Scribner Portfolio

69
! + 300 250 250 200 200 200 250 250 300 250 350 200 300 250 300 300 300 300 300 100 200 150 150 350 200 250 150 300 300 300 200 350 50 200 200 300 200 300 350 200 350 300 200 300 300 250 350 300 400 200 400 350 250 400 400 250 300 150 350 350 400 300 200 400 250 250 350 150 400 400 400 250 Stump Pond Rensselaer Lake S a n d C r e e k San d Cr e ek K r u m K il l K r u m K i l l S h a k er s Cr eek N o r m a n s K i l l N o r m a n s K i ll N o r m a n s K ill S h ak e r s C r e e k Nor mans K ill Ri v er STEPHEN SCRIBNER portfolio [11.2012]

description

Graduate design, professional architecture, and design-build works

Transcript of Scribner Portfolio

  • 3!+

    300

    250

    250

    200

    200

    200

    250

    250

    300

    250

    350

    200

    300250

    300

    300

    300

    300

    300

    100

    200

    150

    150

    350

    200

    250

    150

    300

    300

    300

    200

    350

    50

    200

    200

    300

    200

    300

    350

    200

    350

    300

    200

    300

    300

    250

    350

    300

    400

    200

    400

    350

    250

    250

    400

    400

    250

    300

    150

    350

    350

    400

    300

    200

    400

    250

    250

    350

    150

    400

    400

    400

    250

    Stump Pond

    Rensselaer Lake

    Sa

    nd

    Creek

    San

    d C

    reek

    Krum Kill

    Kru

    m K

    il l

    Sh

    aker

    s C

    reek

    N

    ormans Kill

    Nor

    mans Kill

    Norm

    ans Kill

    Sh

    aker

    s C

    reek

    Nor

    man

    s Ki

    ll

    Normans Kill

    Hu

    dso

    n R

    iver

    S T E P H E N S C R I B N E R

    p o r t f o l i o[ 1 1 . 2 0 1 2 ]

  • Graduate Design Work

    Parsons the New School for Design

    Re:Source Albany - Masters Thesis (Astrid Lipka)

    Shanghai Design Center (Henry Smith-Miller)

    Solar Decathlon (David Lewis)

    Upper West Side Urban Spring (David Leven)

    Studio Walakuba (Jinga, Uganda)

  • XX

    X

    X

    X

    XX

    XX

    XX

    XX

    XX

    XX

    XX

    XX

    X

    X X X

    SUBMISSIONS:Prelim HARC 1 01.20.06Partner Set 1Partner Set 2 01.12.07Partner Set 3/Marketing 03.16.07Pricing 1 03.23.07Code Review 04.25.07

    05.03.0706.13.07

    10.05.0707.12.07

    11.03.06

    Construction 1/Pricing 2Code/Life SafetyPermit/CAA/Pricing 3Excavation Permit

    02.29.08GMP 4/CD 2/Permit 203.31.08HARC CAA 3/Permit 3

    185'

    90 Units in 1983 Subdivision74 Units in 1996 Developers Agreement (Lapsed) (Includes 2 Employee Units)53 Units in Current Scheme: 38 Proposed units (Includes 2 Employee Units) + 15 Existing units (72% of 1996 density)

    BUILDING MAXIMUM HEIGHTS:30% (Approx.) of New Structures to be at 60' Height Limit70% (Approx.) of New Structures to be at 45' Height Limit

    GROSS ABOVE GRADE FLOOR AREA

    Lobby/Bar/Luggage/KitchenCentral Building Wet Spa

    COMMON AREAS:

    82,561.8 S.F.

    2343.1 s.f.1,673.4 s.f.

    DENSITY:

    SW. Bldg Lot Coverage:3696 s.f.l.c. (3.0% of Lot)60' Height Limit 45' Height Limit

    Cntrl. Bldg. Lot Coverage:6362.8 SF (5.2% of Lot)

    122,713.4 s.f. (2.8 acres)LOT SIZE:

    1996 APPROVED LOT COVERAGE:

    FLOOR AREA SUMMARYPER 3-210.C.11Allowable Max. 30,000 s.f. Per Structure

    Central Building UnitsWest Building UnitsSouthWest Building UnitsSouth Building UnitsEast Building UnitsRiver Building UnitsTOTAL

    FLOOR AREA12,391.1 s.f.18500.8 s.f.9,834.4 s.f.

    15,567.0 s.f.17,429.1 s.f.

    4822.9 s.f.78,545.3 s.f.

    51,540 s.f.L.C.(42% Lot Size)

    LOT COVERAGE BREAKDOWNNew Central BuildingNew West BuildingNew SouthWest BuildingNew South BuildingsNew East BuildingsNew River BuildingNew Mechanical SpaceTotal New Buildings

    ALLOWABLE LOT COVERAGE 49,085.4 s.f. (40.0%) 30% for Lots > 100,000 s.f. = 36,814.0 s.f.L.C. +10% for 100% of Parking Enclosed = 12,271.3 s.f.L.C. =40% Net Allowable Lot Coverage = 49,085.4 s.f.L.C.

    6362.8 s.f.L.C.6,325.6 s.f.L.C.3,696.0 s.f.L.C.6,534.8 s.f.L.C.8557.8 s.f.L.C.

    2,362.8 s.f.L.C.787.5 s.f.L.C.

    34,627.3 s.f.L.C.

    55'-6" ABOVE FIN. GRADET.O. RIDGE

    LAND USE SUMMARYLegal description :L.U.C. Zone district :HARC Treatment Area :

    Use :

    LOT COVERAGE SUMMARYPER 3-2100.C.15

    Lot 1A, XYZ SubdivisionAccommodations IIAccommodations/

    River Park Corridor Overlay/Transitional HillsideMulit-Family Dwelling Units/Affordable Housing/

    Open Space

    (Including Garage)

    Lot Coverage:13232 s.f. (10.8% of Lot)

    L.U.C.COMPLIANCE

    SHEET

    AFFORDABLE HOUSING MITIGATION CALCULATION:Per LUC 3-740

    Proposed Freemarket Residential Units:Proposed Affordable Housing Units:

    (Based on Lot Coverage)

    SCALE:LAND USE CODE DIAGRAM

    1" = 20'-0"B

    E. Bldg. Lot Coverage:8557.8 s.f. (7.0% of Lot)45' Height Limit

    BULK PLANE

    1:1.5

    39'-1

    0"

    PROPOSEDRIVER BUILDING

    SAN MIGUELRIVER

    EXISTING TERRACE River House Lot Coverage:2362.8 s.f. (1.9% of Lot)45' Height Limit

    45' Height Limit

    S. Bldgs Lot Coverage:6534.8 SF (5.3% of Lot)

    70'-0

    "

    70'-0"

    20.14'

    22'-1112"

    20.14'

    LINE OF 60' HT. LIMIT

    80'-0"

    180'

    -4"

    BULK

    PLA

    NE1:

    1.5

    39'-1

    0"

    RIVER PARKCORRIDOR

    BOUNDARY LINE

    PROPOSEDRIVER BUILDING

    LINE OF 60'HEIGHT LIMIT

    EXISTINGBUILDING

    PROPOSED SCHEME SUMMARY

    REQUIRED AFFORDABLE HOUSING:Per Jan. 2006 60' Height Waiver:Per L.U.C. (36 x .33/residential units x 350s.f./employee x .40 : + 1403.5 commercial s.f. x 4.5/1000 x 350s.f./employee x .40) :

    GRANDFATHERED EXISTING CASCADES AREAS:Total Liveable Floor Area:Lobby Floor Area:TOTAL FLOOR AREA:Garage & Mech Floor Area

    32,410.0 S.F.2,343.1 S.F.

    34,753.1 S.F.7,039 S.F.

    8807'-3"+ 44'-5" MAX HT.

    8797'-5"+ 41'-5" MAX HT.

    8791'-2"+59'-2"

    LINE OF 70' ACCESS EASEMENT

    20.1

    4' S

    KI E

    ASE

    MEN

    T

    8791'-0"+50'-0" MAX HT.

    51'-8"

    25'-9"

    W. Bldg Lot Coverage:6325.6 s.f. (5.2% of Lot)60' Height Limit

    8802'-7"+59'-7" MAX HT.

    8783'-8 1/2"+ 44'-9" MAX HT.

    8813'-3"+ 44'-3" MAX HT.

    8825-3"+ 43'-8" MAX HT.

    8815'-0 1/2"+37' MAX HT.

    8800'-4"+40'-3" MAX HT.

    8769'-10"+ 38' MAX HT.

    8771'-10"+ 40'-4" MAX HT.

    FUNICULAR

    WESTBUILDING

    SOUTHWESTBUILDING

    CENTRAL BUILDING

    SOUTH BUILDINGS

    BUILDINGEAST

    RIVERHOUSE

    Existing Cascades BuildingExisting GarageExisting Lobby (Not below W Bldg.)Total Existing Structures

    TOTAL LOT COVERAGE

    9,683.1 s.f.L.C.2,800.2 s.f.L.C.1,865.9 s.f.L.C.

    14,349.2 s.f.L.C.

    48,976.5 S.F.L.C.(= 39.991% Lot Size)

    5,233.4 s.f.1,663.2 s.f.

    884.2 s.f.2,547.4 s.f.

    362

    8830'-9 1/2"+36' MAX HT.

    8827'-8 1/2"+37'-8" MAX HT.

    9'-2

    1 2"

    60'-4

    "

    87'-4

    "

    COMMERCIAL:1,403.5 S.F. = Office Commercial - in Existing Cascades Building5,256.8 S.F. = Max. Allowable (15% of 35,045 gross s.f. in Principle Building)1,403.5 S.F. = Total Proposed Commercial s.f.

    SCALE:LAND USE CODE DIAGRAM

    1" = 20'-0"B

    8831'-3"+ 41' MAX HT.

    PARKING SUMMARYPER L.U.C. 3-D: 1 Space Per Dwelling Unit + 1 Space Per 1,000 s.f. Commercial Floor AreaPER 2003 IBC SECTION 1106, TABLE 1106.1: For 51 to 75 spaces provided, min. 3 accessible spaces

    must be provided, one of which must be van accessible.NUMBER OF UNITS PER BUILDINGWest BuildingCentral BuildingSouthwest BuildingSouth 1 BuildingSouth 2 BuildingEast BuildingRiver Building Total Spaced Required per Units

    10782272

    38

    TOTAL COMMERCIAL S.F. PER BUILDINGWest BuildingCentral Building Total S.F. Spaces Required per Commercial Area

    2343.13431.15774.2

    6

    TOTAL NEW SPACES REQUIRED 44

    PARKING SPACE SUMMARYExisting Unit SpacesNew SpacesAccessible Spaces

    1844

    3

    TOTAL SPACES PROVIDED 64

    Tommy Hein Architects Anam New City, Nigeria

    Ophir Design/BuildElement 52 Residences

    Bhatia Residence

    Elk Run Residence

    Professional Construction/ Management

  • r e : s o u r c e a l b a n y[ m a s t e r s t h e s i s ]_ a s t r i d l i p k a

  • TIPPING FLOOR

    WASTE

    DELIVER

    Y

    POST-PROCESSING

    COLLECTION/ METERING

    SORTING/ SCREENING LINE

    ADMINISTRATION

    EDUCATION CENTER

    MECHANICAL & HAND SORTING LINE

    BALING & STORAGE

    ORGANIC MATERIAL SCREENING & MIXING

    BIODIGESTION & SOLIDS SEPARATION

    VISITORS CENTER

    BIOGAS CONDITIONING

    AND FILLING

    SOUTH S

    WAN ST.

    SOUTH S

    WAN ST.

  • Integrated waste processing/ biofuel & energy production facility

    TIPPI

    NG

    FLOO

    R

    BALIN

    G/

    LOAD

    ING

    PRE-S

    ORTIN

    G LIN

    E

    MEC

    HANI

    CAL

    ROOM

    SORT

    ING

    LINE

    SORT

    ING

    LINE

    BIOD

    IGES

    TION

    TANK

    S

    MECHANICAL

    ROOM

    BIOF

    UEL

    PROC

    ESSI

    NG

    AND

    FILL

    ING

    PUBLIC PATH

    PUBLIC PATH

    COLL

    ECTIO

    N/

    MET

    ERIN

    G

    BALING/ LOADI NG

    TIPPI

    NG

    FLOO

    R

    COLL

    ECTIO

    N/

    MET

    ERIN

    G

    PRE-S

    ORTIN

    G LIN

    E

    SORT

    ING

    BELO

    W

    CENT

    ER

    ABOV

    EBIO

    DIGE

    STIO

    N

    BELO

    W

    BIOF

    UEL

    PROC

    ESSI

    NG

    AND

    FILL

    ING

    ADM

    INST

    RATIO

    N

    EMPL

    OYEE

    LOCK

    ERS

    EMPL

    OYEE

    LOUN

    GE

    CAFE

    TERI

    A

    EDUC

    ATIO

    NCE

    NTER

    PUBLIC PATH

    PUBLIC PATH

    Re-source Albany re-imagines the relationship between Americans and their refuse by embedding waste management practices into the patterns of the everyday. The design integrates

    landscape, architecture, and urban infrastructure, creating a new relationship between people and their waste while transforming byproducts into energy resources.

