LECTURE 40 – MULTI ACTUATOR CIRCUITS
SELF EVALUATION QUESTIONS AND ANSWERS
1. Square shaped work has to be drilled using a drilling machine which is pneumatically
operated. Work pieces are fed from a gravity magazine to a drilling machine. These work
pieces are pushed and clamped by means of clamping cylinder 1.0 (A). hole is drilled by the
drilling cylinder 2.0 (B). and work piece is ejected by ejecting cylinder 3.0 (C). The
displacement step diagram is shown in Figure1 . The sequence of operation has to be carried
out either for one cycle or for continuous cycle with start and stop controls. Develop a
pneumatic circuit to implement the given control task.
B+ B-
A-
1
0
0 A
B
1
Step 0 Step 3 Step 4 Step2 Step1
Position step
C+ C- C
Step 5 Step 6 Step7 Step 8
A+
![Page 2: SE Lecture 40](https://reader036.fdocuments.net/reader036/viewer/2022071709/55cf9265550346f57b96170d/html5/thumbnails/2.jpg)
2 Two clips are to be riveted together on a semi automatic press. Components and rivets
are positioned by hand and then removed by hand on completion of the components
operation. The automated part of the working cycle consists of the holding and clamping of
the components (cylinder A) and also the riveting (cylinder B), and the cycle be performed
ending at the starting position after operating a start button.
Design circuit using cascade method.
![Page 3: SE Lecture 40](https://reader036.fdocuments.net/reader036/viewer/2022071709/55cf9265550346f57b96170d/html5/thumbnails/3.jpg)
0.1I
5
4 A+
1.1
A- 2
1
3
4
5
4 B+
2.1
B- 2
3
c1 c0 a0 b1
a0
3 1 3 1 3 1 3 1 3 1
a1
c0
c1
III
I
0.2I III
4
4 3.1 2 C+
5
C-
3
1.0 2.0 3.0
12
a1 3 1
Stop for continuous cycle Start for continuous cycle
Start Single cycle
b0
b1
b0
![Page 4: SE Lecture 40](https://reader036.fdocuments.net/reader036/viewer/2022071709/55cf9265550346f57b96170d/html5/thumbnails/4.jpg)
Q2 Solution
1
4
B(2.0) A(1.0)
Start
5
4 A+
1.1
A-
2
1
3 5
4 B+
2.1
B- 2
3
a0 a1 b0
0
b1
G
2
Pneumatic circuit for A+ B+ B- A-
2 2 2
a1 & b1 Connected to
group ̅ a0 & b0 Connected to group
2
b0
II
2
I
a1
(line1)
b1 a0
a0
(line2)
a1
b1 (line 3) b0 (line 4)
B+ B-
A- A+
1
0
0 A
B
1
Step 1 Step 4 Step 5=1 Step 3 Step 2
Position step
a1 b1 b0
a0