    Scott Avenue Transit Plaza

    Christopher C. Poehler, Senior V.P.

    Engineering & New Systems Development

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    2/17

    Grand Avenue Viaduct Present

    Narrow, non-ADA-compliant sidewalks

    Six undivided

    traffic lanes

    Bus stops in

    traffic lane No shelter forMetro

    customers

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    3/17

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    4/17

    Metro-related bridge improvements

    Bus pullouts added currently busesstop in the traffic lanes.

    Wider, more pedestrian-friendly

    sidewalks installed.

    Elevator towers moved north to a better

    location. Attractive, spacious wind and rain

    shelters for Metro customers .

    Metro-Related Bridge Improvements

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    5/17

    A preliminary shelter design that would

    provide bus stop rain protection all the

    way to the roadside.

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    6/17

    Wind and rain shelter for the

    customers using the stairsdown to MetroLink.

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    7/17

    Grand MetroLink Station Present

    Scott Avenue

    Elevator Tower

    Bus Shelters

    Platform Access

    on east end

    On-street

    parking

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    8/17

    $7.3 m project: Change patron access

    from east to west end

    of platform. Move elevator towers

    for better visibility.

    New stairs & elevators.

    Add parking lot.

    New plaza waiting area for Metro customers.

    Scott Transit Plaza Project

    Current crossing with on-street

    parking in the background.

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    9/17

    Create unobstructed view

    and improve line of sight onthe platform by moving the

    elevator towers.

    New Crossing Area on

    west end of platform

    Grand Avenue bridge

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    10/17

    On-street parking willbe replaced.

    Removal of a portion of

    the freight track nolonger needed east of

    MetroLink platform.

    New lot with 50-70 carcapacity.

    A New Park-Ride Lot

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    11/17

    New Transit Plaza Area

    Old piers will beremoved.

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    12/17

    New Transit Plaza Area

    Provide a comfortable, well-lit and attractivewaiting and service area for customers.

    Provide new upgraded shelters, seating,

    landscaping, and both decorative andfunctional fences.

    Provision for public/operator restrooms.

    Artist involvement with design for visuallystriking plaza with lighted sculpture artwork.

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    13/17

    Elevator

    Tower and

    Stairs

    DecorativeFencing

    Seating

    Wall

    New Parking Lot

    MetroLink platform

    Relocated AccessVending Area

    Restroom

    area

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    14/17

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    15/17

    Design includes

    translucent bluestones lit from

    beneath by LED lights

    Colored paving, decorative

    fence, and landscaping create

    organic and welcoming space

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    16/17

    Detail showing

    decorative iron fence

  • 8/14/2019 Scott Avenue Transit Plaza CCP Feb 09 2010 (2)

    17/17

    Project Benefits

    Improve on-bridge facilities: upgradedsidewalks, bus pullouts, shelter for patrons.

    Improve platform visibility & comfort: Remove

    elevator towers & change platform access. Provide new bus plaza with seating, shelters,

    and service amenities.

    Create a well-lit, pleasant, comfortableexperience for Metro customers.

    Add park and ride lot for 50-70 cars.