  • timothy grassfox-tailcrab-grassbrome grassbermuda grass

    cilantrolemon grassmarigoldbasilnasturtiumparsleymarjoram

    thymetarragonmarjorampeppermintsagestrawberryoreganoanise

    BlueberryDogwoodelderberrywitch hazelbay laurellilacJuniperlavender

    Eastern HemlockpineFirSprucecedar

    maplebeechwalnutoakbirchelm

    TIME

    GRASSLAND VEGETABLE HERB SHRUB CONIFER HARDWOODSOIL

    YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7

    ECOLOGICAL STAGESSUCCESSION OF PLANT COMMUNITIES AT RE:SOURCE PARK

  • The rooftop park, which features playgrounds, community gardens and a handicap accessible path from downtown Albany to Sheridan Hollow, will track through time the processes in the facilitys heart: as fertilizer is produced (a by-product of the biodigestion process) it will be used as soil on the roof. The

    roofscape will then change as more soil is added and the plant species evolve through biological succession. Inside, a direct route cuts through the heart of the building, providing glimpses of and access to the metabolic activity within.

    Harnessing gravity on the sites steep natural slope, Re:Source Albany filters waste through a series of manual and mechanical processes. Over 150 semi-skilled workers will facilitate the sorting and digestion process.

    Gravitational Metabolism

    e c o l o g i c a l s u c c e s s i o n

  • MIXED RECYCLINGAND COMPOST

    RECYCLEABLES

    COMPOST

    LARGE ITEMS

    COMPOSTMETERING

    HOPPER

    RECYCLEABLESMETERING

    HOPPER

    PRE-SORTLINE

    PRE-SORTCONVEYORS

    TRASH

    WEIGHSTATION

    TIPPINGFLOOR

    PRE-SORTLINE

    COMBINATIONSCREEN

    COMPOST & WATER BLENDING TANK

    1ST STAGE ANAEROBIC

    REACTOR

    DISK SCREENS

    COMPOST

    SMALLOBJECTS

    NEWSPAPER BALER

    NEWSPAPER

    GLASS PACKING FOR SHIPPING

    BROKEN GLASS

    MIXED PAPERBALER

    RECYCLEABLE PAPER

    LARGE

    OBJECTS

    HAND SORTCONVEYORS

    CARDBOARDBALER

    MIXED FIBER SORTING LINE

    SMALLOBJECTS

    NEW

    SPAPER

    COM

    POST

    NEWSPAPERSORTING LINE

    MAGNET

    MANUAL SORTING LINE

    NEWSPAPERFILTER

    RIGID

    CO

    NTAIN

    ERS

    STEELBALER

    GLASS SCREEN

    BIOSWALE

    BIOSWALE

    BIOTOPE

    PAPER

    COMPOST MIXING HOPPER

    CONTAINERS

    STEEL CANS

    MIXED CONTAINERS

    TRASH

    YARD WASTE

    SURFACERUNOFF WATER

    STORMWATERSEWER

    TRASH

    TRASH

    BIOLO

    GICALLY

    TREATED W

    ATER

    BIOLOGICALLY TREATED WATER

    ALUMINUMBALER

    PLASTICBALER

    PLASTICBALER

    PLASTICBALER

    PLASTICBALER

    PLASTICBALER

    PLASTICBALER

    PLASTICBALER

    OPTICAL SORTING MACHINE

    ALUMINUM

    MIXED PLASTIC

    PLASTIC #1P.E.T.

    PLASTIC #2H.D.P.E.

    PLASTIC #3PVC

    PLASTIC #4LDPE

    PLASTIC #5POLYPROPYLENE

    PLASTIC #6POLYSTYRENE

    PLASTIC #7OTHER

    GLASH CRUSHER

    EDDY CURRENT SEPARATOR

    GLASS

    PLASTIC & ALUMINUM

    FERTILIZER

    WASTE MANAGEMENT TRUCK FLEET

    2ND STAGE ANAEROBIC

    REACTOR

    HEAT EXCHANGER

    BIOGASCONDITIONING

    ROTARY PRESS

    EFFLUENT

    LEACHATE HOT WATER

    EFFLUENT

    LEACHATE

    METHANE

    GENERATOR

    BUILDING HEATING SYSTEM

    PHYSICAL PLANT POWER SUPPLY

    The waste management process is three-fold:

    1) Process trash at the heart of the city, reducing transportation en-ergy use and creating urban jobs

    2) Digest all organic material, generating energy and drastically reducing landfill volume

    3) Reveal sorting and digestion processes, displaying the next phase of material life cycles and heightening public awareness

  • Albanys Sheridan Avenue is a lowland corridor of post-industrial neglect, in need of urban and ecological revitalization.

    URBAN PRINCIPLES

  • Albany waste management network modelFinal model 1/8=1

    Rhino model, sky view

    study model

  • Bridging the derelict Sheridan Hollow neighborhood with the architecture of power of the State Government district, Re:Source Albany provides a social link and economic catalyst for downtown Albany.

  • s h a n g h a i d e s i g n c e n t e r[ s c h o o l o f c o n s t r u c t e d e n v i r o n m e n t s ]_ h e n r y s m i t h - m i l l e r

  • BUS ROUTE

    BUS RO

    UTE

    These artifacts provide glimpses of alternative ways of being human-RICHARD RORTY

  • BUS ROUTE

    BUS RO

    UTE

    At the scale of the narrow pe-destrian walkways, the SCE|SDC exists as small portals through and between the existing built fabric; the new buildings then rise above

    the existing roofs, revealing the neighborhood in its entirety, be-fore leading students and faculty to expansive viewfinders on the ever-growing and changing city.

    This intervention reflects Parsons programmatic requirements and pedagogical intents while responding to existing cultural, social, economic, and

    physical conditions; it responds simultaneously to a fine-grained historic neighborhood and an exploding modern megacity

    Shanghai campus for Parsons School of Constructed Environments

  • 23

    4

    5

    6

    78

    1

    0

    LOCATION

    TRANSITION

    TRANSITION

    LOCATION

    CONN

    ECTION

    SEPARA

    TION

    PENETRATION

    CONVOCATION

    TRANSITION

  • A few steps past the entry gate to the neighborhood, a wide court-yard opens to left. This unusually wide space forms a sort of exterior lobby, into it a rusted steel frame projects from an historic building;

    this pedestrian-scale storefront reads in the same language and materiality as the cantilevered form as viewed from the street, and one knows he has found the entrance to SCE.

  • Plan of studio and office spaces

    section through stair, classrooms, studios

  • section through atrium, viewing dorms

    This perspectival unfolding is an essential part of the experience that transforms the simultaneity of space into a sequence in time-RICHARD ARNHEIM

    Co-opting an existing pocket park as a de-facto exterior lobby, the SDC building is entered through a compressed lobby inside an existing building; a tall

    stair atrium then dramati-cally expands drawing one up past student housing into spacious studios and classrooms

  • 1/32 massing model: view from north (main studio space shown in foreground)

  • The three buildings of the Shanghai Design Center are accessed from three different alleys. The main building (in the foreground above), is accessed from near the main bus route to the north, and projects over this main street.

    The large north-facing aperture gives even daylight and a direct visual connection to Shanghai at the scale of the city to the studio space, and simultaneously presents the activity of Parsons to the activity below.

  • e m p o w e r h o u s e[ s o l a r d e c a t h l o n ]

    P R O J E C T M A N A G E R_ d a v i d l e w i s

  • DD submittal rendering

    Deanwood design review model

    schematic submittal model

    Deanwood schematic submittal model

    1=1 final model

  • Net-Zero design-build competition hosted by DOE on national mallThe Parsons-Stevens proposal used passivhaus principles, in-depth solar analysis, energy modeling, and community feedback to generate form and organize

    program. The competition module is now part of a duplex in a nearby underserved neighborhood of Washington DC

  • This competition board presents the Parsons-Stevens approach to the Solar Decathlon: to build a passivhaus duplex for a nearby low-income neighborhood of Wash-ington DC. We constructed one unit for display on the national mall; it was subsequently moved and added to by Habitat For Humanit, and will be inhabited by a deserving family by the end of the year. To accomplish this our design incorporated neighborhood feedback, site-specific solar analysis, energy modeling, and modular construction systems for multiple assembly/ disassembly.

  • The Parsons/ Stevens Solar Decathlon project spanned two years, over 10 disciplines, and more than 100 students. It evolved from individual and small group charrettes to large groups working very closely together. The images on this page show a few stages in this process, from an initial sketch I made (right), to the final 1/2=1 model (below).

  • Schematic rendering for DRB

    DD models for DRB and competition

    1=1 final model

  • Voted project manager because of my experience with various construction trades and architec-ture firms as well as my leadership abilities, my role on the Empower-house project included facilitating

    collaboration between engineers, architects, and other involved stu-dent groups, spearheading permit and construction documentation processes, and helping organize and lead construction teams.

  • [ u p p e r w e s t s i d e ]

    u r b a n s p r i n g_ d a v i d l e v e n

  • Holistic stormwater drainage and circulation solution

    This project seeks to turn New York citys current stormwater drainage crisis into a desireable resource by treating rainwater through surface biological processes, and creating a community well gathering hub and educational facility. re-

    figuring the original watershed in the area through bioswales, wetlands, and living machine treatment cells.

    1 . a . m . n . h . f o u n t a i n

    2 . b i o s w a l e b o u l e v a r d

    3 . t e r r a c e d w e t l a n d p a r k

    4 . c i s t e r n

    5 . a n o x i c p r e - t r e a t m e n t c e l l s

    6 . l i v i n g m a c h i n e g r e e n h o u s e

    7. c o m m u n i t y w e l l

  • 79 t h s t re et

    9 6t h s t re et

    1 3 0 t h s t re et

    42 n d s t re et

    we s t h o u s to n

    ca n a l

    hudson riv

    er

  • se

    ve

    nty-n

    in

    th

    stre

    et

    TTTTTTT

    EE

    TTTTTTTN

    TV

    4 1

    58

    0

    55

    35

    61

    74

    88

    80

    RRR

    SH

    hudson r i ver

    r i vers ide d r i ve

    roundabout

    amer ican museumeamer ican museumeamer ican mus Sof natura l h i s torysHf natura l h i s toryHof natura l h i s torH

    henry hudson expresswaysnry hudson expresswayRhenry hudson expresswaR

    west end ave

    broadway

    amsterdam ave

    columbus ave

    se

    ve

    nty-n

    in

    th

    stre

    et

    TTTTTTT

    EE

    TTTTTTTN

    TV

    4 1

    58

    0

    55

    35

    61

    74

    88

    80

    RRR

    SH

    hudson r i ver

    r i vers ide d r i ve

    roundabout

    amer ican museumeamer ican museumeamer ican mus Sof natura l h i s torysHf natura l h i s toryHof natura l h i s torH

    henry hudson expresswaysnry hudson expresswayRhenry hudson expresswaR

    west end ave

    broadway

    amsterdam ave

    columbus ave

  • 17

    5

    B

    Section BB

    Section AA

    11

    12

    8

    8

    4

    6

    1

    2

    2

    2

    community well level plan (01)

    1. community well2. living machine cells/ exhibit3. anoxic pre-clean cells4. fountain5. road6. bike path

    7. boat storage/ rental8. bathrooms9. dirty water cistern10. pre-cleaned water storage11. clean water storage12. train

    A

    A

    B

  • 525

    5

    111

    3

    12

    5

    12

    2

    3

    5

    2

    e-w section through wetlands, highway, train, greenhouse, and estuary

    ne-sw section through highway, train, drainage swale, greenhouse, community well, landscaped riverbank, and river

    1) A landscape/ biological process that uses vegetated swales, constructed wet-lands, and enclosed biological treatment cells to slow, filter, and purify rainwater from the neighborhood watershed and provide clean usable water.

    2) An experiential path that facilitates interaction with and understanding of the water filtering processes as it brings residents to their newly desir-able resource, culminating in a new neighborhood gathering hub.

    Urban Spring uses the site to hybridize two parallel systems:

    basement level plan (00)

    A

    B

    A

    B

    A

    BA

    B

    A

    B

    A

    B

    roof plan traffic level plan (02)

  • 3155

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    MASTERBEDROOM

    ENTRYPORCH

    CEMENT PLASTER CEILING ON 50 X 75BRANDERINGS25 X 230 FASCIA BOARDS

    FLOOR:25MM CMT. SCREED ON100MM CONCRETE FLOOR SLAB ON150MM HARDCORE230MM BURNT CLAY PLINTH WALL ON690 X 230MM CONCRETE STRIPFOUNDATION ONTERMITE TREATED COMPACTED MURRAM

    CONCRETE SPLASH APRON, TYP.

    10.2

    0

    2845

    3075

    26.57

    50 X 150 TIMBER BEAM TO SUPPORT PORCHROOF

    1 : 1008SECTION CC

    1 : 1007SECTION DD

    WINDOW SCHEDULE

    MARK

    1

    1

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    NOTE: T.O. of all windows aligns to B.O. of ring beam

    1

    1

    9 AXONOMETRIC VENTILATION DIAGRAM

    OPENING FROM BEDROOMINTO STORAGE SPACE

    VENTILATOR BRICK LOUVER, TYP.

    NOTE: FLOOR SLAB TO BE ABOVE GRADE SOTHAT SEWAGE LINE MAY SLOPE 1:50 TO NWSMAIN SEWAGE LINE. CONTRACTOR TO VERIFYIN FIELD.

    LOUVERS OVER ALLWINDOWS AND DOORS, TYP.

    NOTE: ALL CEILINGS TO BE ON UNDERSIDEOF ROOF STRUCTURE, EXCEPT RENTERBATHROOM CEILING AND VESTIBULE TO BE2400 MM ABOVE FINISH FLOOR

    STORAGE SPACE OVERBATHROOM CEILING

    OPENING FROM BEDROOMINTO STORAGE SPACE

    STORAGE SPACE OVERVESTIBULE CEILING

    VENTILATOR BRICK LOUVER, TYP.

    s t u d i o w a l a k u b a[ internat ional f ie ld program_uganda]_michael cohen, b i l l morr ish

  • Rendering of proposed house for Jane and Simon Ibanda.

