  • AGENDA NOTES FOR 472nd MEETING OF OPERATION & COORDINATIONSUB-COMMITTEE OF WRPC

    TO BE HELD ON 10th JUNE 2015 AT AHMEDABAD

    ITEM No. 1: CONFIRMATION OF THE MINUTES

    Minutes of 471st meeting of Operation & Coordination Sub-Committee of WRPC

    held on 13th May 2015 at WRPC, Mumbai were forwarded vide letter No.

    WRPC/OPN/OCC-Minutes/2015-16/4440 dated 18.05.2015.

    No comment has been received. Sub-Committee may confirm the same.

    ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF MAY2015.

    2.1 Frequency Particulars

    The average frequency during the month of May, 2015 was 49.98 Hz. The

    maximum instantaneous frequency was 50.55 Hz at 18:03 hrs on 19th May-15

    while minimum instantaneous frequency was 49.55 Hz at 14:45 hrs on 05th May-

    15. The frequency profile during May, 2015 was as under:

    01-May-2015 to 31-May-2015 % time

    IEGC band (49.9 < f < 50.05 Hz) 64.74

    < 49.9 Hz 15.82

    > 50.05 Hz 19.44

    The Sub-Committee may like to note.

    2.2 INTER-REGIONAL EXCHANGES

    There was a net inter-regional export of 3388 MUs by WR against net export

    schedule of 3208 MUs.

    The Sub-Committee may like to discuss.2.3 Voltage Profile

    Voltage profile at some of 765/400 kV sub-stations during the month of May

    2015 furnished by WRLDC is enclosed at Annex-2.3.

    The Sub-Committee may like to discuss.

    2.4 U/F Relay OperationsAs per WRLDC records during May 2015 the system frequency didn’t touch 49.2 Hz

    and no UFR operation has been reported by WRLDC.

  • 2

    472nd OCCM AGENDA

    The Sub-Committee may like to note.

    2.5 Power Cuts / Load Restrictions

    Details of Power Cuts and Regulatory measures during May 2015 as furnished by

    the state utilities are given in Annex. 2.5.

    The Sub-Committee may note.

    2.6 Details of Generating Units under Forced outages

    Details of generating units under forced outages during May 2015 are given inAnnex-2.6.

    The Sub-Committee may discuss.

    2.7 Details of Generating Units under Planned outages

    The details of generating units under Planned Outages during May 2015 are given inAnnex-2.7

    The Sub-Committee may discuss.

    ITEM NO.3: OPERATIONAL PLANNING

    3.1Proposed Planned maintenance programme of generating units.

    The maintenance programme of generating units for June 2015 & July 2015 isgiven in Annex 3.1.

    The Sub-Committee may discuss and finalize the outage schedule ofgenerating units for the above period.

    3.2 OUTAGE PROGRAMME OF TRANSMISSION LINES/ELEMENTS

    Maintenance programme for transmission lines during the months of June 2015 &July 2015 is given in Annex 3.2 B.

    The Sub-Committee may discuss and finalize the maintenance programmeproposed above.

    3.3 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS – JUNE 2015& JULY - 2015

    Details of anticipated restricted & un-restricted demands for the months of June 2015 &

    July 2015 are given in Annex 3.3.

    Constituents may furnish the anticipated station wise Availability & Energy for the months

    of June 2015 & July 2015.

  • 3

    472nd OCCM AGENDA

    ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF MAY 2015

    The details of actual generation, demand, drawl of power from grid; exchanges etc.

    are given in the following Annexures:

    Annex 4.1 - Actual Generation and Requirement for May 2015.

    Annex 4.2 - Peak Demand: Schedule Vs Actual for May 2015.

    Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines

    for May 2015.

    Annex 4.7 – Details of level of Major Reservoirs in Western Region for May 2015.

    The Sub-Committee may like to note.

    ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGIONThere was no major grid disturbance in the Western Region during the month.

    However the details of minor incidences during the month received from WRLDC are

    enclosed at Annexure-5.The Sub-Committee may like to note/discuss.

    ITEM NO. 6: Healthiness status of SERs/DRs of equipment in the system.

    Constituents have furnished the status of healthiness of SER/DRs in their systems onthe dates below :

    Sl No. Name ofconstituents

    Date of Receipt

    1 PGCIL,WRTS-I 03.06.20152 PGCIL,WRTS-II 07.05.20153 MPPTCL 13.05.20154 NTPC 04.06.20155 CSPTCL 04.06.20156 GETCO 06.05.20157 MSETCL 13.05.2015

    The sub-Committee may like to note.

  • 4

    472nd OCCM AGENDA

    ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS, TRANSMISSION LINES ANDGENERATING UNITS IN WR.

    7.1 Status of completion of ongoing Schemes for Commissioning of reactors in2015-16.

    As per the approval of 33rd & 36TH standing committee of WR and subsequentlydiscussion in 28TH WRPC meeting the following reactors have to be installed at thevarious occasions in WR.Accordingly the information regarding the commissioning schedule is as below:

    S.No.

    400 kVSub/stn.

    Size(MVAR)

    Implementingagency

    Expected commissioningdate

    1 Nanded 125 MVAR MSETCL June – 2016

    2 Sholapur 125 MVAR MSETCL June – 2016

    3 Kolhapur 125 MVAR MSETCL June – 2016

    4 Akola 125 MVAR MSETCL June – 2016

    *5 Nagda 125 MVAR MPPTCL July – 2015

    6 Bhopal 80 MVAR MPPTCL June – 2015

    7 ISP 125 MVAR NHDC December 2015

    8 Line reactorat Nagda-ISPline at Nagdaend

    50MVAR MPPTCL July 2015

    11 Satpura 50 MVAR MPPGCL April-2016

    12 Sasan Busreactor

    240 MVAR RELIANCE Commissioned on 23rd May-2015

    *50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor after

    commissioning of 125 MVAr reactor at Nagda.

    *50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor.

    Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above. Utilities may give update on thestatus of implementation.

  • 5

    472nd OCCM AGENDA

    7.2 Status of completion of 765/400 kV and above on going Transmission Schemesbeing executed/implemented by Transmission Agencies.

    The updated status on various ongoing transmission schemes for the year 2015-16 asper the current information available is as follows: -

    S.No.

    Name of the Line TargetCompletionDate

    Remarks

    POWERGRID1 400 kV Navsari – Kudus D/C Line June-15 ROW problem2 765 kV Gwalior - Jaipur line (1st Ckt)

    S/CJune-15

    3 765 kV Dharamjaygarh - JabalpurPooling Station D/C line

    July-15

    4 765 kV Wardha –Nizamabad-Hyderabad D/C

    March-16

    5 765 kV Narendra-Kolhapur D/C Dec-156 400 kV Aurangabad - Boisar line D/C

    lineNov -2015

    7 765 kV Aurangabad (PG) - Padghe(PG) D/C

    Sept-2015

    8 800kV DC Champa – KurukshetraBipole

    Sept 2015

    9 765 kV Aurangabad- Solapur D/Cline

    Oct- 2015

    10 LILO of both circuits of Aurangabad –Pune 400 kV D/c line at Pune765/400 kV GIS

    June-15

    11 400 kV Parli-Pune(Sikarapur) LILO atSikarapur

    Commissioned on24.02.2015

    CHHATTISHGARH1 LILO of 400 kV Korba west-

    Khedamara at MarwaJune- 2015

    2 400 kV DCDS Raipur(Raita)-Jagdalpur(DCDS)

    July 2015

    3 220 kV DCDS lines Chhuri to Mopka(Bilaspur), (DCDS)

    July- 2015

    4 LILO of 220 kV Raigarh-Budipadar at400 kV PGCIL S/s Raigarh

    August -2015

    5 LILO of 220 Korba (E)- Bishrampurline at 220 kV Churri S/s

    Commissioned on01/05/2015.

    GUJARAT1 400 kV D/C Mundra-Zerda line No. 1 Sept -20152 400 kV D/C Mundra-Zerda line No. 2 Sept -20153 400 kV D/C Vadinar-Amreli line Sept -20154 400kV APL-Hadala LILO to Halvad Sept -20155 400 kV D/C Amreli-Kasor line(Part-1) Sept -20156 400 kV Charanka- Veloda Sept -2015

  • 6

    472nd OCCM AGENDA

    MADHYA PRADESH1

    Satpura TPH-Ashta 400KV DCDSLine

    1st ckt commissioned on30th March 2015.2nd ckt – expected byJuly 2015.

    MAHARASHTRA(STU)1 400KV D/C line from Koradi-(II) to

    Wardha S/S(PG) D/CJune- 2015

    2 LILO of 400 kV Chandrapur-Parli atNanded Dec-15

    3 2x1500 MVA 765/400 kV, ICTs atEktuni Dec -15

    4 400 kV Bableshwar-Kudus D/C(Quad) Jun-16

    5 765 kV Akola(II)-Ektuni -2 ( To becharge at 400kV at Tapthithanda) May 2015

    Within a week time.

    6 400kV IEPL-Warora May 2015GUJARAT (IPTC route) by WRTransmission (Guj) Pvt. Ltd1 400 kV Rajgarh(PG)-Karamsad

    (GETCO) D/C July 2015

    STERLITE (JTCL)1 765 kV Dhramjaygarh - Jabalpur (JTCL)

    D/C lineMay -2015 Severe ROW Problem

    2 765 kV Jabalpur - Bina (JTCL) S/c May -2015 Severe ROW ProblemSTERLITE (BDTCL)1 765 kV Vadodara - Dhule (BDTCL) S/C May-20152

    765kV Bhopal JabalpurCompleted in allrespects. Expected by25th May 2015.

    The Sub-Committee may discuss and update the status.

    7.3 Commissioning of new Generating units in Western Region and thecapacity expected to be commissioned during the year 2015-16.

    The status regarding Generating units, commissioned /expected to becommissioned during the year 2015-16 according the available information is as below:

    Name of the Power Projects Unit No. Capacity(MW)

    Date of Commissioning/Schedule Date

    GUJARATSIKKA TPS EXT 1 250 Sep-15SIKKA TPS EXT 2 250 Dec-15CHHATTISGARH

    Marwa 1 500May 2015(expected by23.05.15).

