Major Research Support Activities
• South Pole Telescope• Icecube• AGASEA• ANDRILL• SHALDRILL• WAIS Divide Core• Workshops
– Long-range aerogeophysics – McMurdo Sound LTER– IPY
LC-130 Outlook
• Trends– SPSM missions beginning to decrease
– Increase in science flights to South Pole due to SPT and Icecube
• Deep field– WAIS Divide beginning 05-06
– Increase in remote field activity
• Overall mission availability in FY07 looks good
Cryogenics
• Major issues– Liquid helium supply capabilities– Location of new cryogenics facility– Future issues?
Increasing LHe Requirements
0
10
20
30
40
50
60
70
80
90
100
FY'02 FY'03 FY'04 FY'05 FY'06 FY'07 FY'08
FY'02
FY'03
FY'04
FY'05
FY'06
FY'07
FY'08
?
?
Liquid Helium Supply Capability
• Current projection does not meet projected demand for winter 2005.
• Concerns regarding sufficient backup in the event of major transport failure.
• Need to begin investing in long-term solutions.
Current StatePassive
0
2000
4000
6000
8000
10000
12000
14000
16000
02/0
9/2
001
02/2
3/2
001
03/0
9/2
001
03/2
3/2
001
04/0
6/2
001
04/2
0/2
001
05/0
4/2
001
05/1
8/2
001
06/0
1/2
001
06/1
5/2
001
06/2
9/2
001
07/1
3/2
001
07/2
7/2
001
08/1
0/2
001
08/2
4/2
001
09/0
7/2
001
09/2
1/2
001
10/0
5/2
001
10/1
9/2
001
Series1
Series2
W1
W2
W3
4.3K
Liquid Empty 1 Sept
One Pulse Tube + Extra 3KOne ZBO + 3K
0
2000
4000
6000
8000
10000
12000
14000
16000
02/0
9/2
001
02/2
3/2
001
03/0
9/2
001
03/2
3/2
001
04/0
6/2
001
04/2
0/2
001
05/0
4/2
001
05/1
8/2
001
06/0
1/2
001
06/1
5/2
001
06/2
9/2
001
07/1
3/2
001
07/2
7/2
001
08/1
0/2
001
08/2
4/2
001
09/0
7/2
001
09/2
1/2
001
10/0
5/2
001
10/1
9/2
001
11/0
2/2
001
11/1
6/2
001
11/3
0/2
001
Series1
Series2
W1
W2
W3
4.3K
3K
Liquid Empty 15 Nov
Zero Boil Off OptionZBO
0
2000
4000
6000
8000
10000
12000
14000
16000
02/0
9/2
001
02/2
3/2
001
03/0
9/2
001
03/2
3/2
001
04/0
6/2
001
04/2
0/2
001
05/0
4/2
001
05/1
8/2
001
06/0
1/2
001
06/1
5/2
001
06/2
9/2
001
07/1
3/2
001
07/2
7/2
001
08/1
0/2
001
08/2
4/2
001
09/0
7/2
001
09/2
1/2
001
10/0
5/2
001
10/1
9/2
001
Series1
Series2
W1
W2
W3
4.3K
Liquid Empty 6 Oct
Helium Costs Rising
From the USGS Mineral Commodities Summary, January 2004:– Cost increases averaging 10-12% in FY2003.– Demand projected to increase at 5% per year
through 2004 and 2005