Sea – Air – Space

8
“Sea Power to the Hands of Our Sailors” Distribution Statement A: Approved for Public Release; Distribution Unlimited. Sea – Air – Space RDML Jon Hill April 13, 2015

Transcript of Sea – Air – Space

“Sea Power to the Hands of Our Sailors”

Distribution Statement A: Approved for Public Release; Distribution Unlimited.

Sea – Air – Space

RDML Jon HillApril 13, 2015

2Distribution Statement A: Approved for Public Release; Distribution Unlimited.

ActivationRomania Poland

LethalityModernization

FORD (CVN 78)Combat System Activation

ZUMWALT (DDG 1000)Combat System Activation

AMOD IAMD Flight III AMDR Lethality &

Commonality

“Sea Power to the Hands of Our Sailors”

2Distribution Statement A: Approved for Public Release by NAVSEA PAO MM/DD/YY; Distribution Unlimited.

3Distribution Statement A: Approved for Public Release; Distribution Unlimited.

PEO IWS Programs and Projects

DISTRIBUTION STATEMENT D: Distribution authorized to DOD and DOD contractors only; Other requests must be referred to PEO IWS. AN/SPQ-9B

AN/SLQ-32

SPS-55

SPS-49

SPS-64

MMSP

SPY-3

SPY-1A/B/D

CEC

ECIDIS-N

MIPS III

SFSEFTAMD

NIFC-CA

SM-6

AGS

Griffin

LRLAP

MK 57 VLS

MK 46 30mm

MK 38

MK 45 SM-2 Blk IIIB/BLK IV

SeaRAM

NFCS

MK 75 76mm

RAM GMLS

Phalanx

SQQ-89: 2 Countries

SM-1/SM-2: 15 Countries

CIWS: 9 Countries

MK 41 VLS: 8 Countries

CEC: 1 Country AEGIS/ AWS:

5 Countries

MK 34 GWS:4 Countries

BFTT: 1 Country

SQQ-89

MK-32

Sub Arctic Warfare Dev.

CADRT

USW DSS

CV-TSC

ASW Advanced Dev.

Surface ASW Systems Imp.

SQS-56

SDRW/SRD/SCD

WQC-2A/6UQN-4A

LCS Mission Modules

SSDS Combat Systems Integration

in the following classes:

CPSCDS

AEGISCombat Systems Integration into DDG 51 and CG 47 class ships

AMIIP

LCS 1 & LCS 2 Combat Systems

Variant Integration

DDG 1000 Combat Systems (TSCE)

Integration

LPD

LHA

LSD

LCS 1

LCS 2

AN/WSN-9

RLGNAN/BSN-2

CVN

LHD

EnterpriseT&E (SDTS)

BL 9 Common Source Library

AEGIS Modernizationn New Construction

Single SourceLibrary

Common Computing Equipment

DDG 1000

WSN-7/9: 4 Countries

NFCS: 1 Country

Ammunition: 17 Countries

Radars: 1 Country

RIM-7/MK57 NSSMS

ESSM BLK 1/2

Information Assurance AboveWaterSensors

UnderseaSystems Surface Ship 

Weapons

International& FMS

SSDSFuture C/S

NSPO

RAM

RAM BLK 2

RAM BLK 1

SPS-67

SPS-48SPS-40

SPS-73

SEWIP

AN/SPY-6

NULKA

AOEW AMP

DBR

AN/SPY-6Integration

125 – Program & Projects

3 – ACAT I6 – ACAT II4 – ACAT III3 – ACAT IV3 – R&D

29 – Inactive77 – Non ACAT

Mission: To develop, deliver, and sustain operationally dominant combat systems to Sailors and Marines: “Sea Power to the Hands of our Sailors”MK 110 57mm

4Distribution Statement A: Approved for Public Release; Distribution Unlimited.

