School Facility Audits - Alberta · School Facilities Branch School Facility Evaluation Project ......

33
Alberta Infrastructure School Facilities Branch School Facility Evaluation Project Part IV - Additional Notes and Comments School F.P. Walshe Date Nov. 25, 1999 School Name: F. P. Walshe School School Code: 6306 Location: Ft. MacLeod Facility Code: 344 Region: South Superindendent: Dr. Lloyd Cavers Jurisdiction: Livingstone Range Contact Person: Del Gehring School Division N0. 68 Telephone: (403) 625-3556 Grades: Eight - Twelve School Capacity: 735 Year of Compl. No. of Floors Gross Bldg Area (Sq.M.) Type of Construction (i.e., structure, roof, cladding) Description of Mechanical Systems (incl. major upgrades) Comments/Notes 1969 1 6410.5 Masonry / Flat roof Hot water heating for base building with preheat and reheat coils in air handling units. 1978 ? 1 1 105.2 10.6 Masonry / Flat roof Masonry Original exit vest. Converted to spec. ed. Classroom - new exit vest. added Evaluator's Name: W. Dziver & Company: Gowling & Gibb Architects Building Section Original Building Additions/ Expansions 1

Transcript of School Facility Audits - Alberta · School Facilities Branch School Facility Evaluation Project ......

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

School Name: F. P. Walshe School School Code: 6306Location: Ft. MacLeod Facility Code: 344

Region: South Superindendent: Dr. Lloyd CaversJurisdiction: Livingstone Range Contact Person: Del Gehring

School Division N0. 68 Telephone: (403) 625-3556

Grades: Eight - Twelve School Capacity: 735

Year of Compl.

No. of Floors

Gross Bldg Area (Sq.M.)

Type of Construction (i.e., structure, roof, cladding)

Description of Mechanical Systems (incl. major upgrades) Comments/Notes

1969 1 6410.5 Masonry / Flat roof Hot water heating for base building with preheat and reheat coils in air handling units.

1978

?

1

1

105.2

10.6

Masonry / Flat roof

Masonry Original exit vest. Converted to spec. ed. Classroom - new exit vest. added

Evaluator's Name: W. Dziver& Company: Gowling & Gibb Architects

Building SectionOriginal Building

Additions/ Expansions

1

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

1969(1989)

1994

1

1

231.5 Same

Same Replacement of domestic hot water handlers - 1994

Reno - 1A Dble. stationand CR117 to ANC

Reno. / modernization of Admin., PRI, VP, CNS, CNS, INF, INF, AND S.

N/A

No reports provided by jurisdiction / district.(not done)Mini-plans provided are not current - areas of deviation indicated.

List of Reports/ Supplementary Information

Portable Struct. (identify whether attached/perman. or free-standing/ relocatable)

Upgrading/ Modernization (identify whether minor or major)

2

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Evaluation Components Summary Assessment Estim. Cost

1 Site Conditions Minor fence repair, overlay existing paving.Provide paved on-site parking and sidewalk replacement.

$170,000.00

2 Building Exterior Ext. window / door replacement.Excludes roofingNeed: Roofing Report

$418,100.00

3 Building Interior Interior modernization.Excludes Hazardous Materials and F.I. Items.Need: Authority Having Jurisdiction reports, Hazardous Materials Audit, and Health Report

$592,600.00

4 Mechanical Systems Mech. System consists of perim. hot water heating. Central ventilation system with air conditioning. Hot water heating requires remedial work. The air handling units require replacement.

$535,000.00

5 Electrical Systems Upgrade lighting $17,500.00

6 Portable Buildings N/A N/A

7 Space Adequacy:7.1 Classrooms 14 this facility / 18 projected / Deficient (344.1 m2)

7.2 Science Rooms/Labs 8 this facility / 4 projected / Deficient (60.5 m2)

7.3 Ancillary Areas 4 this facility / 5 projected / Deficient (17.5 m2)

7.4 Gymnasium 1 this facility / 1 projected / Deficient (412.4 m2)

7.5 Library/Resource Areas 1 this facility / 1 projected / Deficient (212.2 m2)

7.6 Administration/Staff Areas 22 this facility / 18 projected / Deficient (122.2 m2)

7.7 CTS Areas BSE - 1 this facility / 3 projected / Deficient (232.0 m2)HEC - 2 this facility / 2 projected / Deficient (35.7 m2)IA - 1 this facility / 2 projected / Surplus 145.3 m2