    Rendering of house for Jane

    House for Miriam - under construction 04.2011 Lot and sewer map of SWID lots, created by Studio Walakuba

  • TUESDAY JUNE 8DISCUSSED PLAN OPTIONS AT SWID OFFICE

    Presentation of designs at early savings group meeting

    Studio Walakuba was a team of four Parsons architecture students. In the summer of 2010 we traveled to Jinja, Uganda, to create housing designs for Slum Womens

    Initiative for Development (SWID), a grassroots NGO which was formed to empower local women to purchase their land through savings cooperatives.

    Housing Design work for African womens organization

  • DN

    79

    81

    83

    85

    87

    89

    91

    93

    95

    97

    99

    101

    103

    26

    24

    22

    20

    18

    16

    14

    12

    10

    8

    6

    1

    3

    5

    7

    9

    11

    1328

    26

    24

    22

    20

    18

    16

    14

    12

    10

    8

    6

    4

    2

    1

    3

    5

    7

    9

    11

    13

    15

    17

    19

    21

    23

    25

    79

    24

    22

    20

    18

    12

    10

    8

    6

    4

    2

    1

    3

    5

    7

    9

    11

    13

    15

    17

    19

    21

    23

    25

    128

    126

    124

    122

    120

    118

    116

    114

    112

    110

    108

    106

    104

    4

    24

    2220

    18

    1614

    6563

    61

    5957

    5553

    51 10

    11

    13

    15

    67

    8

    9

    67

    69

    71

    73

    75

    77

    79

    100

    98

    96

    94

    92

    90

    88

    86

    8482

    8078

    11

    12

    13

    1

    3

    5

    79

    2

    475

    4

    132

    130

    9

    16

    14

    SCOTT ROAD

    MWONDHA ROAD

    JOHNMAGEZI ROAD

    MUDDUAW

    ULIRA(MUDDUNI) ROAD

    MUTEKANGA

    ROAD

    KYAB

    AZIN

    GARO

    AD

    MUKU

    BACL

    OSE

    MUKU

    BA

    KYABAZINGALANE

    OSE

    10128.5

    .2

    .

    .

    3

    1

    5.

    8.

    4

    SEWAGELINE

    GULLEYTRAP

    MANHOLE

    TO MUNICIPALSEWAGE LINE

    SEWAGELINE

    GULLEYTRAP

    MANHOLEGULLEYTRAP

    6

    STORE

    MASTER BEDROOM4200 X 2700

    KITCHEN2850 X 3050

    VERANDA

    ENTRY PORCH

    25mm f.f. CEMENT-SAND SCREED

    25mm f.f. CEMENT-SAND SCREED

    25mm f.f. CEMENT-SAND SCREED

    BEDROOM 13400 x 2500

    25mm f.f. CEMENT-SAND SCREED

    7

    91

    ROOM 43400 x 2700

    25mm f.f. CEMENT-SAND SCREED

    3

    8

    1775

    ROOM 33400 x 2500

    SITTING3650 X 5450

    25mm f.f. CEMENT-SAND SCREED

    2

    800

    1465

    0

    7.

    6.

    900

    MANHOLE

    25mm f.f. CEMENT-SAND SCREED

    1600

    2095

    1600

    600

    150 3400 150 3000

    150

    2700

    150

    3050

    150

    5450

    150

    1465

    0

    150

    2700

    150

    1600

    150

    2500

    150

    2500

    150

    1600

    150

    2700

    150

    150 4200 150 3000

    7500

    SOIL VENT PIPE

    SOIL VENT PIPE

    LINE OF ROOFABOVE

    SPLASH APRON

    4

    2

    5

    1

    1

    1

    1

    2

    2

    2

    1

    2

    1

    1

    2

    1

    AA

    BB

    CC

    DD

    1525

    1525

    2000

    700

    1275 2125

    1300

    300

    600

    1200

    700

    1250

    1250

    900

    1800

    2100 2100

    925

    1775

    505

    1095

    1600 1250 800

    1100

    2950

    1400

    10

    MANHOLE MANHOLE

    600 1000STEPS ASREQ`D

    800

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    5.

    T.O. ROOF5200

    SITTINGBATH

    26.57

    3155

    2600

    AA

    3155

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    8.

    T.O. ROOF5200

    ROOM 3 BEDROOM 2 MASTERBEDROOM

    7.

    6.

    BATHROOM 4 BATH

    BB CC DD

    N

    1466

    0

    2905

    6540

    600

    6545

    6002110

    4000

    7500

    2130

    2340

    26

    24

    22

    MUDDUAW

    ULIRA(MUDDUNI) ROAD

    BOUN

    DARY

    23.5m

    BOUN

    DARY

    25m

    BOUNDARY12.2m

    BOUNDARY14.2m

    ParkingArea

    Path

    Path

    Manhole

    Gulley Trap

    Manhole

    Manhole

    Manho

    le

    Manhole

    Gulley TrapSewage Line

    N

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    5.

    MASTERBEDROOM

    ENTRYPORCH

    ROOF:SLOPE 26.57, 10.2PRE-PAINTED IRON RIDGE ON50 X 150 ROOF JOISTS ON100 X 75 WALL PLATECEMENT PLASTER CEILING ON 50 X 75BRANDERINGS25 X 230 FASCIA BOARDS

    FLOOR:25MM CMT. SCREED ON100MM CONCRETE FLOOR SLAB ON150MM HARDCORE230MM BURNT CLAY PLINTH WALL ON690 X 230MM CONCRETE STRIPFOUNDATION ONTERMITE TREATED COMPACTED MURRAM

    CONCRETE SPLASH APRON, TYP.

    10.2

    0

    3075

    4774

    2845

    3075

    26.57

    AA

    50 X 150 TIMBER BEAM TO SUPPORT PORCHROOF

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    5.

    T.O. ROOF5200

    KITCHENBATH

    AA

    3155

    3188

    26.2

    5

    PROPOSED RESIDENTIAL BUILDING TO BE BUILT ONPLOT __, ________ ROAD, JINJA TOWN COUNCIL

    Jinja Office, Plot 53 Oboja Road, Box 1828, Jinja.

    Telephone 033 276068; 0772 544450

    JERUSALEM INTERNATIONAL LTD

    Scales:

    Dwgs

    DateClient:

    Client Signature

    Drawn by:

    Sheet:

    Title

    FilenameSCRIBNER STEPHEN

    A01

    SWID 02

    ..........................................

    VARIOUSChecked by:

    ARCH. KOMAKECH STEPHEN

    PLANS, SECTIONS, ELEVATIONS, NOTES AND SCHEDULES

    1 of 1

    SWID 02

    JUNE 2010

    1 : 5012GROUND FLOOR

    1 : 1004SIDE ELEVATION 2

    1 : 1008SECTION CC

    1 : 1005SECTION AA

    1 : 25011BLOCK PLAN

    1 : 200010LOCATION PLAN

    1 : 1001FRONT ELEVATION

    1 : 1003REAR ELEVATION

    1 : 1002SIDE ELEVATION 1

    1 : 1007SECTION DD

    1 : 1006SECTION BB

    GENERAL NOTES

    Pre-painted iron ridge to match on pre-painted ironroofing sheets on 100 x 150mm timber purlins on 100 x75mm wall-plate. Ridge should extend oneither side to prevent leaking.

    Cement plaster ceiling on expanded metal lath on 75 x50mm softwood branderings at 600mm c/c on roof joists.

    All exterior walls, load-bearing and interior walls are 1wythe thick (140mm) of230 x 140 x 10mm burnt clay bricks with 1.5mm mortarjoints. All walls are plastered and/or painted. All walls toinclude hoop irons every 2 courses of brick. Damp proofcourse under all walls.

    25mm f.f. cement-sand screed on 100mm oversiteconcrete mix 1:3:6 on 150mm thick hardcore oncompacted gravel.

    230mm thich burnt clay brick plinth wall, depth to bedetermined on site, min. 500mm on 690 x 230mmconcrete footer, mix 1:3:6 on termite treated compactedlevelled murram.

    FOUNDATION

    FLOOR

    WALLS

    CEILING

    ROOF1

    2

    3

    4

    5

    DOOR SCHEDULEWINDOW SCHEDULE

    MARK FAMILY & TYPE LOCATION HEIGHT WIDTH

    1 SINGLE-PANEL 2 : EXTERIOR SITTING ROOM 2050 mm 960 mm

    2 SINGLE-PANEL 2 : EXTERIOR ROOM 4 2050 mm 860 mm

    3 BATH 2050 mm 860 mm

    4 SINGLE-PANEL 2 : EXTERIOR ROOM 3 2050 mm 860 mm

    5 SINGLE-PANEL 2 : EXTERIOR KITCHEN 2050 mm 860 mm

    6 SINGLE-FLUSH : INTERIOR KITCHEN 2050 mm 860 mm

    7 SINGLE-FLUSH : INTERIOR BEDROOM 1 2050 mm 860 mm

    8 BATH 2050 mm 860 mm

    9 MASTER BEDROOM 2050 mm 860 mm

    10 ROOM 3 2050 mm 860 mm

    SINGLE-FLUSH : INTERIOR

    SINGLE-FLUSH : INTERIOR

    SINGLE-FLUSH : INTERIOR

    MARK FAMILY & TYPE LOCATION HEIGHT WIDTH

    1 CASEMENT DBL WITH TRIM BEDROOM 1 1200 mm 1000 mm

    ROOM 3

    ROOM 4

    AREA

    1.2 sq. m

    BATH

    ROOM 4

    1

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    NOTE: T.O. of all windows aligns to B.O. of ring beam

    CASEMENT DBL WITH TRIM

    CASEMENT DBL WITH TRIM

    CASEMENT DBL WITH TRIM

    CASEMENT DBL WITH TRIM

    CASEMENT DBL WITH TRIM

    KITCHEN

    MASTER BEDROOM

    SITTING ROOM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    MASTER BEDROOM

    SITTING ROOM

    1200 mm 1000 mm 1.2 sq. m

    1200 mm 1000 mm 1.2 sq. m

    1200 mm 1000 mm 1.2 sq. m

    1200 mm 1000 mm 1.2 sq. m

    1200 mm 1000 mm 1.2 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    MASTER BEDROOM

    1 CASEMENT DBL WITH TRIM 1200 mm 1000 mm 1.2 sq. m

    1 CASEMENT DBL WITH TRIM 1200 mm 1000 mm 1.2 sq. m

    SITTING ROOM

    BATH

    KITCHEN

    9 AXONOMETRIC VENTILATION DIAGRAM

    OPENING FROM BEDROOMINTO STORAGE SPACE

    VENTILATOR BRICK LOUVER, TYP.

    NOTE: FLOOR SLAB TO BE ABOVE GRADE SOTHAT SEWAGE LINE MAY SLOPE 1:50 TO NWSMAIN SEWAGE LINE. CONTRACTOR TO VERIFYIN FIELD.

    LOUVERS OVER ALLWINDOWS AND DOORS, TYP.

    NOTE: ALL CEILINGS TO BE ON UNDERSIDEOF ROOF STRUCTURE, EXCEPT RENTERBATHROOM CEILING AND VESTIBULE TO BE2400 MM ABOVE FINISH FLOOR

    STORAGE SPACE OVERBATHROOM CEILING

    OPENING FROM BEDROOMINTO STORAGE SPACE

    STORAGE SPACE OVERVESTIBULE CEILING

    VENTILATOR BRICK LOUVER, TYP.

    SINGLE-PANEL 2 : EXTERIOR

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY AN AU

    TOD

    ESK STUD

    ENT PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY

    AN A

    UTO

    DES

    K ST

    UD

    ENT

    PRO

    DU

    CT

  • DN

    79

    81

    83

    85

    87

    89

    91

    93

    95

    97

    99

    101

    103

    26

    24

    22

    20

    18

    16

    14

    12

    10

    8

    6

    1

    3

    5

    7

    9

    11

    1328

    26

    24

    22

    20

    18

    16

    14

    12

    10

    8

    6

    4

    2

    1

    3

    5

    7

    9

    11

    13

    15

    17

    19

    21

    23

    25

    79

    24

    22

    20

    18

    12

    10

    8

    6

    4

    2

    1

    3

    5

    7

    9

    11

    13

    15

    17

    19

    21

    23

    25

    128

    126

    124

    122

    120

    118

    116

    114

    112

    110

    108

    106

    104

    4

    24

    2220

    18

    1614

    6563

    61

    5957

    5553

    51 10

    11

    13

    15

    67

    8

    9

    67

    69

    71

    73

    75

    77

    79

    100

    98

    96

    94

    92

    90

    88

    86

    8482

    8078

    11

    12

    13

    1

    3

    5

    79

    2

    475

    4

    132

    130

    9

    16

    14

    SCOTT ROAD

    MWONDHA ROAD

    JOHNMAGEZI ROAD

    MUDDUAW

    ULIRA(MUDDUNI) ROAD

    MUTEKANGA

    ROAD

    KYAB

    AZIN

    GARO

    AD

    MUKU

    BACL

    OSE

    MUKU

    BA

    KYABAZINGALANE

    OSE

    10128.5

    .2

    .

    .

    3

    1

    5.

    8.

