WHAT TO EXPECT TONIGHT
Welcome, Introductions, HAT, Q&A, County ADU Plans
Dan Gjerde, 4th District County Supervisor
County and Coastal Zone Second Unit (ADU) Regulations, Requirements, Coastal Ordinance
Linda Ruffing, North Coast Community Planning
Construction and Working with a Contractor
Cynthia Sharon, Dancing Dog Design Build
Finances of Building and Renting an ADU
Marie Jones, Marie Jones Consulting
Requirements for Accessory Dwelling Units in Mendocino County
Linda Ruffing forHousing Action Team workshopThursday, October 24, 2019
1
1. “Accessory” to an existing residence. Independent living unit with
kitchen and sanitation facilities. May not be sold separate from primary
residence. Intended to increase supply of rental housing.
2. Junior ADU (JADU) –
▪ Contained within an existing residence
▪ Considered to be part of that residence
▪ 500 SF size limit
▪ Separate entrance required
▪ Efficiency kitchen required
▪ Separate or shared bath ok
▪ May not be used as vacation rental
▪ Owner must live on premises
▪ JADU deed restriction required
3. ADU –
▪ Attached or detached
▪ 1,200 SF size limit (detached)
▪ If attached, may not exceed the lesser of 50% of existing living area or 1,200 SF 2
What is an Accessory Dwelling Unit (ADU)?
Three Sets of Regulations for ADUs
in Unincorporated Mendocino County
1. Inland: Mendocino County Code, Title 20, Division I
2. Coastal Zone (including Gualala Town Plan area): Mendocino
County Code, Title 20, Division II
3. Town of Mendocino: Mendocino County Code, Title 20,
Division III
3
First Question: Inland or Coastal?
4
▪ ADU is not allowed if there is more than one dwelling unit on parcel. (JADU is not
considered a separate dwelling unit)
▪ ADU is not allowed if there is more than one “accessory residential unit” (guest cottage,
detached bedroom) on parcel.
▪ 1 parking space is required per ADU. Tandem parking is ok. No parking required if located
within ½ mile of public transportation stop.
▪ Fire sprinklers are not required if they are not required in primary residence.
Process:
1. Environmental Health sign-off on septic
2. Environmental Health sign-off on water
3. Preliminary clearance from CalFIRE
4. Building permit
5
Mendocino County – Inland ADU Requirements
▪ Only one JADU is permitted per parcel.
▪ Owner must reside on site.
▪ No additional parking required.
▪ JADU is considered part of primary residence.
▪ JADU may not be used as vacation rental.
Process:
1. Environmental Health sign-off on septic and water. For
purposes of evaluating septic and water capacity, JADU is
not considered an additional bedroom
2. Deed restriction
3. Building permit6
Mendocino County – Inland JADU Requirements
▪ Current Local Coastal Program (LCP) prohibits ADUs, except in Town of
Mendocino and Gualala Town Plan area
▪ Planning Commission made recommendation to BOS on draft LCP
Amendment for ADUs (July 18, 2019)
▪ Board of Supervisors will conduct public hearing and consider action on LCP
Amendment for ADUs (Nov 5, 2019 at St. Anthony’s Hall in Mendocino)
▪ Once LCP Amendment is submitted to Coastal Commission, it will take about
6 months for review and certification
▪ Then LCP Amendment (General Plan and zoning ordinance amendments)
must go through local adoption process
▪ New regulations for ADUs in coastal zone should be in place by late 2020
7
Mendocino County - Coastal Zone ADU Regulations
Status Update
In general, Coastal ADU regulations will be aligned with Inland ADU regulations, with the following
additional requirements:
▪ 500-unit cap will be established on number of ADU permits that may be issued after which County
must update SR 1 Capacity Study and process an LCP Amendment to modify or remove cap.
JADUs are not subject to the cap
Gualala Town Plan area retains separate 100-unit cap on ADUs
▪ ADUs and JADUs may not be used as vacation rentals (Inland: ADUs can be VHRs)
▪ Deed restriction required for ADUs and JADUs (Inland: not req’d for ADUs)
▪ Local fire district and CalFIRE clearance required (Inland: only CalFIRE clearance req’d)
▪ In Gualala Town Plan area-
Existing size limitations for ADUs are retained: 960 SF for detached; 500 SF for attached
Existing prohibition on ADUs west of SR 1 is retained
▪ Coastal resource protection policies and Coastal Development Permit requirements
8
Mendocino County Coastal ADU and JADU Requirements
1. JADUs will be Exempt from the CDP requirement.
2. ADUs that are consistent with “objective criteria” in checklist (shown on next slides) will
be eligible for a new Ministerial CDP process.
▪ Streamlined permit process
▪ No public hearing required
▪ No local (BOS) appeal process
▪ If within Coastal Commission’s appeal jurisdiction, may be appealed to Coastal
Commission
3. ADUs that are not consistent with the “objective criteria” but can be found to be
consistent with LCP coastal resource protection policies may apply for a Standard
CDP.
