SEADRIFT PIPELINE CORPORATION - Seabrook, TX
Transcript of SEADRIFT PIPELINE CORPORATION - Seabrook, TX
PIPELINE DESIGN DATA
1.1 GENERAL INFORMATION
1.2 APPLICANT/OWNER: SEADRIFT PIPELINE CORPORATIONC/O THE DOW CHEMICAL COMPANY1254 ENCLAVE PARKWAYHOUSTON. TX. 77077ATTENTION: MR. JERE DIAL (281) 966-4068
1.3 PIPELINE NAME: 6’ UCAR PIPELINE
1.4 PRODUCT: Ethylene
2.1 PIPELINE DESIGN DATA
2.2 DESIGN CODES: CODE OF FEDERAL REGULATIONSTITLE 49, PART 192MINIUM FEDERAL STANDARDS FOR THETRANSPORTATION OF HAZARDOUS GAS BY PIPELINETHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME B31.4. PIPELINE TRANSPORTATION FOR LIQUIDSASME B31.8 GAS TRANSMISSION AND DISTRIBUTION
2.3 DESIGN PRESSURE: 1585 PSIG (MAXIMUM ALLOWABLE OPERATING PRESSURE)
2.4 TEST PRESSURE: 3020 PSIG (MINIMUM TEST PRESSURE) X 24 HRS
3.1 CARRIER LINE PIPE AND CROSSING PIPE DATAITEM LINE PIPE
3.2 OUTSIDE DIAMETER: 6.625”3.3 WALL THICKNESS: 0.312” AT CLASS 1 LOCATIONS
0.432” AT CLASS 3 LOCATIONS AND HDDS
3.3 SPECIFICATION: API 5L 2M or N X423.4 SPECIFIED TENSILE: 42,000 PSI (MIN) YIELD PROPERTIES3.5 MATERIAL: CARBON STEEL3.6 PROCESS OF MFG: ELECTRIC RESISTENCE WELDED (ERW)3.7 EXTERIOR COATING: FUSION BONDED EPOXY
4.0 CATHODIC PROTECTION RECTIFIER IMPRESSED CURRENT
5.1 CONSTRUCTION METHODS
5.2 0.312 wt PIPELINE INSTALLED BY OPEN CUT WITH MINIMUM COVER OF 39”
SEADRIFT PIPELINE CORPORATION6” UCAR PIPELINE Sheell
DRAWN BY CHECKED BY APPROVED BY REVISION DATE:11-14-17 DRAWING NUMBER —
-0- IWGMIJ0b#1O9614 —
PIPELINE DESIGN DATA
1.1 GENERAL INFORMATION
1.2 APPLICANT/OWNER: SEADRIFT PIPELINE CORPORATIONC/O THE DOW CHEMICAL COMPANY1254 ENCLAVE PARKWAYHOUSTON. TX. 77077ATTENTION: MR. JERE DIAL (281) 966-4068
1.3 PIPELINE NAME: 10” MB PIPELINE
1.4 PRODUCT: Propane
2.1 PIPELINE DESIGN DATA
2.2 DESIGN CODES: CODE OF FEDERAL REGULATIONSTITLE 49, PART 192MINIUM FEDERAL STANDARDS FOR THETRANSPORTATION OF HAZARDOUS GAS BY PIPELINETITLE 49, PART 195MINIUM FEDERAL STANDARDS FOR THETRANSPORTATION OF HAZARDOUS LIQUID BY PIPELINETHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME B31.4. PIPELINE TRANSPORTATION FOR LIQUIDSASME B31.8 GAS TRANSMISSION AND DISTRIBUTION
2.3 DESIGN PRESSURE: 2116 PSIG (MAXIMUM ALLOWABLE OPERATING PRESSURE)
2.4 TEST PRESSURE: 3174 PSIG (MINIMUM TEST PRESSURE) X 24 HRS
3.1 CARRIER LINE PIPE AND CROSSING PIPE DATAITEM LINE PIPE
3.2 OUTSIDE DIAMETER: 10.750”3.3 WALL THICKNESS: 0.438” AT CLASS 1 LOCATIONS
3.3 SPECIFICATION: API 5L 2M or N X523.4 SPECIFIED TENSILE: 52,000 PSI (MIN) YIELD PROPERTIES3.5 MATERIAL: CARBON STEEL3.6 PROCESS OF MEG: ELECTRIC RESISTENCE WELDED (ERW)3.7 EXTERIOR COATING: FUSION BONDED EPOXY