    4

    SEWAGELINE

    GULLEYTRAP

    MANHOLE

    TO MUNICIPALSEWAGE LINE

    SEWAGELINE

    GULLEYTRAP

    MANHOLEGULLEYTRAP

    6

    STORE

    MASTER BEDROOM4200 X 2700

    KITCHEN2850 X 3050

    VERANDA

    ENTRY PORCH

    25mm f.f. CEMENT-SAND SCREED

    25mm f.f. CEMENT-SAND SCREED

    25mm f.f. CEMENT-SAND SCREED

    BEDROOM 13400 x 2500

    25mm f.f. CEMENT-SAND SCREED

    7

    91

    ROOM 43400 x 2700

    25mm f.f. CEMENT-SAND SCREED

    3

    8

    1775

    ROOM 33400 x 2500

    SITTING3650 X 5450

    25mm f.f. CEMENT-SAND SCREED

    2

    800

    1465

    0

    7.

    6.

    900

    MANHOLE

    25mm f.f. CEMENT-SAND SCREED

    1600

    2095

    1600

    600

    150 3400 150 3000

    150

    2700

    150

    3050

    150

    5450

    150

    1465

    0

    150

    2700

    150

    1600

    150

    2500

    150

    2500

    150

    1600

    150

    2700

    150

    150 4200 150 3000

    7500

    SOIL VENT PIPE

    SOIL VENT PIPE

    LINE OF ROOFABOVE

    SPLASH APRON

    4

    2

    5

    1

    1

    1

    1

    2

    2

    2

    1

    2

    1

    1

    2

    1

    AA

    BB

    CC

    DD15

    2515

    25

    2000

    700

    1275 2125

    1300

    300

    600

    1200

    700

    1250

    1250

    900

    1800

    2100 2100

    925

    1775

    505

    1095

    1600 1250 800

    1100

    2950

    1400

    10

    MANHOLE MANHOLE

    600 1000STEPS ASREQ`D

    800

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    5.

    T.O. ROOF5200

    SITTINGBATH

    26.57

    3155

    2600

    AA

    3155

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    8.

    T.O. ROOF5200

    ROOM 3 BEDROOM 2 MASTERBEDROOM

    7.

    6.

    BATHROOM 4 BATH

    BB CC DD

    N

    1466

    0

    2905

    6540

    600

    6545

    6002110

    4000

    7500

    2130

    2340

    26

    24

    22

    MUDDUAW

    ULIRA(MUDDUNI) ROAD

    BOUN

    DARY

    23.5m

    BOUN

    DARY

    25m

    BOUNDARY12.2m

    BOUNDARY14.2m

    ParkingArea

    Path

    Path

    Manhole

    Gulley Trap

    Manhole

    Manhole

    Manho

    le

    Manhole

    Gulley TrapSewage Line

    N

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    5.

    MASTERBEDROOM

    ENTRYPORCH

    ROOF:SLOPE 26.57, 10.2PRE-PAINTED IRON RIDGE ON50 X 150 ROOF JOISTS ON100 X 75 WALL PLATECEMENT PLASTER CEILING ON 50 X 75BRANDERINGS25 X 230 FASCIA BOARDS

    FLOOR:25MM CMT. SCREED ON100MM CONCRETE FLOOR SLAB ON150MM HARDCORE230MM BURNT CLAY PLINTH WALL ON690 X 230MM CONCRETE STRIPFOUNDATION ONTERMITE TREATED COMPACTED MURRAM

    CONCRETE SPLASH APRON, TYP.

    10.2

    0

    3075

    4774

    2845

    3075

    26.57

    AA

    50 X 150 TIMBER BEAM TO SUPPORT PORCHROOF

    GROUND FLOOR0

    B.O. RINGBEAM2100

    FOUNDATION-800

    5.

    T.O. ROOF5200

    KITCHENBATH

    AA

    3155

    3188

    26.2

    5

    PROPOSED RESIDENTIAL BUILDING TO BE BUILT ONPLOT __, ________ ROAD, JINJA TOWN COUNCIL

    Jinja Office, Plot 53 Oboja Road, Box 1828, Jinja.

    Telephone 033 276068; 0772 544450

    JERUSALEM INTERNATIONAL LTD

    Scales:

    Dwgs

    DateClient:

    Client Signature

    Drawn by:

    Sheet:

    Title

    FilenameSCRIBNER STEPHEN

    A01

    SWID 02

    ..........................................

    VARIOUSChecked by:

    ARCH. KOMAKECH STEPHEN

    PLANS, SECTIONS, ELEVATIONS, NOTES AND SCHEDULES

    1 of 1

    SWID 02

    JUNE 2010

    1 : 5012GROUND FLOOR

    1 : 1004SIDE ELEVATION 2

    1 : 1008SECTION CC

    1 : 1005SECTION AA

    1 : 25011BLOCK PLAN

    1 : 200010LOCATION PLAN

    1 : 1001FRONT ELEVATION

    1 : 1003REAR ELEVATION

    1 : 1002SIDE ELEVATION 1

    1 : 1007SECTION DD

    1 : 1006SECTION BB

    GENERAL NOTES

    Pre-painted iron ridge to match on pre-painted ironroofing sheets on 100 x 150mm timber purlins on 100 x75mm wall-plate. Ridge should extend oneither side to prevent leaking.

    Cement plaster ceiling on expanded metal lath on 75 x50mm softwood branderings at 600mm c/c on roof joists.

    All exterior walls, load-bearing and interior walls are 1wythe thick (140mm) of230 x 140 x 10mm burnt clay bricks with 1.5mm mortarjoints. All walls are plastered and/or painted. All walls toinclude hoop irons every 2 courses of brick. Damp proofcourse under all walls.

    25mm f.f. cement-sand screed on 100mm oversiteconcrete mix 1:3:6 on 150mm thick hardcore oncompacted gravel.

    230mm thich burnt clay brick plinth wall, depth to bedetermined on site, min. 500mm on 690 x 230mmconcrete footer, mix 1:3:6 on termite treated compactedlevelled murram.

    FOUNDATION

    FLOOR

    WALLS

    CEILING

    ROOF1

    2

    3

    4

    5

    DOOR SCHEDULEWINDOW SCHEDULE

    MARK FAMILY & TYPE LOCATION HEIGHT WIDTH

    1 SINGLE-PANEL 2 : EXTERIOR SITTING ROOM 2050 mm 960 mm

    2 SINGLE-PANEL 2 : EXTERIOR ROOM 4 2050 mm 860 mm

    3 BATH 2050 mm 860 mm

    4 SINGLE-PANEL 2 : EXTERIOR ROOM 3 2050 mm 860 mm

    5 SINGLE-PANEL 2 : EXTERIOR KITCHEN 2050 mm 860 mm

    6 SINGLE-FLUSH : INTERIOR KITCHEN 2050 mm 860 mm

    7 SINGLE-FLUSH : INTERIOR BEDROOM 1 2050 mm 860 mm

    8 BATH 2050 mm 860 mm

    9 MASTER BEDROOM 2050 mm 860 mm

    10 ROOM 3 2050 mm 860 mm

    SINGLE-FLUSH : INTERIOR

    SINGLE-FLUSH : INTERIOR

    SINGLE-FLUSH : INTERIOR

    MARK FAMILY & TYPE LOCATION HEIGHT WIDTH

    1 CASEMENT DBL WITH TRIM BEDROOM 1 1200 mm 1000 mm

    ROOM 3

    ROOM 4

    AREA

    1.2 sq. m

    BATH

    ROOM 4

    1

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    NOTE: T.O. of all windows aligns to B.O. of ring beam

    CASEMENT DBL WITH TRIM

    CASEMENT DBL WITH TRIM

    CASEMENT DBL WITH TRIM

    CASEMENT DBL WITH TRIM

    CASEMENT DBL WITH TRIM

    KITCHEN

    MASTER BEDROOM

    SITTING ROOM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    CASEMENT WITH TRIM

    MASTER BEDROOM

    SITTING ROOM

    1200 mm 1000 mm 1.2 sq. m

    1200 mm 1000 mm 1.2 sq. m

    1200 mm 1000 mm 1.2 sq. m

    1200 mm 1000 mm 1.2 sq. m

    1200 mm 1000 mm 1.2 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    400 mm 600 mm 0.24 sq. m

    MASTER BEDROOM

    1 CASEMENT DBL WITH TRIM 1200 mm 1000 mm 1.2 sq. m

    1 CASEMENT DBL WITH TRIM 1200 mm 1000 mm 1.2 sq. m

    SITTING ROOM

    BATH

    KITCHEN

    9 AXONOMETRIC VENTILATION DIAGRAM

    OPENING FROM BEDROOMINTO STORAGE SPACE

    VENTILATOR BRICK LOUVER, TYP.

    NOTE: FLOOR SLAB TO BE ABOVE GRADE SOTHAT SEWAGE LINE MAY SLOPE 1:50 TO NWSMAIN SEWAGE LINE. CONTRACTOR TO VERIFYIN FIELD.

    LOUVERS OVER ALLWINDOWS AND DOORS, TYP.

    NOTE: ALL CEILINGS TO BE ON UNDERSIDEOF ROOF STRUCTURE, EXCEPT RENTERBATHROOM CEILING AND VESTIBULE TO BE2400 MM ABOVE FINISH FLOOR

    STORAGE SPACE OVERBATHROOM CEILING

    OPENING FROM BEDROOMINTO STORAGE SPACE

    STORAGE SPACE OVERVESTIBULE CEILING

    VENTILATOR BRICK LOUVER, TYP.

    SINGLE-PANEL 2 : EXTERIOR

    PRODUCED BY AN AUTODESK STUDENT PRODUCTPR

    OD

    UC

    ED BY AN

    AUTO

    DESK STU

    DEN

    T PRO

    DU

    CT

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY

    AN A

    UTO

    DES

    K ST

    UD

    ENT

    PRO

    DU

    CT

  • t o m m y h e i n a r c h i t e c t s[ t e l l u r i d e c o l o r a d o ]

  • SKI RUN

    PROPOSED EASTBUILDING BEYOND

    EXISTINGCASCADESBUILDING

    "SYMBOLICAVENUE"

    EXISTING/PROPOSED GRADE

    SCALE:ELEVATION FROM "SYMBOLIC STREET" LOOKING EAST

    3/32" = 1'-0"1

    WESTCOMPILED

    SUBMISSIONS:Prelim HARC 1 01.20.06Partner Set 1Partner Set 2 01.12.07Partner Set 3/Marketing 03.16.07Pricing 1 03.23.07Code Review 04.25.07

    05.03.0706.13.07

    10.05.0707.12.07

    11.03.06

    Construction 1/Pricing 2Code/Life SafetyPermit/CAA/Pricing 3Excavation Permit

    02.29.08GMP 4/CD 2/Permit 203.31.08HARC CAA 3/Permit 3

    PROPOSEDSOUTHBUILDINGS

    PROPOSED CENTRALBUILDING

    RIDGE 8830'-9 1/2"36'-0" ABOVE LOWESTGRADE BELOW

    GRADE BELOW

    RIDGE 8797'-5"43'-0 1/2" ABOVE LOWEST

    RIDGE 8783'-8 1/2"44'-9" ABOVE LOWESTGRADE BELOW

    GRADE BELOW

    RIDGE 8807'-3"44'-5" ABOVE LOWEST

    RIDGE 8813'-3"44'-3" ABOVE LOWESTGRADE BELOW

    1210

    1A3.15

    1A3.15

    SCALE:KEY PLAN

    N.T.S.2

    129

    124

    912

    ENTRYPORCH

    "SYMBOLIC"FRONT YARD

    SUBMISSIONS:Prelim HARC 1 01.20.06Partner Set 1Partner Set 2 01.12.07Partner Set 3/Marketing 03.16.07Pricing 1 03.23.07Code Review 04.25.07

    05.03.0706.13.07

    10.05.0707.12.07

    11.03.06

    Construction 1/Pricing 2Code/Life SafetyPermit/CAA/Pricing 3Excavation Permit

    02.29.08GMP 4/CD 2/Permit 203.31.08HARC CAA 3/Permit 3

    SCALE:LEVEL 05 COMPILED PLAN

    3/32" = 1'1

    LEVEL 05COMPILED

    PLAN

    N

    PLAN CUT AT EL. 8792'-6"

    UNIT E-58783'-3"T.O. SLAB

    UNIT E-68786'-6"T.O. SLAB

    UNIT E-78789'-9"T.O. SLAB

    UNIT S2-B8790'-0"T.O. SLAB

    UNIT S2-A8784'-0"T.O. SLAB

    UNIT S1-B8783'-6"T.O. SLAB

    UNIT S1-A8789'-0"T.O. SLAB

    UNIT SW-4028788'-0"T.O. SLAB

    UNIT SW-4018788'-0"T.O. SLAB

    LINE OF 10' TELSKI EASEMENTAND LICENSING AGREEMENT

  • SKI RUN

    PROPOSED EASTBUILDING BEYOND

    EXISTINGCASCADESBUILDING

    "SYMBOLICAVENUE"

    EXISTING/PROPOSED GRADE

    SCALE:ELEVATION FROM "SYMBOLIC STREET" LOOKING EAST

    3/32" = 1'-0"1

    WESTCOMPILED

    SUBMISSIONS:Prelim HARC 1 01.20.06Partner Set 1Partner Set 2 01.12.07Partner Set 3/Marketing 03.16.07Pricing 1 03.23.07Code Review 04.25.07