    2 500 July 2015

  • 7

    472nd OCCM AGENDA

    MAHARASHTRACHANDRAPUR 9 500 September 2016KORADI 9 660 August 2015KORADI 10 660 March -2016PARLI 8 250 December 2015MADHYA PRADESHM/s Jhabua Power, Seoni 1 600 May – 2015Moser Bear (Hindustan power) 2 600 December 2015Essar Power MP Ltd(Mahan) 2 600 May -2015CENTRAL SECTOR/IPPVINDYACHAL 13 500 OCT -2015KSK 2 600 May – 2015KSK 5 600 May – 2015SASAN 6 600 APRIL 2015

    ACBIL(Maruti) 1 300Commissioned on17.04.2015

    RKM 1 350 June-2015RKM 2 350 Sept 2015RKM 3 350 Dec 2015

    The WR utilities may intimate the current status on above.

    ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS

    (A) FOLLOW-UP

    ITEM NO. 8.1: QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

    All the constituents are requested to submit the CMP report for the fourth quarter

    (January 2015 to March 2015) for the year 2014-15.

    The Sub-Committee may like to note and furnish details in respect of above.

    ITEM NO. 8.2: STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR

    Status of physical & cyber security in Power Sector for the fourth quarter (January

    2015 to March 2015) have not been received from some of the constituents.

    The Sub-Committee may like to note and furnish details in respect of above.

  • 8

    472nd OCCM AGENDA

    ITEM NO. 8.3: READINESS OF SLDC AT GOA, OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADA/EMS SYSTEMDuring 28th WRPC meeting it was decided that the status of progress of SLDC’s &

    Back-up SLDC’s of WR constituents /WRLDC would be regularly monitored in monthly

    OCC meeting.

    In 471st OCC meeting following status was furnished by constituents:

    Representative from SLDC Jabalpur intimated that the site will be ready at Bhopal for

    installation by July 2015 & hardware installation will be completed by August 2015.

    Representative from SLDC Gujarat intimated that Back up SLDC will start functioning at

    Gandhinagar by June 2015.

    Representative from SLDC Chhattishgarh intimated that the site is ready for installation

    & hardware installation will be completed by July 2015.

    Representative from SLDC Maharashtra intimated that the back-up SLDC has been

    working at Ambazari(Nagpur) has been functioning. Links from WRLDC, TATA Power &

    Reliance to Nagpur is under progress & will be made available at the earliest.

    The present status of progress of SLDC’s & Back-up SLDC’s of WR constituents

    /WRLDC attached at Annexure – 8.3.All the constituents are requested to give an update in attached format.

    ITEM NO: 8.4 HOURLY SCHEDULED AND UNSCHEDULED POWER CUTS/LOADSHEDDING DATA:

    CEA through its letter no I/AI/COR/GM-2015/346-350 dated 27-02-2015 informed thatpeak demand met in the country should be based on hourly all India demand data.The matter was taken up with POSOCO for getting the hourly data of peak demandmet for each month in respect of all the regions in the country in the first week offollowing month and they have assured to furnish the same. To calculate the demand,data of hourly scheduled and unscheduled power cuts/load shedding is also required,which is not available with POSOCO.Gujarat, Maharashtra & DNH generally submit the data within first two workingdays, however there is delay in submission of hourly scheduled andunscheduled power cuts/load shedding data from Chhattishgarh, MadhyaPradesh, Goa & DD.It is therefore requested that hourly figures of scheduled and unscheduledpower cuts/load shedding data may be submitted by States/UTs to WRPC inenclosed format at Annexure-8.4. wherein first two working days as is beingdone by Gujrat, Maharashtra and DNH.The state utilities/UT’s are requested to furnish the data in time.

  • 9

    472nd OCCM AGENDA

    ITEM NO 8.5: PROCUREMENT OF EMERGENCY RESTORATION SYSTEM FORSUBSTATION AT 400/220/33KV

    DGM, WRLDC informed that during 14th WRPC meeting held on 19th Aug, 2010,

    POWERGRID proposed for procurement of Emergency restoration System for

    Substation at 400/220/33kV level to meet the contingency arising out of natural

    calamities like earthquake, flood, cyclone etc. WRPC agreed in principle and suggested

    discussion in technical committee meeting to examine the proposal.

    The technical committee subsequently discussed the issue and in TCC meeting of 15th

    WRPC meeting held on 11th Nov, 2010, members did not agree to the procurement of

    ERS Substation at 400kV level in this phase. TCC suggested that the procurement of

    ERS of lower voltage level i.e. 220kV, 110kV/132kV could be explored by the constituent

    states.

    During 16th WRPC meeting held on 12th February, 2011, POWERGRID had clarified that

    the ERS Substation can be installed anywhere even below the EHV lines. The units can

    cater load at 33kV level upto 33% of the rated capacity of the transformer besides

    establishing connectivity over 400/220kV level. However, WRPC did not agree to the

    proposal of procurement of ERS Substation.

    Recently, cyclones of the scale of Phailin in Odhisha and Hudhud in Vizag caused

    enormous damage to Power transmission infrastructure in the respective regions which

    triggered revisiting the requirement of ERS Substation at 400/220/33kV level. Matter was

    again discussed in TCC meeting of 28th WRPC held on 3rd March, 2015 where TCC

    members agreed to the suggestion of MS, WRPC that the earlier view taken by WRPC

    about three to four years ago on the ERS substation can be relooked under the present

    changed scenario.

    During CCM meeting held on 4.06.2015 it was recommended that the proposal for ERS

    s/s be discussed first in OCC for technical details and tentative cost estimate. So that

    recommendations of OCC could be put up to TCC/WRPC ensuing meeting.

    The Sub-Committee may like to discuss the same.

  • 10

    472nd OCCM AGENDA

    ITEM NO 8.6: INTIMATION OF REVISED ANNUAL LGBR

    MoP/CEA revised generation targets on 09.04.2015, which included three more

    generating units in western region i.e. Sikka, Anuppur & Sasan unit-6 results in total 1.5

    MU increase in WR.

    Sr No Name of Station Generation Target in MUs

    Previous Revised

    1 Anuppur 400 800

    2 Sasan 18900 19500

    3 Sikka 560 1050

    The net availability increased by 1.46 MUs (Ex bus). This is for intimation to concerned

    utilities.

    It is further intimated that first quarterly review of annual LGBR for the year 2015-16 will

    be tentatively scheduled in the last week of June 2015.

    The Sub-committee may like to discuss/note the same.

    ITEM NO. 9 : ITEMS FROM WRLDC:

    9.1 NEW-SR GRID SEPARATION AND ROUGH SYNCHRONIZATION ON 24-MAY-15 AND 31-MAY-15.

    SR Grid separated from NEW Grid on 24-May-15 at 19:19:00 and again on 31-

    May-15 at 17:00 hrs.

    a) Separation on 24-May-15 at 19:19 hrsSequence of Events as Under

    1) 400kV Bhadrawati –Ramagundam-2 tripped at 17:12 hrs, thereby reducing

    the flow on HVDC Bhadrawati from 900MW to 600MW.

    2) Before the event, multiple units in SR tripped (1534MW) leading to rise in

    flow of 765kV Solapur-Raichur-2xS/c from 250MW to 1200MW.

    3) Talchar-Kolar Bipole was carrying 2300MW.

    4) 500kV HVDC Talcher-Kolar Pole-1 tripped at 19:18:34 and the flow on

    765kV Solapur-Raichur-2xS/c increased from 1200MW to 2000MW,

    initiating the operation of SPS-1, the flow settled at 1500MW.

  • 11

    472nd OCCM AGENDA

    5) Tripping of 500kV HVDC Talcher-Kolar Pole-2 at 19:18:50 hrs, the flow on

    765kV Solapur-Raichur-2xS/c further increased from 1500MW to above

    3000MW, this initiated the operation of SPS-1. After 10 sec of continuous

    loading of 1000MW/ckt (current exceed 800 amp) has initiated the operation

    of SPS-7 and thereby tripping of both the circuit of 765kV Solapur-Raichur-

    2xS/c lines. Both the line disconnected at Raichur(SR) end but remained

    connected at Solapur(WR) end.

    6) Auto synchronisation facility is available only at Solapur(WR) end. The line

    which was connected from Solapur end was disconnected and charged

    from Raichur(SR) and subsequently synchronised at Solapur end at 20:48

    hrs.

    7) It was observed from PMU data that 765kV Solapur-Raichur-1 had a rough

    synchronization at Solapur end. The initial power flow on this circuit was

    from +3000MW to -3000MW, the current in the circuit has crossed 5000A

    and Bus voltage at 765kV Solapur has dipped by 481kV. Further, it was

    observed from angular different plot 765kV Solapur Bus and 400kV Raichur

    Bus was more than 50 degrees at the time of synchronization.

    b) Separation on 31-May at 17:00 hrs

    There was bad weather and heavy rain. The 765kV Solapur-Raichur-II tripped

    at 16:58hrs on B-ph to earth fault, subsequently 765kV Solapur-Raichur-I

    tripped on Y-ph to earth fault at 17:00 hrs, leading to separation of NEW-SR

    Grid.

    The 765kV Solapur-Raichur-1 charged from Raichur at 17:42hrs.

    Synchronization was done through the tie CB at Solapur end at 19:00 hrs.

    There was a power swing of +/- 3000MW was observed which trigged SPS-1

    and caused backing down in WR and Load shedding in SR. 765kV Solapur-

    Raichur-II was restored at 19:25 hrs. Further analysis revealed that

    synchronization command was given at angular separation of 116 degrees.

    Following issues need detailed deliberations and review :1) Rough Synchronization: On 24-May synchronization was done at angular

    separation of around 50 degrees, while on 31-May the synchronization was

  • 12

    472nd OCCM AGENDA

    done at 116 degrees. POWERGRID may confirm the Protocol and settings

    adopted for synchronization.