9
Mendocino County Coastal ADU Requirements
Coastal Development Permits
❑ ADU (including site improvements such as parking, driveways, wells,
septic, etc.) may not be located within 100 feet from boundary of
Environmentally Sensitive Habitat Area.
❑ ADU may not be located within Highly Scenic Area unless it would not
be visible from public areas (highways, roads, coastal trails, beaches,
parks, streams and waters used for recreational purposes).
❑ ADU may not be located within 125 feet from edge of coastal bluff
unless within existing legally permitted structure.
❑ Total amount of grading may not exceed 20 cubic yards.
❑ ADU may not interfere with public or prescriptive access to blufftop or
shoreline. (no exceptions)
10
Mendocino County Coastal ADU Requirements
Coastal Resource Protection Checklist
❑ ADU may not be located on parcels designated as FP, DL or SS
Combining Districts.
❑ On parcels with AG, RL, FL or TPZ zoning, ADU may only be located
within 150’ of existing legally permitted structure. (no exceptions)
❑ On parcels with AG or RL zoning, ADU may only be located on non-
prime soils.
❑ On parcels zoned FL and TPZ, ADU may only be permitted in locations
where no timber removal is necessary.
❑ ADU may not be located within 200’ of lands designated AG, RL, FL or
TPZ unless it is attached to existing residence and maintains existing
setback. (no exceptions)
11
Mendocino County Coastal ADU Requirements
Coastal Resource Protection Checklist
✓ Stay involved. Attend the November 5th Board of Supervisors hearing.
Write to the Coastal Commission and voice your concerns. Attend
the Coastal Commission hearing.
✓ Be patient. Coastal ADU regulations are still a year out.
✓ Getting permits for a JADU or an ADU that qualifies for the Ministerial
CDP will be much easier, quicker, and less costly than getting a
Standard CDP for an ADU.
✓ If you need a Standard CDP, be prepared to provide supplemental
studies (botanical, geotechnical, story poles, etc.).
✓ When you file a CDP application - make sure it includes a very clear
and thorough site plan.
GO FOR IT + GOOD LUCK!12
ADVICE
13
QUESTIONS?
Dancing Dog Design BuildCynthia Sharon, Contractor
www.dancingdogdesignbuild.com
A Small Sample of
Dancing Dog Small Units
2nd Unit Design Considerations
Smaller & more efficient
Build in flexibility
Focus on quality & details
Simple = less expensive
Always do passive solar
More environmentally sustainable
Right size for smaller household
Ways to proceed....
Option 1: Hire an
Architect & Contractor
and let them do most
of the work
Option 2: Use free
second unit and plans,
with small modifications
and hire a contractor
to do the work.
Option 3: Use free plans, hire
a contractor to do most of
the work, and complete some
of the finish work yourself.
Option 4: Act as your own
general contractor and hire
and manage all subs.
Considerations
Selecting a contractor
Word of mouth, reputation
Check status of License at the
State Licensing Board
Ask to talk to previous clients
Ask for pictures of work
Goodness of fit - comfortable
working together
Further Considerations
Construction is stressful
Commitment of time
and money
Realization of your
vision
Give yourself a
financial cushion
Types of Contracts
Value of the Contract - defines expectations and
protects both parties
Fixed Bid - requires all design decisions be made
before biding or many change orders....
Time & Materials - get a budget (estimate) allows
for more design flexibility throughout the
construction process.
Not to Exceed Contract - Hybrid
Contract Questions
Fixed bid
What is in the bid?
Get as much detail in the bid
as you can. Provides info to
negotiate future change orders
What are the allowances?
How are change orders
handled?
Do you have a time frame in
your contract with penalties for
non-performance?
Time & materialsWhat is the P&O rate
What is the hourly rate
Can you purchase some of the materials yourself to save on markup?
Good communication regarding changes in design & materials
Comparing bids
Price is not the only
issue
Quality of workmanship
Reputation
Timing of job
Handling change
orders
Quality of
Communication
Cleanliness of job site
Paying the contractor
Fixed Bid - monthly
progress payments
based on amount
complete
Time and Materials -
payments based on
work completed and
materials used
Retention is 5 to 10%
Construction - Straw Bale
Sustainable
Super insulating for
sound and heat
Fewer local
contractors with
skill
Beautiful aesthetic
Construction - Stick frame
Easy permitting
Most flexibility of
design
Most customizable
Easier DIY
Proven in our area
Many capable
contractors
Easy resale value
3 to 6 months for
construction
Slab or perimiter
foundation
Type of finishes drive
cost
More articulation =
more cost
Tiny Home
Can you really live is
such a small space
Permitting & legality
“Affordable”
Customizable
Many self-contained
systems
Construction - Manufactured
and Modular
Variable time frame for
delivery
Transportation costs &
timing
Difficult to find contractor
to take on this type of
project
Can be lower quality
Financing issues
May be less expensive
Questions?
