SCHEME FOR CONSTRUCTION AND RUNNING OF GIRLS’
HOSTELS FOR STUDENTS OF SECONDARY AND HIGHER
SECONDARY SCHOOLS
STATE EDUCATION SECRETARIES CONFERENCE
DATED : 5TH JANUARY, 2012
Annexure-16
Presented by :
ARUN PRABHA
Deputy Secretary(Girls Hostel)
Deptt. of SE&L, MHRD, Govt. of India
INTRODUCTION
�A new Centrally Sponsored Scheme launched in 2008-09 isbeing implemented from 2009-10.
�The Scheme has replaced the earlier NGO driven Schemeunder which assistance was provided to voluntary organizationsfor running Girls’ Hostels.under which assistance was provided to voluntary organizationsfor running Girls’ Hostels.
�The Scheme envisages construction and running of 100-beddedhostels for girl students of classes 9-12 in the 3500Educationally Backward Blocks (EBBs) of the country.
� To improve access to and retain the girl child in Secondary and HigherSecondary classes so that the girl students are not denied the opportunity tocontinue their study due to distance to school, parents’ financial affordabilityand other connected societal factors.
� The girl students in the age group of 14-18 yrs. studying in classes IX and XIIbelonging to SC, ST, OBC, Minority communities and BPL families will formthe target group of the Scheme. Students passing out of KGBV will be givenpreference in admission in hostels. At least 50% of the girls admitted will be
SALIENT FEATURES OF THE SCHEME
preference in admission in hostels. At least 50% of the girls admitted will befrom SC, ST, OBC and Minority Communities.
� To be implemented by the State Government societies established forimplementation of the scheme, with the sharing pattern being 90:10 betweenGovernment of India and State Governments.
� State Schedules of Rates to be used for construction of hostels including thehostels already sanctioned in 2009-10 & 2010-11 as per the specified detailednorms for a 100 bedded hostel.
200.00
250.00
300.00
350.00
400.00
250
.00
396
.88
189
.32
Funds Allocated (Rs. in crore)
STATUS OF RELEASE OF GRANTS W.R.T. ALLOCATION
0.00
50.00
100.00
150.00
2009-'10 2010-'11 2011-'12 (till
31.12.'11)
Total (Rs. in crore)
80
.00
66
.88
65.
15
56.0
4
68
.13
crore)
Grants Released (Rs. in crore)
PHYSICAL AND FINANCIAL PROGRESS
� 1505 hostels in 19 states have been recommended by the Project Approval
Board (PAB) till date and an amount of Rs.185.62 crore has been released
as non-recurring grant for construction of 538 hostels in 11 States.
� No Grant could be released for the remaining 967 hostels for want of certain
information/documents/revised proposals from the State Govts. ofinformation/documents/revised proposals from the State Govts. of
Gujarat, Jharkhand, Maharashtra, Nagaland, Orissa, U.P., Uttarakhand and
W.B.
� Out of 538, 67 hostels have become functional in Rajasthan during
2011-12 for which a recurring grant of Rs. 1.99 crore has been released.
Contd... …
PHYSICAL & FINANCIAL PROGRESS CONTD…..
HOSTELS FUNCTIONING IN TEMPORARY
LOCATIONS
STATES NO. OF HOSTELS RECURRING
GRANT
RELEASEDRELEASED
CHHATTISGARH 56 Rs. 1.43 crore
UTTARAKHAND 15 Rs. 0.28 crore
MADHYA
PRADESH
197 Nil
KARNATAKA 62 Nil
PHYSICAL PROGRESS w.r.t. RELEASE OF
FUNDS
�More than 50% - Punjab
�More than 25% - Rajasthan
but less than 50%but less than 50%
�Less than 25% - Arunachal Pradesh
�Nil Progress - Bihar, Chhatisgarh, Himachal Pradesh,
J&K, Karnataka, Madhya Pradesh,
Mizoram, Tamil Nadu.
STATES WHO HAVE NOT SENT ANY PROPOSAL/
REVISED PROPOSAL TILL DATE
No Proposal Received From Revised Proposal Not Received From
�Dadra & Nagar Haveli (01)
�Kerala (01)
�Arunachal Pradesh (38)
�Haryana (37)�Kerala (01)
�Manipur (05)
�Haryana (37)
�Himachal Pradesh (5)
�Jharkhand (203)
�Madhya Pradesh (201)
�Orissa (173)
�Tripura (09)
�West Bengal (87)
STATES WHO HAVE SENT REVISED
PROPOSALS BUT ARE NOT IN CONFORMITY
WITH SCHEME NORMS
� Assam
� Gujarat
� J&K
� Karnataka
� Maharashtra
� Meghalaya
� Mizoram
� Nagaland
� Tamil Nadu
� Uttarakhand
� Uttar Pradesh
DOCUMENTS / INFORMATIONS REQUIRED TO
BE SUBMITTED ALONG WITH PROPOSALS
� LOCATION / SITE
� AVAILABILITY OF LAND
� PROVISION OF STATE SHARE
� NOTIFICATION REGARDING ARRIVAL OF COST SUPPORTED
WITHWITH
� DETAILED ARCHITECTURAL & STRUCTURAL DRAWINGS
� DETAILED ESTIMATE BASED ON STATE / UT SORs
� CERTIFICATES/DECLARATIONS (viz. rate conformity, stability,
scheme norms conformity, additional expenditure related)
� COSTING DETAILS OF FURNITURE AND EQUIPMENTS, BEDDING
AND UTENCILS
� IMPLEMENTATION SCHEDULE
� DETAILS FOR RECURRING GRANTS
Sl. No. Name of State No. of Hostels
sanctioned till
date
Amount
released in
2009-10
Amount
released in
2010-11
Amount
released in
2011-12
Total Non-
Recurring Grant
released till date
1 Himachal
Pradesh5 0.96 0 - 0.96
2 Madhya
Pradesh30 5.74 0 - 5.74
Girls’ Hostels Sanctioned and funds released As on
1.1.2012
Pradesh
3 Rajasthan 186 5.16 45.81 - 50.97
4 Punjab 21 4.02 4.01 - 8.03
5 Mizoram 1 0.19 0 - 0.19
6 Chhatisgarh 74 14.14 0 22.67 36.81
7 Arunachal
Pradesh5 0.96 0 - 0.96
8 Karnataka 62 10.56 0 - 10.56
9 Tamil Nadu 44 8.42 0 - 29.50
10 Jammu &
Kashmir19 3.44 0.19 - 3.63
11 Bihar 91 11.56 6.03 41.76 59.35
Total 538 65.15 56.04 64.43 185.62