    2) Healthiness and correctness of System Protection Scheme along withcommunication system: The tripping of Solapur –Raichur on 24-Mayoccurred due to triggering of SPS-7 at Raichur end. This SPS-7 was

    supposed to be blocked when both the lines are in service.( Ref:-

    POSOCO/NLDC/System Operation/SPS/472 dt 7th July’14). The SPS-7 was

    supposed to be armed, when only one circuit of Solapur-Raichur is in

    Service [Trip the 765kV Solapur-Raichur line with delay of 10 sec, when

    single line carrying more than 1000MW (800 amp)]. POWERGRID may

    confirm the setting of SPS-7 adopted at Raichur and Solapur end.

    Healthiness of auto-synchronizing facility: Normally 765kV Solapur-Raichur-2xS/c is synchronised at Solapur end. Auto synchronization facility

    is configured only at Solapur (WR) end. The auto synchronization facility

    was not working at Solapur (WR) during this crisis situation. On 24-May-15

    Synchronization could be done after 1hrs 29 minutes, while on 31-May it

    took 2hrs. POWERGRID may confirm the healthiness of auto-synchronizing

    facility and capability to synchronize through any of the breakers at Solapur

    as well as Raichur. This may help the system for early restoration during

    such crisis condition.

    3) Inadequate response from envisaged generators during SPS-1operation on 765kV Solapur-Raichur-D/c as evident from the table below.

    SPS-1 DateOperation Time

    SignalReceived

    Generators

    DesiredRelief (MW)

    Actual Relief(MW)

    SholapurRaichur D/C> 2000 MW(EnvisageGenerationBackdown by800MW inWR)

    24-05-2015

    19:19Hrs

    Yes JPL 300 145Yes NSPCL 50 100Yes LANCO 100 0Not Informed KWPCL 100 0Not-Informed DB

    Power 100 0Yes KSK 150 40

    24-05-2015

    20:48Hrs

    Yes JPL 300 110Yes NSPCL 50 100Yes LANCO 100 0Not Informed KWPCL 100 0

  • 13

    472nd OCCM AGENDA

    SPS-1 DateOperation Time

    SignalReceived

    Generators

    DesiredRelief (MW)

    Actual Relief(MW)

    Not-Informed DBPower 100 0

    Yes KSK 150 30

    KWPCL and DB Power was not generating during the event. KWPCL and DB Power

    may confirm whether the SPS signal was received at their generating stations.

    9.2 FREQUENCY RESPONSE CHARACTERISTICS OF REGIONAL ENTITIESIN WESTERN REGION.

    All utilities may ensure compliance to IEGC regarding RGMO / FGMO. All SLDCs may

    compute FRC in line with the CERC order dated 3.05.13 petition no 47, 48, 49, 50,

    51/MP/2012. The CERC approved procedure for FRC computation is available at

    URL: http://www.cercind.gov.in/2013/orders/SO47.pdf

    The Frequency Response from Western Regions Utilities for two events i,e a)

    1000MW Kudukulam unit trip in SR and b) 3000MW load loss in NR and ER due to

    Nepal earthquake are as below.

    The Generator Frequency Response from Western Regions Utilities

    States/Generators

    Event-1 (Kundukulam (1000MW)Tripping in SR)

    Event-2 (Nepal Earthquake 3000MWload Loss)

    Drop in Frequency from 50.05 to49.88Hz (Drop by 0.17 Hz)

    Increase in Frequency from 49.99Hzto 50.48Hz. (Rise of 0.49 Hz)

    GenerationBefore theevent

    GenerationAfter theevent Difference

    GenerationBefore theevent

    GenerationAfter theevent Difference

    KSTPS 2459 2451 -7 2093 2110 18VSTPS 3244 3213 -31 3370 3346 -23SIPAT 2027 2077 50 2072 2060 -12Mouda 0 0 0 0 0 0NSPCL 227 225 -1 398 403 4JPL TAMNAR 1059 1059 0 530 523 -7LANCO PATHADI 189 188 -1 173 173 0KAWAS 0 0 0 296 289 -7GAND-HAR 0 0 0 273 275 3SSP 124 124 0 60 60 0CGPL 3325 3320 -5 2557 2557 0

  • 14

    472nd OCCM AGENDA

    EMCO 248 252 4 390 390 0SASAN 697 697 0 3044 3044 0APL 3483 3479 -4 3546 3540 -6APML 1868 1866 -2 2464 2458 -6KSK 431 431 -1 433 430 -3DB Power 0 0 0 0 0 0JP NIGRIE 601 601 0 0 0 0ESSARMAHAN 0 0 0 5 5 0Vadinar 0 0 0 0 0 0

    State Control Area Frequency Response.

    States/Generators

    Event-1 (Kundukulam (1000MW) Trippingin SR)

    Event-2 (Nepal Earthquake3000MW load Loss)

    Drop in Frequency from 50.05 to 49.88Hz(Drop by 0.17 Hz)

    Increase in Frequency from49.99Hz to 50.48Hz. (Rise of0.49 Hz)

    DrawlBefore theEvent (MW)

    Drawl AfterThe evnt(MW)

    Difference(MW)

    DrawlBeforetheEvent

    DrawlAfterTheevnt Difference

    GUJ 751 734 -18 3039 3229 190

    MAH 4618 4555 -64 5166 4912 -254

    MP 3526 3446 -79 4023 4031 7

    Chhattisgarh 1009 1052 43 1178 1151 -27

    GOA 326 321 -5 385 388 3

    DD 249 249 0 308 310 2

    DNH 623 623 0 697 687 -10

    Total 11102 10980 -123 14797 14708 -88

    Indicate NO FRC Response during the event

    Sub-Committee may review the frequency response characteristics ofStation/Generators.

    9.3 MOCK BLACK START EXERCISE IN WESTERN REGION

    As mandated by IEGC the Black start capable units need to conduct mock black start

    exercises once in every 6 months. Western Region has 29 generating stations withblack start capability. As per the information available with WRLDC only 3 Black Start

  • 15

    472nd OCCM AGENDA

    stations have completed the Mock exercise in the year 2015. Concern representative

    may update the status and plan for pending Mock-dill exercise.

    Sl

    No

    Power Station State

    Black start

    conducted in

    2013-15

    Tentative dates

    (Jan’15- Jun’15)

    Approved in 467th

    OCC

    Status as on

    May’15

    1 Ukai (H) Gujarat 17.12.2013 1st wk. of Feb’15 -

    2 Kadana Gujarat 02.04.2013 4th wk. of Feb’15 Completed

    3 Dhuvaran Gujarat - 3rd wk of Mar’15 -

    4 GIPCL-I Gujarat - 1st wk of April’15 -

    5CLPIPL Gujarat

    -3rd wk of April’15

    6-March

    Completed

    6 Sugen Gujarat - 4th wk.of April’15 -

    7 SSP Gujarat 22.06.2014 1st wk of May’15 -

    8 Kawas Gujarat 15.10.2013 4th wk of May’15 -

    9 Gandhar Gujarat 07.12.2014 1st wk.of june’15 -

    10 Mini Hydro Gujarat - -

    11

    Hasdeo

    BangoChattisgarh

    06.04.20142nd wk.of April’15

    17-May/

    Completed

    12Gandhisagar

    Madhya

    Pradesh

    21.05.20141st wk. of Feb’15 -

    13Birsinghpur

    Madhya

    Pradesh

    -4th wk. of Feb’15 -

    14Pench

    Madhya

    Pradesh

    09.06.20141st wk. of Mar’15 -

    15Bargi

    Madhya

    Pradesh

    08.10.20142st wk of April’15 -

    16

    Bansagar

    Stage-I

    Madhya

    Pradesh

    -4th wk.of April’15 -

    17Indira Sagar

    Madhya

    Pradesh

    10.06.20141st wk of May’15 -

    18 Omkareshwar Madhya - 4th wk of May’15 -

  • 16

    472nd OCCM AGENDA

    Sl

    No

    Power Station State

    Black start

    conducted in

    2013-15

    Tentative dates

    (Jan’15- Jun’15)

    Approved in 467th

    OCC

    Status as on

    May’15

    Pradesh

    19Medikheda

    Madhya

    Pradesh

    -1st wk. of june’15 -

    20Rajghat

    Madhya

    Pradesh

    -4th wk of June’15 -

    21 Koyna I & II Maharashtra 24.11.2014 2nd wk of Feb’15 -

    22 Uran (Gas) Maharashtra 02.12.2014 2nd wk of Mar'15 -

    23 Ghatghar Maharashtra 19.12.2014 4th wk of Mar’15 -

    24 Khopoli Maharashtra - 2nd wk of April’15 -

    25 Bhivpuri Maharashtra - 4th wk of April’15 -

    26 Bhira Maharashtra - 1st wk of May’15 -

    27 Bhira PSS Maharashtra - 4th wk of May’15 -

    28 Paithan Maharashtra - 2nd wk. of june’15 -

    29 Trombay Maharashtra - 4th wk of June’15 -

    Mock Blackstart drill of Hasdeo Bango was successfully conducted on 17-May 2015.

    SLDC Chattisgarh may update regarding commissioning of RTU at Hasdeo Bango

    and healthiness of communication system to restore telemetry from Korba (E).

    NCA had proposed to carryout Blacktstart exercise of one unit of RBPH by extending

    supply to a thermal unit in Gujarat (say Wanakbori / Ukai TPS). A meeting was

    proposed for finalizing the procedure. NCA / SLDC

    Gujarat may update the progress.

    9.4CONSTRAINTS IN GRID OPERATION DUE TO NON-AVAILABILITY OFTELEMETRY FROM MSETCL/MAHAGENCO STATIONS

    Non-availability of telemetry from large number of EHV stations of MSETCL and

    Mahagenco has been flagged by WRLDC and is being deliberated in the OCC forum

    for more than a year. There are nearly 22 stations like 400 kV Warora, Chandrapur2,

    Bhusawal, Lonikhand and Taptithanda where the integration of database is pending

  • 17

    472nd OCCM AGENDA

    even several months after commissioning of the substations and there are nearly 48

    stations where database integration is completed but data from these station is highly

    intermittent due to continuous failure of communication link.