7.8 Other Non-Instructional Areas (incl. gross-up)

This facility = 1031.0 m2 / Projected = 1870 m2 / Deficient (839.0 m2)

$1,733,200.00Overall School Conditions & Estim. Costs

3

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 1 Site Conditions Rating Comments/Concerns Estim. Cost1.1 General Site Condions

1.1.1 Overall site size.

4 N/A

1.1.2 Outdoor athletic areas.

4 Good - although tennis court could be re-surfaced. N/A

1.1.3 Outdoor playground areas, including condition of equipment and base.

N/A N/A

1.1.4 Site landscaping.

4 Good - irrigated (w/ pop-up heads) including sports field. N/A

1.1.5 Site accessories (i.e., perimeter and other fencing, guard rails, bike stands, flag poles).

3 Fencing at perimiter of tennis courts requires repair. $2,500.00

1.1.6 Surface drainage conditions (i.e., drains away from building, signs of ponding).

4 N/A

1.1.7 Evidence of sub-soil problems.

4 N/A

1.1.8 Safety and security concerns due to site conditions.

4 N/A

Other

1.2 Access/Drop-Off Areas/Roadways/Bus Lanes1.2.1 Vehicular and pedestrian access points (i.e., size,

number, visibility, safety).

4Pedestrian access points from town sidewalk - ok.Vehicle access to Fire Lane -ok.No on-site parking - see 1.3.1.

N/A

4

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 1 Site Conditions Rating Comments/Concerns Estim. Cost1.2.2 Surfacing of on-site road network (note whether

asphalt or gravel).

3 Paved - needs resurfacing c/w curbs. Fire access lane 4600 sq. m., South Compound 836 sq. m. Install 38mm overlay. $60,000.00

1.2.3 Bus lanes/drop-off areas (note whether on-site or off-site).

2 Street - Conflict with street parking - buses block staff / visitors parking - parking should be relocated. $100,000.00

1.2.4 Fire vehicle access.

4 Street and paved Pike access road @ S. side of building. N/A

1.2.5 Signage.

4 N/A

Other

5

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 1 Site Conditions Rating Comments/Concerns Estim. Cost1.3 Parking Lots and Sidewalks

1.3.1 Number of parking spaces for staff, students and visitors (including stalls for disabled persons).

2 Street widened for angled parking - no on-site parking.See 1.2.3. N/A

1.3.2 Layout and safety of parking lots.

2 Conflict with bus lane (off-site).See 1.2.3. N/A

1.3.3 Surfacing and drainage of parking lots (note whether asphalt or gravel).

N/A Off-site - street. N/A

1.3.4 Layout and safety of sidewalks.

4 Layout - ok.See 1.3.5. N/A

1.3.5 Surfacing and drainage of sidewalks (note type of material).

3 Conc. Sidewalks - heaved, cracked, and drain towards building - replace 120 sq. m. $7,500.00

1.3.6 Curb cuts and ramps for barrier free access.

4 On-site ok. N/A

Other

Overall Site Conditions & Estimated Costs $170,000.00

6

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 2 Building Exterior Rating Estim. Cost2.1 Overall Structure Bldg.

Section Description/Condition

2.1.1 Floor structure and beams (i.e., signs of bending, cracking, heaving, settlement, voids, rust, stains).

4

N/A

2.1.2 Wall structure and columns (i.e., signs of bending, cracking, settlement, voids, rust, stains).

4

N/A

2.1.3 Roof structure (i.e., signs of bending, cracking, voids, rust, stains).

4

N/A

Other

Comments/Concerns

7

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 2 Building Exterior Rating Estim. CostComments/Concerns2.2 Roofing and Skylights

Identify the availability of an up-to-date inspection report or roofing program. Note if roof sections are of different ages and/or in varying

Bldg. Section or Roof Section

Description/Condition/Age

2.2.1 Based on the inspection report (and to the extent possible, direct observation), assess and rate roof conditions and estimate costs for required improvements (i.e., covering materials, membrane, insulation, other components). F.I. All Roofing report not available. (not done) F.I.