The Business of Building,
Owning and Selling a 2nd UnitMarie Jones
Marie Jones Consulting
Topics...
Do second units add value to your property for resale?
Designing and locating a second unit for maximum
value
Typical cost of construction
Is it financially smart to build a second unit? Understand
the Cap rate and IRR....
How to finance your second unit
How to run it like a business
Tax implications of a second unit
How do realtors and banks value
second units?
Biggest purchasing demographic is the out-of-town buyer, retiring sometime in the future, who wants to get income from their property, but still have a place to come and stay when they come to the area themselves.
Glut of vacation rentals, vacancy rates are increasing and income potential is going down.
Rent the primary home on a month-month, and the 2nd unit has value for an out of town owner who wants a place to visit.
Typical appraisal valuation of a second unit is around $100,000, implications for bank loan
Second units are currently a fair investment for resale, although it depends on the cost of construction.
Design/location for Maximum Rental &
Resale Value
Considerations: How good is your neighborhood? How much can you anticipate in rental income? Nicer units attract better tenants who are more responsible and can pay more. You can spend too much money making the unit nice....
Option 1 - Separate Second Unit
Separate vehicle entrance
Construct the unit a fair distance from primary unit, consider utility connections....
Separate yard & landscaping
Quality kitchen and bath
Best size is in the 800 to 1,200 SF range
Option 2 - Second Unit above a garage.
Construction Costs
Soft Costs (15 to 25%)
Permitting (time & money) - $8,000 - $15,000
Studies: Botanical & Biological, Geotechnical, Archaeology, Visual
Analysis $3,000 to $10,000
Design & Engineering $0 to $15,000
Hard Costs (75 to 85%)
Site Clearing & Access - $5,000 to $20,000+
Construction - $120,000 - $170,000+
Utilities (septic, water, PG&E, Propane, etc.) $3,000 - $15,000+
Landscaping $1,000 to ?
Realistic total cost $150,000 to $200,000 could be more depending
on site conditions and design
Feasibility Analysis
CAP Rate
Simple way of evaluating the financial performance of a real estate asset
(Total Annual Rent-taxes and insurance)/Total Cost of Structure
Preferred CAP rate for a real estate investment is 8%+
Example: Second Unit Evaluation
Total cost to construct second unit estimated at $120,000
Total Annual Rent estimated as $14,400 ($1200/month)
Total annual taxes and insurance $1,500
Cap Rate ($14,400-$1,500)/$150,000 = 8.6%
Feasibility Analysis continued
Internal Rate of Return (IRR)
Complex evaluation of return on investment.
Considers the cost of the improvement, the
revenues minus expenses over a twenty-year
time frame and the appreciation of the asset
upon sale in 20 years.
This is the actual amount of money you will
make from the 2nd unit.
Financing Your Project
Your Cash – may be best option…
Construction Loan
Pay interest only on out standing amount. Higher interest rate.
Loan to value ratio 70% - 80% based on value of improvement upon
completion
Take out Mortgage
Manufactured homes not eligible for secondary market financing.
Second Mortgage, may be difficult because most mortgage companies
don’t want to hold a second mortgage due to heightened risk. Possible if
you have significant equity in your property. Higher interest rate.
Refinance Existing Mortgage – probably not a great idea if you have paid
off more than five years of your mortgage.
Operating a 2nd Unit Rental
Revenues & Expenses
Expenses
Taxes – reappraisal
Insurance
Utilities – separate electrical meter, well cost, septic pumping, propane
Maintenance & repair reserve (3 to 5% of revenue per year)
Depreciation
Management costs (plan on one month of vacancy every 2 years and
associated cleaning costs)
Revenues
Rent
Utilities payment (Sub Metering)
Operating a 2nd UnitTax implications
Schedule E for rental income
If your residential home is on the same property as the rental unit,
you can not have a net negative (loss) income from the rental
Depreciation (loss) = value of 2nd Unit/27.5 years.
Tax rate for net rental income is the same as your
income tax rate.
Income Analysis Example
$150K Second Unit
Second Unit Tax Analysis
Annual
Rental Income 15,600.00$
Expenses
Mortgage (Attributable to 2nd unit) 5,700.00$
Property Taxes 1,500.00$
Direct expenses 700.00$
Depreciation 5,454.55$
Total Expenses 13,354.55$
Net Taxable Rental Income 2,245.45$
Actual Rental Income 7,700.00$
Operating a 2nd Unit Rental
Enjoy working with people, who may
sometimes be demanding
Enjoy small repair projects
Can handle the rental cycle: advertise,
show, select a tenant, lease for a year or
two, repair & clean and repeat.
Inspect and repair properties
Book keeping, tracking revenues and
expenses and completing schedule E
Questions?