    In the absence of telemetry from these stations, severe constraints are being

    experienced by WRLDC control room personnel in real-time supervision and operation

    of the grid.

    Further, it was stated by MSETCL in 470th OCC held at Lucknow that all telemetry

    issues related to Maharashtra shall be sorted out by the month of May-15.

    MSETCL may apprise the progress.

    9.5 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATIONAS PER SEC. 5.4.2 OF IEGC:As per the Hon’ble CERC’s order, WRLDC is monitoring the implementation of ADMS

    in Western Region. As per the information received from all constituents, progress of

    implementation of ADMS is as follows.

    Gujarat: ADMS in Gujarat has been implemented with all respects in all fourState Discoms as per letter dated 7th May,2015. Approximately 30 to 40 MW loadrelief is envisaged from over drawing Discom when average frequency remains below

    49.80 Hz for 10 minutes and State over drawal is more than 150 MW and Discom’s

    over drawal is more than 50 MW.

    Maharashtra: Completion target is 2nd quarter of 2015 as per information receivedon January, 2015. Progress of implementation has not been furnished.

    Madhya Pradesh: Completion target is 3rd/4th quarter of 2015 as per the progressreport received 31.01.2015. No progress of implementation has been furnished

    Chhattisgarh. Committee has been formed for implementation of ADMS. Target forproject completion is Q4 of 15-16 as per letter 20.03.2015. Further progress is not

    been informed.

    9.5TELEMETRY AND AVAILABILITY OF DATA FROM RES FROM STATES INWR.

    Renewable Energy installed capacity is 10225 MW, which is 12% of total installed

    capacity in Western Region. This include Wind installed capacity of 8517 MW and

    Solar installed capacity of 1708 MW. The installed capacity state vice is given in below

    table.

  • 18

    472nd OCCM AGENDA

    RES Installedcapacity

    Gujarat MaharashtraMadhyaPradesh

    Total (WR)

    Wind (MW) 3581 4369 567 8517

    Solar (MW) 974 341 393 1708

    SCADA telemetry data is available from Gujarat only, where only net Gujarat solar

    generation and net Gujarat wind generation are displayed in real time. The station vice

    generation from different solar and wind plant are not available in WRLDC SCADA.

    SCADA telemetry from renewable generation of Maharashtra and Madhya Pradesh

    are also not available at WRLDC.

    Station level SCADA telemetry may be facilitated for correct computation of Net State

    generation, State demand met and the impact of renewable generation in real time.

    Concerned utilities are requested to arrange for availability of SCADA data at WRLDC.

    9.6SUBMISSION OF LOAD/GENERATION LOSS DETAILS DURING ANY GRIDINCIDENTS/DISTURBANCE

    Any Grid events is to be reported to NLDC and WRPC at the earliest with the

    Category of the Grid Incident or Grid Disturbance. The Category of Grid Incident or

    Grid Disturbance are computed by the percentage loss of antecedent Generation or

    Load, whichever is higher, in a regional Grid. The Category indicate the severity of the

    Grid Incident or Disturbance.

    It has been observed that many of the utilities are not submitting the Generation/ Load

    Loss details, which is hampering in calculating the correct Category of GD/GI.

    So, as an interim measure, WRLDC is calculating an approximate loss in generation

    and Load, both in MW and MU, based on its SCADA data. The logic used for

    computation is based on three parameters i.e. Demand Reduction, Drawal reduction,

    and Power number. The energy unserved is being calculated from the area under the

    demand met curve from the starting of event till its restoration, when compared with

    previous day demand met curve for the subjected utility from WRLDC SCADA.

  • 19

    472nd OCCM AGENDA

    Hence, it requested from all utilities to send the detail at the earliest, about the

    Generation/Load loss quantum (MW and MUs) with supporting document from their

    SCADA or site.

    The sub-committee like to discuss the same.

    ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING471st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

    10. Accordingly, as per roster, it is proposed to host 473rd by TATA Power in the

    month of July 2015. The tentative date for 473rd OCC meeting is 14th July 2015. TATA

    Power may intimate the exact venue details etc.

    Further as per roster 474th OCC meeting would be hosted by M/s Jindal Power Ltd in

    the month of August 2015.

    ******************************

  • Anaulagnak 2.1

    maah ma[- 2015

    1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

    1.1 MAXIMUM FREQUENCY 50.32 Hz. BETWEEN 1700 Hrs & 1800 Hrs Hrs. ON 19.05.2015

    AiQaktma AavaRi%t

    1.2 MINIMUM FREQUENCY 49.75 Hz. BETWEEN 2200 Hrs & 2300 Hrs Hrs. ON 04.05.2015

    nyaUnatma AavaRi%t

    1.3 AVERAGE FREQUENCY 49.98 Hz.

    AaOsat AavaRi%t

    2. INSTANTANEOUS ta%kailak

    2.1 MAXIMUM FREQUENCY 50.55 Hz. AT 18:02:57 Hrs. ON 19.05.2015

    AiQaktma AavaRi%t

    2.2 MINIMUM FREQUENCY 49.55 Hz. AT 14:45:09 hrs Hrs. ON 05.05.2015

    nyaUnatma AavaRi%t

    3. %AGE OF TIME WHEN FREQUENCY WAS MAY 2015 APRIL 2015 MARCH 2015

    AavaRi%t ka samaya p`itSat maoM

    3.1 BELOW 48.5 Hz. 0.00 0.00 0.00

    48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00

    48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00

    48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00

    49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.72 0.59 0.57

    49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 15.10 14.35 17.20

    49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 64.74 60.20 58.47

    49.9 hT\ja AaOr 50.05 hT\ja ko baIca3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 19.44 24.86 23.76

    50.05 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00

    51.5 hT\ja ko }pr

    4.1 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI

    4.2 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI

    4.3 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI

    maoM AavaRi%t ko AaMkD,aoM ka ivavarNa

    FREQUENCY PARTICULARS DURING MAY 2015

    (AS PER FREQUENCY REPORT OF WRLDC)

    (piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)

  • Voltage Profile during the month of May 2015Annex-I

    Date

    Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 418 398 417 399 437 414 432 400 416 402 421 408 416 407 409 3952 417 394 415 395 430 404 429 396 414 395 420 408 416 403 408 3963 418 399 416 399 431 407 433 397 415 403 421 409 418 404 410 3954 417 396 414 397 431 406 427 396 416 397 420 407 412 402 408 3935 415 393 411 396 431 407 426 394 414 393 420 404 412 403 411 3956 419 394 416 394 430 400 430 396 414 396 421 400 416 400 412 3977 416 395 417 396 429 400 430 398 415 397 421 410 417 407 408 3968 417 398 416 398 429 407 434 402 414 399 420 408 416 407 410 3969 419 394 417 393 432 403 434 398 416 400 421 408 418 408 407 397

    10 420 399 419 398 424 424 432 400 416 403 421 408 417 408 408 399

    ANNEXURE 2.3

    जेतपुरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

    मई 2015

    इंदौर इटारसी कराड धलेु असोज कासोर

    ,Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

    भार , WRLDC, Mumbaiसचूना MIS

    10 420 399 419 398 424 424 432 400 416 403 421 408 417 408 408 39911 413 394 412 393 424 424 429 395 414 399 419 407 416 408 408 39612 417 399 414 397 424 424 429 399 414 399 418 410 415 407 408 39813 416 396 416 394 430 413 430 394 414 396 419 408 417 405 410 39614 415 394 414 397 436 410 429 400 415 398 419 409 416 407 409 39615 416 397 413 397 434 408 429 397 414 399 418 409 414 406 408 39816 419 398 413 395 432 404 429 401 416 398 421 409 415 406 407 39517 419 404 414 399 435 408 431 405 417 405 422 410 420 410 407 39718 418 395 414 394 433 405 429 393 417 397 420 408 418 408 410 39719 419 393 417 386 432 409 431 398 417 398 420 409 418 406 409 39820 416 395 415 396 431 395 428 396 416 393 418 405 418 406 410 39621 419 394 416 391 429 401 424 396 413 396 419 407 418 406 407 39722 416 400 416 399 432 399 433 396 416 399 419 408 418 408 410 39423 418 402 417 400 433 403 432 402 416 394 421 406 420 410 409 39824 420 403 418 400 434 410 434 404 415 404 420 410 422 411 408 39825 417 401 415 400 433 402 434 396 416 396 420 407 418 407 411 39826 416 396 411 393 434 394 429 391 414 396 418 404 416 406 408 38827 418 399 416 397 431 397 429 398 415 395 420 408 419 410 411 39728 416 398 414 397 429 402 425 396 411 396 418 407 419 409 410 39829 416 399 412 397 432 405 431 401 414 397 420 409 419 410 411 39730 414 398 411 396 433 410 423 395 410 396 417 408 416 404 407 39531 416 399 414 397 431 410 430 396 414 400 421 409 416 406 408 397

    420 393 419 386 437 394 434 391 417 393 422 400 422 400 412 388भार , WRLDC, Mumbai

    सचूना MISभार , WRLDC, Mumbai

    सचूना MIS

  • Date

    Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv

    1 417 400 412 389 421 402 428 408 766 752 778 758 786 750 790 7572 416 402 408 390 420 397 426 403 766 750 781 754 785 751 787 7593 417 403 407 392 422 404 428 406 767 752 781 759 780 752 786 7604 414 400 405 388 423 401 424 403 763 750 776 754 777 746 781 7525 412 399 403 391 420 396 421 401 763 751 776 753 775 752 775 7576 415 399 403 390 423 398 428 401 767 751 780 775 775 758 780 7537 421 403 406 392 418 399 428 404 766 754 783 758 783 755 791 7598 415 400 406 390 420 402 428 408 768 754 783 757 782 752 786 7569 415 400 406 390 422 399 429 403 767 754 783 757 782 752 786 75610 420 402 409 390 423 404 427 406 768 752 786 772 785 754 794 76211 412 401 409 396 417 398 423 398 763 753 775 750 786 764 784 76212 417 403 413 395 421 403 424 405 763 752 776 754 793 756 792 76313 414 396 417 399 421 399 428 399 766 748 780 746 790 758 790 758

    Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

    नागदा खंडवा

    ,Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

    भार , WRLDC, Mumbaiसचूना MIS

    13 414 396 417 399 421 399 428 399 766 748 780 746 790 758 790 75814 415 401 411 399 420 400 424 404 765 754 777 760 788 762 788 76315 417 405 411 395 420 401 425 404 762 752 777 751 785 757 788 76616 415 399 410 394 423 403 424 406 755 755 774 757 783 754 786 75817 414 402 410 392 422 409 426 412 755 755 780 763 782 752 787 75818 416 399 409 392 423 401 427 405 755 755 782 758 780 752 785 75619 419 396 413 390 424 399 429 402 755 755 785 748 794 740 795 74520 416 405 411 388 421 401 426 403 755 755 778 754 785 745 786 77021 413 400 408 389 421 399 428 402 755 755 786 757 780 743 781 75422 413 400 408 389 420 404 428 409 755 755 786 757 780 743 781 75423 417 400 410 390 421 404 429 410 755 755 786 761 782 751 789 76024 418 401 413 387 423 408 430 412 755 755 789 767 788 743 792 75925 413 403 408 393 421 403 428 408 755 755 780 760 782 750 782 76026 413 399 408 394 420 399 423 402 755 755 776 752 784 748 781 75227 413 405 406 391 421 402 427 408 755 755 784 765 778 754 777 76028 423 401 409 391 418 400 427 407 755 755 780 758 788 754 797 75829 414 400 406 386 419 402 426 409 755 755 781 765 782 748 783 75630 413 399 408 391 414 400 421 405 755 755 782 765 788 755 783 75931 414 400 410 392 418 401 421 409 755 755 779 758 790 759 786 758

    423 396 417 386 424 396 430 398 768 748 789 746 794 740 797 745

    ,Power System Operation Corporation Ltd(A wholly owned subsidiary company of POWERGRID)

    भार , WRLDC, Mumbaiसचूना MIS

    भार , WRLDC, Mumbaiसचूना MIS

  • No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    1 01-May-15 0 0 0 0 0 0 0 02 02-May-15 0 0 0 0 0 0 0 03 03-May-15 0 0 0 0 0 0 0 04 04-May-15 0 0 0 0 0 0 0 05 05-May-15 0 0 0 0 0 0 0 06 06-May-15 0 0 0 0 0 0 0 07 07-May-15 0 0 0 0 0 0 0 08 08-May-15 0 0 0 0 0 0 0 09 09-May-15 0 0 0 0 0 0 0 0

    10 10-May-15 0 0 0 0 0 0 0 011 11-May-15 0 0 0 0 0 0 0 012 12-May-15 0 0 0 0 0 0 0 013 13-May-15 0 0 0 0 0 0 0 014 14-May-15 0 0 0 0 0 0 0 015 15-May-15 0 0 0 0 0 0 0 016 16-May-15 0 0 0 0 0 0 017 17-May-15 0 0 NIL NIL NIL 018 18-May-15 0 0 0 0 0 0 0 019 19-May-15 0 0 0 0 0 0 0 020 20-May-15 0 0 0 0 0 0 0 021 21-May-15 0 0 0 0 0 0 0 022 22-May-15 0 0 0 0 0 0 0 023 23-May-15 0 0 0 0 0 0 0 024 24-May-15 0 0 0 0 0 0 0 025 25-May-15 0 0 0 0 0 0 0 026 26-May-15 0 0 0 0 0 0 0 027 27-May-15 0 0 0 0 0 0 0 028 28-May-15 0 0 0 0 0 0 0 029 29-May-15 0 0 0 0 0 0 0 030 30-May-15 0 0 0 0 0 0 0 031 31-May-15 0 0 0 0 0 0 0 0

    1025 91 490 851

    ANNEX -2.4

    DateSl. No Madhya Pradesh( Compiled from the data received from the constituents)

    Chhattisgarh

    Under Frequency Operation in various Constituent System of Western Region during the month MAY - 2015

    Recommonded Load relief at49.2 Hz / 49.0/48.8/48.6 Hz

    Gujarat Maharashtra

  • ANNEXURE-2.5ma[- 2015 ko daOrana piScama xao~ maoM ivaVut kTaOityaaM/ pabMaidyaaM

    Power Cut/Restrictions in Western Region for the month of May-2015

    k : gaujarat Gujarat

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut/ Restriction on Industriesa) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,

    then they will have to staggered on notified day only & cannot avail as per their choice.b) All industries are required to keep their recess timings staggered.

    2 kRiYa va gaàmaINa xao~aoM kao ivaVut AapUit-2. Power supply to Agricultural & Rural Sectors

    a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phasesupply during rest of 16 Hrs by providing LSTC.

    b) Jyotigram Yojana 24 hrs.

    3 Anya jaanakarI3. Any other information: NIL.K : maQya p`doSa Madhya Pradesh

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

    process HT/LT Industries M(b) Baar inayamana Load Shedding

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    (c) Anya jaanakarI Other information1.Weekly Off2.Staggering of power supply

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector: -

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-PhaseSupply(DLF)

    01.05.2015 31.05.2015 23:38 21:35 23:15

    2.1 Three-PhaseSupply(Irrigation)

    01.05.2015 31.05.2015 09:53 09:01 09:45

    2.1 Three-PhaseSupply(Mixed)

    01.05.2015 31.05.2015 23:34 21:04 23:06

  • 3 Anya jaanakarI3. Any other information

    SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

    idnaaMk Datetk To idnaaMk

    DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

    Max.(Hrs)

    Min. (Hrs) Average (Hrs)

    3.1 Commissionary H. Qtrs. 01.05.2015 31.05.2015 23:52 21:52 23:443.2 District Head Qtrs. 01.05.2015 31.05.2015 23:56 23:08 23:473.3 Tehsil Head Qtrs. 01.05.2015 31.05.2015 23:50 23:35 23:33

    ga : maharaYT/ Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1. Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    pìt idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /dayFrom To

    (a) Power Cuts/Restriction on HT/LT Industries(b) Load SheddingFrom 01.05.15 to 31.05.15

    SaUnya Nil

    @ 0-916 MW

    SaUnya Nil

    00.00

    SaUnya Nil

    24.00

    SaUnya Nil

    @ 1.6 MUs/day

    (c) Any other information1.Weekly Off2. Staggering of power supplyIndustrial Staggering LSwithdrawn from 03/02/2012

    SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day

    Max. (Hrs) Min. (Hrs) Average (Hrs)2.1 Three-Phase Supply 01.05.2015 31.05.2015 10:00 08:00 09:00

    2.2 Single-Phase Supply 01.05.2015 31.05.2015 18:00 18:00 18:00

    3 Anya jaanakarI Any other information:There is no load shedding on industrial feeders in Maharashtra

  • Ga : C%tIsagaZ, Chhattisgarh:1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

    pabandI ka samayaRestriction Time

    p`it idna kula}jaa- kTaOtI

    TotalEnergy Cut(MUs /day)

    sao From tkTo

    (A) Scheduled(a) (i) Power Cuts/Restriction on HT Industries(ii) Power Cuts/Restrictionon LT Industries(iii) Power Cuts/Restrictionon Rural(iv) Agriculture pump*

    (v)Urban/ Sub-Urban(iv)Town feeders(C-1to C-6)

    (B) Un-Scheduled(a) Load Shedding

    00.00(Av)

    00.00(Av)

    00.00 (Av)00.00 (Av)00.00(Av)00.00 (Av)

    1.Rural 70 MW(Av) For 05.19 Hrs.2.Town Feeders (C-1to C-6 & X) : 0.00(Av)

    -

    -

    -00.00

    --

    -

    -

    -

    -00.00

    --

    -

    -

    -

    -

    -0.00

    --

    0.211

    -

    3. HT Industries 89 (Av) For 103.40 Hrs.0.193

    Total Energy Cut/day 0.404( b) Any other information1.Weekly Off/staggering ofpower supply

    1day (In a week as perconsumer’s option) 50MW(Av.) - - 0.039

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply 01.05.2015 to 31.05.2015, 6.00Hrs (Power cut)

    18.00

    2.2 Single-Phase Supply - - - - -2.3 Remarks/Note/ - - - - -

    3 Anya jaanakarI / Any other information: SaUnya Nilca : gaaovaa Goa: SaUnya Nil

  • Annex-2.6

    ( )

    ,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    मई 2015Details of forced unit outages during the month of May 2015

    अनु

    Sl.No

    Unitसंघटक

    Constituent/IPPमता

    मेगावॉटCap.MW

    सoFrom

    समय

    सoFrom

    समय

    कारणReason

    Time Date Date1. ESSAR-2 GSECL 172 12:12 22-02-13 Still out Still out Shortage of gas

