Seca seminar 2013 clean marine - nils høy-pettersen

21
Clean Marine AS Presenting Exhaust Gas Cleaning System at Shortsea shipping seminar 20th June 2013 Wednesday, May 18, 2022 1

description

 

Transcript of Seca seminar 2013 clean marine - nils høy-pettersen

Page 1: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023

Clean Marine ASPresenting

Exhaust Gas Cleaning Systemat

Shortsea shipping seminar 20th June 2013

1

Page 2: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 2

Clean Marine AS

• Company created in 2006 - one of two founders of EGCS Association• Invested more than USD 20 mill in EGCS development• Pioneering and patented multi stream and hybrid system • 20+ employees with deep maritime and process expertise• HQ in Oslo, Norway • The major shareholders are well-reputed maritime investors:

– Klaveness Invest AS (Klaveness Marine)– Nanga Partnership L.P. (advised by Smedvig Capital) – AS Atlantis Vest (Rieber)

Page 3: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023

With proven technology and the recent contract with Samsung / AET we are well positioned for sales growth• Contracts:

– MV Balder: EGCS installed 2012/2013 and is now fully certified – Samsung / AET – 2 x 120k dwt. shuttle tankers to be delivered Q4 2014 + Q1 2015

• Main focus – bulk, tankers, Ro-Ro, PCTC, containers • A growing agency network in Europe and Asia will facilitate sales & after service

10 exhaust sources (2xME, 5xAE, 3xBoiler )

served by one EGCS!

Agent established / under discussion

Page 4: Seca seminar 2013   clean marine - nils høy-pettersen

Only 19 months left for ship owners to complywith the IMO Annex VI Sulfur requirements

3,5 %

0,5 %

0,1 %

1,0 %

2015 2020 2025

ECA

GLOBAL

• Local requirements will probably be aligned with ECA

• Legislation for EU Ports and California presently require 0,1% sulfur content

4,5 %

Today

Sulfur in fuel

2015 2020 2025

(*)

Pending fuel situation in 2018

(*)

8,000 vessels affected?

60,000 vessels affected?

Page 5: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 5

The business case for installing an EGCS

Options for compliance with regulations:1. Switch to distillate (MGO) – pay the extra fuel bill 2. Install EGCS – continue operation on HFO3. Switch to other fuel types (LNG or LPG) – limited supply

Optimal choice depend on:4. How much the vessel will be trading in ECA5. The power (MW) and fuel consumption of the vessel6. Assumed price difference between MGO and HFO

Example:10MW vessel trading in ECA and USD 300 fuel spread gives fuel cost = USD 3,4 mill./yearEGCS price: USD 2,6 mill + Installation cost USD 0,8 mill = USD 3,4 mill.

ECA%

Payback (years)

20% 40% 60% 80% 100%123456789

10

Price diff. < 300

Price diff > 300

Page 6: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 6

Scrubber technologies

Page 7: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 7

EGCS – technologies

Page 8: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 8

EGCS vendors

SIT

1st

2nd

New?

Page 9: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 9

Various products and applications

Page 10: Seca seminar 2013   clean marine - nils høy-pettersen

Clean Marine EGCS

Main Engine

April 10, 2023

Boiler Aux. Engine

Gas recirc

Fans

P0

P1

AVC

True multi stream• Zero back pressure • No blockage risk High trapping efficiency• SOx• PM

Hybrid – open / closed loop• Seamless operation• High pH in washwater

Easy to operate and monitor• Excellent noise abatement• Self cleaning• Installation friendly

Page 11: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 11

Rules, Certification, Limits

• Rules and regulations: IMO Guideline, Class Guidelines, Regional/Local regulations (EU directive, VGP US)

• Certification: Scheme A or Scheme B (monitoring)• Monitoring:

– SO2/CO2 (97-98 % reduction required)– pH (6,5 at 4m from outlet, 6 at outlet suggested by VGP) – Turbidity (Diff In/Out 25 FNU)– PAHphenantrene equiv. (Pending amount of water per MW)

Page 12: Seca seminar 2013   clean marine - nils høy-pettersen

Process diagram

April 10, 2023 12

Page 13: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 13

Certification

Concept study

Fabrication and Installation

Planning

Lay out plans

Plans for approval

Hearing

Plan approval - class adopted EGCS rules

Site inpsction

Commissioning and Certification

Scheme B

• OMM• ETM-B• SECP

Statement

Approved plans

Installation inspection

report

Compliance verification

• MED-B• MED-F

Hand over IAPP Survey IAPP Endorsment

Page 14: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 14

IAPP CERTIFICATE

Page 15: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023

Delivery and comissioning timeline

15

Tasks/phases Deliveries WeeksConcept study Lay out - conceptual

Equipment specification - preliminaryInstallation requirements - general Budget

4

Contract 1 Letter of Intent 1Detailed study Lay out verification - ship inspection