3

District advises:B.U.R. with no slopes, poor drainage, occasional leaks. Estimate will perfom approx. 5 years w/ maintenance.

$315,000

2.2.2 Roof accessories (i.e., ladders, stairs, hatches, masts, exhaust hoods, chimneys, gutters, downspouts, splashpads). F.I. All

Roofing report not available - roof not recessed.(not done)

F.I.

2.2.3 Control of ice and snow falling from roof.

N/A

Flat roof

N/A

2.2.4 Skylights (i.e., signs of distress, leaks, ice build-up, condensation, deteriorated materials/seals).

N/A N/A

Other

8

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 2 Building Exterior Rating Estim. CostComments/Concerns2.3 Exterior Walls/Building Envelope Bldg.

Section Description/Condition

2.3.1 Exterior wall finishes (i.e., signs of deterioration, cracks, brick spalling, effluorescence, water stains).

4

N/A

2.3.2 Fascias, soffits, parapets (i.e., signs of looseness, stains, rust, peeling paint).

4

N/A

2.3.3 Building envelope (i.e., evidence of air infiltration/ exfiltration through the exterior wall or ice build up on wall, eaves, canopy).

4

N/A

2.3.4 Interface of roof drainage and ground drainage systems.

4

N/A

2.3.5 Inside faces of exterior walls (i.e., signs of cracks, water stains, dust spots).

4

N/A

Other

2.4 Exterior Doors and Windows Bldg. Section

Description/Condition

2.4.1 Doors (i.e., signs of deterioration, rusting metal, glass cracks, peeling paint, damaged seals, sealed unit failure). 3 1969

Poor condition - replace all. - Alum. c/w hardware. $22,500.00

9

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 2 Building Exterior Rating Estim. CostComments/Concerns2.4.2 Door accessories (i.e., latches, hardware, screens,

locks, alarms, holders, closers, security devices).

3 1969

Deteriorated - needs replacement.See 2.4.1.

N/A

2.4.3 Exit door hardware (i.e., safety and/or code concerns).

3 1969

Needs replacing.See 2.4.1.

N/A

2.4.4 Windows (i.e., signs of deterioration, rusting metal, glass cracks, peeling paint, damaged seals, sealed unit failure). 3 1969

Needs replacing. $80,600.00

2.4.5 Window accessories (i.e., latches, hardware, screens, locks, alarms, holders, closers, security devices). 3 1969

Needs replacing.See 2.4.4.

N/A

2.4.6 Building envelope (i.e., signs of heavy condensation on doors or windows).

4 1969

N/A

Other

Overall Bldg Exterior Condition & Estim Costs$418,100.00

10

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 3 Building Interior - Overall Conditions Rating Estim. Cost3.1 Interior Structure Bldg.

Section Description/Condition

3.1.1 Interior walls and partitions (i.e., signs of cracks, spalling, paint peeling).

3 1969

G.W.B. cracking at locker bulkhead areas. Repair and paint. $20,000.00

3.1.2 Floors (i.e., signs of cracks, heaving, settlement).

4 1969 N/A

Other

3.2 Materials and Finishes Bldg. Section

Description/Condition

3.2.1 Floor materials and finishes.

3 1969

Carpet - replace.Lino. - worn / poor - replace.Gym / Stage - hardwood - refinish.

$195,000.00

3.2.2 Wall materials and finishes.

3 1969

Masonry - ok.Corridor G.W.B. - vinyl peeling - remove / repair and paint.See also 3.1.1.

N/A

3.2.3 Ceiling materials and finishes.

3 1969

Susp. Acoustic - tile mismatched / damaged / discontinued - replace all.G.W.B. - Water damaged in misc. areas - repair / paint.

$150,000.00

3.2 Materials and Finishes (cont'd) Bldg. Section

Description/Condition

3.2.4 Interior doors and hardware.

3 1969

Replace 3 pr. damaged doors.Replace one damaged door frame.Remainder - ok, hardware - ok.