    2. GTPS-2 GSECL 120 20:20 22-10-14 Still out Still out RSD

    3. GTPS-1 GSECL 120 5:36 22-10-14 Still out Still out Flame failure

    4. UTPS-2 GSECL 120 15:02 10-11-14 Still out Still out RSD

    5. SUGEN-2 GSECL 382 11:46 31-01-15 Still out Still out RSD

    6. HAZIRA Ext-1 GSECL 351 0:37 25-03-15 Still out Still out Restoration time longuncertain

    7. GPEC-1 GSECL 218 01:22 10.04.2015 Still out Still out RSD

    8. UTRAN STG II-1 GSECL 375 23:15 18-04-2015 13:57 08.05.2015 Costly generation

    9. UKAI-1 GSECL 120 20:41 24.04.2015 Still out Still out RSD

    10. GPEC-3 GSECL 218 20:33 05.05.2015 03:37 27.05.2015 RSD

    11. DGBP-1 GSECL 107 23:44 08.05.2015 Still out Still out RSD

    12. UKAI-6 GSECL 500 07:13 09.05.2015 07:27 12.05.2015 BTL

    13. DGBP-2 GSECL 112 01:21 12.05.2015 06:49 15.05.2015 RSD

    14. UTRAN STG-1 GSECL 375 15:04 12.05.2015 06:33 01.06.2015 RSD

    15. STPS-1 GSECL 120 09:25 14.05.2015 Still out Still out Cable fault

    16. ALTPS-2 GSECL 125 14:30 16.05.2015 08:34 20.05.2015 Bottom ash problem

    17. GTPS-3 GSECL 210 16:20 22.05.2015 06:15 29.05.2015 RSD

    18. GPEC-2 GSECL 218 13:29 23.05.2015 23:26 28.05.2015 RSD

    19. Wanakbori-5 GSECL 210 14:07 23.05.2015 06:29 28.05.2015 RSD

    20. DGBP-2 GSECL 112 00:00 24.05.2015 05:42 27.05.2015 RSD

    21. GIPCL-2 GSECL 165 19:19 29.05.2015 Still out Still out RSD

    22. GPEC-2 GSECL 218 01:48 30.05.2015 Still out Still out RSD

    23. SLPP-2 GSECL 125 02:15 30.05.2015 Still out Still out BTL

    24. GPEC-3 GSECL 218 00:16 29.05.2015 Still out Still out RSD

    25. C'PUR-1 MAHAGENCO 210 7:15 28-08-14 Still out Still out BTL

    26. BHUSAWAL-2 MAHAGENCO 210 12:43 07-09-14 Still out Still out Flame failure/economyshutdown

    27. URAN-6 MAHAGENCO 108 16:35 01-04-2015 Still out Still out Clean drain tank levelhigh

  • 28. TROMBAY-6 MAHAGENCO 500 16:27 06-04-2015 10:37 01.06.2015 Economy s/d

    29. PARLI-4 MAHAGENCO 210 11:27 13.04.2015 Still out Still out Turbine vibration high

    30. URAN-7 MAHAGENCO 108 04:18 17.04.2015 Still out Still out CTO temperature high

    31. BHUSAWAL-3 MAHAGENCO 210 00:00 20.04.2015 Still out Still out No buyer as perMSEDCL requirement

    32. C'PUR-5 MAHAGENCO 500 04:30 01.05.2015 17:25 10.05.2015 Air heater problem

    33. NASIK-5 MAHAGENCO 210 05:25 02.05.2015 17:05 05.05.2015 BTL

    34. C'PUR-6 MAHAGENCO 500 11:29 02.05.2015 19:49 05.05.2015 BTL

    35. WPCL-1 MAHAGENCO 135 13:02 03.05.2015 05:33 07.05.2015 BTL

    36. PARLI-3 MAHAGENCO 210 20:51 03.05.2015 06:50 15.05.2015 Heavy Sparking in slipring

    37. PARLI-5 MAHAGENCO 210 50:25 06.05.2015 07:52 11.05.2015 BTL

    38. KHAPARKHEDA-3

    MAHAGENCO 210 17:41 08.05.2015 18:24 11.05.2015 Flame failure

    39. KHAPARKHEDA-5 MAHAGENCO 500 05:27 10.05.2015 09:31 13.05.2015 BTL

    40. KORADI-5 MAHAGENCO 200 04:16 11.05.2015 13:16 12.05.2015 Bearing temp high

    41. CHANDRAPUR-4 MAHAGENCO 210 09:18 12.05.2015 15:40 15.05.2015 BTL

    42. JAIGAD-1 MAHAGENCO 300 19:16 14.05.2015 Still out Still out Turbine bearing problem

    43. PARLI-5 MAHAGENCO 210 20:34 23.05.2015 15:05 28.05.2015 BTL

    44. APL TIRODA-2 Adani Power 660 04:23 06.05.2015 21:00 11.05.2015 FRS MOV BONNETLEAKAGE

    45. APL TIRODA-3 Adani Power 660 00:52 11.05.2015 Still out Still out Steam leakage

    46. CGPL-50 CGPL 830 13:11 05.05.2015 21:13 11.05.2015 Tube leakage

    47. CGPL-20 CGPL 830 05:20 23.05.2015 17:21 30.05.2015 Maintenance

    48. CGPL-40 CGPL 830 06:13 25.05.2015 Still out Still out BTL

    49. AMRAVATITPP(Indiabull)-1

    RATTANPOWER INDIA

    LTD270 23:28 21.03.2015 Still out Still out Turbine vibration

    50. AMRAVATITPP(Indiabull)-3

    RATTANPOWER INDIA

    LTD270 22:01 05-04-2015 Still out Still out Reason awaited

    51. AMRAVATITPP(Indiabull)-5

    RATTANPOWER INDIA

    LTD270 14:22 03-04-2015 Still out Still out Turbine shaft vibrations

    52. ESSAR GT-1 ESSAR 172 01:47 12.03.2015 Still out Still out RSD

    53. EPGL-2 ESSAR 600 16:53 28.05.2015 Still out Still out Air pre heater problem

    54. RGPPL-1B RGPPL 320 23:00 31-03-14 Still out Still out Dry preservation

    55. RGPPL-3A RGPPL 320 18:57 17-04-14 19:40 01.06.2015 Less requisition

    56. RGPPL-1A RGPPL 320 13:30 8-07-14 Ready Ready Less requisition

    57. RGPPL-2A RGPPL 332 12:00 21-07-14 Still out Still out CW pump problem

    58. RGPPL-3B RGPPL 332 19:30 20-08-2014 17:56 30.05.2015 Auxiliary Stop valveproblem

    59. RGPPL-2B RGPPL 332 13:30 1-09-14 Ready Ready Less requisition

    60. RGPPL-3B RGPPL 332 18:09 30.05.2015 Still out Still out No schedule

    61. Amarkantak-4 MPGCL 120 11:13 30-04-14 Still out Still out Turbine vibration

    62. AMARKANTAK-3 MPGCL 120 0:25 12-01-15 Still out Still out Fire caught in turbine floor

    63. JPBINA-1 MPPGCL 250 09:21 14.04.2015 Still out Still out RSD

  • 64. SINGAJI-2 MPPGCL 600 00:10 16.04.2015 12:49 24.05.2015 RSD

    65. SINGAJI-1 MPPGCL 600 14:15 23.04.2015 07:14 23.05.2015 Low system demand

    66. JPBINA-2 MPPGCL 250 12:48 28.04.2015 Still out Still out RSD

    67. SGTPS-2 MPPGCL 210 12:38 29.04.2015 23:00 08.05.2015 RSD

    68. SATPURA-III-9 MPPGCL 210 05:58 10.05.2015 22:40 15.05.2015 BTL

    69. SATPURA-II-6 MPPGCL 200 12:59 15.05.2015 07:20 25.05.2015 Water valve tubeleakage

    70. MB POWER-1 MPPGCL 600 03:18 16.05.2015 10:25 21.05.2015Taken out aftersuccessful COD at17:45HRS/15.05.2015

    71. SGTPS-2 MPPGCL 210 10:47 23.05.2015 Still out Still out RSD

    72. SGTPS-3 MPPGCL 210 11:30 23.05.2015 Still out Still out RSD

    73. SGTPS-4 MPPGCL 210 12:00 23.05.2015 Still out Still out RSD

    74. SATPURA-III-9 MPPGCL 210 13:30 23.05.2015 Still out Still out Fire in GT

    75. SGTPS-5 MPPGCL 500 18:20 24.05.2015 02:40 29.05.2015 SGTPS-4

    76. SINGAJI-1 MPPGCL 600 09:14 31.05.2015 Still out Still out Air compressor trip

    77. SINGAJI-2 MPPGCL 600 09:14 31.05.2015 Still out Still out Air compressor trip

    78. SGTPS-1 MPPGCL 210 11:44 29.05.2015 Still out Still out Furnace pressure high

    79. Korba(E)-5 CSPGCL 120 10:50 17.05.2015 16:05 20.05.2015 RHTL

    80. Korba(W)-4 CSPGCL 210 22:00 25.05.2015 Still out Still out ARC in GT

    81. Korba(W)-3 CSPGCL 210 13:48 27.05.2015 Still out Still out BTL

    82. DGEN -52 DGEN 400 12:05 15-01-15 08:05 01.06.2015 No schedule

    83. DGEN -53 DGEN 400 12:00 30.04.2015 06:06 01.06.2015 No schedule

    84. KSK-4 KSK 600 17:53 09.04.2015 Still out Still out Stop valve problem

    85. KWPCL-1 KWPCL 600 00:005 19.05.2015 Still out Still out Problem in ash and coalhandling plant

    86. JP NIGRI-1 JP-NIGRI 660 3:37 23-03-15 Still out Still out ESP WORKS

    87. JPL-STG-II-1 JINDALPOWER

    600 21:40 05.05.2015 20:26 13.05.2015Ash handling systeminspection.