4.0 CATHODIC PROTECTION RECTIFIER IMPRESSED CURRENT
5.1 CONSTRUCTION METHODS
5.2 0.438 wt PIPELINE INSTALLED BY OPEN CUT WITH MINIMUM COVER OF 39”
SEADRIFT PIPELINE CORPORATION10” MB PIPELINE Sheet I
DRAWN BY CHECKED BY APPROVED BY REVISION DATE:11-14-17 DRAWING NUMBER
-0- IWGMIJob#109614
SITE:LOCATION:
PROJECTLOCATION ‘qq/d
DIVISION: A4-MDT14O15-172413
LEGENDWATERS EDGE
WATER
WETLM~D
JOB NO: 109614
Di EN TRY..= 13:7s4,3e~.7.5
3.234.31852
TX-GV-MDT-0 0.70CENTERPOINT ENERGY
HOUSTON ELECTRIC LLC
PIPE SPECIFICATIONS10.750’ O.D X 0.438 W.T., X52DUAL FEE WITH ARC FBE TOPCOAT 35.40 MILSMAOP: 2116 PSIGTEST PRESSURE. 3174 PSIGPRODUCT PROPANECONSTRUCTION METHOD HDD
PIPE SPECIFICATIONS6.626’O.D.x ‘.312W.T X42D AL FBE WITH ARO FBE TOPCOA 35-41 MI SMAOP 1585 P510TEST PRESS RE. 3020 P510PRODUCT: ETHYLENECONSTRUCTION METHOD HDD
TX-GV-MDT-020.10FAY &FAY, LTD.
Iiiz-J
I0I—
MPORARYWORKSPACE
“ii
‘~A 1I.
45’ TEMPORARYWORKSPACE ~t;~ t~/ Sjn
29 TEMPORARYTX-HR-MDT-012i0 • WORKSPACE
CENTE~OINT ENERGY4OIJSTON ELECTRIC U.C
A‘I
PROPOSED 6” PIPELINE& 10” PIPELINE
PLANSCALE: 1”= 1000’
TX-GV-M DT-0 18.50CENTER POINT ENERGY It~C
HOU$TO~EL.ECIR
I:p.
TX-HR-MDT-020.30HCFCD
TX-GV-MDT-020.00FAY& PAY, TO.
if
>-
I—zUJ~.
+
InC’,d
~1
.~ or
p *4•tt ~
4 ~ 80995 ~zes~qI~ 6~ONALt~’..f3
C,z
G9D
>
zw
InC0
0F0a
I 300
-30-60-90
•120-150
NATURAL%Ic$GROUND
-180-210
PROFILE1” = 1000’ HORIZ
1” = 200’ VERT.BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983NSRS 2007), SOUTH CENTRAL ZONE, US
SURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS.
SEADRIFT PIPELINE CORPORATIONPROPOSED 6’ & 10” PIPELINES SECTION 10
CROSSING CLEAR CREEK CHANNEL
~T14015-172413STATE HIGHWAY 146 PIPELINE RELOCREV DATE SCALE ATION PROJECT
SHEET: 2OF3
Ui2‘C2LU-JU
SITE:LOCATION
~14;
PROJECTLOCATION ~b
DIVISION: A4-MDT14O15-172413
LEGEND
WATERS EDGE
WATER
WETLAND
JOB NO: 109614
fl-GV-MDT.O18.50CENTERPOINT ENERGY rib
-lousroS EtECTRIC
I—zLLJZDctS0—
+~fjCt,£
DL ENTRY= 13;764,36~.m
3.234.316.62
TX-GV-MDT-O 10.70CENTERPOINT ENERGY
HOUSTON ELECTRIC LLC
PIPE SPECIFICATIONSlO.750 0.0 X 0.438 W.T. X52DUAL FBE WITH ARO FBE TOPCOAT 3540 MILSMAOP: 2116 PSIGTEST PRESSURE 3174 P510PRODUCT: PROPANECONSTRUCTION METHOD HDD
PROFILE
PIPE SPECIFICA IONS 1:1000’ HORIZ,1 200 VERT.8.626 O.D. x ‘.3 12 W.T X42DUAL FBE WITH ~RO FBE TOPCOAT 3540 MILS.MAOP 1585 PSIGTEST PRESSURE. 3020 P510PRODUCT: ETHYLENECONSTRUCTION METHOD: HOD
TX-H R-MDT-02O,3OHCFCD
LUz-JIC)I—
EMPORARYRKSPAGE / Si
45 TEMPORARYWORKSPACE
TX-HRMDT4I2.10CENTERPOINT ENERGY
I4OUSTON ELECTRIC LLC
25’ TEftWORARYWORKSPACE
/‘‘‘‘
PROPOSED 6” PIPELINE& 10” PIPELINE
PLANSCALE: 1”,I000’
NATURALGROUND
TX-GV-MDT-O20.10FAY &FAY, LTD.
