0.1204

4000 2020 1380 7400 133.1

#3/0 7 315 0.1 0.14 0.098

4600 2150 1520 8270 167.8

#4/0 8 360 0.08 0.12 0.0894

5200 2280 1670 9150 211.6

#250 9 450 0.06 0.08 0.0529

6450 2430 1870 10750 250

1880 2550 3325

4275 5000 6250

7431

11638

1970 2453

3322

4249 5031

6297

7391

11567

1 2 3 4 5 6 7 8

Un

it C

ost

($

)

Transformer Sizes

Transformer Data Vs. Third order model

Series1 Series2

Page 63: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

52

Figure 6.2 Cable Cost Fit Into Second Order Model

Source Provided by Authors

Figure 6.3 Cable Cost For Different Sizes

Source Provided by Authors

Series1

0

100

200

300

1 2 3 4 5 6 7 8

Axis

Tit

le

Cable Sizes

Cable Data Vs. Second Order Model

Series1

Series2

0

2000

4000

6000

8000

10000

12000

#4 #3 #2 #1 #1/0 #2/0 #3/0 #4/0 #250

Co

st

$

Cable Size

Cable Size vs. Cost

Page 64: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

53

Table 6.1 --Summary of the Runs

(Source Provided by Authors)

i=10% Run 1 Run 2 Run 3 Run 4 Run 5 Run 6

Low Electric Markup ,

ECoff= 0.015, ECon = 0.02,

Power Factor = 0.9

Class 1

10,12,18

kVA

SL=320ft

SD=80ft

Class 1

10,12,18

kVA

SL=480ft

SD=120ft

Class 2

4.4,6,10

kVA

SL=320ft

SD=80ft

Class 2

4.4,6,10

kVA

SL=480ft

SD=120ft

Class 3

1.2,1.5,

2.5 kVA

SL=320ft

SD=80ft

Class 3

1.2,1.5,

2.5 kVA

SL=480ft

SD=120ft

Optimized

ST-kVA 80.94 80.94 38.71 38.71 13.217 13.217

ASL-kcmil 267.19 267.19 133.59 133.59 33.4 33.4

ASD-kcmil 141.7 141.7 78.72 78.72 19.68 19.68

TAC-$ 8127 10447 4750 6005 2254 2626

Standard

ST-kVA 100 100 50 50 15 15

ASL-kcmil 300 300 167.8 167.8 41.74 41.74

ASD-kcmil 167.8 167.8 83.69 83.69 41.74 41.74

TAC-$ 8230 10573 4827 6099 2348..5 2766

Voltage Drop

Total -percentage (%) 6 7.27 6.18 7.45 5.55 6.364

VDT-Transformer 2 2.4 1.9 1.9 1.824 1.824

VDSL-Service Lateral 3 3.845 3.539 4.44 3.365 3.997

VDSD-Service Drop 0.684 1.026 0.742 1.113 0.3615 0.542

Page 65: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

54

Table 6.1 --Summary of the Runs Continued

(Source Provided by Authors)

i=15% Run7 Run 8 Run 9 Run 10 Run 11 Run 12

Low Electric Markup ,

ECoff= 0.015, ECon = 0.02,

Power Factor = 0.9

Class 1

10,12,18

kVA

SL=320ft

SD=80ft

Class 1

10,12,18

kVA

SL=480ft

SD=120ft

Class 2

4.4,6,10

kVA

SL=320ft

SD=80ft

Class 2

4.4,6,10

kVA

SL=480ft

SD=120ft

Class 3

1.2,1.5,

2.5 kVA

SL=320ft

SD=80ft

Class 3

1.2,1.5,

2.5 kVA

SL=480ft

SD=120ft

Optimized

ST-kVA 80.48 80.48 38.5 38.5 13.15 13.15

ASL-kcmil 262.4 262.4 131.2 131.2 32.8 32.8

ASD-kcmil 139.16 139.16 77.31 77.31 19.32 19.32

TAC-$ 11968 15387 7016 8866 3350 3901

Standard

ST-kVA 100 100 50 50 15 15

ASL-kcmil 300 300 133.1 133.1 41.74 41.74

ASD-kcmil 167.8 167.8 83.69 83.69 41.74 41.74

TAC-$ 12142 15603 7086 8939 3498 4120

Voltage Drop

Total -percentage (%) 5.648 7.2719 6.923 7.45 5.55 6.364

VDT-Transformer 2.4 2.4 1.9 1.9 1.824 1.824

VDSL-Service Lateral 2.563 3.845 4.28 4.44 3.365 3.997

VDSD-Service Drop 0.684 1.0264 0.742 1.113 0.3615 0.0542

Page 66: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

55

Table 6.1 --Summary of the Runs Continued

(Source Provided by Authors)

i=10% Run13 Run14 Run15 Run16 Run17 Run18

High Electric Markup ,

ECoff= 0.03, ECon =

0.04, Power Factor = 0.9

Class 1

10,12,18

kVA

SL=320ft

SD=80ft

Class 1

10,12,18

kVA

SL=480ft

SD=120ft

Class 2

4.4,6,10

kVA

SL=320ft

SD=80ft

Class 2

4.4,6,10

kVA

SL=480ft

SD=120ft

Class 3

1.2,1.5,2.5

kVA

SL=320ft

SD=80ft

Class 3

1.2,1.5,2.5

kVA

SL=480ft

SD=120ft

Optimized

ST-kVA 82.2 82.2 39.28 39.28 13.39 13.278

ASL-kcmil 281.07 281.07 140.54 140.54 35.134 33.99

ASD-kcmil 149.06 149.06 82.81 82.81 20.7 20.03

TAC-$ 8563 10999 4966 6282 2313 3977

Standard

ST-kVA 100 100 50 50 15 15

ASL-kcmil 300 300 167.8 167.8 41.74 41.74

ASD-kcmil 167.8 167.8 83.69 83.69 41.74 41.74

TAC-$ 8638 11084 5027 6354 2397 4179

Voltage Drop

Total -percentage (%) 5.648 7.272 6.182 7.453 5.55 6.364

VDT-Transformer 2.4 2.4 1.9 1.9 1.824 1.824

VDSL-Service Lateral 2.563 3.845 3.539 4.44 3.365 3.997

VDSD-Service Drop 0.684 1.026 0.742 1.113 0.3615 0.5423

Page 67: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

56

Table 6.1 --Summary of the Runs Continued

(Source Provided by Authors)

i=15% Run19 Run20 Run21 Run22 Run23 Run24

High Electric Markup ,

ECoff= 0.03, ECon= 0.04,

Power Factor = 0.9

Class 1

10,12,18

kVA

SL=320ft

SD=80ft

Class 1

10,12,18

kVA

SL=480ft

SD=120ft

Class 2

4.4,6,10

kVA

SL=320ft

SD=80ft

Class 2

4.4,6,10

kVA

SL=480ft

SD=120ft

Class 3

1.2,1.5,

2.5 kVA

SL=320ft

SD=80ft

Class 3

1.2,1.5,

2.5 kVA

SL=480ft

SD=120ft

Optimized

ST-kVA 81.39 81.39 38.91 38.91 13.278 13.278

ASL-kcmil 271.9 271.9 135.95 135.95 33.987 33.987

ASD-kcmil 144.2 144.2 80.11 80.11 20.03 20.03

TAC-$ 12411 15949 7234 9148 3411 3977

Standard

ST-kVA 100 100 50 50 15 15

ASL-kcmil 300 300 167.8 167.8 41.74 41.74

ASD-kcmil 167.8 167.8 83.69 83.69 41.74 41.74

TAC-$ 12549 16114 7341 9276 3547 4179

Voltage Drop

Total -percentage (%) 5.648 7.27 6.182 7.453 5.55 6.36

VDT-Transformer 2.4 2.4 1.9 1.9 1.824 1.824

VDSL-Service Lateral 2.564 3.845 3.539 4.44 3.365 3.997

VDSD-Service Drop 0.684 1.026 0.742 1.113 0.3615 0.5423

Page 68: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

57

Table 6.1 --Summary of the Runs Continued

(Source Provided by Authors)

