Sebastian Kastuli Commercial Manager Songas Tanzania
Transcript of Sebastian Kastuli Commercial Manager Songas Tanzania
Sebastian KastuliCommercial Manager
SongasTanzania
Songas Project – 8 years record of achievement
� Supplies around 1/3 of the country’s power from UPP
� Cheapest thermal power in the country <$0.06/kWh
� Provides gas for around half of the country’s useable power capacity
� Savings to Tanzania >USD 2.0 billion
� Two Investments so far
� 2004 original investment
� 2005 further generating capacity
Songas business today
TANESCOGas Sellers
(PAT / TPDC)
Train 1
Train 2Pipeline
UGT 1 UGT 2
UGT 3 UGT 4
UGT 6UGT 5
Song's provides two services:�Process & transport gas on behalf of TPDC & PAT to DSM�Generate Electricity for TANESCO
Ubungo Power Plant (UPP)
� Six gas turbines at UPP generate and supply electricity to Tanesco.
� 2 gas turbines are Siemens’engines – SGT-600 average capacity of 20MW each,
� 4 gas turbines are General Electric engines type LM6000 average capacity of 35MW each.
� Total Generation Capacity 180MW
Siemens SGT-600 Industrial Gas Turbine
An aerial view of the SSI Gas Plant
Capacity of the current infrastructure
SSI Production - Monthly Max Capacity, Average daily output per month (MMSCFD)
Promoting Private Sector Investment in Tanzania
� Clear responsibility for the planning of and contracting for new investments,
� Clear strategic energy sector master plan,
� Stable and transparent legal and regulatory framework,
� Government responsiveness to the needs of the investors,
� Minimum government interference to private investment,
� Provide opportunities for private sector to build, operate and own power facilities,
� Improve the public debate about the energy sector.
What investors needs from National Government?
Promoting Private Sector Investment in Tanzania (Continued)
� Establish a regulatory e.g. .EWURA in Tanzania,
� Implement realistic and sustainable electricity pricing tariff
� Implementation of structural reforms that clearly delineate the roles of grid and distribution system operator and the generation sector
� Taxes and duties e.g. Exemption from taxes, tax relief, grace periods for debts
� Adequate cash flow in the sector e.g. Cost-reflective tariffs setting TZ as example
What investors needs from Regulator & The Utility.
Benefits of private Sector Investments
� Mobilise international (and domestic) Capital,
� Reduced Burden on Government Budget,
� Allows focus of Governmental funds on sectors that can’t attract private capital
� Ensures world class performance of availability, Reliability, Efficiency of the power
� Maintain international standards of;
� Safety
� Operation and Maintenance� Environmental Compliance
� Regulatory and Legal Compliance
� Enhance Local competence
� Stimulate the introduction of new technology
Promoting Private Sector Investment
THANK YOU
ANY QUESTIONS/COMMENTS PLEASE?