• FLEET READINESS – Execute determined focus on sustainment– In‐service support for Sensors, Weapons, Launchers and Combat Systems – Navigation Wholeness – LCS Combat System Readiness – Maritime Theater Missile Defense Forum At‐Sea Demo 15

• PACE THE THREAT – Fleet introduction of new capabilities– AEGIS Air Defense Cruiser and IAMD Destroyer DT/OT, Fleet Introduction – NIFC‐CA DT/OT, Fleet Introduction – SM‐6 DT/OT, Fleet Introduction – AEGIS Ashore In‐service Operations under Navy Leadership

• ENGINEERING DEVELOPMENT – Aggressively manage cost and deliver on time

– LCS Radar Trades and Common Combat System– ZUMWALT Combat System Activation – CVN 78 Combat System Activation– Modernization Programs for AEGIS, Carriers, Amphibs and LCS– CVN 79/80 Combat System and Radar Baseline Definition– DDG 51 Class Flight III Combat System Development

• PEOPLE ‐Maintain Our Professional Workforce

PEO IWSFY15 Priority Focus Areas

5Distribution Statement A: Approved for Public Release; Distribution Unlimited.

DDG-51 Flight III AEGIS Combat System

NOV 2014: ESSM Block II program achieved the Milestone B Decision

and an approved Acquisition Decision Memorandum

DEC 2014: DDG 51 FLT III Program Review SPY-6 Hardware Critical Design Review

JAN 2015: ESSM Block II E&MD contract agreement reached: $520M. Delivered a signed ESSM Block II Engineering &

Manufacturing Development MOU between the 12 nations of the NATO SEASPARROW Consortium

Achieved a successful SEWIP Block 3 Milestone B

FEB 2015: SEWIP Block III Contract awarded to Northrop Grumman

MAR 2015: DDG Flight III AEGIS ACB 20 Scope Definition approved.

Near Term Events APR 2015: SPY-6 System Critical Design Review APR 2015: DDG 51 Gate 6/CSB Review MAY 2015: SEWIP Block III SFR

Long Term

ECP award to DDG 51 contract for Flight III configuration- FY16

1st AEGIS ACB 20 Light-Off- FY 2020 Q4 DDG 51 Flight III Ship Delivery – 2021 ACB 20 Initial Operational Capability- Q4

FY 2023

AEGIS Combat System Scope (ACB 20 OPNAV FEB 2015)

6Distribution Statement A: Approved for Public Release; Distribution Unlimited.

AMDRAir & Missile Defense Radar

Long Term Radar System CDR - Apr 2015 AMDR-S, RSC EDM to PMRF - Mar 2016 Testing at PMRF to complete - May 2017 In-yard Need Date - 2019 DDG 51 Flight III Ship Delivery – 2021

Far Field Range McKinney, TX

Recent Accomplishments MAY 2014: Hardware Delta

Preliminary Design Review (PDR) AUG 2014: System Delta PDR DEC 2014: Air & Missile Defense

Radar Hardware Critical Design Review

JAN 2015: ACAT I Program Review Selected USNS HARRY L.

MARTIN (T-AK 3015) as a launch platform for the AMDR DT-3 targets

FEB 2015: Entered Engineering Development Model (EDM) array production

MAR 2015: AMDR Gate 6 Sufficiency/CSBB

Near Term Events APR 2015: AMDR Critical Design

Review (Sudbury, MA)

AMDR is a multi-function, active-phased array radar capable of simultaneous search, detection, and tracking of airborne missile targets and ballistic missile targets

for engagement support S-band radar (AMDR-S) X-band radar (SPQ-9B for the first 12 shipsets) Radar Suite Controller (RSC).

7Distribution Statement A: Approved for Public Release; Distribution Unlimited.

EASREnterprise Air Surveillance Radar

Recent Accomplishments MAR 2015: Completed draft EASR RFP

specification adjudication

Office of Naval Research (ONR) Integrated Topside Program (InTop) 18 Months, Completes Spring 2015

Near Term JUN 2015: Expected completion of the

Enterprise Radar Suite Naval Capabilities Document (NCD).

MAY 2015: Expected completion of RFP

Long Term JAN-MAR 2016: Gate 3/Gate 4 Briefs AUG 2016: Contract Award

Shipboard Fixed Phased Array(backfit or forward fit)

Rotating Phased Array(backfit)

Common RadarTechnology

EASR is slated to go on the Navy’s second Ford-class aircraft carrier, the USS KENNEDY (CVN 79), as well as the services’ third big-deck America-class amphib, called LHA 8. It will replace the in-service SPS-48 and SPS-

49 radars.

“Sea Power to the Hands of Our Sailors”

Distribution Statement A: Approved for Public Release; Distribution Unlimited.