i=10% Run 25 Run 26 Run 27 Run 28 Run 29 Run 30

Low Electric Markup ,

ECoff= 0.015, ECon=0.02,

Low Power Factor = 0.7

Class 1

10,12,18

kVA

SL=320ft

SD=80ft

Class 1

10,12,18

kVA

SL=480ft

SD=120ft

Class 2

4.4,6,10

kVA

SL=320ft

SD=80ft

Class 2

4.4,6,10

kVA

SL=480ft

SD=120ft

Class 3

1.2,1.5,

2.5 kVA

SL=320ft

SD=80ft

Class 3

1.2,1.5, 2.5

kVA

SL=480ft

SD=120ft

Optimized

ST-kVA 80.94 80.94 38.71 38.71 13.217 13.217

ASL-kcmil 267.19 267.19 133.59 133.59 33.4 33.4

ASD-kcmil 141.7 141.29 78.72 78.72 19.68 19.68

TAC-$ 8127 10447 4750 6005 2254 2626

Standard

ST-kVA 100 100 50 50 15 15

ASL-kcmil 300 300 167.8 167.8 41.74 41.74

ASD-kcmil 167.8 167.8 83.69 83.69 41.74 41.74

TAC-$ 8230 10573 4827 6099 2349 2766

Voltage Drop

Total -percentage (%) 5.6 7.2 6.405 7.854 5.643 6.45

VDT-Transformer 2.4 2.4 1.9 1.9 1.824 1.824

VDSL-Service Lateral 2.479 3.718 3.732 4.795 3.448 4.07

VDSD-Service Drop 0.721 1.0826 0.7721 1.158 0.3705 0.555

Page 69: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

58

Table 6.1 --Summary of the Runs Continued

(Source Provided by Authors)

i=15% Run 31 Run 32 Run 33 Run 34 Run 35 Run 36

Low Electric Markup ,

ECoff= 0.015, ECon = 0.02,

Power Factor = 0.7

Class 1

10,12,18

kVA

SL=320ft

SD=80ft

Class 1

10,12,18

kVA

SL=480ft

SD=120ft

Class 2

4.4,6,10

kVA

SL=320ft

SD=80ft

Class 2

4.4,6,10

kVA

SL=480ft

SD=120ft

Class 3

1.2,1.5,

2.5 kVA

SL=320ft

SD=80ft

Class 3

1.2,1.5,

2.5 kVA

SL=480ft

SD=120ft

Optimized

ST-kVA 80.48 80.48 38.5 38.5 13.15 13.15

ASL-kcmil 262.4 262.4 131.2 131.2 32.8 32.8

ASD-kcmil 139.14 139.14 77.31 77.31 19.33 19.33

TAC-$ 11968 15387 7016 8866 3350 3901

Standard

ST-kVA 100 100 50 50 15 15

ASL-kcmil 300 300 133.1 133.1 41.74 41.74

ASD-kcmil 167.8 167.8 83.69 83.69 41.74 41.74

TAC-$ 12142 15603 7086 8939 3498 4120

Voltage Drop

Total -percentage (%) 5.6 7.2 7.206 7.854 5.643 6.45

VDT-Transformer 2.4 2.4 1.9 1.9 1.824 1.824

VDSL-Service Lateral 2.478 3.718 4.53 4.795 3.448 4.07

VDSD-Service Drop 0.721 1.0826 0.772 1.158 0.3705 0.555

Page 70: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

59

Table 6.1 --Summary of the Runs Continued

(Source Provided by Authors)

i=10% Run 37 Run 38 Run 39 Run 40 Run 41 Run 42

Low Electric Markup ,

ECoff= 0.015, ECon =

0.02, Power Factor = 0.9

Class 1

10,12,18

kVA

SL=320ft

SD=80ft

Class 1

10,12,18

kVA

SL=480ft

SD=120ft

Class 2

4.4,6,10

kVA

SL=320ft

SD=80ft

Class 2

4.4,6,10

kVA

SL=480ft

SD=120ft

Class 3

1.2,1.5,2.5

kVA

SL=320ft

SD=80ft

Class 3

1.2,1.5,2.5

kVA

SL=480ft

SD=120ft

Optimized * *

ST-kVA 80.94 80.94 38.71 38.71 13.217 13.217

ASL-kcmil 267.19 267.19 133.59 133.59 33.4 33.4

ASD-kcmil 141.7 141.29 78.72 78.72 19.68 19.68

TAC-$ 8127 10447 4750 6005 2254 2626

Standard

ST-kVA 100 100 50 50 15 15

ASL-kcmil 350 300 205 300 66.36 105.6

ASD-kcmil 167.8 Out 83.69 83.69 41.74 41.74

TAC-$ 8230 Of 4827 6099 2349 2626

Voltage Drop Bound

Total -percentage (%) 5.37 4.69 7.85 4.27 4.40

VDT-Transformer 2.40 1.90 1.90 1.82 1.82

VDSL-Service Lateral 2.28 2.06 4.80 2.08 2.03

VDSD-Service Drop 0.68 0.74 1.16 0.36 0.54

Page 71: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

60

Table 6.1 --Summary of the Runs Continued

(Source Provided by Authors)

i=15% Run 43 Run 44 Run 45 Run 46 Run 47 Run 48

Low Electric Markup ,

ECoff= 0.015, ECon =

0.02, Power Factor = 0.9

Class 1

10,12,18

kVA

SL=320ft

SD=80ft

Class 1

10,12,18

kVA

SL=480ft

SD=120ft

Class 2

4.4,6,10

kVA

SL=320ft

SD=80ft

Class 2

4.4,6,10

kVA

SL=480ft

SD=120ft

Class 3

1.2,1.5,2.5

kVA

SL=320ft

SD=80ft

Class 3

1.2,1.5,2.5

kVA

SL=480ft

SD=120ft

Optimized * *

ST-kVA 80.48 80.48 38.5 38.5 13.15 13.15

ASL-kcmil 262.4 262.4 131.2 131.2 32.8 32.8

ASD-kcmil 139.14 139.14 77.31 77.31 19.33 19.33

TAC-$ 11968 15387 7016 8866 3350 3901

Standard

ST-kVA 100 100 50 50 15 15

ASL-kcmil 350 300 205 300 66.36 66.36

ASD-kcmil 167.8 Out 83.69 83.69 41.74 41.74

TAC-$ 12142 Of 7086 8939 3498 4120

Voltage Drop Bound

Total -percentage (%) 5.37 4.70 4.94 4.27 4.40

VDT-Transformer 2.40 1.90 1.90 1.82 1.82

VDSL-Service Lateral 2.28 2.06 1.92 2.08 2.03

VDSD-Service Drop 0.68 0.74 1.11 0.36 0.54

We made sure we run the program for at least several cases. We also subjected the

runs to the constraints of at least five (5) percent voltage drop for service lateral, and 10

percent overall.

Page 72: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

61

We first ran the Matlab program (OptimizeTAC) for class 3 residence customer,

as specified in the Table 4.1 (reflecting Table 6.4 of the Dr. Gonen’s Distribution book

[1], and as provided earlier here in this paper. The program (OptimizeTAC) reached a

solution and gave a 15-kVA transformer with a No. 4 conductor, as the answer. Service

Lateral (SL) and Service Drop (SD) were both optimized at a No. 4 conductor (ASL = 41

kcmil).

We then ran the program similarly for the Class 2 residences (Table 4.1) and

obtained the answer as a 50-kVA transformer, with a No. 2/O conductor (ASL = 133.1

kcmil) for SL and a No. 1 conductor (ASL = 83.69 kcmil) for the SD. In both program

runs for Class 1, 2 and 3, the voltage drops were within the specified tolerance limits of 5

percent per component (10 percent total).

When we entered the Class 1 data in the program, TAC equation derivative

answer is a complex value for the transformer (ST). The imaginary part is probably due

to the large maximum load. Long blocks, which will have longer wire lengths, can cause

the voltage drop constraint in the program to be violated earlier. That effect is more

profound when we lower the tolerance level of the voltage constraint to much below 10

percent. Class 1 data in the program run yielded the answer of a 100-kVA transformer, a

No. 300 MCM service lateral (ASL = 300 kcmil), and a No. 3/O conductor (ASL = 167.8

kcmil) for SD.

Page 73: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

62

In fact, we ran each of the normal Runs with a 50 percent longer length to see

this effect. We did not notice any constraint violations until we increased the lengths to

about twice long and Class 1 with high loading showed constraint violations earlier.

Alternately, one can reduce the tolerance of the voltage drop in the program to see similar

change taking place.

We also wanted to test the sensitivity of the program to the higher electricity

mark-up cost. We have provided 12 runs under high electric mark-up case (twice the

normal value in Runs 13 thru 24).

We have also provided an alternate similar run of each case with lower

capitalization value to see the results. We replaced the capitalization rate (utility rate of

return) to lower (10%) and higher (15%) values to discover program sensitivity to the

solution based on the assumed capitalization rate (ὶ ), as tabulated in the above tables, to

obtain the utility valuation based upon a conservative long-term policy towards higher

capital investment.

Finally, we first executed the program with the original runs at power factor of 90

percent and then we lowered the power factor to 70 percent to compare the results. The

results do not show that lower power factor exacerbates the voltage drop constraint,

which is counter-intuitive to our initial expectations. The reality, however, is that

constant energy loads under lower power factor condition will demand higher current,

Page 74: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

63

which ultimately result in higher kVA and cause program to choose higher conductor

sizes, consequently. However, we have no way of reflecting that in our simple program

as we input the Table 4.1 column values. We have to increase the loads proportionately to

capture that lowered power factor effect. Higher conductor sizes will undoubtedly affect

cost and cause higher TAC for the utility company.