    05.03.0706.13.07

    10.05.0707.12.07

    11.03.06

    Construction 1/Pricing 2Code/Life SafetyPermit/CAA/Pricing 3Excavation Permit

    02.29.08GMP 4/CD 2/Permit 203.31.08HARC CAA 3/Permit 3

    PROPOSEDSOUTHBUILDINGS

    PROPOSED CENTRALBUILDING

    RIDGE 8830'-9 1/2"36'-0" ABOVE LOWESTGRADE BELOW

    GRADE BELOW

    RIDGE 8797'-5"43'-0 1/2" ABOVE LOWEST

    RIDGE 8783'-8 1/2"44'-9" ABOVE LOWESTGRADE BELOW

    GRADE BELOW

    RIDGE 8807'-3"44'-5" ABOVE LOWEST

    RIDGE 8813'-3"44'-3" ABOVE LOWESTGRADE BELOW

    1210

    1A3.15

    1A3.15

    SCALE:KEY PLAN

    N.T.S.2

    129

    124

    912

    ENTRYPORCH

    "SYMBOLIC"FRONT YARD

    42-unit, 100,000 sf ski-in/ ski-out multifamily development

    e l e m e n t 5 2

    On a tight, complex and highly regulated (nearby historic district, federal wetland regulations)hillside site, this project included a funicular, spa, and very deep

    parking garage. My work ranged from schematic proposals and code analysis to construction documentation and consultant coordination

  • XX

    X

    X

    X

    XX

    XX

    XX

    XX

    XX

    XX

    XX

    XX

    X

    X X X

    SUBMISSIONS:Prelim HARC 1 01.20.06Partner Set 1Partner Set 2 01.12.07Partner Set 3/Marketing 03.16.07Pricing 1 03.23.07Code Review 04.25.07

    05.03.0706.13.07

    10.05.0707.12.07

    11.03.06

    Construction 1/Pricing 2Code/Life SafetyPermit/CAA/Pricing 3Excavation Permit

    02.29.08GMP 4/CD 2/Permit 203.31.08HARC CAA 3/Permit 3

    185'

    90 Units in 1983 Subdivision74 Units in 1996 Developers Agreement (Lapsed) (Includes 2 Employee Units)53 Units in Current Scheme: 38 Proposed units (Includes 2 Employee Units) + 15 Existing units (72% of 1996 density)

    BUILDING MAXIMUM HEIGHTS:30% (Approx.) of New Structures to be at 60' Height Limit70% (Approx.) of New Structures to be at 45' Height Limit

    GROSS ABOVE GRADE FLOOR AREA

    Lobby/Bar/Luggage/KitchenCentral Building Wet Spa

    COMMON AREAS:

    82,561.8 S.F.

    2343.1 s.f.1,673.4 s.f.

    DENSITY:

    SW. Bldg Lot Coverage:3696 s.f.l.c. (3.0% of Lot)60' Height Limit 45' Height Limit

    Cntrl. Bldg. Lot Coverage:6362.8 SF (5.2% of Lot)

    122,713.4 s.f. (2.8 acres)LOT SIZE:

    1996 APPROVED LOT COVERAGE:

    FLOOR AREA SUMMARYPER 3-210.C.11Allowable Max. 30,000 s.f. Per Structure

    Central Building UnitsWest Building UnitsSouthWest Building UnitsSouth Building UnitsEast Building UnitsRiver Building UnitsTOTAL

    FLOOR AREA12,391.1 s.f.18500.8 s.f.9,834.4 s.f.

    15,567.0 s.f.17,429.1 s.f.

    4822.9 s.f.78,545.3 s.f.

    51,540 s.f.L.C.(42% Lot Size)

    LOT COVERAGE BREAKDOWNNew Central BuildingNew West BuildingNew SouthWest BuildingNew South BuildingsNew East BuildingsNew River BuildingNew Mechanical SpaceTotal New Buildings

    ALLOWABLE LOT COVERAGE 49,085.4 s.f. (40.0%) 30% for Lots > 100,000 s.f. = 36,814.0 s.f.L.C. +10% for 100% of Parking Enclosed = 12,271.3 s.f.L.C. =40% Net Allowable Lot Coverage = 49,085.4 s.f.L.C.

    6362.8 s.f.L.C.6,325.6 s.f.L.C.3,696.0 s.f.L.C.6,534.8 s.f.L.C.8557.8 s.f.L.C.

    2,362.8 s.f.L.C.787.5 s.f.L.C.

    34,627.3 s.f.L.C.

    55'-6" ABOVE FIN. GRADET.O. RIDGE

    LAND USE SUMMARYLegal description :L.U.C. Zone district :HARC Treatment Area :

    Use :

    LOT COVERAGE SUMMARYPER 3-2100.C.15

    Lot 1A, XYZ SubdivisionAccommodations IIAccommodations/

    River Park Corridor Overlay/Transitional HillsideMulit-Family Dwelling Units/Affordable Housing/

    Open Space

    (Including Garage)

    Lot Coverage:13232 s.f. (10.8% of Lot)

    L.U.C.COMPLIANCE

    SHEET

    AFFORDABLE HOUSING MITIGATION CALCULATION:Per LUC 3-740

    Proposed Freemarket Residential Units:Proposed Affordable Housing Units:

    (Based on Lot Coverage)

    SCALE:LAND USE CODE DIAGRAM

    1" = 20'-0"B

    E. Bldg. Lot Coverage:8557.8 s.f. (7.0% of Lot)45' Height Limit

    BULK PLANE

    1:1.5

    39'-1

    0"

    PROPOSEDRIVER BUILDING

    SAN MIGUELRIVER

    EXISTING TERRACE River House Lot Coverage:2362.8 s.f. (1.9% of Lot)45' Height Limit

    45' Height Limit

    S. Bldgs Lot Coverage:6534.8 SF (5.3% of Lot)

    70'-0

    "

    70'-0"

    20.14'

    22'-1112"

    20.14'

    LINE OF 60' HT. LIMIT

    80'-0"

    180'

    -4"

    BULK

    PLA

    NE1:

    1.5

    39'-1

    0"

    RIVER PARKCORRIDOR

    BOUNDARY LINE

    PROPOSEDRIVER BUILDING

    LINE OF 60'HEIGHT LIMIT

    EXISTINGBUILDING

    PROPOSED SCHEME SUMMARY

    REQUIRED AFFORDABLE HOUSING:Per Jan. 2006 60' Height Waiver:Per L.U.C. (36 x .33/residential units x 350s.f./employee x .40 : + 1403.5 commercial s.f. x 4.5/1000 x 350s.f./employee x .40) :

    GRANDFATHERED EXISTING CASCADES AREAS:Total Liveable Floor Area:Lobby Floor Area:TOTAL FLOOR AREA:Garage & Mech Floor Area

    32,410.0 S.F.2,343.1 S.F.

    34,753.1 S.F.7,039 S.F.

    8807'-3"+ 44'-5" MAX HT.

    8797'-5"+ 41'-5" MAX HT.

    8791'-2"+59'-2"

    LINE OF 70' ACCESS EASEMENT

    20.1

    4' S

    KI E

    ASE

    MEN

    T

    8791'-0"+50'-0" MAX HT.

    51'-8"

    25'-9"

    W. Bldg Lot Coverage:6325.6 s.f. (5.2% of Lot)60' Height Limit

    8802'-7"+59'-7" MAX HT.

    8783'-8 1/2"+ 44'-9" MAX HT.

    8813'-3"+ 44'-3" MAX HT.

    8825-3"+ 43'-8" MAX HT.

    8815'-0 1/2"+37' MAX HT.

    8800'-4"+40'-3" MAX HT.

    8769'-10"+ 38' MAX HT.

    8771'-10"+ 40'-4" MAX HT.

    FUNICULAR

    WESTBUILDING

    SOUTHWESTBUILDING

    CENTRAL BUILDING

    SOUTH BUILDINGS

    BUILDINGEAST

    RIVERHOUSE

    Existing Cascades BuildingExisting GarageExisting Lobby (Not below W Bldg.)Total Existing Structures

    TOTAL LOT COVERAGE

    9,683.1 s.f.L.C.2,800.2 s.f.L.C.1,865.9 s.f.L.C.

    14,349.2 s.f.L.C.

    48,976.5 S.F.L.C.(= 39.991% Lot Size)

    5,233.4 s.f.1,663.2 s.f.

    884.2 s.f.2,547.4 s.f.

    362

    8830'-9 1/2"+36' MAX HT.

    8827'-8 1/2"+37'-8" MAX HT.

    9'-2

    1 2"

    60'-4

    "

    87'-4

    "

    COMMERCIAL:1,403.5 S.F. = Office Commercial - in Existing Cascades Building5,256.8 S.F. = Max. Allowable (15% of 35,045 gross s.f. in Principle Building)1,403.5 S.F. = Total Proposed Commercial s.f.

    SCALE:LAND USE CODE DIAGRAM

    1" = 20'-0"B

    8831'-3"+ 41' MAX HT.

    PARKING SUMMARYPER L.U.C. 3-D: 1 Space Per Dwelling Unit + 1 Space Per 1,000 s.f. Commercial Floor AreaPER 2003 IBC SECTION 1106, TABLE 1106.1: For 51 to 75 spaces provided, min. 3 accessible spaces

    must be provided, one of which must be van accessible.NUMBER OF UNITS PER BUILDINGWest BuildingCentral BuildingSouthwest BuildingSouth 1 BuildingSouth 2 BuildingEast BuildingRiver Building Total Spaced Required per Units

    10782272

    38

    TOTAL COMMERCIAL S.F. PER BUILDINGWest BuildingCentral Building Total S.F. Spaces Required per Commercial Area

    2343.13431.15774.2

    6

    TOTAL NEW SPACES REQUIRED 44

    PARKING SPACE SUMMARYExisting Unit SpacesNew SpacesAccessible Spaces

    1844

    3

    TOTAL SPACES PROVIDED 64

  • XX

    X

    X

    X

    XX

    XX

    XX

    XX

    XX

    XX

    XX

    XX

    X

    X X X

    SUBMISSIONS:Prelim HARC 1 01.20.06Partner Set 1Partner Set 2 01.12.07Partner Set 3/Marketing 03.16.07Pricing 1 03.23.07Code Review 04.25.07

    05.03.0706.13.07

    10.05.0707.12.07

    11.03.06

    Construction 1/Pricing 2Code/Life SafetyPermit/CAA/Pricing 3Excavation Permit

    02.29.08GMP 4/CD 2/Permit 203.31.08HARC CAA 3/Permit 3

    185'

    90 Units in 1983 Subdivision74 Units in 1996 Developers Agreement (Lapsed) (Includes 2 Employee Units)53 Units in Current Scheme: 38 Proposed units (Includes 2 Employee Units) + 15 Existing units (72% of 1996 density)

    BUILDING MAXIMUM HEIGHTS:30% (Approx.) of New Structures to be at 60' Height Limit70% (Approx.) of New Structures to be at 45' Height Limit

    GROSS ABOVE GRADE FLOOR AREA

    Lobby/Bar/Luggage/KitchenCentral Building Wet Spa

    COMMON AREAS:

    82,561.8 S.F.

    2343.1 s.f.1,673.4 s.f.

    DENSITY:

    SW. Bldg Lot Coverage:3696 s.f.l.c. (3.0% of Lot)60' Height Limit 45' Height Limit

    Cntrl. Bldg. Lot Coverage:6362.8 SF (5.2% of Lot)

    122,713.4 s.f. (2.8 acres)LOT SIZE:

    1996 APPROVED LOT COVERAGE:

    FLOOR AREA SUMMARYPER 3-210.C.11Allowable Max. 30,000 s.f. Per Structure

    Central Building UnitsWest Building UnitsSouthWest Building UnitsSouth Building UnitsEast Building UnitsRiver Building UnitsTOTAL

    FLOOR AREA12,391.1 s.f.18500.8 s.f.9,834.4 s.f.

    15,567.0 s.f.17,429.1 s.f.

    4822.9 s.f.78,545.3 s.f.

    51,540 s.f.L.C.(42% Lot Size)

    LOT COVERAGE BREAKDOWNNew Central BuildingNew West BuildingNew SouthWest BuildingNew South BuildingsNew East BuildingsNew River BuildingNew Mechanical SpaceTotal New Buildings

    ALLOWABLE LOT COVERAGE 49,085.4 s.f. (40.0%) 30% for Lots > 100,000 s.f. = 36,814.0 s.f.L.C. +10% for 100% of Parking Enclosed = 12,271.3 s.f.L.C. =40% Net Allowable Lot Coverage = 49,085.4 s.f.L.C.

    6362.8 s.f.L.C.6,325.6 s.f.L.C.3,696.0 s.f.L.C.6,534.8 s.f.L.C.8557.8 s.f.L.C.

    2,362.8 s.f.L.C.787.5 s.f.L.C.

    34,627.3 s.f.L.C.