TX-GVMDT.02D.0OFAY&FAY, LTD.
-J
tc_or
~
4 80995 /4J‘I 2~N~ft’fl / -
‘~~~t~S-’ 3/I ?/ t’
C,
gC-,
>
zLU
>-00
C
LU
C0-
300
-30-60-90
-120-150-180-210
::z::::.::z::: .:::::::::~:::::::::::::::::::::::: . .....:.:........-::,
PROPQSED-6~PIPEL/NE~
BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983(NSRS 2007 SOUTH CENTRAL ZONE USSURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS.
SEADRIFT PIPELINE CORPORATION I ____
I V\/~f WOOD GROUP USA. INC.PROPOSED 6” & 10” PIPELINES SECTION 10 I ~S~SDENONE~F~F.2909
I PROJECT NO: 00006CROSSING CLEAR CREEK CHANNEL I
STATE HIGHWAY 146 PIPELINE RELOCATION PROJECTA4-MDT14O15-172413REV DATE SCALE ____________________
SHEET: 2OF3 _______
SITE:LOCATION
DIVISION: A4-MDT14O15-172413
LEGENDWATERS EDGE
WATER
PROJECT WETI.ANDLOCATION
JOB NO: 109614
ITh-GV-&4DT.Q 18.50
CENTERPOINT ENERGY u4’cH0USTOI~ $.EOTR
-180-210
o ENTRY13,76436~J5
—J.234 318.52
t(-GV-MDr-0 070CENTERPOINT ENERGY
HOUSTON ELECTRIC LLC
>-
I—2
Z~
+
U,C”a‘-C
PIPE SPECIFICATIONS10.750 0.0 X 0.438 W.T. X52DUAL FBE WiTH ARO FBE TOPCOAT 35-40 MILSMAOP 2116 PSIGTEST PRESSURE: 3174 PSIGPRODUCT’ PROPANECONSTRUCTION METHOD HDD
PIPE SPECIFICATIONS6.626 0.D. x ‘.312W. X42DUA FBE WITH ARO FBE TOPCOAT 35-40 MILS.MAOP 1585 P516TEST PRESSURE. 3020 PS 6PRODUC ETHYLENECONSTRUCTION METHOD: HOD
L
wz-J
xC-)I—
TEMPORARYWORKSPACE
20
45’ TEMPORARYWORKSPACE
‘I/
iii,TX4IR4IDT.012.10
CENTERPOINT ENERGYHOeJ~TON ELECTRIC Lit
25 TEMPORARYWORKSPACE
TX-GV-MOT.02O.IOFAY &FAY, LTD.
TX-GV-MDT-020.OOFAY & AY. LTD.
1~.0
4.
TX-HR-MDT-02o. I
HCFCD
PROPOSED 6” PIPELINE& 10” PIPELINE
/ ‘PLAN . -
SCALE: 1’=lOOO’
NATURALGROUND
~Si
‘t c.~4s / -
%iSIONAi. £,f3/13/f‘%%~4.~~
0
PC’)>
zw
00
I
300
-30-60-90
-120-150
PROFILE1’ = 1000’ HORIZ.
1” = 200’ VERT.
IiJ~flh.P.fr1vfle1I;I
BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983(NSRS 2007), SOUTH CENTRAL ZONE, USSURVEY FEET, ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS,
I I
SEADRIFT PIPELINE CORPORATIONPROPOSED 6” & 10” PIPELINES SECTION 10
CROSSING CLEAR CREEK CHANNEL
________ A4-M DT14O 15-1 724 13STATE HIGHWAY 146 PIPELINE RELOCREV DATE SCALE ATION PROJECT
SHEET: 2•F3•IIaiI’I’
LU
zUJ-JLJ~69
TX-HR-MDT-023.40OHN M. BURKLAND& WIFE BETTY J. 1XHR-MDT-023.60
BURKLAND STACEY 0000
TX-H R-MDT-023JOHN M. BURKLAND
PROPOSED 6” PIPELINE6 10” PIPELINE
‘1± ~ —.