We also wanted to show the effect of lowering the Voltage Drop constraint. By

setting the constraint to 2.5 percent in SL and SD, and 5 percent overall voltage drop, we

force the Matlab program to choose larger size conductors, as it is shown in the Runs 37

to 48. The TAC equation yields complex solution and it results in out-of-bound answers

for the longer lengths in Class 1 column data. High loading is the main cause of not

reaching solution and ultimately, the designed distribution calls for a revision.

Page 75: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

64

Chapter 7

CONCLUSIONS

Optimization of the secondary distribution is a tedious process. It first requires an

understanding and familiarity of the primary and secondary system to identify the

uniqueness (if any) of the system. Based on this layout, demographical expectations and

growth anticipated, the system designer can then derive the cost figure for this Primary

system. In more sophisticated optimization models, the integer programming and

dynamic programming techniques are employed, as they are more appropriate solutions.

However, our assignment was confined with use of simple Matlab programming to

devise a method to optimize the system secondary, and still account for a constraint,

which in this case was the overall voltage drop for the secondary system. We were

destined to prove the point using only Matlab programming technique and capability.

In our program, the dimension of the blocks, and therefore the lots, are parameters

that can be safely changed for sensitivity analysis. The program constraint limit of

voltage drop can also be altered for ease of analysis. We have justified our cost structure

in chapter 6 (Economic Estimation and Analysis), but those cost data may also be

adjusted for fine tuning or sensitivity analysis, as well. Finally, the number of the

transformers and radial feeding configuration can be altered without many great

obstacles. Of course, the optimization program will have to be accordingly revised to

account for the required formulation.

Page 76: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

65

With the procedures described above the voltage profile, the conductor thermal

capacity, tapering and short-circuit strength and the protective grounding of a radial

secondary power distribution system can be examined. If the results of this examination

are not satisfactory to the system designer, alternative optimizing technical solutions must

be proposed, which concern transformer changes or conductor replacements or both.

These solutions are economically estimated and the most economical one is finally

adopted.

Adjusting for load growth is also challenging for the distribution designers, as it

will pose the predicament for the system designers to be more conservative with their

initial designs and allow higher equipment rating or better specification to fit into the

primary side. Higher protection standards and non-linear nature of many loads cause

equipment to fail prematurely, or heat up and result in shorter life due to harmonics.

Adding to this challenge will be the integration of renewable Distributed Energy

Resources (DER) that will dominate the future distribution grid. Many of these DERs

have solid state inverters that will exacerbate the harmonics effect.

Furthermore, the planned procedures must provide for some degree of the

flexibility from the norm. Electric Cars charging needs, e.g., requires direct upgrade of

the transformers and conductors in some neighborhoods distribution systems, and

therefore, the concept of effective integration is vital because of the charging capability

Page 77: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

66

of each vehicle. Future distribution system engineers and designers undoubtedly are faced

with great many challenges and game changes, as well.

The loading on the distribution transformers will be significantly increased once the

ownership of Plug-In-Hybrid Electrical Vehicle (PHEV) becomes prevalent in our

modern society and when the average neighborhood displays a significant presence of

these cars. The average electric car will need about 20 to 30 kW-hour of charge for a

round trip of about 60 miles. While that is not a huge load by itself, relative to size of

transformers and wires, it puts undue burden on the grid [14]. One can imagine that while

the early adoption may be low, even only two out of twelve houses owning and charging

these electrical vehicles can seriously burden the neighborhood distribution grid. Finally,

the new utility tariff and rate structure must be provided by the regulators to provide for

the shifting paradigm in the utility industry and its ultimate migration to the Smart grid

domain.

The purpose of this masters project was to demonstrate that (1) the optimization

process is essential between main components of the distribution system, being primary

or secondary and (2) the optimization process can be implemented between the main

components on the basis of fixed initial cost and operating cost of the system, and even a

basic Matlab Program is capable of obtaining solutions to the design problem. Future

Smart grid vision is to develop and deploy a more reliable, secure, economic, efficient,

safe, and environmentally friendly electric system. It will hinge on optimization of

Page 78: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

67

several sub system to attain that goal. Advanced grid technologies will help attaining that

goal with the increase in grid efficiency and reliability

Page 79: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

68

Bayliss, Colin, Transmission and Distribution Electrical Engineering, 2nd Edition, Jordan Hill, Oxford:

APPENDIX A

Matlab Optimization Program for Secondary Distribution System

Instructions for Running the Matlab Optimization Program in Distribution System

The following are instruction steps to utilize the Matlab Optimization program:

1. The program is designed to provide the design parameters to the distribution

designer who will layout the typical urban area City block. It can easily be

modified to use it for bigger acreages available in the agricultural areas as well.

This program is constructed with the idea that configuration of distribution

system greatly affects the outcome as the layout will determine the efficient

means of distribution, and hence, we have assumed a city residential block

typically found in the urban areas of most major U.S cities (typically 960 feet

long by 330 feet wide).

2. Typically, the utility would like to reduce the voltage drop at the end of the line

and hence would bring the distribution high voltage side to the middle of the

circuit so that two almost equal strings can service the two sides of the pattern.

The utility therefore serves the two strings by the two transformers from the

utility Right of Way which service these blocks, by single-phase distribution

circuit of the serving electric utility. We provided the input queries for the

Page 80: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

69

dimensions of this block as to the length and width, which will have a bearing

upon the length of service laterals and service drop conductors serving the

neighborhood area. The example in the book has assumed two single-phase

transformers serving this block, and each transformer serving power to twelve

customers (we have assumed 12 kV primary distributions for these transformers,

and 240- volt secondary to customers). [1]

3. The utilities have to justify their cost expenditures to their financial managers

and public agencies involved, as the total expenditures will undoubtedly affect

the tiered electric rates that ratepayers must pay. Therefore, extra prudence is

applied so that the utility is not heavily weighted in the purchase of non-utilized

assets. Of course, different assets have different life spans and that is why the

utility industry has developed the annualized asset cost to have comparison basis

of measuring alternative proposals on an equal footing. When the assets are

compared on the basis of their amortized life, it will simplify the job of planning

managers to develop the consensus for funding the suitable alternatives.

4. The optimized equations in the program are derived from the absolute

maximized or minimized equations to provide the optimal value for the

variables. However, the standard sizes available in the commercial market do

not render themselves to exact sizes. It is pertinent for a distribution system

designer to obtain a standard size that can still provide near optimal value to the

Page 81: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

70

utility, minimizing the Total Annualized Cost (TAC) that service utility must

burden with.

5. The average load a house may use may greatly depend on the neighborhood

demography and its location. Over the past century electricity consumption has

increased substantially per capita, mainly due to exponential use of automation in

human life in the developed world, while it provides the advances in quality of

life. Interestingly, while the utilities seek to dampen the peak power usage to

curtail high cost of their spot generation, they have to design their distribution

conservatively to accommodate the perceived peak load, even though this

equipment may not be fully utilized a great portion of the time. Hence, sizing

their equipment for average load is allowed, which is somewhat diversified by

the local authorities having jurisdictions. The average household load is also

provided thru an input to the program, as different type of residential areas may

vary in their demography and their electrical usage. The program calculates the

load, sizes the next commercially available transformer, and provides the

appropriate sizes for the Service Lateral (SL) and Service Drop (SD) conductors.

It then calculates the TAC.

6. Two files are attached with this instruction sheet. One is the Matlab program

called OptimizeTAC.m and the other is the Excel input data called

TransfDataTryVD24.xls. You would need to save the TransfDataTryVD24.xls in

Page 82: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

71

the folder that Matlab works with to be able to import the table values

automatically into Matlab.

