Scheduling of Parallel Jobs In a Heterogeneous Multi- Site Environment By Gerald Sabin from Ohio St ate Reviewed by Shengchao Yu 02/2005

Transcript of Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio...

Page 1: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment

By Gerald Sabin from Ohio State

Reviewed by Shengchao Yu 02/2005

Page 2: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Overview – job scheduling

Most research focused on homogeneous multi-site environment

Limited research on heterogeneous systems Each job mapped to a single processor Only addressed the scheduling of independent

sequential jobs or precedence constrained task graphs where each task is sequential

Page 3: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Problem of the Paper

Target system A heterogeneous multi-site environment with each

site as a homogeneous cluster of processor, but processors at different sites having different speeds

A stream of parallel jobs submitted to a metascheduler

Page 4: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Goal & Approach

Goal Find an effective schedule to achieve optimized

average turnaround time of the jobs. Basic Approach

Extension of proven back-filling based parallel scheduling in single-site scheduling: Multiple (or K) simultaneous requests (MR) Completion-based conservative backfilling Use of Effective Utilization (Efficacy), instead of raw

utilization

Page 5: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Extend Backfilling with MR

Backfilling – conservative, aggressive Move forward smaller jobs to fill idle process

cycles without delaying any jobs with future reservation

Multiple Request (MR) Submit each job to multiple sites, and cancel

redundant submissions once the job started on one of the sites

Page 6: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Extend Backfilling with MR

Page 7: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Adapt Backfilling to Heter Sys

Characteristics on Heter. Sys. The same application performs differently on diffe

rent sites No site is the fastest on all applications

Simple greedy and MR schemes fail Introduction of Efficacy and Effective Utilization Adoption of completion-based conservative backfi

lling

Page 8: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Introduction of Efficacy and Effective Utilization

Page 9: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Aggressive Vs. Conservative

Prefer completion time rather than start time Conservative backfilling chosen

Higher Effective Utilization Smaller Average Turnaround time

Fig. 6, 7, 8

Page 10: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Aggressive Vs. Conservative

Page 11: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Aggressive Vs. Conservative

Page 12: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Efficacy Based Scheduling

Replace Greedy Policy (FCFS) with Efficacy Use efficacy as the priority order for the jobs in

the queue, so that jobs with higher efficacies will attempt to backfill before jobs with lower efficacies

In another word, a job will have a greater chance to run on its faster machines.

Page 13: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Efficacy Based Scheduling

Page 14: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Restricted MR

Communication Overhead due to Deciding earliest completion time Data transfer for a job

Select K sites with best completion time All about compromise Fig 11, 12

Page 15: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Restricted MR

Page 16: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Restricted MR

Page 17: Scheduling of Parallel Jobs In a Heterogeneous Multi-Site Environment By Gerald Sabin from Ohio State Reviewed by Shengchao Yu 02/2005.

Conclusion

Extension of backfilling with the application of MR, Completion time based conservative scheme and Efficacy in a orthogonal fashion

A good attempt to optimization across a collection of independent jobs for GRID environment with the characteristics of the heterogeneous system in mind

A Heuristic Approach Scalability and Fault-tolerance Sensitivity to the type of applications