$5,000.00

Comments/Concerns

11

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 3 Building Interior - Overall Conditions Rating Estim. CostComments/Concerns3.2.5 Millwork

3 1969

Obsolete / poor condition - replace.STA, SWR, SCI (4), SCP (4), DR, HEC (sewing), HEC (cooking), & BSE.

$85,000.00

3.2.6 Fixed/wall mounted equipment (i.e., writing boards, tackboards, display boards, signs).

4

N/A

3.2.7 Any other fixed/mounted specialty items (i.e., CTS equipment, gymnasium equipment).

3 1969

Gym - folding bleachers damaged - replace (34.1m x 6 tier). $40,000.00

3.2.8 Washroom materials and finishes.

3 1969

GWR (111) / BWR (112) complete upgrade required.Boy's SDA (171) H.M. shower stalls rusted - replace 5.Girl's SDA (173) H.M. shower screen damaged - replace.

$14,000.00

Other

3 1969

Lockers damaged - poor to fair condition - replace. $83,600.00

3.3 Bldg. Section

Description/Condition

F.I.

Authority having jurisdiction reports not available. (not done)

F.I.

3.3.1 Building construction type - combustible or non-combustible, sprinklered or non-sprinklered.

4 1969

Non-comb. / non-sprinklered.Note: Roof construction is not determined (concealed).

N/A

3.3.2 Fire separations (i.e., between buildings, wings, zones if non-sprinklered).

4 1969

Appear to be present. - fire compartments not confirmed - no code reports N/A

Health and Safety Concerns --- Intent is to identify renovations considered necessary to meet applicable codes, primarily due to safety concerns. Basis of evaluation should be an up-to-date inspection report from the authority having jurisdiction together with direct observations as appropriate. Evaluator should note if in his opinion a comprehensive code evaluation is

12

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 3 Building Interior - Overall Conditions Rating Estim. CostComments/Concerns3.3.3 Fire resistance rating of materials (i.e., corridor walls

and doors).3 1969

Flame spread re: vinyl wall covering in corridor - see 3.2.2 re: removal. Ref.3.2.2.

3.3.4 Exiting distances and access to exits.

4

3.3.5 Barrier-free access.

4

N/A

3.3.6 Availability of hazardous materials audit (i.e., evidence of safety concerns with respect to asbestos, PCB's, chemicals). F.I. 1969

No reports available. (not done)District advises some asbestos removed - possible areas remain.

F.I.

3.3.7 Other health and safety concerns (i.e., evidence of excessive noise conditions, air quality problems)

F.I. 1969

Kit. Exh. Hood outdated. Commercial dishwasher not working (health).

F.I.

Other

Overall Bldg Interior Condition & Estim Costs $592,600.00

13

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 4 Mechanical Systems Rating Estim. Cost4.1 Mechanical Site Services

4.1.1 Site drainage systems (i.e., surface and underground systems, catch basins).

3 1969 No on site storm drainage/ Surface run-off. $30,000.00

4.1.2 Exterior plumbing systems (i.e., irrigation systems, hose bibs).

4 1969 Exterior hose bibbs with landscape irrigation.

4.1.3 Outside storage tanks.

N/A

Other

4.2 Fire Suppression Systems Bldg. Section Description/Condition

4.2.1 Fire hydrants and siamese connections.

4 1969 Municipal street fire hydrant coverage.

4.2.2 Fire suppression systems (i.e., pumps, sprinklers, piping, reservoirs, hoses, stand pipes, CO2 systems).

3 1969 Stand pipe and fire hose throughout c/w fire dept. connection. Fire sprinkler system to satisfy current code requirements. $140,000.00

4.2.3 Hand extinguishers, blankets and showers (i.e., in CTS areas).

4 1969 Hand fire extinguishers throughout

4.2.4 Other special situations (e.g., flammable storage areas, science labs, CTS areas).

4 1969 Kitchen hood fire surpression system appears adequate.

Other

Comments/Concerns

14

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 4 Mechanical Systems Rating Estim. CostComments/Concerns4.3 Water Supply and Plumbing Systems Bldg.