Page 83: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

72

Matlab Optimization Program in Distribution System

%This program evaluates the distribution circuit requirements for a

block %development and then determines the transformers' size, Service

Laterals, %and Service Drops. Block length and widths are inputs given

to the program %as specifications as well as the residential load,

voltage and power factor. clear all clc

foadfile1='TransfDataTryVD24.xls'; %reads data from the first

worksheet in sheet=1; %the Excel spreadsheet file named 'foadfile1' and returns

the x1range='B10:N17'; % numeric data in array num. subsetA=xlsread(foadfile1,sheet,x1range); A=subsetA;

foadfile2='TransfDataTryVD24.xls'; %reads data from the second

worksheet in sheet=2; %the Excel spreadsheet file named 'foadfile2' and returns

the x2range='B10:N22'; % numeric data in array num. subsetB=xlsread(foadfile2,sheet,x2range); B=subsetB;

Lab=input('Enter the spacing for block length Lab in ft: '); Wac=input('Enter the spacing for block width Wab in ft: '); volt=input('Enter the secondary distribution voltage: '); prompt1 = 'What is Max Average Load for each of 12 customers in KVA? '; La12=input (prompt1); prompt2= 'What is the Load for 4 customers in KVA ? '; L4=input (prompt2); prompt3 = 'What is Max Load for 1 customer in KVA? '; L1=input (prompt3); pf=input('Enter the distribution system power factor (pf)cos(Phi): '); %Lab=1*960;Wac=1*330;volt=240;La12=4.4;L4=6;L1=10;pf=0.9; i=0.15; % The utility cost annualized Rate (Capitalization Rate) ICCAP=15;ICsys=8*350;Iexc=0.015;FLD=0.35;ECoff=.015;ECon=.02; % Defining the parameters; XX=2; % No of Transformers YY=12; % No of Customers poles=6; % No. of Poles LotW=Lab/12; % Lot Width LotL=Wac/2; % Lot Length LSL=4*LotW; % Length of SL LSD=0.5*LotL; % Length of SD phi=acos(pf); % Phi Angle (phi) Smin=YY*1.1; % In kVA Aload=YY*La12; if Aload<Smin ST=Smin;ASL=41.74;ASD=26.24;

Page 84: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

73

else

ST=iscolumn(A(1));ASL=iscolumn(B(12));ASD=iscolumn(B(12));RSL=iscolumn(

B(3));

XSL=iscolumn(B(5));RSD=iscolumn(B(3));XSD=iscolumn(B(5));AMP=iscolumn(B

(2)); SD1=iscolumn(B(2)); end syms ST positive syms ASL positive syms ASD positive

C1=XX*8*(250+7.26*ST)*i; % $/Block-2 trx per block & 12 services per

ea. trx C2=XX*8*(60+4.5*ASL)*i*2*(LSL/1000); %Triplex aluminum cable cost for

Service Lateral per transformer C3=XX*8*(60+4.5*ASD)*i*YY*LSD/1000; % Service Drop initial cost

($/block) C4=8*160*poles*i; % Cost of Poles $/ block C5=2*Iexc*ST*ICCAP*i; % Capacitors’cost for System energizing and I

excitation C6=2*(ICsys*i+8760*ECoff)*0.004*ST; % Cost of iron losses/ upleg of

Secondary ($/ block) FLS=0.3*FLD+0.7*FLD^2; Smax=YY*La12; % This is found from Table 6.4 for 12 class 2 customers,

per book example PTcu=(0.073+0.00905*ST);% Transformer copper losses Where 15

kVA<=ST<=100 kVA % This is found from (Eq. 6.10) C7=XX*(ICsys*i+8760*ECon*FLS)*(PTcu)*(Smax/ST)^2; %From Eq.6.9, The annual OC of tx copper losses per

block RSL=(20.5*(LSL)*2)/(1000*ASL); % RSL=p*L/1000*ASL (Ohm.kcmil/trx.) PSLcu=(((4*L4*1000)/(volt))^2)*(RSL/1000);

%PSLcu=((4*L4/volt)^2)*(12.3/ASL)/1000; C8=XX*(ICsys*i+8760*ECon*FLS)*PSLcu; % From Eq. 6.11, annual OC of copper losses in the

4 SLs RSD=(20.5*LSD*24*2)/(1000*ASD); %Rc=p*(LSD/1000)*ASD=68.88/ASD

(Ohm.kcmil/block), PSDcu=(((L1*1000/volt))^2)*(RSD/1000); %

PSDcu=((Lmax/volt)^2)*(68.88/ASD)*1/1000; C9=(ICsys*i+8760*ECon*FLS)*PSDcu; % From Eq. 6.11, annual OC of copper

losses in 24 SDs)

TAC=C1+C2+C3+C4+C5+C6+C7+C8+C9; disp(TAC);

diff(TAC,ST);ST1=ans; E=ans; ST=vpa(solve(E),5);ST1=ST;

diff(TAC,ASL); F=ans; ASL=vpa(solve(F),5);ASL1=ASL;

Page 85: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

74

diff(TAC,ASD); G=ans; ASD=vpa(solve(G),5);ASD1=ASD;

ST0=ST1; ASL0=ASL1; ASD0=ASD1;

disp(ST1); disp(ASL1); disp(ASD1);

C01=XX*8*(250+7.26*ST0)*i;% $/Block-2 trx per block & 12 services per

ea. trx C02=XX*8*(60+4.5*ASL0)*i*2*(LSL/1000); %Triplex aluminum cable cost for

Service Lateral per transformer C03=XX*8*(60+4.5*ASD0)*i*YY*LSD/1000; % Service Drop initial cost

($/block) C04=8*160*poles*i; % Cost of Poles $/ block C05=2*Iexc*ST0*ICCAP*i; % Capacitors’cost for System energizing & I

excitation C06=2*(ICsys*i+8760*ECoff)*0.004*ST0; % Cost of iron losses/ upleg of

Secondary ($/ block) FLS=0.3*FLD+0.7*FLD^2; Smax=YY*La12; % This is found from Table 6.4 for 12 class 2 customers,

per book example PTcu=(0.073+0.00905*ST0);% Transformer copper losses Where 15

kVA<=ST<=100 kVA % This is found from (Eq. 6.10) C07=XX*(ICsys*i+8760*ECon*FLS)*(PTcu)*(Smax/ST0)^2; %From Eq.6.9, The annual OC of tx copper losses per

block RSL=(20.5*(LSL)*2)/(1000*ASL0); % RSL=p*L/1000*ASL (Ohm.kcmil/trx.) PSLcu=(((4*L4*1000)/(volt))^2)*(RSL/1000);

%PSLcu=((4*L4/volt)^2)*(12.3/ASL0)/1000; C08=XX*(ICsys*i+8760*ECon*FLS)*PSLcu; % From Eq. 6.11, annual OC of copper losses in the

4 SLs RSD=(20.5*LSD*24*2)/(1000*ASD0); %Rc=p*(LSD/1000)*ASD0=68.88/ASD

(Ohm.kcmil/block), PSDcu=(((L1*1000/volt))^2)*(RSD/1000); %

PSDcu=((Lmax/volt)^2)*(68.88/ASD)*1/1000; C09=(ICsys*i+8760*ECon*FLS)*PSDcu; % From Eq. 6.11, annual OC of copper

losses in 24 SDs)

TAC0=C01+C02+C03+C04+C05+C06+C07+C08+C09; disp(' “Value of TAC0 “'); disp(TAC0);

if ST1<=A(1,1) % Secondary Distribution Transformer (ST) Selection

Logic ST=A(1,1);XT=A(1,13);

Page 86: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

75

disp(ST); elseif ST1<=A(2,1) ST=A(2,1);XT=A(2,13); disp(ST); elseif ST1<=A(3,1) ST=A(3,1);XT=A(3,13); disp(ST); elseif ST1<=A(4,1) ST=A(4,1);XT=A(4,13); disp(ST); elseif ST1<=A(5,1) ST=A(5,1);XT=A(5,13); disp(ST); elseif ST1<=A(6,1) ST=A(6,1);XT=A(6,13); disp(ST); elseif ST1<=A(7,1) ST=A(7,1);XT=A(7,13); disp(ST); elseif ST1<=A(8,1) ST=A(8,1);XT=A(8,13); disp(ST); elseif ST1<=A(9,1) ST=A(9,1);XT=A(9,13); disp(ST); else disp('Provide a different design');

end

%ASL=B(k,12);AMP=B(k,2);XSL=B(k,5);RSL=B(k,3); if ASL1<=B(1,12) % Service Lateral Ampacity (SL) Selection Logic ASL=B(1,12);AMP=B(1,2);XSL=B(1,5);RSL=B(1,3); disp(ASL);disp(AMP); elseif ASL1<=B(2,12) ASL=B(2,12);AMP=B(2,2);XSL=B(2,5);RSL=B(2,3); disp(ASL);disp(AMP); elseif ASL1<=B(3,12) ASL=B(3,12);AMP=B(3,2);XSL=B(3,5);RSL=B(3,3); disp(ASL);disp(AMP); elseif ASL1<=B(4,12) ASL=B(4,12);AMP=B(4,2);XSL=B(4,5);RSL=B(4,3); disp(ASL);disp(AMP); elseif ASL1<=B(5,12) ASL=B(5,12);AMP=B(5,2);XSL=B(5,5);RSL=B(5,3); disp(ASL);disp(AMP); elseif ASL1<=B(6,12) ASL=B(6,12);AMP=B(6,2);XSL=B(6,5);RSL=B(6,3); disp(ASL);disp(AMP); elseif ASL1<=B(7,12) ASL=B(7,12);AMP=B(7,2);XSL=B(7,5);RSL=B(7,3); disp(ASL);disp(AMP); elseif ASL1<=B(8,12) ASL=B(8,12);AMP=B(8,2);XSL=B(8,5);RSL=B(8,3);