100 X 200’ADDITIONAL
usl~ TEMPORARY~ WORKSPACE
zw
>-a,
BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983(NSRS 2007), SOUTH CENTRAL ZONE, USSURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS.
SITE:LOCATION:
DIVISION
LEGEND
JOB NO: 109614
WATERS EDGE
WATER
WETLANDPROJECT NLOCATION
TX-HR-MDT-02O.20~ FAY&FAY, LTD.
45’ TEMPORARYWORKSPACE
TX-I-IR-MDT-021 .10CENTERPOINT ENERGY INC
HOUSTON ELECTRIC
0z‘9D
C,>
7
= -
STATE HWY. 146 UNION PACIFICRAiLROAD
TX-HR-MDT-021 .10CENTERPOINT ENERG INC
HOUSTON ELECTRIC
PLANSCALE: 1” 1000’
+
NATURALGROUND
Io—Sa- -a
-“-(S
0
I0
—IC,
0
zm
~ PIPE SPECIFICATIONS10.750’ O.D.X .438”W T. X52DUAL FBE WITH ARO FBE TOPCOAT 35.40 MILS
~ MAOP2II6PSIG5 TEST PRESSURE. 3174 PSIG~ PRODUCT PROPANE5 CONSTRUCTION METhOD HDD
I9~ SPEC JS 02/01/2018~ CHKD PAC 0310912018~ APPD WRA 03/09/2018
£
25’ TENPO~YWORKSPACE
HDD EXITN 13,775,285.12E = 3,231,126.28 D(-HR-MDT-023.70
CENTERPOJNT ENERGY INCTX-HR-MDT-023.10 HOUSTON ELECTRICfl-HR-MDT-021 .60
CENTERPOINT ENERGY INCHOUSTON ELECTRIC
F><
Co
or:
1wCoCD
-30-60-90-120-150-180-210
PIPE SPECIFICATIONS626 OD x .312WT.,X42
D ALFBEWTHAROFBETOPCOAT 35-4OMILMAOP 1585 P510TEST PRESSURE 3020 P510PRODUCT: ETHYLENECONSTRUCTION METHOD: HOD
W WOOD GROUP USA. INC.TDAS P1OS1~€D SeEERNO R~APROJECT NO: 109514
A4-MDT14O16-1 72413
PROPOSED 6” PIPELINE& 10” PiPELiNE
PROFILE1” — 1000’ HORIZ.
V— 200’ VERT.
BY DATE SEADRIFT PIPELINE CORPORATIONPROPOSED 6” & 10” PIPELINES SECTION 10
CROSSING CLEAR LAKE CHANNELSTATE HIGHWAY 146 PIPELINE RELOCATION PROJECTREV DATE SCALE 1 “lOOO
w
zw-JLILii
-J SHEET: 3OF3
SITE:LOCATION:
DIVISION: JOB NO: 109614
TX-HR-MDT-023.40JOHN M. BURKLAFID
& WIFE BETTY J.BURKLAND
rnHR-~DT-o23.eoSTACEY Oboe
WATERS EDGE
WATER
WETLAND
LEGEND
PROJECT NLOCATION
TX-H R-MDT-020.20~ FAY&FAY, LTD.
45’ TEMPORARYWORKSPACE
TX-HR-MDT-O2 1.10CENTERPOINT ENERGY INC
HOUSTON ELECTRIC
PROPOSED 6” PIPELINE& 10’ PIPELINE
TX-HR-MDT-023.50JOHN M. BURKLAND
a — ———--_____ - . __
STATE HWY. 146-JUi
0 UNION PACIFICRAILROAD
TX-HR-MDT-021.10CENTERPOINT ENERGY INC
HOUSTON ELECTRIC
PLANSCALE: 1’ = 1000’
25’ TEMPORARYWORKSPACE
NbC EXITN 13775,285.12E 3,231,126.28
TX-HR-MDT-023.1OTX-I-IR-MDT-021 .60
CENTERPOINT ENERGY INCHOUSTON ELECTRIC
bfl~LJZ
(3z0D
0
>
zLU
0
C
0-J0-
BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1985(NSRS 2007) SOUTH CENTRAL ZONE, USSURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM GPS OBSERVATIONS.