Installation specificationEquipment specification - BOM and P&IDYard quotes Equipment quotes

4-6

Contract 2 Purchase and installation 1Preplanning Equipment ordering and logistics

Plan drafting and approvalInstallation scope - prefabrication

12 - 14

Installation Equipment ready installed and approvedFinal documentation

4 - 6

Commissioning Successful tests during voyage 1SUM TIME 27 - 33

Page 16: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 16

Principal lay out

Page 17: Seca seminar 2013   clean marine - nils høy-pettersen

Sizing of EGCS

April 10, 2023 17

Amount Exhaust 1000kg 300 260 240 220 200 180 160 140 120 100 90 80 70 60 50 40 30 20 Ø Inner tube 2,3 2,1 2,0 1,9 1,8 1,7 1,6 1,5 1,4 1,3 1,2 1,2 1,1 1,1 1,0 1,0 0,9 0,9Ø Outer tube 3,8 3,5 3,4 3,3 3,1 3,0 2,9 2,7 2,6 2,5 2,4 2,3 2,3 2,2 2,1 2,1 2,0 1,9H1 (Double pipe) 4,1 3,9 3,7 3,6 3,5 3,3 3,2 3,0 2,9 2,8 2,7 2,6 2,6 2,5 2,4 2,3 2,3 2,2H2 (Inlet section) 4,1 3,9 3,7 3,6 3,5 3,3 3,2 3,0 2,9 2,8 2,7 2,6 2,6 2,5 2,4 2,3 2,3 2,2H3 (Branch pipe section) 2,2 2,0 2,0 1,9 1,8 1,7 1,6 1,6 1,5 1,4 1,4 1,3 1,3 1,2 1,2 1,2 1,1 1,1H4 (AVC) 11,4 10,2 9,6 9,0 8,4 7,8 7,2 6,6 6,0 5,4 5,1 4,8 4,5 4,2 3,9 3,6 3,3 3,0H5 (Water trap) 1,8 1,6 1,5 1,4 1,3 1,2 1,1 1,0 0,9 0,7 0,7 0,6 0,6 0,5 0,5 0,4 0,4 0,3H6 (Exhaust outlet pipe) 1,2 1,0 1,0 0,9 0,9 0,8 0,8 0,7 0,7 0,6 0,6 0,6 0,6 0,5 0,5 0,5 0,5 0,4Total height H 24,9 22,6 21,5 20,4 19,3 18,2 17,1 15,9 14,8 13,7 13,1 12,6 12,0 11,5 10,9 10,4 9,8 9,2Width W 12,3 11,2 10,7 10,1 9,6 9,0 8,5 8,0 7,4 6,9 6,6 6,3 6,1 5,8 5,5 5,3 5,0 4,7Depth D 7,3 6,6 6,2 5,9 5,5 5,1 4,8 4,4 4,1 3,7 3,5 3,3 3,2 3,0 2,8 2,6 2,4 2,3Mass mt 33,2 30,0 28,4 26,8 25,2 23,6 22,0 20,4 18,8 17,2 16,4 15,6 14,8 14,0 13,2 12,4 11,6 10,8

Main water pump 1200 1040 960 880 800 720 640 560 480 400 360 320 280 240 200 160 120 80Preinjection pump 60 52 48 44 40 36 32 28 24 20 18 16 14 12 10 8 6 4

Machinery in operation

Load %

Load kW

Exhaust production kg/h

1xME MAN 100 5640 477502x AE Himsen 75 2 x 750 118362xThermal heater 100 2 x 2000 7000Sum 66586

Page 18: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 18

Installation May/June 2012 (10MW)

Page 19: Seca seminar 2013   clean marine - nils høy-pettersen

Removal old funnel, cleaning out upper engine room casing, erection of AVC, installation of AVC, installation of fans

April 10, 2023 19

Page 20: Seca seminar 2013   clean marine - nils høy-pettersen

Installation of new funnel top

April 10, 2023 20

Page 21: Seca seminar 2013   clean marine - nils høy-pettersen

April 10, 2023 21

Thank you!