Page 87: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

76

disp(ASL);disp(AMP); elseif ASL1<=B(9,12) ASL=B(9,12); AMP=B(9,2);XSL=B(9,5);RSL=B(9,3); disp(ASL);disp(AMP); elseif ASL1<=B(10,12) ASL=B(10,12); AMP=B(10,2);XSL=B(10,5);RSL=B(10,3); disp(ASL);disp(AMP); elseif ASL1<=B(11,12) ASL=B(11,12); AMP=B(11,2);XSL=B(11,5);RSL=B(11,3); disp(ASL);disp(AMP); elseif ASL1<=B(12,12) ASL=B(12,12); AMP=B(12,2);XSL=B(12,5);RSL=B(12,3); disp(ASL);disp(AMP); elseif ASL1<=B(13,12) ASL=B(13,12); AMP=B(13,2);XSL=B(13,5);RSL=B(13,3); disp(ASL);disp(AMP); else disp('Provide a different design'); end

ASL2=ASL; VDSL2=4*1000*(L4/(volt)^2)*2*(LSL/1000)*(RSL*cos(phi)+XSL*sin(phi))*100

;

for k=1:1:13 VDSL3=4*1000*(L4/(volt)^2)*2*(LSL/1000)*(RSL*cos(phi)+XSL*sin(phi))*100

; if VDSL2<5 break else ASL3=B(k,12);AMP=B(k,2);XSL=B(k,5);RSL=B(k,3); if VDSL3<5 ASL2=ASL3; VDSL2=VDSL3;

else ASL3=B(k+1,12);AMP=B(k+1,2);XSL=B(k+1,5);RSL=B(k+1,3); end end end VDSL=VDSL2;

if ASD1<=B(1,12) % Secondary Service Drop (SD) Selection Logic ASD=B(1,12);SD1=B(1,2);XSD=B(1,5);RSD=B(1,3); disp(ASD);disp(SD1); elseif ASD1<=B(2,12) ASD=B(2,12);SD1=B(2,2);XSD=B(2,5);RSD=B(2,3); %ZSD=B(2,4); disp(ASD);disp(SD1); elseif ASD1<=B(3,12) ASD=B(3,12);SD1=B(3,2);XSD=B(3,5);RSD=B(3,3); %ZSD=B(3,4); disp(ASD);disp(SD1); elseif ASD1<=B(4,12) ASD=B(4,12);SD1=B(4,2);XSD=B(4,5);RSD=B(4,3); %ZSD=B(4,4); disp(ASD);disp(SD1); elseif ASD1<=B(5,12)

Page 88: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

77

ASD=B(5,12);SD1=B(5,2);XSD=B(5,5);RSD=B(5,3); %ZSD=B(5,4); disp(ASD);disp(SD1); elseif ASD1<=B(6,12) ASD=B(6,12);SD1=B(6,2);XSD=B(6,5);RSD=B(6,3); %ZSD=B(6,4); disp(ASD);disp(SD1); elseif ASD1<=B(7,12) ASD=B(7,12);SD1=B(7,2);XSD=B(7,5);RSD=B(7,3); %ZSD=B(7,4); disp(ASD);disp(SD1); elseif ASD1<=B(8,12) ASD=B(8,12);SD1=B(8,2);XSD=B(8,5);RSD=B(8,3); %ZSD=B(8,4); disp(ASD);disp(SD1); elseif ASD1<=B(9,12) ASD=B(9,12);SD1=B(9,2);XSD=B(9,5);RSD=B(9,3); %ZSD=B(9,4); disp(ASD);disp(SD1); else end

ASD2=ASD; VDSD2=1000*(L1/(volt)^2)*2*(LSD/1000)*(RSD*cos(phi)+XSD*sin(phi))*100;

for j=1:1:9

VDSD3=1000*(L1/(volt)^2)*2*(LSD/1000)*(RSD*cos(phi)+XSD*sin(phi))*100;

if VDSD2<5 break else ASD3=B(j,12);SD1=B(j,2);XSL=B(j,5);RSL=B(j,3); if VDSL3<5 ASD2=ASD3; VDSD2=VDSD3;

else ASD3=B(j+1,12);SD1=B(j+1,2);XSL=B(j+1,5);RSL=B(j+1,3); end end end VDSD=VDSD2;

C1=XX*8*(250+7.26*ST)*i;

% $/Block-2 trx per block & 12 services per ea. trx C2=XX*8*(60+4.5*ASL)*i*2*(LSL/1000); %Triplex aluminum cable cost for

Service Lateral per transformer C3=XX*8*(60+4.5*ASD)*i*YY*LSD/1000; % Service Drop initial cost

($/block) C4=8*160*poles*i; % Cost of Poles $/ block C5=2*Iexc*ST*ICCAP*i; % Capacitors’cost for System energizing & I

excitation C6=2*(ICsys*i+8760*ECoff)*0.004*ST; % Cost of iron losses/ upleg of

Secondary ($/ block) FLS=0.3*FLD+0.7*FLD^2; Smax=YY*La12; % This is found from Table 6.4 for 12 class 2 customers,

per book example

Page 89: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

78

PTcu=(0.073+0.00905*ST);% Transformer copper losses Where 15

kVA<=ST<=100 kVA % This is found from (Eq. 6.10) C7=XX*(ICsys*i+8760*ECon*FLS)*(PTcu)*(Smax/ST)^2; %From Eq.6.9, The annual OC of tx copper losses per block RSL=(20.5*(LSL)*2)/(1000*ASL); % RSL=p*L/1000*ASL (Ohm.kcmil/trx.) PSLcu=(((4*L4*1000)/(volt))^2)*(RSL/1000);

%PSLcu=((4*L4/volt)^2)*(12.3/ASL0)/1000; C8=XX*(ICsys*i+8760*ECon*FLS)*PSLcu; % From Eq. 6.11, annual OC of copper losses in the 4 SLs RSD=(20.5*LSD*24*2)/(1000*ASD); %Rc=p*(LSD/1000)*ASD0=68.88/ASD

(Ohm.kcmil/block), PSDcu=(((L1*1000/volt))^2)*(RSD/1000); %

PSDcu=((Lmax/volt)^2)*(68.88/ASD)*1/1000; C9=(ICsys*i+8760*ECon*FLS)*PSDcu; % From Eq. 6.11, annual OC of copper

losses in 24 SDs)

TAC2=C1+C2+C3+C4+C5+C6+C7+C8+C9; disp(' “Value of TAC2 “'); disp(TAC2);

% The Voltage Drop Constraint is tested on the obtained values % VoltDrop = VDT+VDSL+VDSD; %Zpu=0.02; %Zbase=voltage^2/ST;%Zpu is given in input tables %ZVST=Zpu*Zbase; VDT=1000*(Aload/(volt)^2)*XT*100; % VDT=12*LoadC*ZVST;

VoltDrop=VDT+VDSL+VDSD;

if VoltDrop>10 % The Voltage Drop Constraint is tested for Optimization

disp('"Voltage Drop Too High! -- Provide a different design."'); disp('"VoltDrop in % = "'); disp(VoltDrop); disp(VDT); disp(VDSL); disp(VDSD) disp(TAC2); disp(' “Size of transformer in kVA is = ”');disp(ST); disp(' “Size of ASL “’');disp(ASL2);disp(AMP); disp(' “Size of ASD “');disp(ASD2);disp(SD1); else disp('"VoltDrop in % = "'); disp(VoltDrop);disp(VDT);disp(VDSL);disp(VDSD) disp(TAC2);%disp(ST);disp(ASL);disp(AMP),disp(ASD);disp(SD1); disp(' “Size of transformer in kVA is = ”');disp(ST); disp(' “Size of ASL “’');disp(ASL2);disp(AMP); disp(' “Size of ASD “');disp(ASD2);disp(SD1);

end

Page 90: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

79

APPENDIX B

Instructions for Matlab TAC Program in Distribution System

The following are instruction steps to utilize the Matlab TAC program:

1. This program is constructed with the idea that configuration of distribution system

greatly affects the outcome as the layout will determine the efficient means of

distribution, and hence, we have assumed a city residential block typically found

in the urban areas of most major U.S cities.

2. Typically, two transformers from the utility Right of Way serve these blocks,

usually by single-phase distribution circuit of the serving electric utility. We

assume the secondary distribution system within a City block, as discussed in

Appendix A. The block dimensions are according to Figure 4.4 Similar to

previous program, it queries for the inputs of Transformer size in KVA, Cable

sizes (ASL and ASD) in kcmil, and loads (L1, L4, and La12) in KVA . Values for

loads L1, L4, and La12 can be obtained from Table 4.1, or can be any

combination of average household load for one (maximum load), four, or 12

customers. Similar to the example in the book, we have assumed 12 kV primary

distributions for these transformers, and 240- volt secondary to customers. As

before, two single-phase transformers are serving this block, and each transformer

serving power to twelve customers [1].