    88. JPL-STG-II-2 JINDALPOWER

    600 00:18 14.05.2015 Still out Still out Coal feeding problem

    89. JP Nigri-2 JAYPEE 660 03:01 10.05.2015 08:32 30.05.2015 Coal shortage

    90. VANDANA -1 VANDANA 135 15:00 9-01-15 Still out Still out BTL

    91. DHARIWAL-2 DHARIWAL 300 0:00 22-12-14 Still out Still out RSD

    92. DHARIWAL-1 DHARIWAL 300 02:27 28.05.2015 Still out Still out High vibration problem

    93. LANCO-2LANCO

    AMARKANTAK

    300 12:20 21-08-13 Still out Still out Coal shortage

    94. EMCO-2 GMREMCO 300 14:41 27.04.2015 13:15 07.05.2015 ID fan problem

    95. EMCO-1 GMREMCO 300 10:07 20.05.2015 14:05 26.05.2015 Raw water shortage

    96. VADINAR-2 ESSAR 600 02:35 10.05.2015 19:23 14.05.2015 Hydrogen leakage

  • 97. VADINAR-1 ESSAR 600 15:31 17.05.2015 15:25 21.05.2015 BTL

    98. ACBIL-1 ACBIL 135 15:29 21.05.2015 02:50 24.05.2015 BTL

    99. ACBIL-2 ACBIL 135 14:52 30.05.2015 Still out Still out BTL

    100. ACBIL-1 ACBIL 135 20:08 31.05.2015 Still out Still out Loss of evacuation path

    101. SASAN-4 SASAN_UMPP 660 08:11 24.05.2015 11:24 29.05.2015 BTL

    102. KAWAS-2B NTPC 106 17:54 28.03.2014 Still out Still out Less schedule

    103. KAWAS-2C NTPC 116 18:08 30.03.2014 Still out Still out Less schedule

    104. KAWAS-2A NTPC 106 18:14 30.03.2014 Still out Still out Less schedule

    105. KAPS-2 NPCIL 220 00:19 02.05.2015 03:29 06.05.2015 Boiler level switchproblem

    106. GANDHAR-2 NTPC 219 00:07 03.05.2015 Still out Still out Less schedule

    107. MOUDA-1 NTPC 500 23:59 07.05.2015 21:29 27.05.2015 Less schedule

    108. SIPAT-1 NTPC 660 16:51 12.05.2015 Still out Still out Hydraulic oil leakage

    109. GANDHAR-1 NTPC 219 06:05 12.05.2015 Still out Still out Low schedule

    110. MOUDA-2 NTPC 500 12:32 16.05.2015 19:59 29.05.2015 Low schedule

    111. VSTPS-1 NTPC 210 00:18 17.05.2015 18:53 23.05.2015 Boiler license renewal

    Note: Units out for more than 72 hrs are only included.

  • Annex-2.7

    ( )

    ,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    मई 2015Details of planned unit outages during the month of May 2015

    अनु

    Sl.No

    Unitसंघटक

    Constituent/IPPमता

    मेगावॉटCap.MW

    सoFrom

    समय

    सoFrom

    समय

    कारणReason

    Time Date Time Date1. CGPL-40 TATA 830 00:18 25.04.2015 18:24 22.05.2015 AOH

    2. APLMOUNDRA

    Adani Power 330 04:17 01.05.2015 Still out Still out AOH

    3. MB POWER-1 MPPGCL 600 00:00 26.05.2015 Still out Still out PlannedMaintenance works

    4. TAPS - 1 NPCIL 160 22:39 12-10-14 Still out Still out Refueling works

    5. KAPS-1 NPCIL 220 00:11 05-04-2015 08:54 16.05.2015 AOH

    6. SIPAT - 1 NTPC 660 0:30 20-03-15 00:15 09.05.2015 AOH

    7. VSTPS-3 NTPC 210 00:12 28.05.2015 Still out Still out Annual overhauling

  • (MW) From To1 GUVNL

    1.1 UTPS 6 500 8-Jun-15 16-Aug-15 COH1.2 UGBPS Stage -2 375 8-Jul-15 1-Aug-15 C Inspection1.3 SLPP 3 125 14-Jul-15 3-Aug-15 AOH1.4 STPS 1 120 15-Jul-15 4-Aug-15 AOH1.5 GTPS 5 210 18-Jul-15 20-Aug-15 COH1.6 KLTPS 4 75 21-Jul-15 29-Aug-15 AOH1.7 WTPS 3 210 25-Jul-15 23-Aug-15 AOH

    1.80 APL 6 660 1-Jul-15 30-Jul-15 HIP Rotor thermocouple rectification1.9 APL 8 660 16-Jun-15 10-Jul-15 shutdown for renewal

    22.1 SATPURA 8 210 15.07.15 13.08.15 AOH2.2 SANJAY GANDHI 2 210 01-Jul-15 14.08.15 AOH

    3 CSPGCL

    3.1 KORBA WEST 4 210 01.07.2015 24.07.15 AOH

    44.1 BHUSAWAL 5 500 15.06.15 10.07.15 AOH4.2 PARLI 6 250 25.06.15 30.07.15 COH (As per water availability)4.3 KORADI 7 210 16-7-15 31-8-15 AOH4.4 TROMBAY (TPCL) 7 180 22.7.15 28.7.15 Minor inspection4.5 CHANDRAPUR 2 210 10.7.15 14.8.15 COH,air heater tube replacement4.6 CHANDRAPUR 6 500 10.06.15 15.07.15 AOH4.7 KHAPERKHEDA 4 210 16.6.15 21.7.15 COH

    5 Central Sector5.1 CGPL 10 800 10-Jun-15 15-Jul-15 Air preaheater basket replacement5.2 CGPL 20 800 20-Jul-15 5-Sep-15 Annual Boiler Major Overhaul & Turbine minor overhaul.5.3 VINDHYACHAL 10 500 20-Jun-15 24-Jul-15 COH5.4

    VINDHYACHAL 6 210 11-Jul-15 19-Aug-15Boiler+ HPT+IPT+LPT+GEN+ ESP R&M+DVRReplacement with static VR

    5.5 VINDHYACHAL 7 500 15-Jun-15 24-Jul-15 Boiler+ HPT+IPT+LPT+GEN+ ESP R&M5.6 SIPAT 3 660 01-Jul-15 29-Aug-15 BLR Boiler + HPT+IPT+GEN5.7 TAPS 2 160 15-Jun-15 15-Sep-15 Refueling Works5.8 KORBA ( KSTPS ) 7 500 14-Jun-15 18-Jul-15 Blr,HPT, IPT module OH5.9

    KORBA ( KSTPS ) 2 200 20-Jul-15 02-Sep-15 Boiler + Turbine+ DDCMIS+ESP Modification5.10 Jhanor Gandhar GT-1 144 09-Jun-15 11-Jun-15 Boiler licence renewal5.11 NSPCL BHILAI 2 250 01-Aug-15 04-Sep-15 AOH5.12 Jhanor Gandhar GT-3 144 14-Jul-15 23-Jul-15 B Inspection and Boiler licence Renewal

    DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING JUNE 2015 AND JULY 2015

    Capacity Outage as per AnnualMaintenance Plan

    Annexure- 3.1

    MSPGCL

    MPPGCL

    ReasonS. No. Unit No.

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    1 400 Aurangabad(PG)-Aurangabad(MSETCL) # I 20-Jun-15 7:00 22-Jun-15 18:00 Conti.Replacement of HCB isolator, CTs,Clamps, connectors, Al.Pipe andjumpers under up gradation work

    WRTS-I WRTS-I C

    2 400 Aurangabad-Pune # 1 20-Jun-15 7:00 22-Jun-15 18:00 Conti.Attending problem of TBC isolator,changing of clamps & connectors andAMP works at MSETCL Waluj S/S.

    WRTS-I &WRTMPL WRTS-I C

    3 400 Pune(GIS)-Pune # 1& 2 20-Jun-15 9:00 19-Jul-15 18:00 Daily Online OPGW work. A/R to be kept inNon auto mode

    WRTML WRTS-I C

    4 400 Solapur-Parli # 1& 2 20-Jun-15 9:00 19-Jul-15 18:00 Daily Online OPGW work. A/R to be kept inNon auto mode

    WRTML WRTS-I C

    5 765 Seoni-Wardha # 1 20-Jun-15 9:00 19-Jul-15 18:00 Daily Online OPGW work. A/R to be kept inNon auto mode

    WRTS-I WRTS-I C

    6 400 Bhadrawati-Parli-1 & Bhadrawati -Dhariwal-Parli 20-Jun-15 9:00 19-Jul-15 18:00 DailyOPGW/PID TEST Auto reclose shallbe kept in Non auto mode for bothcircuit. Lines will remain in service.

    WRTS-I WRTS-I R

    7 220 Pune- Talegaon MSETCL Line # 1 20-Jun-15 10:00 20-Jun-15 14:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C8 220 Pune- Talegaon MSETCL Line # 2 20-Jun-15 14:00 20-Jun-15 18:00 Daily FOR NTAMC WORK AT PUNE MSETCL WRTS-I C

    9 765 1500MVA ICT-2 at Solapur 20-Jun-15 9:00 20-Jun-15 18:00 DailyNeutral Bus and Teritiary BusJumpering of ICT-2 B-Phase forcharging.

    WRTS-I WRTS-I C

    10 765 Abad # 1 Main 716 Bay at Wardha 20-Jun-15 9:00 20-Jun-15 18:00 Daily AMP work WRTS-I WRTS-I R

    Outage Planning of Transmission elements during the Duration 20.06.2015 to 19.07.2015ANNEXURE-3.2

    10 765 Abad # 1 Main 716 Bay at Wardha 20-Jun-15 9:00 20-Jun-15 18:00 Daily AMP work WRTS-I WRTS-I R

    11 220 Osmanabad-Barshi D/C line 20-Jun-15 6:00 21-Jun-15 18:00 DailyFor Crossing & construction of 765KvAurangabad-Solapur D/C line. AP 35/0-AP 36/0

    MSETCL WRTS-I C

    12 400 Pune (GIS)-Parli # 1 &Pune(GIS)- Pune # 2 20-Jun-15 7:00 20-Jun-15 18:00 Daily CSD installation at Pune (GIS)WRTS-I &WRTMPL WRTS-I C

    13 400 Aurangabad -Pune D/C line 20-Jun-15 6:00 22-Jun-15 19:00 Conti. For Crossing & construction of 400KvAurangabad-Boisar D/C line at AP 32/0 MSETCL WRTS-I C

    14 765 1000 MVA ICT-II at Indore 20-Jun-15 9:00 20-Jun-15 18:00 Daily To take B phase unit out for correctionof 33 kV LA connection inside the ICT POWERGRIDWR-II c