    55'-6" ABOVE FIN. GRADET.O. RIDGE

    LAND USE SUMMARYLegal description :L.U.C. Zone district :HARC Treatment Area :

    Use :

    LOT COVERAGE SUMMARYPER 3-2100.C.15

    Lot 1A, XYZ SubdivisionAccommodations IIAccommodations/

    River Park Corridor Overlay/Transitional HillsideMulit-Family Dwelling Units/Affordable Housing/

    Open Space

    (Including Garage)

    Lot Coverage:13232 s.f. (10.8% of Lot)

    L.U.C.COMPLIANCE

    SHEET

    AFFORDABLE HOUSING MITIGATION CALCULATION:Per LUC 3-740

    Proposed Freemarket Residential Units:Proposed Affordable Housing Units:

    (Based on Lot Coverage)

    SCALE:LAND USE CODE DIAGRAM

    1" = 20'-0"B

    E. Bldg. Lot Coverage:8557.8 s.f. (7.0% of Lot)45' Height Limit

    BULK PLANE

    1:1.5

    39'-1

    0"

    PROPOSEDRIVER BUILDING

    SAN MIGUELRIVER

    EXISTING TERRACE River House Lot Coverage:2362.8 s.f. (1.9% of Lot)45' Height Limit

    45' Height Limit

    S. Bldgs Lot Coverage:6534.8 SF (5.3% of Lot)

    70'-0

    "

    70'-0"

    20.14'

    22'-1112"

    20.14'

    LINE OF 60' HT. LIMIT

    80'-0"

    180'

    -4"

    BULK

    PLA

    NE1:

    1.5

    39'-1

    0"

    RIVER PARKCORRIDOR

    BOUNDARY LINE

    PROPOSEDRIVER BUILDING

    LINE OF 60'HEIGHT LIMIT

    EXISTINGBUILDING

    PROPOSED SCHEME SUMMARY

    REQUIRED AFFORDABLE HOUSING:Per Jan. 2006 60' Height Waiver:Per L.U.C. (36 x .33/residential units x 350s.f./employee x .40 : + 1403.5 commercial s.f. x 4.5/1000 x 350s.f./employee x .40) :

    GRANDFATHERED EXISTING CASCADES AREAS:Total Liveable Floor Area:Lobby Floor Area:TOTAL FLOOR AREA:Garage & Mech Floor Area

    32,410.0 S.F.2,343.1 S.F.

    34,753.1 S.F.7,039 S.F.

    8807'-3"+ 44'-5" MAX HT.

    8797'-5"+ 41'-5" MAX HT.

    8791'-2"+59'-2"

    LINE OF 70' ACCESS EASEMENT

    20.1

    4' S

    KI E

    ASE

    MEN

    T

    8791'-0"+50'-0" MAX HT.

    51'-8"

    25'-9"

    W. Bldg Lot Coverage:6325.6 s.f. (5.2% of Lot)60' Height Limit

    8802'-7"+59'-7" MAX HT.

    8783'-8 1/2"+ 44'-9" MAX HT.

    8813'-3"+ 44'-3" MAX HT.

    8825-3"+ 43'-8" MAX HT.

    8815'-0 1/2"+37' MAX HT.

    8800'-4"+40'-3" MAX HT.

    8769'-10"+ 38' MAX HT.

    8771'-10"+ 40'-4" MAX HT.

    FUNICULAR

    WESTBUILDING

    SOUTHWESTBUILDING

    CENTRAL BUILDING

    SOUTH BUILDINGS

    BUILDINGEAST

    RIVERHOUSE

    Existing Cascades BuildingExisting GarageExisting Lobby (Not below W Bldg.)Total Existing Structures

    TOTAL LOT COVERAGE

    9,683.1 s.f.L.C.2,800.2 s.f.L.C.1,865.9 s.f.L.C.

    14,349.2 s.f.L.C.

    48,976.5 S.F.L.C.(= 39.991% Lot Size)

    5,233.4 s.f.1,663.2 s.f.

    884.2 s.f.2,547.4 s.f.

    362

    8830'-9 1/2"+36' MAX HT.

    8827'-8 1/2"+37'-8" MAX HT.

    9'-2

    1 2"

    60'-4

    "

    87'-4

    "

    COMMERCIAL:1,403.5 S.F. = Office Commercial - in Existing Cascades Building5,256.8 S.F. = Max. Allowable (15% of 35,045 gross s.f. in Principle Building)1,403.5 S.F. = Total Proposed Commercial s.f.

    SCALE:LAND USE CODE DIAGRAM

    1" = 20'-0"B

    8831'-3"+ 41' MAX HT.

    PARKING SUMMARYPER L.U.C. 3-D: 1 Space Per Dwelling Unit + 1 Space Per 1,000 s.f. Commercial Floor AreaPER 2003 IBC SECTION 1106, TABLE 1106.1: For 51 to 75 spaces provided, min. 3 accessible spaces

    must be provided, one of which must be van accessible.NUMBER OF UNITS PER BUILDINGWest BuildingCentral BuildingSouthwest BuildingSouth 1 BuildingSouth 2 BuildingEast BuildingRiver Building Total Spaced Required per Units

    10782272

    38

    TOTAL COMMERCIAL S.F. PER BUILDINGWest BuildingCentral Building Total S.F. Spaces Required per Commercial Area

    2343.13431.15774.2

    6

    TOTAL NEW SPACES REQUIRED 44

    PARKING SPACE SUMMARYExisting Unit SpacesNew SpacesAccessible Spaces

    1844

    3

    TOTAL SPACES PROVIDED 64

  • BUILDINGSECTIONS

    SUBMISSIONS:

    RESIDENCE

    MOUNTAINVILLAGE, CO

    LOT 246135 PALMYRA LANE

    DRB SKETCH 11.07.06CLIENT REVIEW 01.25.07CLIENT MEETING 02.12.07PROGRESS 02.26.07STRUCTURAL PROGRESS 04.09.07PROGRESS 04.30.07FOUNDATION PERMIT 05.14.07CONSTRUCTION 1 06.21.07DRB FINAL 07.03.07CONSTRUCTION 2/ PRICING 1 08.09.07DRB FINAL CONTINUANCE 09.05.07PERMIT 10.16.07

    SCALE:SECTION 1

    1/4" = 1'-0"1

    SCALE:SECTION 3

    1/4" = 1'-0"3

    SE

    E 1

    /A4.

    1

    9708'-3"T.O. BEAM

    9696'-6"T.O. PLY

    9707'-0"T.O. BEAM

    LIVINGFOYER

    GUESTTREEHOUSE

    BEDROOM 3

    MECHANICAL

    ENTRY BRIDGE

    ENTRY

    CARETAKERSTORAGE

    GARAGE

    MASTER BEDROOM

    9720'-1"T.O. CHANNEL

    9726'-1 1/2"T.O. RIDGE

    9708'-4"T.O. PLY9708'-0"T.O. DECK

    9720'-1"T.O. CHANNEL

    9726'-1 1/2"T.O. RIDGE

    9698'-0"T.O. PLY

    9696'-6"T.O. PLY

    9686'-0"T.O. SLAB

    9677'-9"T.O. SLAB

    9689'-0"T.O. CAP

    9690'-0"T.O. WALL

    9689'-0"T.O. SLAB

    9686'-0"T.O. CAP

    9690'-0"T.O. WALL

    9713'-0"T.O. CAP

    9714'-6"T.O. CAP

    9699'-9 1/2"T.O. PLY

    9699'-0"T.O. PLY

    9713'-10"T.O. RIDGE

    9705'-0 1/2"T.O. PLATE

    9712'-3 1/4"T.O. BEAM

    77A4.68

    A4.79

    A4.810

    A4.811

    A4.9

    1A4.1

    8 8.2 8.4 8.6 8.8 9 10 11

    E CL D

    EXISITING GRADE

    EXISITING GRADE

    127

    129

    129

    129

    129

    12 3

    127

    4A5.1

    3A5.1

    F5

    F6

    F5

    F1

    F1

    F5

    2A8.3

    8A8.6

    5A8.6

    F6

    F1 F1

    F3

    1A8.3

    12A8.6

    12A8.6

    BUILDINGSECTIONS

    SUBMISSIONS:

    RESIDENCE

    MOUNTAINVILLAGE, CO

    LOT 246135 PALMYRA LANE

    DRB SKETCH 11.07.06CLIENT REVIEW 01.25.07CLIENT MEETING 02.12.07PROGRESS 02.26.07STRUCTURAL PROGRESS 04.09.07PROGRESS 04.30.07FOUNDATION PERMIT 05.14.07CONSTRUCTION 1 06.21.07DRB FINAL 07.03.07CONSTRUCTION 2/ PRICING 1 08.09.07DRB FINAL CONTINUANCE 09.05.07PERMIT 10.16.07

    SCALE:SECTION 2

    1/4" = 1'-0"2

    SEE

    1/A

    4.2

    9713'-0"T.O. CAP

    9708'-4"T.O. PLY

    9720'-1"T.O. CHANNEL

    9690'-0"T.O. WALL

    9686'-0"T.O. SLAB

    9696'-6"T.O. PLY

    9708'-3"T.O. BEAM

    9696'-6"T.O. PLY

    2A4.1

    MASTER BATH MASTER BEDROOM MASTER CLOSET KITCHEN DINING LIVING FOYER

    BUNK ROOM 4 GAMES MEDIA BEDROOM 3

    MECHANICAL

    OFFICE

    TREEHOUSE BRIDGE

    GUESTTREEHOUSE

    9712'-3 1/8"T.O. RIDGE

    9726'-1 1/2"T.O. RIDGE

    9677'-9"T.O. SLAB

    9698'-0"T.O. PLY

    9708'-4"T.O. PLY9708'-0"T.O. DECK

    9720'-1"T.O. CHANNEL

    9726'-1 1/2"T.O. RIDGE

    MASTERBATH

    SCALE:SECTION 1

    1/4" = 1'-0"1

    9712'-3 1/4"T.O. RIDGE

    3A4.21 2 3 4 5 6 7

    4A4.3

    5A4.4

    6A4.5

    8A4.7

    1A4.1

    E CL D

    EXISITING GRADE

    EXISITING GRADE

    129

    129

    129

    127

    7A4.6

    2A8.3

    12A8.6

    2A8.3

    4A5.1

    F5

    1A8.3

    F1

    F5

    2A8.3

    F5

    F6

    F6

    F6

    F1

    SUBMISSIONS:

    RESIDENCE

    MOUNTAINVILLAGE, CO

    LOT 246135 PALMYRA LANE

    DRB SKETCH 11.07.06CLIENT REVIEW 01.25.07CLIENT MEETING 02.12.07PROGRESS 02.26.07STRUCTURAL PROGRESS 04.09.07PROGRESS 04.30.07FOUNDATION PERMIT 05.14.07CONSTRUCTION 1 06.21.07DRB FINAL 07.03.07CONSTRUCTION 2/ PRICING 1 08.09.07DRB FINAL CONTINUANCE 09.05.07PERMIT 10.16.07

    SCALE:LEVEL 01 MAIN HOUSE FLOOR PLAN

    1/4" = 1'-0"1

    1 2 3 4 5 6 7 8

    COL

    A

    CL

    G

    E

    D

    2A4.1

    3A4.2

    4A4.3

    5A4.4

    6A4.5

    8A4.7

    A4.11

    1 2 3 4 5 6 7 8

    UP

    MEDIA22'-O" X 17'-0"

    BEDROOM 312'-1" X 20'-3"

    CLOSET5'-3" X 7'-2"

    BATH 312'-1" X 11'-0"

    benc

    h

    LAUNDRY11'-9" X 9'-0"

    TERRACE

    SPA

    9686'-0"T.O. SUB-FLOOR

    GAMES19'-8" X 17'-1"

    BATH 412'-1" X 8'-8"

    CL.CL.

    W

    D

    WET

    BAR

    BUNK ROOM 412'-1" X 18'-9"

    1A3.3

    1A3.2

    1A3.4

    1A3.1

    UP

    15'-3" 18'-0" 13'-0" 18'-0" 18'-0" 21'-0" 13'-0"

    116'-3"

    13'-6

    "13

    '-6"

    4'-6

    "4'

    -6"

    10'-0

    "

    10 X 10TIMBERCOLUMN -TYP

    LEVEL 02 ABOVE

    DECK ABOVE

    LEVEL 02 ABOVE LEVEL 02 ABOVE

    FIRE PIT TOWER

    10 X 10 TIMBERCOLUMN - TYP

    SEE

    1/A

    2.5

    N

    101

    102

    103

    105

    106 107 108 109

    114

    113

    7A4.6

    6'-6"10'-512"10'-6

    14"1'-6"4'-9"4'-9"9'-0

    14"8'-11

    12" 6'-6"1'-6" 2'-9"2'-9"

    15'-0"19'-6" 22'-6"

    2'-1

    0"3'

    -2"

    6'-0

    "

    1'-6

    "

    2'-1

    0"3'

    -2"

    6'-0

    "

    2'-1

    0"

    2'-1

    11 2"

    2'-3

    "11

    '-21 2"

    3'-1112" 2'-012" 1'-9" 4'-5

    12"

    8'-3

    "

    8'-6

    "91 2

    "

    3'-412"6'-3"3'-412"

    6'-0" 6'-212"

    3'-2

    1 2"

    22'-6"15'-0"19'-6"3'-412"6'-3"3'-4

    12"

    8'-6

    "

    2'-0"2'-2"1'-1012"1'-10

    12"2'-2"1'-8"9

    12"

    3'-10" 3'-9" 4'-2"

    5'-2

    1 2"91 2

    "

    6'-0

    "

    2'-1

    1 2"2'

    -83 4"

    3'-3

    3 4"3'

    -3"

    91 2"

    6'-6"6'-6"

    4'-5

    "

    6"

    2'-512"4'-912"4'-9

    12"2'-5

    12"

    4'-9

    1 4"2'

    -111 2

    "

    5'-2

    3 4"2'

    -0"

    17R

    @ 7

    9/1

    6"

    14T

    @ 1

    0 1/

    2"

    17R @ 7 5/8"

    16T @ 10 1/2"

    W7

    W15

    W2

    W2

    W2

    W15

    W7W7

    W5

    W7

    STAIR(see 5/A6.1)

    STAIR(see 4/A6.1)

    Liveable Area - 1982.8 sf.