Page 91: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

80

3. The following questions will be asked when program is run:

What is ST in kVA?

What is ASL in kcmil?

What is ASD in kcmil?

What is the load for 12 customers in kVA?

What is the load for 4 customer in kVA?

What is Max load (1 customer) in kVA?

Then TAC will be calculated by the program in $/block.

Sample Runs

What is ST in kVA? 100

What is ASL in kcmil? 300

What is ASD in kcmil? 167.8

What is the load for 12 customers in kVA? 10

What is the load for 4 customer in kVA? 12

What is Max load (1 customer)in kVA? 18

TAC = 7746

*****************************************************

What is ST in kVA? 50

What is ASL in kcmil? 167.8

What is ASD in kcmil? 83.69

Page 92: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

81

What is the load for 12 customers in kVA? 4.4

What is the load for 4 customer in kVA? 6

What is Max load (1 customer) in kVA? 10

TAC = 4559

*******************************************************

What is ST in kVA? 15

What is ASL in kcmil? 41.74

What is ASD in kcmil? 41.74

What is the load for 12 customers in kVA? 1.2

What is the load for 4 customer in kVA? 1.5

What is Max load (1 customer) in kVA? 2.5

TAC =2255

Page 93: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

82

Matlab Program for Total Annualized Cost (TAC) in Distribution System

prompt1 = 'What is transformer rate in kVA? ';

%input, program asking for %transformer rate in kVA

ST = input (prompt1);

prompt2 = 'What is cable size (ASL) in kcmil? ';

%input, program is asking for %cable size in kcmil

ASL = input (prompt2);

prompt3 = 'What is cable size (ASD) in kcmil? ';

%input, program is asking for %cable size in kcmil

ASD = input (prompt3);

prompt4 = 'What is the load for 12 customers in kVA? ';

% input, Program is %asking for average load for 12 customer. Table can be

used

L12 = input (prompt4);

prompt5 = 'What is the load for 4 customer in kVA? ';

%input, Program is %asking for average load for 4 customer. Table can be used

L4 = input (prompt5);

prompt6 = 'What is Max load (1 customer) in kVA? ';

%input, Program is %asking for average load for 1 customer. Table can be used

L1 = input (prompt6);

% this formula was driven for the cost (C1-C9)in the report page

TAC = (6.048*ASD)+ (4.32*ASL) + (14.9522*ST) +374.536*L1*(L1/ASD) +

2141.28*L4*(L4/ASL) + (6589.33*(L12/ST)*(L12/ST))+(816.9*L12*(L12/ST))+

1306.24;

round(TAC); TAC=ans % TAC is calculated by program

Page 94: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

83

APPENDIX C

Secondary Distribution System Voltage Drop Program

Instructions for Running the Matlab Voltage Drop Calculation Program

The following are instruction steps to utilize the Matlab Voltage Drop Program :

1. The program is designed to provide the design parameters to the secondary

distribution system designer who has the layout of the typical urban Area City

block, found in the urban areas of most major U.S cities (typically 960 feet long

by 330 feet wide).

2. It may also be modified to use it for bigger acreages available in the agricultural

areas, or as a calculator on the primary system. This program calculates the

voltage drop within the Transformer, Service Lateral (SL), and Service Drop

(SD).

3. The utility would reduce the voltage drop at the end of the line by bringing the

distribution high voltage side to the middle of the circuit, so that two almost

equal strings can service the two sides of the pattern. The utility therefore serves

the two strings by the two transformers from the utility Right of Way which

service these blocks, by single-phase distribution circuit of the serving electric

utility. We provided the input queries for the dimensions of this block as to the

Page 95: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

84

length and width, which will have a bearing upon the length of service laterals

and service drop conductors serving the neighborhood area. The example in the

book has assumed two single-phase transformers serving this block, and each

transformer serving power to twelve customers (we have assumed 12 kV primary

distributions for these transformers, and 240- volt secondary to customers) [1].

4. The utilities have technical designers who are responsible to keep voltage drop

within a tolerance level and at the same time must justify their cost expenditures

to their financial managers and public agencies involved, as the total

expenditures will undoubtedly affect the tiered electric rates that ratepayers must

pay. Therefore, extra prudence is applied so that the utility is not heavily

weighted in the purchase of non-utilized assets

5. The load is queried into this program as energy use of a house may greatly

depend on the neighborhood demography and its location. The program queries

for the single family load, diversified loads, and it then calculates the voltage

drops values at the Transformer (ST), Service Lateral (SL) and Service Drop

(SD) conductors. It then calculates the Total Voltage Drop for all three in the

secondary system.

Page 96: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

85

6. Two files are attached with this instruction sheet. One is the Matlab program

called VoltageDrop.m and the other is the Excel input data called

TransfDataTryVD24.xls.

User needs to save the TransfDataTryVD24.xls in the folder that Matlab works

with to be able to import the table values automatically into Matlab.

Page 97: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

86

Matlab Program for Voltage Drop in Distribution System

%This program evaluates the distribution circuit voltage drop

requirements for a block %development and then determines if the

constraint threshold is exceeded, based on the transformers' size,

Service Laterals, %and Service Drops. Block length and widths are

inputs given to the program %as specifications as well as the

residential load, voltage and power factor.

clear all clc

foadfile1='TransfDataTryVD24.xls'; %reads data from first worksheet in sheet=1; %the Excel spreadsheet file named 'foadfile1' and returns the x1range='B10:N17'; % numeric data in array num. subsetA=xlsread(foadfile1,sheet,x1range); %disp(subsetA) A=subsetA;

foadfile2='TransfDataTryVD24.xls'; %reads data from the second

worksheet in sheet=2; %the Excel spreadsheet file named 'foadfile2' and returns the x2range='B10:N22'; % numeric data in array num. subsetB=xlsread(foadfile2,sheet,x2range); %disp(subsetB) B=subsetB; Lab=input('Enter the spacing for block length Lab in ft: '); Wac=input('Enter the spacing for block width Wab in ft: '); volt=input('Enter the secondary distribution voltage: '); prompt1 = 'What is Max Average Load for each of 12 customers in KVA? '; La12=input (prompt1); prompt2= 'What is the Load for 4 customers in KVA? '; L4=input (prompt2); prompt3 = 'What is Max Load for 1 customer in KVA? '; L1=input (prompt3); ST1=input('Enter the distribution system Transformer Size: '); pf=input('Enter the distribution system power factor (pf)cos(Phi): '); ASL1=input('What is the cross section of SL Line? : '); %AMP=input('What is the ampacity of SL Line? : '); ASD1=input('What is the Cross section size of SD Line? : '); %ASD=input('What is the length of SD Line? : ');

%Lab=1*960;Wac=1*330;volt=240;La12=10;L4=12;L1=18;pf=0.9; %ST1=75;ASL1=74;ASD1=43; i=0.1; % The utility cost annualized Rate (Capitalization Rate) ICCAP=15;ICsys=8*350;Iexc=0.015;FLD=0.35;ECoff=.015;ECon=.02; % Defining the parameters; XX=2; % No of Transformers YY=12; % No of Customers poles=6; % No. of Poles LotW=Lab/12; % Lot Width LotL=Wac/2; % Lot Length

Page 98: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

87

LSL=4*LotW; % Length of SL LSD=0.5*LotL; % Length of SD phi=acos(pf); % Phi Angle (phi) Smin=YY*1.1; % In kVA Aload=YY*La12; if Aload<Smin ST=Smin;ASL=41.74;ASD=26.24; else

ST=iscolumn(A(1));ASL=iscolumn(B(12));ASD=iscolumn(B(12));RSL=iscolumn(

B(3));

XSL=iscolumn(B(5));RSD=iscolumn(B(3));XSD=iscolumn(B(5));AMP=iscolumn(B

(2)); SD1=iscolumn(B(2)); end %disp(ST1); %disp(ASL1); %disp(ASD1);

if ST1<=A(1,1) %Secondary Distribution Transformer (ST) Selection Logic ST=A(1,1);XT=A(1,13); disp(ST); elseif ST1<=A(2,1) ST=A(2,1);XT=A(2,13); disp(ST); elseif ST1<=A(3,1) ST=A(3,1);XT=A(3,13); disp(ST); elseif ST1<=A(4,1) ST=A(4,1);XT=A(4,13); disp(ST); elseif ST1<=A(5,1) ST=A(5,1);XT=A(5,13); disp(ST); elseif ST1<=A(6,1) ST=A(6,1);XT=A(6,13); disp(ST); elseif ST1<=A(7,1) ST=A(7,1);XT=A(7,13); disp(ST); elseif ST1<=A(8,1) ST=A(8,1);XT=A(8,13); disp(ST); elseif ST1<=A(9,1) ST=A(9,1);XT=A(9,13); disp(ST); else disp('Provide a different design');

end %ASL=B(k,12);AMP=B(k,2);XSL=B(k,5);RSL=B(k,3); if ASL1<=B(1,12) % Service Lateral Ampacity (SL) Selection Logic ASL=B(1,12);AMP=B(1,2);XSL=B(1,5);RSL=B(1,3); disp(ASL);disp(AMP);