Section Description/Condition

4.3.1 Domestic water supply (i.e., pressure, volume, quality - note whether municipal or well supply).

3 1969 Municipal 4" cast iron water service. 4" domestic water and meter. Upgrade to suit sprinkler fire protection $30,000.00

4.3.2 Water treatment system(s).

4 1969 Municipal water treatment.

4.3.3 Pumps and valves (including backflow prevention valves).

3 1969 Domestic hot water recirc pump on domestic hot water system. No back-flow preventor on fire protection system. $10,000.00

4.3.4 Piping and fittings.

4 1969 Cast iron water service entry, copper pipe distribution (1971).

4.3.5 Plumbing fixtures (i.e., toilets, urinals, sinks)

3 1969 Original plumbing fixtures - flush tank water closets, flush valve urinals, vanity lav's. Refrigerated drinking fountains, standard shower trim c/w temperature control. $62,000.00

4.3.6 Domestic hot water system (i.e., heater, storage tanks, failure alarms, pressure, volume, recirculation).

4 1969 Two gas fired domestic hot water heaters replaced in 1990 c/w original two storage tanks. System appears adequate

4.3.7 Sanitary and storm sewers, including sumps and pits (note whether sewage system is municipal or septic).

4 1969 Roof drainage collected through roof drains down spouts to surface run-off. Sanitary collected and run into municipal services.

Other

15

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 4 Mechanical Systems Rating Estim. CostComments/Concerns4.4 Heating Systems Bldg.

Section Description/Condition

4.4.1 Heating capacity and reliability (including backup capacity).

3 1969System appears adequate in capacity with original heating plant comprising of two water tube boilers. System pumps for the reheat coils, radiation air handling units and a standby to maintain space conditions. The system has reached its life cycle.

$90,000.00

4.4.2 Heating controls (including use of current energy management technology.

3 1969 Controls compressor/ dryer/ copper pneumatic tubing has air leaks. $25,000.00

4.4.3 Fresh air for combustion and condition of the combustion chimney.

4 1969 Boiler room combustion air and relief appears adequate.

4.4.4 Treatment of water used in heating systems.

4 1969 Pot feeder c/w filter bypass assembly. Tested on a scheduled basis.

4.4.5 Low water cutoff/pressure relief valves and failure alarms (i.e., hot water heating).

4 1969 Regular preventative maintenance on a yearly basis. Units complete with system controls and relief.

4.4.6 Heating air filtration systems and filters.

N/A

4.4.7 Heating humidification systems and components.

N/A

16

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 4 Mechanical Systems Rating Estim. CostComments/Concerns4.4 Heating Systems (cont'd) Bldg.

Section Description/Condition

4.4.8 Heating distribution systems (i.e., piping, ductwork) and associated components (i.e., diffusers, radiators).

4 1969 Original baseboard radiation throughout with reheat coils on all room distribution.

4.4.9 Heating piping, valve and/or duct insulation.

4 1969 Original heating piping system appears adequate.

4.4.10 Heat exchangers.

N/A

4.4.11 Heating mixing boxes, dampers and linkages.

4 1969Hot water heating coils located in the air handling units satisfy the tempered condition of the ventilation requirements. Status panels on the air handling units report discharge, mixed, and outdoor temperature conditions.

4.4.12 Heating distribution/circulation in larger spaces (i.e., user comfort, temperature of outside wall surfaces).

4 1969 No reported problems.

4.4.13 Zone/unit heaters and controls.

4 1969 Hydronic cabinet heaters in the vestibules and unit heaters in storage and mechanical rooms with pneumatic t'stat control.

Other

17

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 4 Mechanical Systems Rating Estim. CostComments/Concerns4.5 Ventilation Systems Bldg.

Section Description/Condition

4.5.1 Air handling units capacity and condition.

3 1969Five central station packaged air handling systems appear to be adequate for the student classroom instruction, admin and gymnasium areas. These units are reaching their expected life cycle. A new roof top gas fired unit for the industrial arts area satisfies the ventilation requirements.