NATURALGROUND
C-)
r
7
PIPE SPECIFICATIONS
ODq
-jUJ
IOU’ X 200’ADDITIONALTEMPORARYWORKSPACE
TX-HR-MDT-023.70CENTERPOINT ENERGY INC
HOUSTON ELECTRIC
30C-30-60-90-120-150-180-210
PIPE SPECIFICATIONS6.626’ O.D. x 0.3 12 W.T. X42DUAL FEE WITH ~RO FBE TOPCOAT 35-40 NMAOP 1585 P510TEST PRESS RE. 3020 PS CPRODUCT: EThYLENECONSTRUCTION METHOD HDD
PROFILE1” = 1000’ HORIZ.
1’ = 200’ VERT.10.750’ O.D.X O.438’W.T.. X52DUAL FEE WITH ARO FSE TOPCOAT 3540 MILSMAOP: 2116 P510TEST PRESSURE. 3174 P510PRODUCT’ PROPANECONSTRUCTION METHOD HDD
_no SEADRIFT PIPELINE CORPORATIONPROPOSED 6” & 10” PIPELINES SECTION 10
CROSSING CLEAR LAKE CHANNEL
~T14016-172413.STATE HIGHWAY 146 PIPELINE RELOCREV DATE SCALE ATION PROJECT
SHEET: 30F3
w
zUi-JU-6,
SITE:LOCATION:
DIVISION: JOB NO 109614
fl_I, ‘c,<~I~,: ~ ~‘) ~
.H,fou~.1..- .4
L~J4~~“
‘I N’ ~‘ r
TX-H R-MD’r-02O.20PAY & FAY, LTD.
45’ TEMPORARYWORKSPACE
fl-HR-MDT-023.40JOHN M. BURKLAI4D
& WIFE BETTY J.BURKLAND
TX-HR-MDT-02 1.10CENTERPOINT ENERGY INC
HOUSTON ELECTRIC
PROPOSED 6’ PIPELINE& 10” PIPELINE
TX,I-IR-MDT-023.60&TACE’Y âbDO
TX-H R’-MDT-023.5OJOHN Id. BURKLAND
NATURALGROUND
25’ TENPOMRYWORKSPACE
NDD EXITN =13775285.12E 3,231,126.28
TX-HR-MDT-023. 10TX-HR-MDT-O2~ .60
CENTERPOINT ENERGY INCHOUSTON ELECTRIC
Lflj
7wCDCD
300-30-60-90
-120-150
180210
100’ X 200’ADDITIONALTEMPORARYWORKSPACE
LEGEND
nil”PROJECTLOCATION
“ill
WATERS EDGE
WATER
WETLM4D
STATE HWY. 146 UNION PACIFICRAJLROAD
Tx-H R-MDT-021.1DCENTERPOINT ENERGY INC
HOUSTON ELECTRIC
PLANSCALEH”~1O00’
-3’‘U
ii’
~t~— ‘~:..° BEARINGS AND COORDINATES ARE BASED ONTHE TEXAS COORDINATE SYSTEM OF 1983(NSRS 2007) SOUTH CENTRAL ZONE, USSURVEY FEET ELEVATIONS BASED ON THENAVD 88 DERIVED FROM OPS OBSERVATIONS.
C,z
0D
0
TX-HR-MDT-023.70CENTERPOINT ENERGY INC
HOUSTON ELECTRIC
I>t
On
I—
C~)IrzI]1
PIPE SPECIFICATIONS
j
l0.750 0.D.X .436’W.T., X52DUAL FBE WITH ARC FBE TOPCOAT 35-40 MILSMAOP’ 2116 P510TEST PRESSURE: 3174 PSIGPRODUCT PROPANECONSTRUCTION METHOD HDD
PROFILE1” = 1000’ HORIZ.
1” =200 VERT.PIPE SPECIFICATIONS
- 626 00, x 0.312 W.T., X42O AL FBE WITH ARC FBE TOPCOAT 35-40 MMAOP 1565 P510TEST PRESSURE: 3020 PSIGPRODUCT: ETHThENECONSTRUCTION METHOD HDD
SEADRIFT PIPELINE CORPORATIONPROPOSED 6” & 10” PIPELINES SECTION 10
CROSSING CLEAR LAKE CHANNELSTATE HIGHWAY 146 PIPELINE RELOCATION PROJECTREV DATE SCALE A4-MDT14O16-172413.
SHEET: 3OF3