GE Oil & Gas
Where risers or rig floor limitations drive you to welding on a conventional casing head, the SCH1 Casing Head is a cost-effective alternative. Run with the surface casing string through the riser and using normal cementing operations, the SCH1 casing head is immediately available for BOP nipple-up when the riser is removed. Eliminating the casing head weld:
• improves safety, • saves valuable rig time, and • facilitates multi-well drilling programs from a common
location by eliminating “hot” operations.
By installing the support ring below the SCH1, the surface casing is supported by the conductor casing, eliminating the wait-on-cement (WOC) time associated with conventional equipment.
More time can be saved by removing the riser and attaching the BOP stack to the casing head with the optional DVC speed connector. The use of the DVC connector saves additional nipple-up time during drilling. If the DVC speed connector is not used, the threaded-on hold-down flange can be attached to the casing head and the BOP will be made up with a traditional flange. Once the hold-down flange is installed, this head has the same profile as a conventional head, allowing the use of standard components above it.
With the pre-installed pup joint (nipple), no WOC time, and the use of the DVC speed connector, our customers can expect to save in excess of 10 hours of valuable rig time, per well.
Features — • No welding required to install riser on conductor
• No waiting on cement required when running surface casing
• Installed through drilling riser as part of surface casing string
• No welding required to install the casing head
• Allows normal cementing operations including “top-off”
Time-Saving WellheadsPressure Control SCH1 Casing Head
Top Flange Size
Top FlangePressure (psi)
Surface Casing
Production Casing or Tubingless
Completion (TLC)Minimum Riser ID
9”3,000
7-5/8” 2-7/8” thru 5”
13-5/8”8-5/8” 2-7/8” thru 5-1/2”
5,0007-5/8” 2-7/8” thru 5”8-5/8” 2-7/8” thru 5-1/2”
11”3,000
8-5/8” 2-7/8” thru 5-1/2”
15-3/8”9-5/8” 2-7/8” thru 7”
5,0008-5/8” 2-7/8” thru 5-1/2”9-5/8” 2-7/8” thru 7”
295-2807
Hold-Down Flange
Split Support Ring
Conductor
Surface Casing
Production Casing
DVC Connector Profile
Landing Ring
• Field-proven DVC adapter provides safe BOP nipple-up and nipple-down in a few minutes
• Standard W2 bowl profile accepts entire family of W casing hangers for a wide range of production casing sizes
• Accepts all T and MTH2 tubing heads for 3,000, 5,000 or 10,000 psi working pressures
Availability —
GE © 2013. All rights reserved.10/13, PC #05-0112 rev 2
geoilandgas.com/pressurecontrol
Key Stages of SCH1 Installation —
No Welding Needed • Riser assembly is made up or removed
in five minutes, without welding or cutting torches
• The diverter adapter remains on the riser assembly from well to well
Stage 1
295-3535_1
Riser height and flowline are custom fabricated for each rig.
Drilling Surface Hole
Riser Drain Valve(Recommended)
Riser
LRC RiserConnector
1” LPSight Port
Landing Ring Run in ALL6 Set Screws
O-Rings
Ground Level
Conductor
Time Saving • No “wait-on-cement” time
• Riser assembly lifts off quickly
• Cement can be “topped off”
• No welding time to install casing head
Stage 2
295-3535_2
Hang Off Surface CasingAND Casing Head
Running Tool
SCH1 Casing Head
Cement Seal
Verify LandingThrough Sight Hole
Pup Joint
2” LP Flush Plug
Split Support Ring With Circulation Flutes
Surface Casing
Conductor
Variety of Options for Fracturing and Completion
• For 9” SCH1 casing head, any tubing head with 9” 3,000 or 9” 5,000 API bottom can be installed
• For 11” SCH1 casing head, any tubing head with 11” 3,000 or 11” 5,000 API bottom can be installed
• Tubing heads may be – Type ‘T’ – Type ‘T’ prep for fracturing sleeve – MTH2
Stage 4
295-3535_4
Surface Casing
Conductor
Production Casing
Install Any API FlangedTubing Head
3,000 psi or 5,000 psiHold-Down Flange
Time Saving and Improved Safety • Outlet valves, etc. are installed
• DVC adapter attached to the BOP is made up or removed in 10 minutes, without studs or hammer wrenches
• The DVC adapter remains on the BOP stack from well to well
Stage 3
295-3535_3
Drilling Production Hole
Conductor
Surface Casing
27.79”
Drive Screws
Wear BushingRetainer Screws
BOP Stack
Test Port
Lock Ring(Engaged)
SCH1 Casing Head