    [ c o n s t r u c t i o n d o c u m e n t a t i o n _ d e t a i l i n g ]

  • SUBMISSIONS:

    RESIDENCE

    MOUNTAINVILLAGE, CO

    LOT 246135 PALMYRA LANE

    DRB SKETCH 11.07.06CLIENT REVIEW 01.25.07CLIENT MEETING 02.12.07PROGRESS 02.26.07STRUCTURAL PROGRESS 04.09.07PROGRESS 04.30.07FOUNDATION PERMIT 05.14.07CONSTRUCTION 1 06.21.07DRB FINAL 07.03.07CONSTRUCTION 2/ PRICING 1 08.09.07DRB FINAL CONTINUANCE 09.05.07PERMIT 10.16.07

    SCALE:LEVEL 01 MAIN HOUSE FLOOR PLAN

    1/4" = 1'-0"1

    1 2 3 4 5 6 7 8

    COL

    A

    CL

    G

    E

    D

    2A4.1

    3A4.2

    4A4.3

    5A4.4

    6A4.5

    8A4.7

    A4.11

    1 2 3 4 5 6 7 8

    UP

    MEDIA22'-O" X 17'-0"

    BEDROOM 312'-1" X 20'-3"

    CLOSET5'-3" X 7'-2"

    BATH 312'-1" X 11'-0"

    benc

    h

    LAUNDRY11'-9" X 9'-0"

    TERRACE

    SPA

    9686'-0"T.O. SUB-FLOOR

    GAMES19'-8" X 17'-1"

    BATH 412'-1" X 8'-8"

    CL.CL.

    W

    D

    WET

    BAR

    BUNK ROOM 412'-1" X 18'-9"

    1A3.3

    1A3.2

    1A3.4

    1A3.1

    UP

    15'-3" 18'-0" 13'-0" 18'-0" 18'-0" 21'-0" 13'-0"

    116'-3"

    13'-6

    "13

    '-6"

    4'-6

    "4'

    -6"

    10'-0

    "

    10 X 10TIMBERCOLUMN -TYP

    LEVEL 02 ABOVE

    DECK ABOVE

    LEVEL 02 ABOVE LEVEL 02 ABOVE

    FIRE PIT TOWER

    10 X 10 TIMBERCOLUMN - TYP

    SEE

    1/A

    2.5

    N

    101

    102

    103

    105

    106 107 108 109

    114

    113

    7A4.6

    6'-6"10'-512"10'-6

    14"1'-6"4'-9"4'-9"9'-0

    14"8'-11

    12" 6'-6"1'-6" 2'-9"2'-9"

    15'-0"19'-6" 22'-6"

    2'-1

    0"3'

    -2"

    6'-0

    "

    1'-6

    "

    2'-1

    0"3'

    -2"

    6'-0

    "

    2'-1

    0"

    2'-1

    11 2"

    2'-3

    "11

    '-21 2"

    3'-1112" 2'-012" 1'-9" 4'-5

    12"

    8'-3

    "

    8'-6

    "91 2

    "

    3'-412"6'-3"3'-412"

    6'-0" 6'-212"

    3'-2

    1 2"

    22'-6"15'-0"19'-6"3'-412"6'-3"3'-4

    12"

    8'-6

    "

    2'-0"2'-2"1'-1012"1'-10

    12"2'-2"1'-8"9

    12"

    3'-10" 3'-9" 4'-2"

    5'-2

    1 2"91 2

    "

    6'-0

    "

    2'-1

    1 2"2'

    -83 4"

    3'-3

    3 4"3'

    -3"

    91 2"

    6'-6"6'-6"

    4'-5

    "

    6"

    2'-512"4'-912"4'-9

    12"2'-5

    12"

    4'-9

    1 4"2'

    -111 2

    "

    5'-2

    3 4"2'

    -0"

    17R

    @ 7

    9/1

    6"

    14T

    @ 1

    0 1/

    2"

    17R @ 7 5/8"

    16T @ 10 1/2"

    W7

    W15

    W2

    W2

    W2

    W15

    W7W7

    W5

    W7

    STAIR(see 5/A6.1)

    STAIR(see 4/A6.1)

    Liveable Area - 1982.8 sf.

    Single-family residence in southwest Colorado

    b h a t i a r e s i d e n c e

    On a steep, wooded site with ski run access, this house recalled his-toric mining vernacular, particularly the bridges common in the rugged terrain.

    I was central to all phases of de-velopment, from site schematics to construction documents and consultant and contractor coordi-nation.

  • P:\7

    Asp

    en\C

    HER

    RY

    in A

    spen

    \Dra

    win

    gs\S

    heet

    s\A8

    .4-R

    OO

    F D

    ETAI

    LS-C

    HER

    RY.

    dwg,

    A8.

    4 R

    OO

    F D

    ETAI

    LS, 1

    2/8/

    2006

    3:2

    7:26

    PM

    ROOFDETAILS

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    SUBMISSIONS:

    CHERRYRESIDENCE

    SD PROGRESS

    ASPENCOLORADO

    2.11.05

    0109 SHAVANO DRIVE

    SD PROGRESS 4.21.05DRB Conceptual 2 6.09.05DD Evolution 6.22.05

    08.04.05DD/ DRB 312.19.05DRB FINAL

    LOT 40, BLOCK EMOORE FAMILY P.U.D.

    THA PROGRESS 03.23.0604.06.06PERMIT06.02.06PRICING

    PROGRESS 09.14.06CONSTRUCTION 1& REVISED FINISHSCHEDULE

    09.20.06

    CONSTRUCTION 1 09.26.06REFENESTERATION 1 11.15.06

    12.08.06CONSTRUCTION 2

  • P:\7

    Asp

    en\C

    HER

    RY

    in A

    spen

    \Dra

    win

    gs\S

    heet

    s\A5

    .1-W

    ALL

    SEC

    TIO

    NS-

    CH

    ERR

    Y.dw

    g, A

    5.2,

    12/

    8/20

    06 3

    :24:

    50 P

    M

    DETAILS& RAIL

    SUBMISSIONS:

    CHERRYRESIDENCE

    SD PROGRESS

    ASPENCOLORADO

    2.11.05

    0109 SHAVANO DRIVE

    SD PROGRESS 4.21.05DRB Conceptual 2 6.09.05DD Evolution 6.22.05

    08.04.05DD/ DRB 312.19.05DRB FINAL

    LOT 40, BLOCK EMOORE FAMILY P.U.D.

    THA PROGRESS 03.23.0604.06.06PERMIT06.02.06PRICING

    PROGRESS 09.14.06CONSTRUCTION 1& REVISED FINISHSCHEDULE

    09.20.06

    CONSTRUCTION 1 09.26.06REFENESTERATION 1 11.15.06

    12.08.06CONSTRUCTION 2

    SCALE:NORTH TERRACE STONE CAP

    1" = 1'-0"1

    6" X 24" STONECAP

    5" STONE VENEER,SEE SPEC.

    GALVANIZEDCORRUGATED STEELSTONE HANGER, TYP.

    STEEL TIE RODDOWELLED INTO

    CONCRETE

    STONE HEADER

    STONE SILL

    2X FURRING RIPPED TOSLOPE 5

    STEEL TIE RODDOWELLED INTO

    CONCRETE @ 16" O.C.,8" AT TOP OF CMU

    CMU STONESUPPORT

    CONC. FOOTER

    8" CAST-IN-PLACECONCRETE WALL

    F7 SIM

    W8 & 22

    W20 & 22

    W23

    SCALE:TYPICAL WALL SECTION

    1" = 1'-0"2

    W24

    F10

    W11

    F8

    F9

    F5

    W1 SIM.

    grid

    R2

    ALIGN FACE OFBEAM WITH FACE

    OF SIDING - TYP

    ALIGN FACE OFBEAM WITH FACEOF INTERIORFINISH - TYP

    T.O. SUBFLOOR

    T.O. SLAB

    T.O. SLAB

    P:\7

    Asp

    en\C

    HER

    RY

    in A

    spen

    \Dra

    win

    gs\S

    heet

    s\A8

    .4-R

    OO

    F D

    ETAI

    LS-C

    HER

    RY.

    dwg,

    A8.

    4 R

    OO

    F D

    ETAI

    LS, 1

    2/8/

    2006

    3:2

    7:26

    PM

    ROOFDETAILS

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    SUBMISSIONS:

    CHERRYRESIDENCE

    SD PROGRESS

    ASPENCOLORADO

    2.11.05

    0109 SHAVANO DRIVE

    SD PROGRESS 4.21.05DRB Conceptual 2 6.09.05DD Evolution 6.22.05

    08.04.05DD/ DRB 312.19.05DRB FINAL

    LOT 40, BLOCK EMOORE FAMILY P.U.D.

    THA PROGRESS 03.23.0604.06.06PERMIT06.02.06PRICING

    PROGRESS 09.14.06CONSTRUCTION 1& REVISED FINISHSCHEDULE

    09.20.06

    CONSTRUCTION 1 09.26.06REFENESTERATION 1 11.15.06

    12.08.06CONSTRUCTION 2

    e l k r u n r e s i d e n c e sTimber and steel residential construction in southwest Colorado

    The details and photos shown on this and the following page are of three timber and steel houses in San Miguel County. I worked direct-ly with the principle and structural engineers to develop these connec-tion and waterproofing details.

  • P:\7

    Asp

    en\C

    HER

    RY

    in A

    spen

    \Dra

    win

    gs\S

    heet

    s\A4

    .4-N

    _S S

    ECTI

    ON

    S-C

    HER

    RY.

    dwg,

    A4.

    4, 1

    2/8/

    2006

    3:2

    2:12

    PM

    SECTIONSBUILDING

    SCALE:BUILDING SECTION 7

    1/4" = 1'-0"1

    SCALE:BUILDING SECTION 8

    1/4" = 1'-0"2

    KJIHGFEDCBA

    SUBMISSIONS:

    CHERRYRESIDENCE

    SD PROGRESS

    ASPENCOLORADO

    2.11.05

    0109 SHAVANO DRIVE

    SD PROGRESS 4.21.05DRB Conceptual 2 6.09.05DD Evolution 6.22.05

    08.04.05DD/ DRB 312.19.05DRB FINAL

    LOT 40, BLOCK EMOORE FAMILY P.U.D.

    THA PROGRESS 03.23.0604.06.06PERMIT06.02.06PRICING

    PROGRESS 09.14.06CONSTRUCTION 1& REVISED FINISHSCHEDULE

    09.20.06

    CONSTRUCTION 1 09.26.06REFENESTERATION 1 11.15.06

    12.08.06CONSTRUCTION 2

    BEDROOM 4

    55'-2 1/4"T.O. RIDGE

    BATH 4 BEDROOM 5

    EXERCISE

    WEST TERRACEBATH 1MARY'SCLOSET

    BEDROOM 3 CLOSET 4 HALL BATH 5

    EXERCISE

    BUILT-INSTORAGE

    PILATES

    MASTER SUITEMARY'SCLOSETLOFT

    39'-2"T.O. BEAM

    33'-9"T.O. SUBFLOOR

    21'-6"T.O. SLAB

    30'-7"T.O. WALL

    20'-9"T.O. SLAB

    33'-9"T.O. SUBFLOOR

    39'-2"T.O. BEAM

    21'-6"T.O. SLAB

    30'-1"T.O. WALL

    20'-9"T.O. SLAB

    1A4.1

    2A4.1

    1A4.2

    2A4.2

    1A4.3

    2A4.3

    1A4.2

    1A4.1

    2A4.1

    2A4.2

    1A4.3

    2A4.3

    L

    A

    B C FE

    D

    G IH KJ L

    8A8.4

    8A8.4

    W6

    W2

    W12 W11

    W11W2

    W7

    W11

    W12

    W11

    W11

    W2

    W7

    W11W11

    W6

    F8 F8F6

    F10

    F8 F8 F8 F12

    F6 F8

    F10

    W11

    6A8.4

    6A8.4

    R2

    LOFT

    SIM. F12

    R1

    W12

    W11

    F10F10

    (SEE STRUCT'S)

    F7

    6A5.1

    DRAIN

    FOUNDATIONDRAIN

    FOUNDATIONDRAIN

    3A5.1

    SIM.W2 3'

    -51 4"

    EGRESSW11 W12 W11

    W12

    R1

    F10 F10

    W7

    FOUNDATIONDRAIN

    FOUNDATIONDRAIN

    R2

    8A8.5 TYP.

    8A8.5 TYP.

  • P:\7

    Asp

    en\C

    HER

    RY

    in A

    spen

    \Dra

    win

    gs\S

    heet

    s\A4

    .4-N

    _S S

    ECTI

    ON

    S-C

    HER

    RY.

    dwg,

    A4.

    4, 1

    2/8/

    2006

    3:2

    2:12

    PM

    SECTIONSBUILDING

    SCALE:BUILDING SECTION 7

    1/4" = 1'-0"1

    SCALE:BUILDING SECTION 8

    1/4" = 1'-0"2

    KJIHGFEDCBA

    SUBMISSIONS:

    CHERRYRESIDENCE

    SD PROGRESS

    ASPENCOLORADO

    2.11.05

    0109 SHAVANO DRIVE

    SD PROGRESS 4.21.05DRB Conceptual 2 6.09.05DD Evolution 6.22.05

    08.04.05DD/ DRB 312.19.05DRB FINAL

    LOT 40, BLOCK EMOORE FAMILY P.U.D.