$140,000.00

4.5.2 Outside air for the occupant load (if possible, reference CFM/occupant).

3 1969 The outside air requirements appear adequate with no reported problems. A rebalance and calibration of controls is required. REF. 4.5.1

4.5.3 Air distribution system (if possible, reference number of air changes/hour).

3 1969 Air distribution appears adequate but entire system requires a power vacuum cleaning and rebalancing of the system. $8,000.00

4.5.4 Exhaust systems capacity and condition.

4 1969 General exhaust system appears adequate with no reported problems

4.5.5 Separation of out flow from air intakes.

4 1969 Air distribution appears adequate with no reported problems.

4.5.6 Special/dedicated ventilation and/or exhaust systems (i.e., kitchen, labs, CTS areas).

4 1969Industrial arts dust collectors appear adequate with no reported problems. Machine shop and welding exhaust appears adequate. The kitchen exhaust fan appears adequate. Make-up air provided through general ventilation.

Other

4.5 Ventilation Systems (cont'd) Bldg. Section Description/Condition

Note: Only complete the following items if there are separate ventilation and heating systems.

18

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 4 Mechanical Systems Rating Estim. CostComments/Concerns4.5.7 Ventilation controls (including use of current energy

management technology).

4 1969 Pneumatic status panels at all air handling units record digital readout of unit temperatures.

4.5.8 Air filtration systems and filters.

4 1969 Filter replacement on a regular maintenance schedule.

4.5.9 Humidification system and components.

N/A

4.5.10 Heat exchangers.

N/A

4.5.11 Ventilation distribution system and components (i.e., ductwork, diffusers, mixing boxes, dampers, linkages).

4 1969 Appears adequate with no reported problems.

Other

19

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 4 Mechanical Systems Rating Estim. CostComments/Concerns4.6 Cooling Systems Bldg.

Section Description/Condition

4.6.1 Cooling system capacity and condition (i.e., chillers, cooling towers, condensers).

4 1969 Original chiller/compressor package rebuilt in 1998. (R-134A refrigerant change). Evap condenser appears adequate.

4.6.2 Cooling distribution system and components (i.e., ductwork, diffusers, mixing boxes, dampers, linkages)

4 1969 See Ventilation Systems

4.6.3 Cooling system controls (including use of current energy management technology).

4 1969 See Ventilation Systems

4.6.4 Special/dedicated cooling systems (i.e., labs, CTS areas).

4 1969 See Ventilation Systems

Other

4.7 Building Control Systems Bldg. Section Description/Condition

4.7.1 Building wide/system wide control systems and/or energy management systems.

4 1969 Andover C51 building management system installed and provides status for mechanical systems in original building.

Overall Mech Systems Condition & Estim. Costs $535,000.00

20

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 5 Electrical Systems Rating Estim. Cost5.1 Site Services

5.1.1 Primary service capacity and reliability (i.e., access, location, components, installation, bus sizes - note whether overhead or underground). 4 UNDERGROUND 1200 AMP, 277/480 VOLT 3PH 4W SERVICE

PEAK LOAD AT ~800AMPS

5.1.2 Site and building exterior lighting (i.e., safety concerns).

2LOCAL PHOTO-CELL & SWITCH OPERATIONINSUFFICIENT QUANTITY OF LUMINAIRESPARKING AT SOUTH END OF BUILDING NOT ILLUMINATED

SEE5.4.3.

5.1.3 Vehicle plug-ins (i.e., number, capacity, condition).

NONE

Other

5.2 Life Safety Systems Bldg. Section

Description/Condition

5.2.1 Fire and smoke alarm systems (i.e., safety concerns, up-to-date technology, regularly tested).

4 EDWARDS CONTROL PANEL

5.2.2 Emergency lighting systems (i.e., safety concerns, condition).

4 18.75KVA, 277/480V-3PH-4W NATURAL GAS GENERATOR FOR ALL EMERGENCY POWEREMERGENCY LIGHTING LEVELS APPEAR SATISFACTORY

5.2.3 Exit lighting and signage (i.e., safety concerns, condition).

2 ADDITIONAL EXIT SIGNAGE IS REQUIRED $2,500.00

Other

Comments/Concerns

21

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 5 Electrical Systems Rating Estim. CostComments/Concerns5.3 Power Supply and Distribution Bldg.