Page 99: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

88

elseif ASL1<=B(2,12) ASL=B(2,12);AMP=B(2,2);XSL=B(2,5);RSL=B(2,3); disp(ASL);disp(AMP); elseif ASL1<=B(3,12) ASL=B(3,12);AMP=B(3,2);XSL=B(3,5);RSL=B(3,3); disp(ASL);disp(AMP); elseif ASL1<=B(4,12) ASL=B(4,12);AMP=B(4,2);XSL=B(4,5);RSL=B(4,3); disp(ASL);disp(AMP); elseif ASL1<=B(5,12) ASL=B(5,12);AMP=B(5,2);XSL=B(5,5);RSL=B(5,3); disp(ASL);disp(AMP); elseif ASL1<=B(6,12) ASL=B(6,12);AMP=B(6,2);XSL=B(6,5);RSL=B(6,3); disp(ASL);disp(AMP); elseif ASL1<=B(7,12) ASL=B(7,12);AMP=B(7,2);XSL=B(7,5);RSL=B(7,3); disp(ASL);disp(AMP); elseif ASL1<=B(8,12) ASL=B(8,12);AMP=B(8,2);XSL=B(8,5);RSL=B(8,3); disp(ASL);disp(AMP); elseif ASL1<=B(9,12) ASL=B(9,12); AMP=B(9,2);XSL=B(9,5);RSL=B(9,3); disp(ASL);disp(AMP); elseif ASL1<=B(10,12) ASL=B(10,12); AMP=B(10,2);XSL=B(10,5);RSL=B(10,3); disp(ASL);disp(AMP); elseif ASL1<=B(11,12) ASL=B(11,12); AMP=B(11,2);XSL=B(11,5);RSL=B(11,3); disp(ASL);disp(AMP); elseif ASL1<=B(12,12) ASL=B(12,12); AMP=B(12,2);XSL=B(12,5);RSL=B(12,3); disp(ASL);disp(AMP); elseif ASL1<=B(13,12) ASL=B(13,12); AMP=B(13,2);XSL=B(13,5);RSL=B(13,3); disp(ASL);disp(AMP); else disp('Provide a different design'); end

ASL2=ASL; VDSL2=4*1000*(L4/(volt)^2)*2*(LSL/1000)*(RSL*cos(phi)+XSL*sin(phi))*100

;

for k=1:1:13

VDSL3=4*1000*(L4/(volt)^2)*2*(LSL/1000)*(RSL*cos(phi)+XSL*sin(phi))*100

;

if VDSL2<15 break else ASL3=B(k,12);AMP=B(k,2);XSL=B(k,5);RSL=B(k,3); if VDSL3<15 ASL2=ASL3;

Page 100: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

89

VDSL2=VDSL3;

else ASL3=B(k+1,12);AMP=B(k+1,2);XSL=B(k+1,5);RSL=B(k+1,3); end end

end VDSL=VDSL2;

if ASD1<=B(1,12) % Secondary Service Drop (SD) Selection Logic ASD=B(1,12);SD1=B(1,2);XSD=B(1,5);RSD=B(1,3); disp(ASD);disp(SD1); elseif ASD1<=B(2,12) ASD=B(2,12);SD1=B(2,2);XSD=B(2,5);RSD=B(2,3); %ZSD=B(2,4); disp(ASD);disp(SD1); elseif ASD1<=B(3,12) ASD=B(3,12);SD1=B(3,2);XSD=B(3,5);RSD=B(3,3); %ZSD=B(3,4); disp(ASD);disp(SD1); elseif ASD1<=B(4,12) ASD=B(4,12);SD1=B(4,2);XSD=B(4,5);RSD=B(4,3); %ZSD=B(4,4); disp(ASD);disp(SD1); elseif ASD1<=B(5,12) ASD=B(5,12);SD1=B(5,2);XSD=B(5,5);RSD=B(5,3); %ZSD=B(5,4); disp(ASD);disp(SD1); elseif ASD1<=B(6,12) ASD=B(6,12);SD1=B(6,2);XSD=B(6,5);RSD=B(6,3); %ZSD=B(6,4); disp(ASD);disp(SD1); elseif ASD1<=B(7,12) ASD=B(7,12);SD1=B(7,2);XSD=B(7,5);RSD=B(7,3); %ZSD=B(7,4); disp(ASD);disp(SD1); elseif ASD1<=B(8,12) ASD=B(8,12);SD1=B(8,2);XSD=B(8,5);RSD=B(8,3); %ZSD=B(8,4); disp(ASD);disp(SD1); elseif ASD1<=B(9,12) ASD=B(9,12);SD1=B(9,2);XSD=B(9,5);RSD=B(9,3); %ZSD=B(9,4); disp(ASD);disp(SD1); else end

ASD2=ASD; VDSD2=1000*(L1/(volt)^2)*2*(LSD/1000)*(RSD*cos(phi)+XSD*sin(phi))*100;

for j=1:1:9

VDSD3=1000*(L1/(volt)^2)*2*(LSD/1000)*(RSD*cos(phi)+XSD*sin(phi))*100;

if VDSD2<5 break else ASD3=B(j,12);SD1=B(j,2);XSL=B(j,5);RSL=B(j,3); if VDSL3<5 ASD2=ASD3;

Page 101: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

90

VDSD2=VDSD3;

else ASD3=B(j+1,12);SD1=B(j+1,2);XSL=B(j+1,5);RSL=B(j+1,3); end end end VDSD=VDSD2; % The Voltage Drop Constraint is tested on the obtained values % VoltDrop = VDT+VDSL+VDSD; %Zpu=0.02; %Zbase=voltage^2/ST;%Zpu is given in input tables %ZVST=Zpu*Zbase; VDT=1000*(Aload/(volt)^2)*XT*100; % VDT=12*LoadC*ZVST; %VDSD=1000*(L1/(volt)^2)*2*(LSD/1000*((RSD*cos(phi))+XSD*sin(phi)))*100

; VoltDrop=VDT+VDSL+VDSD;

if VoltDrop>20 % The Voltage Drop Constraint is tested for Optimization disp('"Voltage Drop Too High! -- Provide a different design."'); disp('" VoltDrop in % = "'); disp(VoltDrop);disp(VDT);disp(VDSL);disp(VDSD); disp(' “Size of transformer in kVA is = ”');disp(ST); disp(' “Size of ASL “');disp(ASL2);disp(AMP); disp(' “Size of ASD “');disp(ASD2);disp(SD1); else disp('"VoltDrop in % = "'); disp(VoltDrop);disp(VDT);disp(VDSL);disp(VDSD); disp(' “Size of transformer in kVA is = ”');disp(ST); disp(' “Size of ASL “');disp(ASL2);disp(AMP); disp(' “Size of ASD “');disp(ASD2);disp(SD1); end

Page 102: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

91

APPENDIX D

Distribution System Component Information Background

Conductors

For utility companies one of the most expensive components is the conductors.

Due to this fact, it is imperative that distribution system engineer and planner choose the

most appropriate conductor type and size so that optimum operating efficiency can be

realized[38][39]. The designer must come up with best price for a conductor with best

conductivity-to-weight ratio and/or strength -to-weight ratio. For necessary ratio designer

needs to look at all the factors such as voltage stability of the line, loading of the line,

losses of the line, tension load, and environmental factors [40].

For selecting a conductor, technical and financial criteria need to be considered.

Not only maximum power transfer, minimum loss and thermal capacity , per the system

design specification, but also the price should be take in to account. While choosing a

new conductor that has to match or work the existing conductor in the network, it has to

be suitable for environmental conditions, as well.

Most common conductor materials are Aluminum and copper. Copper is the best

conductor and is the base-line reference for conductivity characteristics. On the other

hand, the closest alternative for conductivity is Aluminum with less weight. Aluminum

conductivity is 61 percent, its weight is 30 percent, and its breaking strength is 43 percent

of copper [16].

Page 103: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

92

Because of the breaking strength of aluminum, aluminum conductor is made with

strands of high-strength steel in their central core, and the combination is called

Aluminum Cable Steel Reinforced or ACSR. ACSR is lighter than copper and has

strength and conductivity of copper. At the same time, ACSR has longer life span and it

last much longer than conductor usual 40 years. Following figure shows various

configuration and size of ACSR conductors.

Page 105: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

94

Distribution Transformers

In the beginning, working power systems used direct current (DC) which carries

low voltage and high current. Because of this combination there were a very large voltage

drops and power losses especially in long distance distribution. The development of

Alternating Current (AC) eliminated above problems and issues and made efficient and

cost effective long-distance transmission and distribution a possibility.

