Scintillating fibre tracker

21
Scintillating fibre tracker First SHiP Workshop Zurich, 12 June, 2014 Vladimir SHEVCHENKO, on behalf of Kurchatov Institute SciFi group, Moscow, Russia

description

Scintillating fibre tracker. Vladimir SHEVCHENKO, o n behalf of Kurchatov Institute SciFi group, Moscow, Russia. First SHiP Workshop. Zurich, 12 June, 2014. Warm up: a comment ( SciFi –unrelated). Suggested solutions to hierarchy problem:. - PowerPoint PPT Presentation

Transcript of Scintillating fibre tracker

Page 1: Scintillating fibre tracker

Scintillating fibre tracker

First SHiP Workshop

Zurich, 12 June, 2014

Vladimir SHEVCHENKO, on behalf of Kurchatov Institute SciFi group,

Moscow, Russia

Page 2: Scintillating fibre tracker

Warm up: a comment (SciFi–unrelated)

12 June 2014 SciFi Tracker First SHiP Workshop, Zurich 2

Suggested solutions to hierarchy problem:

Version 3. Something is wrong with the states (SUSY etc)

Version 2. Something is wrong with the current (composite Higgs etc)

Version 1. There is a symmetry which keeps

Sensitivity to the physics above UV cutoff

Page 3: Scintillating fibre tracker

12 June 2014 3SciFi Tracker First SHiP Workshop, Zurich

For quantum field theory defined on a lattice with link a :

Actual physical dynamics IS fine tuned:

Lattice here can be seen as a «detector», a measuring devicewhich brings its own storyto the theory.

We know from experiment in all these cases that 1/a terms are irrelevant.

Not (yet) deep enough understanding of quantum field theory?

Page 4: Scintillating fibre tracker

New Scintillating Fibre Tracker for LHCb

12 June 2014 4SciFi Tracker First SHiP Workshop, Zurich

Page 5: Scintillating fibre tracker

LHCb Scintillating Fibre Tracker layout-I

(slide from Fred Blanc)

12 June 2014 5SciFi Tracker First SHiP Workshop, Zurich

Page 6: Scintillating fibre tracker

Layout-II

12 June 2014 SciFi Tracker SHIP Workshop, Zurich 6

Page 7: Scintillating fibre tracker

Scintillating Fibre Tracker SiPM readout

12 June 2014 7SciFi Tracker First SHiP Workshop, Zurich

(slide from Fred Blanc)

Page 8: Scintillating fibre tracker

SiPM Photo-Detection Efficiency

12 June 2014 8SciFi Tracker First SHiP Workshop, Zurich

(slide from Fred Blanc)

Page 9: Scintillating fibre tracker

Cladding and transmission mechanism Kuraray SCSF-78MJ scintillating fiber is double cladding

12 June 2014 9SciFi Tracker First SHiP Workshop, Zurich

Page 10: Scintillating fibre tracker

Attenuation length in 250 µm Kuraray fibre

Latt. in cm:

The recent order of 100 km (8 spools) from Kuraray SCSF-78MJ scintillating fibres showed Latt values around 3.2m

12 June 2014 10SciFi Tracker First SHiP Workshop, Zurich

(slide from C. Joram)

Page 11: Scintillating fibre tracker

SciFi Tracker in numbers

12 June 2014 11SciFi Tracker First SHiP Workshop, Zurich

(slide from Fred Blanc)

Page 12: Scintillating fibre tracker

Sci-Fibre tracker for SHIP neutrino detectorStereo layers of the fibre-ribbon walls readout by SiPM

ECC mini-walls Fibre Tracker

12 June 2014 12SciFi Tracker First SHiP Workshop, Zurich

(picture from G. De Lellis)

SciFi spatial resolution (≤100 µm) is more than sufficient to predict τ-neutrino vertex.No problems with radiation hardness, SiPM cooling, overall positioning etc.

Page 13: Scintillating fibre tracker

2 steps:• Fibre rewinding from a large Kuraray cardboard (Ø 1000 mm) drum to a smaller (Ø300 mm) plastic one, fibre quality control during rewinding.

• Winding process allows production of 5(6)-layer fibre ribbon using the EpoTec epoxy glue impregnated with TiO2 bonding

SciFi ribbon fabrication method

12 June 2014 13SciFi Tracker First SHiP Workshop, Zurich

Page 14: Scintillating fibre tracker

Drum from Kuraray

Measurement of fiber diameterand light leak

Data base for traceability

Cleaning (dust)

Drum ready for production

Tension control

Similar setup is running at Dortmund TU.

Fibre quality control (RWTH, Aachen)

12 June 2014 14SciFi Tracker First SHiP Workshop, Zurich

(picture by B.Leverington)

Page 15: Scintillating fibre tracker

Winding process:

Fibers are placed in grooves on drum

by precise CNC winding machine.

Pitch of grooves on drum: 275 μm.

Fiber cut after each layer.

Then, fibres are placed in the grooves

between the fibres of the bottom layers.

Tension increased (20100 g) for each

next layer.

5(6) layers wound on top of each other.

SciFi ribbons production (RWTH, Aachen)

12 June 2014 15SciFi Tracker First SHiP Workshop, Zurich

Page 16: Scintillating fibre tracker

Winding hub production at IPT

12 June 2014 16SciFi Tracker First SHiP Workshop, Zurich

(pictures by Th.Kirn)

Page 17: Scintillating fibre tracker

New SciFi ribbon winding wheel (matrix)

Stainless steel precise threaded wheel Ø 822 mm on aluminum hub.

12 June 2014 17SciFi Tracker First SHiP Workshop, Zurich

Page 18: Scintillating fibre tracker

LHCb SciFi Tracker production schedule

The SciFi project schedule calls for the R&D phase to be completed by the middle of the 2015 followed by the production phase which should end by the middle of 2017. The fibre and the carrier panel procurement will start by September 2014. With an average production rate of 1 fibre ribbon per day at least two full rate production facilities are needed to comply with the project schedule. One of them is being built at NRC Kurchatov Institute.

12 June 2014 18SciFi Tracker First SHiP Workshop, Zurich

Page 19: Scintillating fibre tracker

Production clean room at NRC KI , Moscow

240 m2 area clean room, 10.000-100.000 class, being constructed

12 June 2014 19SciFi Tracker First SHiP Workshop, Zurich

Page 20: Scintillating fibre tracker

Production clean room floor plan

Work zones:

I – ribbon winding zone,II – fibre quality control,III – cutting and assembly, IV,V – CR entrance zone,VI – module storage area.

Equipment lay-out:

12 June 2014 20SciFi Tracker First SHiP Workshop, Zurich

Page 21: Scintillating fibre tracker

Conclusions for SHiP

12 June 2014 21

• The main «propaganda picture» is very nice. There could be something behind it.

• SciFi tracking technology is very nice. We should develop it for LHCb upgrade and use all its advantages in full for the SHiP project.

• Perhaps it is (or will be in some time) worth thinking about focused satelite-based project complementary to SHiP (Space SHiP ?). SciFi is well suited for that (reliability, small mass, low power dissipation etc).

SciFi Tracker First SHiP Workshop, Zurich