Section Description/Condition

5.3.1 Power service surge protection.

4 TYCOR SURGE SUPPRESSION ON 120/208 VOLT DISTRIBUTION CENTRE

5.3.2 Panels and wireways capacity and condition.

4 PANEL BOARD BREAKERS CAPACITY IS FULL

4 DISTRIBUTION CENTRES BREAKER CAPACITY - FULL

5.3.3 Emergency generator capacity and condition and/or UPS (if applicable).

4 18.75KVA, 277/480V NATURAL GAS GENERATOR TESTED ON A MONTHLY BASIS

5.3.4 General wiring devices and methods.

4 SATISFACTORY

5.3.5 Motor controls.

4

4

MOTOR CONTROL CENTRE - 480V, 600 AMP - 4-PLEX

LOOSE STARTERS

Other

22

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 5 Electrical Systems Rating Estim. CostComments/Concerns5.4 Lighting Systems Bldg.

Section Description/Condition

5.4.1 Interior lighting systems and components (i.e., illumination levels, conditions, controls).

4

4

4

FLUORESCENT LIGHTING HAS BEEN UPGRADED TO T-8

LIGHTING LEVELS ARE SATISFACTORY

LIGHTING CONTROL IS LOCAL SWITCHING

5.4.2 Replacement of ballasts (i.e., health and safety concerns).

4 BALLASTS ARE NEW

5.4.3 Implementation of energy efficiency measures and recommendations.

4

2

INTERIOR LIGHTING HAS BEEN UPGRADED

EXTERIOR LIGHTING SHOULD BE REPLACED, CONTROL BY PHOTO-CELL & TIME CLOCK $6,000.00

Other

23

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 5 Electrical Systems Rating Estim. CostComments/Concerns5.5 Network and Communication Systems Bldg.

Section Description/Condition

5.5.1 Telephone system and components (i.e., capacity, reliability, condition).

4 CABLING TO TELEPHONE BACKBOARD IN ROOM 101

5.5.2 Other communication systems (i.e., public address, intercom, CCTV, satellite or cable TV).

4 PUBLIC ADDRESS SYSTEM

2 CATV IN LIBRARY, ADD TO OFFICE

5.5.3 Network cabling (if available, should be category 5 or better).

4 CAT 5 CABLING USED IN COMPUTER LAB & ADMIN

2 NO COMPUTER CABLING IN CLASSROOMS

5.5.4 Network cabling installation (i.e., in conduit, secured to walls or tables).

4 SATISFACTORY

5.5.5 Wiring and telecommunication closets (i.e., size, security, ventilation/cooling, capacity for growth).

4 SATISFACTORY

5.5.6 Provision for dedicated circuits for network equipment (i.e., hubs, switches, computers).

4NEW PANELS ADDED FOR COMPUTER LABS

I.G. RECEPTACLES FOR COMPUTER STATIONS

Other

$1,500.00

$7,500.00

24

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 5 Electrical Systems Rating Estim. CostComments/Concerns5.6 Miscellaneous Systems Bldg.

Section Description/Condition

5.6.1 Site and building surveillance system (if applicable).

N/A

5.6.2 Intrusion alarms (if applicable).

4 ADT SECURITY SYSTEM CONSISTS OF DOOR CONTACTS & MOTION SENSORS

5.6.3 Master clock system (if applicable).

N/A

Other

5.7 Elevators/Disabled Lifts (If applicable)5.7.1 Elevator/lift size, access and operating features (i.e.,

sensing devices, buttons, phones, detectors).4 1969 Stair lift - main floor to stage area.

5.7.2 Condition of elevators/lifts.

4

5.7.3 Lighting and ventilation of elevators/lifts.

4

Other

Overall Elect. Systems Condition & Estim Costs $17,500.00

25

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Section 6 Portable Buildings Rating Comments/Concerns Estim. CostNote: Separate sheets can be completed, if necessary, for portable buildings of different ages and/or conditions.

N/A None on this site.