The first modern transmission was built in 1885 by William Stanley [37]. A

simple transformer consist of two set of coil wrapped around a ferromagnetic core. When

there is current in primary coil there will be flux created in the core and these flux going

troughs the secondary coil create current in secondary circuit. The powers in primary and

secondary circuits are identical (for ideal transformer). Because of that if the current goes

up in secondary voltage goes down in secondary and if current goes down in secondary

voltage goes up in secondary. Voltage ratio of primary over secondary is equal to the

ratio of coil turn in primary over the coil turn in secondary

(Vp/Vs)=(Np/Ns) , Pp=Ps , (Ip/Is)=(Ns/Np)

Vp Primary voltage

Vs Secondary voltage

Np Number of turn in primary coil

Ns Number of turn in secondary coil

Pp Power in primary

Ps Power in secondary

Page 106: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

95

Ip Current in primary

Is Current in secondary

Distribution Transformers are typically rated up to 500kVA, whereas power

transformers maintain rating of over 500 kVA at voltage levels of 69kV or greater [36].

Following page shows some typically rated transformers and associated data.

Page 107: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

96

BIBLIOGRAPHY

[1] Turan Gonen, “ Electric Power Distribution System Engineering”, Second Edition,

2007. Original by: T.Gonen, "Electric Power Distribution System Engineering",

McGraw Hill, 1986.

[2] Leon Freris and David Infield, “Renewable Energy in Power Systems”, 2008, Pages

18-19, and pages 240-241.

[3] Donald G. Fink and H. Wayne Beaty, “Standard Handbook for Electrical

Engineers”, 11th

Edition, McGraw- Hill, New York, 1978.

[4] Safigianni A.S., “Optimization of a secondary Power distribution system” --Electrical

Power and Energy System”, September 2004.

[5] Safigianni A., “ Technical optimization of a secondary power distribution system”.

Proceedings of the IASTED EuroPES, Rhodes, Greece, July; 2001: p. 430-435.

[6] R.Billinton, A.N.Allan, "Reliability Evaluation of Power Systems", Pitman

Publishing Limited, 1984

[7] Ali Keyhani, “Design of Smart Power Grid Renewable Energy Systems, 2011”,

Published by John Wiley & Sons, Inc.

[8] Shirmohammadi D, Hong H W, Semlyen A, Luo G X. A compensation-based power

flow method for weakly meshed distribution and transmission networks, IEEE Trans

Power Deliv 1988; 3(2):753-62.

[9] Bin Wu, Yongqiang Lang, Navid Zargari, and Samir Kouro, “Power Conversion and

Control of Wind Energy Systems, 2011 copyright by IEEEE, Inc, Published by John

Wiley & Son, Inc., page 20-21.

[11] Renewable Energy Policy Network for the 21st Century (REN21), Renewable Global

Status Report 2009 Update, available at www.ren21.net.

[12] Yifan Tang, Power Distribution System Planning with Reliability Modeling and

Optimization, Siemens Power Corporation

[13] Modeling and Optimization of Electricity Distribution Planning System Using

Dynamic Programming Techniques: A Case of Power Holding Company of Nigeria

(PHCN), By: 1Chinwuko C.E., 2Chukwuneke J.L., 2Okolie P.C., and 2Dara E.J.

INTERNATIONAL JOURNAL OF MULTIDISCIPLINARY SCIENCES AND

ENGINEERING, VOL. 3, NO. 6, JUNE 2012.

Page 108: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

97

[14] “Lapping The EV Race”, One utility out Front –Heads off Disruption, Martin

Rosenberg, EnergyBiz, The energy web magazine, April 28, 2013.

[15] “Time to take a second look at conservation voltage regulation”, Intelligent Utility”

a web magazine, where smartgrid meets business and reality, June 6, 2013.

[16] M.Ponnavaikko, etc, "Distribution System Planning through a Quadratic Mixed-

integer Programming Approach", IEEE Trans. Power Delivery, Vol. PWRD-2, No. 4,

October 1987.

[17] J. H. Spare, Minutes of Distribution Reliability Applications Task Force, IEEE PES

Winter Meeting, January 31, 1994, New York, NY 1973, pp. 348-354.

[18] S. Karkkainen, etc, "Statistical Distributions of Reliability Indices and Unavailability

Costs in Distribution Networks and Their Use in the Planning of Networks", CIRED

1981.

[19] G.Kjolle, L.Rolfseng, E.Dahl, "The Economic Aspect of Reliability in Distribution

System Planning", IEEE Trans. Power Delivery, Vol. 5, No. 2, April 1990, pp. 1153-

1157.

[20] Westinghouse Electric Corp., "Research into Load Forecasting and Distribution

Planning" (Volume l), EPRI Project, 1980

[21] T. Gonen, etc, "Optimal Multi-stage Planning of Power Distribution Systems", IEEE

Trans. Power Delivery, Vol. PWRD-2, No. 2, April 1987.

[22] I.J. Ramirez-Rosado, T.Gonen, "Pseudo-dynamic Planning for Expansion of Power

Distribution Systems", IEEE Trans. Power Systems, Vol. 6, No. 1, February 1991, pp.

245-254.

[23] K.Kara, etc, "Multi-year Expansion Planning for Distribution Systems", IEEE

Trans. Power Systems, Vol. 6, No. 3, August 1991, pp. 952-958.

[24] Adkins, E. M., "Planning and load characteristics," in Electric Transmission and

Distribution, Bernhardt G. A. Skrotzki, Ed. Malabar, Florida: Robert E. Krieger

Publishing Company, 1954, pp. 387-410.

[25] Bayliss, Colin, Transmission and Distribution Electrical Engineering, 2nd Edition,

Jordan Hill, Oxford: Newnes, 1996, pp. 849-887.

[26] Tomiyama, Katsuyuki, John P. Daniel, and Satoru lhara, "Modeling Air

Page 109: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

98

Conditioner Load for Power System Studies,"IEEE Transactions on Power Systems,

Vol.13, No.2, ay 1998, pp.1-8.

[27] Pylvanainen, Jouni K., Kirsi Nousiainen, and Pekka Verho, "Studies to Utilize

Loading Guides and ANN for Oil-Immersed Distribution Transformer Condition

Monitoring," IEEE Transactions on Power Delivery, Vol. 22, No. 1, January

2007, pp.201-207.

[28] Radakovic, Z., E Cardillo, and K. Feser, "The influence of transformer loading

to the ageing of the oil-paper insulation," presented at the XIIIth International

Symposium on High Voltage Engineering, Netherlands, 2003.

[29] IEC Loading guide for oil-immersed power transformers, IEC Standard 60076-

7- Power transformers-Part 7, Committee draft 14/403/CD, 2001.

[30] Yang, Minghao, Yajun Shi, and Jing Zhang, "Efficient Operation Regions of

Power Distribution Transformers," IEEE Transactions on Power Delivery, Vol. 19,

No.4, October 2004, pp. 1713-1717.

[31] R.N.Adams, M.A.Laughton, "A Dynamic Programming /Network Flow Procedure

for Distribution System Planning", PICA,

[32] J.L.Kennington, R.V.Helgason, "Algorithms for Network Programming", John

Wiley & Sons, 1980.

[33] D.L.Wal1, G.L.Thompson, J.E.D.Northcote-Green, "An Optimization Model for

Planning Radial Distribution Networks", IEEE Trans. PAS, Vol. PAS-98, No. 3,

May/June 1979, pp. 1061-1068.

[34] T.H.Fawzi, K.F.Ali, S .M.El-Sobki, "A New Planning Model for Distribution

Systems", IEEE Trans. PAS, Vol. PAS-102, No. 9, September 1983, pp. 3010-3017.

[35] Stanley H. Horowitz and Arun Phadke, “ Power System Relaying”, Third Edition,

John Wiley And Sons, Inc., 2007.

[36] Turan Gonen, “ Electrical Machines”, Carmichael. California: Power International

Press, 1998, pp.101-102.

[37] Stephen J Chapman, “ Electric Machinery Fundamentals”, 4th Edition, New York,

New York: Mc Graw Hill,2005, pp. 65-67.

[38] D. A. Douglass, “ Economic measures of bare overhead conductor characteristics”,

IEEE Transaction on Power Delivery, Vol. 3, No.2, April 1998, pp. 745-761.

Page 110: SECONDARY DISTRIBUTION SYSTEM OPTIMIZATION METHODOLOGY …

99

[39] R.E. Kennon, and D. A. Douglass, “ EHV transmission line design opportunities for

cost reduction”, IEEE paper 89 TD 434-2 PWRD.

[40] Jerry M. Hersterlee, Eugene T. Sanders, and Frank R. Thrash, Jr., “ Bare overhead

transmission and distribution conductor design overview”, IEEE Transactions on

Industry application, Vol. 32, No. 3, May/June 1996, pp. 709-713.