    THA PROGRESS 03.23.0604.06.06PERMIT06.02.06PRICING

    PROGRESS 09.14.06CONSTRUCTION 1& REVISED FINISHSCHEDULE

    09.20.06

    CONSTRUCTION 1 09.26.06REFENESTERATION 1 11.15.06

    12.08.06CONSTRUCTION 2

    BEDROOM 4

    55'-2 1/4"T.O. RIDGE

    BATH 4 BEDROOM 5

    EXERCISE

    WEST TERRACEBATH 1MARY'SCLOSET

    BEDROOM 3 CLOSET 4 HALL BATH 5

    EXERCISE

    BUILT-INSTORAGE

    PILATES

    MASTER SUITEMARY'SCLOSETLOFT

    39'-2"T.O. BEAM

    33'-9"T.O. SUBFLOOR

    21'-6"T.O. SLAB

    30'-7"T.O. WALL

    20'-9"T.O. SLAB

    33'-9"T.O. SUBFLOOR

    39'-2"T.O. BEAM

    21'-6"T.O. SLAB

    30'-1"T.O. WALL

    20'-9"T.O. SLAB

    1A4.1

    2A4.1

    1A4.2

    2A4.2

    1A4.3

    2A4.3

    1A4.2

    1A4.1

    2A4.1

    2A4.2

    1A4.3

    2A4.3

    L

    A

    B C FE

    D

    G IH KJ L

    8A8.4

    8A8.4

    W6

    W2

    W12 W11

    W11W2

    W7

    W11

    W12

    W11

    W11

    W2

    W7

    W11W11

    W6

    F8 F8F6

    F10

    F8 F8 F8 F12

    F6 F8

    F10

    W11

    6A8.4

    6A8.4

    R2

    LOFT

    SIM. F12

    R1

    W12

    W11

    F10F10

    (SEE STRUCT'S)

    F7

    6A5.1

    DRAIN

    FOUNDATIONDRAIN

    FOUNDATIONDRAIN

    3A5.1

    SIM.W2 3'

    -51 4"

    EGRESSW11 W12 W11

    W12

    R1

    F10 F10

    W7

    FOUNDATIONDRAIN

    FOUNDATIONDRAIN

    R2

    8A8.5 TYP.

    8A8.5 TYP.

    e l k r u n r e s i d e n c e s

  • a n a m n e w c i t y[ a n a m b r a , n i g e r i a ]

  • timber truss roof structure:

    prefabricated for cost and efficiency

    extend roof andupper walls at gable ends for additional

    shading and to create spaces for shops and gathering

    thatch layer over bottom cord of truss to

    absorb heat re-radiated from roof

    yam storage: hanging and shelved for maximum loading and unloading efficiency, rodent and

    insect-proofing, and inspectability

    pvc vents cast into floor and stemwalls to optimize air flow

    ventilated bricks above 1.75m aff to maximize

    ventilationbicycle trailer yam delivery enterprise

  • o g w u y o n e i g h b o r h o o d[ a n a m c i t y ]

    Master plan, housing design, construction management

    gutter for rainwater collection, typ.

    water tank in plenum space near roof for gravity distribution to xtures

    50mm x 75mm purlin, typ.

    vent pipe for biogas digestion tank

    passive solar water heater

    ceiling below roof structure to block heat

    radiated from roong and reduce sound

    ring beam, typ.

    exposed compressed stabilized earth brick wall,

    made from locally fabricated bricks of local soil

    locally fabricated wood furniture

    concrete drainage pan to move water away

    from house

    ventilation pipe for biogas digester

    blackwater inlet into biodigestion tank

    kitchen located near exterior cooking

    porch

    greywater from sink reused to

    ush toilet

    hanging yam storage

    stand-alone biogas digestion tank - part of decentralized wast management system

    methane gas outlet

    oce area for home business

    ventilation louvers over all windows for passive

    cooling

    vent pipe for underground biogas digestion waste treatment system

    louver bricks in high part of wall to facilitate passive cooling

    louver bricks in high part of wall to facilitate

    passive cooling

    concrete ring beam, typ.

    greywater from sink reused to

    ush toilet

    50mm x 150mm timber beam at porch overhang

    100mm x 100mm steel column

    green screen living shade wall

    concrete column below porch (use concrete to resist termites)

    large overhang to south to provide shade and prevent solar heat gain

    large overhang to south to provide shade and prevent solar heat gain

    outdoor kitchen/ cooking area

    rainwater storage tank

    solar panel array, tied to local microgrid (cooperative utility)

    inci

    dent

    sola

    r ra

    diat

    ion

    inci

    dent

    sola

    r ra

    diat

    ion

    gravity-fed biological water lter

    A hybrid rural-urban model for sustainable development in Africa, the Anam City project balances ecology with economic growth. Focusing on the first

    neighborhood, I designed several prototype houses, an agricultural storage facility, workshed structures, and a health center

  • Sheet IDProject NameANAM NEW CITY, NIGERIAANAMCITY.COM

    Sheet IDGeneral NotesItems

    Rev.

    DESIGNED BY:CHIFE FOUNDATION

    DATE:

    DWN BY: CKD BY:

    SUBMITTED BY:

    PLOT SCALE:

    SIZE:A3

    FILE NAME:

    PLOT DATE:

    PROJECT CODE:

    SUBPROJECT CODE:

    FILE ADDRESS:A001

    BUNGALOW HOUSE - AHSG10.05.2012

    SLS

    ADC COVEROGW-H3.a

    1 SKY VIEW PERSPECTIVE

    AFFORDABLE HOUSING

    BUNGALOW HOUSE

    Sheet List

    A001 COVERA101 SITE PLANA200 GROUND FLOOR PERSPECTIVE PLANA201 GROUND FLOOR PLANA202 FOUNDATION PLANA203 CONCRETE COLUMN PLANA204 ROOF PLANA301 ELEVATIONSA302 ELEVATIONSA303 SECTIONSA401 WALL SECTIONA402 BATHROOM FLOOR SECTIONSA403 BATHROOM FLOOR AXONSA501 WALL DETAILSA502 FOUNDATION DETAILSA503 ROOF FRAMING PLANA504 ROOF FRAMING DETAILSA601 BRICK STACKING DIAGRAMSA602 BRICK STACKING PLANSA603 BRICK PLANS - WINDOW COURSESA604 BRICK PLANS - WINDOW COURSESA700 SCHEDULESA801 INTERIOR ELEVATIONSE201 ELECTRICAL PLAN

    PHASE 1

    PHASE 2

    PHASE 3

    PHASE 4

    PHASE 5

    OUTLINE SCHEDULE

    SUBSTRUCTURE & FLOOR

    WALLS

    ROOF

    FINISHES

    ELECTRICAL AND MECHANICAL

    14 DAYS

    30 DAYS

    21 DAYS

    45 DAYS

    10 DAYS

    450,000 NAIRA

    970,000 NAIRA

    440,000 NAIRA

    610,000 NAIRA

    160,000 NAIRA

    120 DAYS 2,630,000 NAIRA

    68 square meter 2-bedroom house withliving room, kitchen, and one bathroom,as well as outdoor cooking and sittingporches. This house has inexpensivefinishes, including painted ceilings andplumbing; bedroom and bathroom wallswill be unfinished brick, living room willbe plastered. Floors will be 600 x 600vitrified tile.

    DESCRIPTION

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY AN AU

    TOD

    ESK STUD

    ENT PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY

    AN A

    UTO

    DES

    K ST

    UD

    ENT

    PRO

    DU

    CT

    Sheet IDProject NameANAM NEW CITY, NIGERIAANAMCITY.COM

    Sheet IDGeneral NotesItems

    Rev.

    DESIGNED BY:CHIFE FOUNDATION

    DATE:

    DWN BY: CKD BY:

    SUBMITTED BY:

    PLOT SCALE:

    SIZE:A3

    FILE NAME:

    PLOT DATE:

    PROJECT CODE:

    SUBPROJECT CODE:

    FILE ADDRESS:A001

    WALAKUBA HOUSE AHSG

    10.05.2012

    SLS

    ADC COVEROGW-H4.a

    AFFORDABLE HOUSING

    WALAKUBA HOUSE A

    1 Street View2 Birds Eye From Back Yard

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY AN AU

    TOD

    ESK STUD

    ENT PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY

    AN A

    UTO

    DES

    K ST

    UD

    ENT

    PRO

    DU

    CT

    Sheet IDProject NameANAM NEW CITY, NIGERIAANAMCITY.COM

    Sheet IDGeneral NotesItems

    Rev.

    DESIGNED BY:CHIFE FOUNDATION

    DATE:

    DWN BY: CKD BY:

    SUBMITTED BY:

    PLOT SCALE:

    SIZE:A3

    FILE NAME:

    PLOT DATE:

    PROJECT CODE:

    SUBPROJECT CODE:

    FILE ADDRESS:A101

    COMPACT HOUSE 2HSG28.01.2012

    SLS

    COVER

    1 SKY VIEW PERSPECTIVE2 STREET VIEW FROM SOUTH

    AFFORDABLE HOUSING

    COMPACT HOUSE_ALT 2

    3 SECTION PERSPECTIVE

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY AN AU

    TOD

    ESK STUD

    ENT PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY

    AN A

    UTO

    DES

    K ST

    UD

    ENT

    PRO

    DU

    CT

    Sheet IDProject NameANAM NEW CITY, NIGERIAANAMCITY.COM

    Sheet IDGeneral NotesItems

    Rev.

    DESIGNED BY:CHIFE FOUNDATION

    DATE:

    DWN BY: CKD BY:

    SUBMITTED BY:

    PLOT SCALE:

    SIZE:A3

    FILE NAME:

    PLOT DATE:

    PROJECT CODE:

    SUBPROJECT CODE:

    FILE ADDRESS:A101

    COMPOUND HOUSEHSG

    14.05.2012

    SLS

    COVEROGW-H6.a

    1 SKY VIEW PERSPECTIVE2 STREET VIEW FROM SOUTH

    3 REAR YARD VIEW FROM NORTH

    AFFORDABLE HOUSING

    COMPOUND HOUSEOGW-H6

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY AN AU

    TOD

    ESK STUD

    ENT PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PRO

    DU

    CED

    BY

    AN A

    UTO

    DES

    K ST

    UD

    ENT

    PRO

    DU

    CT

    H6.a

    H6.b

    H3.b H4.a

    H5.b

    H5.c H4.bH5.a

    H1.b

    H2.b

    H1.a

    H2.a

    H1.c

    H2.c

    H1.d

    H3.aH6.c

    BUNGALOW HOUSE

    OGUWYO HOUSING NIEGHBORHOODHOUSE TYPE KEY PLAN

    BAMBOO HOUSE

    BASIC HOUSE

    WALAKUBA HOUSE

    COMPACT HOUSE COMPOUND HOUSE

    OGW-H3OGW-H1

    N

    OGW-H2

    OGW-H4

    OGW-H5 OGW-H6

  • ----

    ----

    ----

    ----

    ----

    ----

    ----

    ----

    ----

    ----10

    98

    7

    6 5

    4

    32

    1

    Sheet IDProject NameANAM NEW CITY, NIGERIAANAMCITY.COM

    Sheet IDGeneral NotesItems

    Rev.

    DESIGNED BY:CHIFE FOUNDATION

    DATE:

    DWN BY: CKD BY:

    SUBMITTED BY:

    PLOT SCALE:

    SIZE:A3

    FILE NAME:

    PLOT DATE:

    PROJECT CODE:

    SUBPROJECT CODE:

    FILE ADDRESS: 1 : 100

    A601OGW-H3.b-BUNGALOW HOUSE - BHSG/ H3.b

    10.05.2012

    Author

    Checker BRICK STACKINGDIAGRAMS

    1A TYP. CORNER - ODD

    1B TYP. CORNER - EVEN 2B CORNER 2 - EVEN 3B CORNER 3 - EVEN 4B CORNER 4 - EVEN 5B CORNER 5 - EVEN 6B CORNER 6 - EVEN

    7B CORNER 7 - EVEN 8B CORNER 8 - EVEN 9B CORNER 9 - EVEN 10B CORNER 10 - EVEN

    1 : 1001BRICK STACKING KEY PLAN

    2A CORNER 2 - ODD 3A CORNER 3 - ODD 4A CORNER 4 - ODD 5A CORNER 5 - ODD 6A CORNER 6 - ODD

    7 CORNER 7 - ODD 8 CORNER 8 - ODD 9 CORNER 9 - ODD 10 CORNER 10 - ODD

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PR

    OD

    UC

    ED

    BY

    AN

    AU

    TOD

    ES

    K S

    TUD

    EN

    T PR

    OD

    UC

    T

    PRODUCED BY AN AUTODESK STUDENT PRODUCT

    PR

    OD

    UC

    ED

    BY

    AN

    AU

    TOD

    ES

    K S

    TUD

    EN

    T P

    RO

    DU

    CT

    o f f - g r i d a f f o r d a b l e h o u s i n g[ a n a m c i t y ]

    Under construction, the affordable housing neighborhood was designed to use locally-produced compressed-earth bricks and unskilled labor. I designed 6 house typologies of varying complexity,

    costing between $2,000 and $26,000. These off-grid structures hybridize local knowledge and appropriate sustainable technologies.

  • To provide temporary sheltered outdoor workspaces, this project was an exciting collaboration with local bamboo craftsmen. Harnessing local knowledge and indigenous building techniques, and capitalizing

    on skills and craftsmanship particular to bamboo construction, we were able to create very stable space-frame truss systems to carry fairly expansive roofs on limited columns.

    b a m b o o s p a c e - f r a m e s[ a n a m c i t y ]

  • 2500 sf design-build sustainable gut remodel

    o p h i r d e s i g n / b u i l d[ o p h i r , c o l o r a d o ]

    I purchased this log house in 2006; design goals included energy efficiency improvements and extensive material re-use.

    Reconstructed interior and exterior framing, fenestration, lighting, heating, plumbing, electrical systems, and finishes.