6.1.1 Foundation and structure (i.e., signs of bending, cracking, settlement, rust, voids, stains).

6.1.2 Roof materials and components (i.e., signs of deterioration, leaks, ice build-up).

6.1.3 Exterior wall finishes (i.e., signs of deterioration, cracks, water stains).

6.1.4 Doors and windows (i.e., signs of deterioration, rusting hardware, glass cracks, peeling paint, damaged seals).

6.1.5 Interior finishes (i.e., floors, walls, ceiling).

6.1.6 Millwork (i.e., counters, shelving, vanities, cabinets).

6.1.7 Fixed/wall mounted equipment (i.e., writing boards, tackboards, display boards, signs)

6.1.8 Heating system.

6.1.9 Ventilation system.

6.1.10 Electrical, communication and data network systems.

6.1.11 Health and safety concerns (i.e., fire and smoke alarms, fire protection systems, exiting, fire resistance rating of materials).

6.1.12 Barrier-free access.

Overall Portable Bldgs Condition & Estim Costs N/A

26

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

No. Size Total Area No. Size Total Area

7.1 Classrooms

14 SeeComm. 1095.9 18 80 1440 -344.1

CR sizes as follows: [email protected], [email protected], [email protected], 84.2, 85.5, 144

7.2 Science Rooms/Labs

8 SeeComm. 419.5 4 120 480 -60.5

4 Sci ([email protected], 94.2, 79.2 = 359.6)4 Scp (16.9, 16.3, 11.7, 15.0, = 59.9)

7.3 Ancillary Areas (i.e., Art, Computer Labs, Drama, Music,) 4

70.1110.9241.090.5

512.5 5 2@1303@90 530 -17.5

Includes stage (Rm 177) & student lunch (rm 133)Rm 156 now a computer lab.

7.4 Gymnasium (incl. gym storage)1

668.929.739.0

737.6 1 1050100 1150 -412.4

Includes 1 storage (29.7) and weight room (Rm 154)

7.5 Library/Resource Areas1 165.8 165.8 1 378 378 -212.2

7.6 Administration/Staff, Physical Education, Storage Areas

22350.8209.1149.3

675.8 18 +stor

467180151

798 -122.2

10 Admin/staff (includes INF, CNS, CNF excludes SWR) 247.310 Storage rooms (350.8)3 P.E. Rooms (SDA & 2 offices)Rm 104 & 105 as well as 174 & 175 are now 1 storage rm each 149.3Rms 103 & 105 converted to storage.

7.7 CTS Areas 7.7.1 Business Education

1 113 113 3 115 345 -232

7.7.2 Home Economics2 117.8

106.5 224.3 2 160100 260 -35.7

7.7.3 Industrial Arts1 436.2

9.1 445.3 2 300 300 145.3Includes DR (rm 122) Equiv. New facility total area based on single IA room from Supplement max. gross area of school Bldg. Project

7.7.4 Other CTS ProgramsN/A N/A N/A N/A N/A N/A N/A

7.8 Other Non-Instructional Areas (i.e., circulation, wall area, crush space, wc area) 16 See

Comm. 1031

108151915190

1870 -839

5 mech/El./Mtr (95.3)5 WR's (147.1)6 Jan (55.8)Circ (732.8)

Overall Space Adequacy Assessment 70 5420.7 5420.7 54 7551 7551 -2130.3 Total No. of rms required for new facility includes all except storage & other non instructional areas.

Section 7 Space Adequacy Comments/ConcernsSurplus/ Deficiency

This Facility Equiv. New Facility

27

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Evaluation Component/ Sub-Component Additional Notes and Comments

28

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Evaluation Component/ Sub-Component Additional Notes and Comments

29

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Evaluation Component/ Sub-Component Additional Notes and Comments

30

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Evaluation Component/ Sub-Component Additional Notes and Comments

31

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Evaluation Component/ Sub-Component Additional Notes and Comments

32

Alberta InfrastructureSchool Facilities Branch

School Facility Evaluation ProjectPart IV - Additional Notes and Comments

School F.P. WalsheDate Nov. 25, 1999

Evaluation Component/ Sub-Component Additional Notes and Comments

33