    15 400 Dehgam -Wankbori Main Bay- 412 atDehgam s/s

    20-Jun-15 10:00 20-Jun-15 18:00 Daily AMP works POWERGRID

    WR-II R

    16 765 Sasan - Satna Ckt-I 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    17 765 Gwalior - Agra Ckt-II 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    18 765 Satna - Gwalior Ckt-I 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    19 400 Vapi - Kala 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    20 400 Navsari - Boiser # 1 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    21 220 Kawas - Haldarwa 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    22 220 Gandhar - Haldarwa 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    23 220 Kawas - Navsari GIS 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    24 220 Vav - Navsari (GETCO) 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    25 220 Bhopal 400 - Bhopal 220 20-Jun-15 7:00 19-Jul-15 18:00 DailyOnline replacement of E/W withOPGW. A/R shall be kept in non automode

    POWERGRIDWR-II C

    26 400 Vapi Kala Ckt I 20-Jun-15 9:00 20-Jun-15 17:00 Daily Attending Spacer and VD between LocNo 36B/0 to 36 A/0 and 35A/0 to 36/0 POWERGRIDWR-II R26 400 Vapi Kala Ckt I 20-Jun-15 9:00 20-Jun-15 17:00 DailyAttending Spacer and VD between LocNo 36B/0 to 36 A/0 and 35A/0 to 36/0 POWERGRIDWR-II R

    27 400 Bay 413 ( Main Bay of 400 Tarapur -Boisar Line 1) at Boisar

    20-Jun-15 9:00 20-Jun-15 17:00 Daily AMP POWERGRIDWR-II R

    28 400 125 MVAr Bus Reactor at Dehgam SS 20-Jun-15 10:00 20-Jun-15 18:00 Daily Commissioning of CSD relay POWERGRIDWR-II C

    29 765 765 Satna-Gwalior-2 Tie Bay (714Bay) at Satna

    20-Jun-15 9:00 20-Jun-15 18:00 DAILY For annual maintenace work POWERGRIDWR-II R

    30 220 Jhanor-Haldharwa 1 20-Jun-15 8:00 24-Jun-15 18:00 Continous

    220KV CT Erection ,Commitioning&Testing

    NTPC NTPC

    31 400 Sequential outage of SwitchyardBreakers at JPL - stage - II 20-Jun-15 8:00 19-Jul-15 18:00 Daily

    Sequential outage, one breaker at atime for replacement of 400kVDefective CB interrupter [ Power Flowwill not be affected ]

    JPL JPL

    32400 CGPL Limbdi - Mansar Line 20-Jun-15 6AM 20-Jun-15 6PM Daily

    Line EMVT - B phase SF6 GasLeakage Problem. EMVT replacementwith new one. PGCIL CGPL

    33 765 AURANGABAD-WARDHA 1 & 2 21-Jun-15 9:00 22-Jun-15 18:00 Daily OPGW works, WRTS-I WRTS-I C

    34 400 Parli-Lonikand D/C line 21-Jun-15 6:00 22-Jun-15 18:00 Conti.For Crossing & construction of 765KvAurangabad-Solapur D/C line. AP 61/0 -AP 62/0

    MSETCL WRTS-I C

    35 400 Pune (GIS)-Parli # 2 &Pune(GIS)- Pune # 1 21-Jun-15 7:00 21-Jun-15 18:00 Daily CSD installation at Pune (GIS)WRTS-I &WRTMPL WRTS-I C

    36 HVDC Ramagundam-1 Main Bay (CWD DIA50 Q51) at Bhadrawati

    22-Jun-15 9:00 22-Jun-15 18:00 Daily CSD Installation at Bhadrawati WRTS-I WRTS-I R

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    37 400 BUS-1 at Solapur 22-Jun-15 9:00 23-Jun-15 18:00 Daily For isolator erection work of 404 bay. WRTS-I WRTS-I C

    38 400 Talegaon- Chakan Line 22-Jun-15 10:00 22-Jun-15 12:00 Daily FOR NTAMC WORK AT PUNE MSETCL WRTS-I C39 400 Pune (Talegaon)- Pune GIS # 2 22-Jun-15 12:00 22-Jun-15 14:00 Daily FOR NTAMC WORK AT PUNE MSETCL WRTS-I C

    40 400 Main Bay (407) Pune GIS # 2 at Pune(Talegoan)

    22-Jun-15 14:00 22-Jun-15 18:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    41 220 Beed-Parli D/C line 22-Jun-15 6:00 23-Jun-15 19:00 Conti. For Crossing & construction of 765KvAurangabad-Solapur D/C line.

    MSETCL WRTS-I C

    42 765 240MVAr Bus reactor at Seoni 22-Jun-15 8:00 25-Jun-15 18:00 Conti. Spare reactor commissionig works &shall be taken in service.

    WRTS-I WRTS-I C

    43 400 Parli # 2 Main 409 Bay at Wardha 22-Jun-15 9:00 27-Jun-15 18:00 Conti. Pull rod replacement work. WRTS-I WRTS-I R44 765 Abad # 1 Tie 717 Bay at Wardha 22-Jun-15 9:00 22-Jun-15 18:00 Daily AMP work WRTS-I WRTS-I R

    45 765 1500MVA ICT-1 at Aurangabad(PG) 22-Jun-15 7:00 23-Jun-15 18:00 Daily OLTC & Fire fighting commisioningworks. WRTS-I WRTS-I C

    46 220 ICT-II (Main bay -202) at Seoni 22-Jun-15 8:00 22-Jun-15 18:00 Daily AMP works (DCRM test) WRTS-I WRTS-I R

    47 400 BAY 420(TIE BAY OF400KV Indore -indore #2)

    22-Jun-15 9:00 22-Jun-15 18:00 Daily AMP OF BAY EQUIPMENT POWERGRIDWR-II R

    48 765 765 BINA - 1 L/R (SWITCHABLE),Gwalior

    22-Jun-15 10:00 23-Jun-15 18:00 Daily AMP WORKS POWERGRIDWR-II R

    49 400 Dehgam-Wankbori Tie Bay- 411 atDehgam s/s

    22-Jun-15 10:00 22-Jun-15 18:00 Daily AMP works POWERGRID

    WR-II R49 400 Dehgam-Wankbori Tie Bay- 411 atDehgam s/s

    22-Jun-15 10:00 22-Jun-15 18:00 Daily AMP works POWERGRID

    WR-II R

    50 400 400 Sasan-JBP Line 22-Jun-15 10:00 22-Jun-15 14:00 Daily AMP OF LINE TERMINALEQUIPMENT

    MPPTCL WR-II R

    51 400 Magarwada Kala Ckt 1 22-Jun-15 9:00 22-Jun-15 17:00 Daily Attending Spacer and VD between LocNo 36B to 37

    POWERGRIDWR-II R

    52 400 Bay 410 ( Main Bay of 400 TarapurBoisar Line 2 ) at Boisar

    22-Jun-15 9:00 22-Jun-15 17:00 Daily AMP POWERGRIDWR-II R

    53 400 63MVAr Bus reactor Main Bay-401 atDehgam 22-Jun-15 9:00 29-Jun-15 18:00 ContinuousFor completely replacingdamaged/deteriorated inter-pole wiringof the 20yrs old BHEL Make CB

    POWERGRID WR-II R

    54 765 Satna-Gwalior 2 Line 22-Jun-15 9:00 23.06.15 18:00 Daily

    For Cheching of PLCC &Commissioning of fire fighting systemand formation of auxiliary bus,commissioning of on line DGA andDryout System

    POWERGRIDWR-II C

    55 400 SUGEN VAPI LINE 22-Jun-15 9:00 22-Jun-15 18:00 Daily Attending the hotspot on Bus-A isolator TPL-SUGENTPL-SUGENR

    56 220 Kawas-Navsari 2 22-Jun-15 8:00 22-Jun-1518:00 Daily Attending Hot Spot in isolator 89-2

    Rphase (Bus side) NTPC NTPC

    57 220 Kawas-Bus#2 22-Jun-15 8:00 22-Jun-1518:00 Daily Attending Hot Spot in isolator 89-2

    Rphase (Bus side) NTPC NTPC

    58 220 MALANPUR - GWL( PG) CKT - I 22/Jun/15 9:00 23/Jun/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    59400 CGPL Limbdi Line - 1 22-Jun-15 6AM 22-Jun-15 6PM Daily

    Line EMVT - B phase SF6 GasLeakage Problem. EMVT replacementwith new one. PGCIL CGPL

    60 HVDC Ramagundam-2 Main Bay (CWD DIA50 Q52) at Bhadrawati

    23-Jun-15 7:00 23-Jun-15 18:00 Daily Half yearly Amp works WRTS-I WRTS-I R

    61 400 Pune (Talegaon )-Aurangabad # 2 23-Jun-15 10:00 23-Jun-15 14:00 Daily FOR NTAMC WORK AT PUNE WRTML WRTS-I C62 400 Pune (Talegaon )-Aurangabad # 1 23-Jun-15 14:00 23-Jun-15 18:00 Daily FOR NTAMC WORK AT PUNE WRTML WRTS-I C

    63 400 Main Bay (409) Aurangabad # 1 atPune (Talegoan)

    23-Jun-15 14:00 23-Jun-15 18:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    64 765 AURANGABAD-WARDHA 1 23-Jun-15 9:00 23-Jun-15 18:00 Daily Erection of NGR at Wardha WRTS-I WRTS-I R65 220 Seoni- I(Main bay-204) at Seoni 23-Jun-15 8:00 23-Jun-15 18:00 Daily AMP works (DCRM test) WRTS-I WRTS-I R

    66 400 BAY 421(Main bay 400kv Indore-Indore#2)

    23-Jun-15 9:00 23-Jun-15 18:00 Daily AMP OF BAY EQUIPMENT POWERGRIDWR-II R

    67 400 125 MVAR BR Main bay (401) atJabalpur

    23-Jun-15 10:00 23-Jun-15 17:00 Daily Checking of Isolator RemoteOperation.

    POWERGRIDWR-II R

    68 400 Vapi Kala Ckt 2 23-Jun-15 9:00 23-Jun-15 17:00 Daily Attending to VD and Rectification ofshut down nature defects

    POWERGRIDWR-II R

    69 220 Bay 204 ( Bus Coupler Bay ) atBoisar

    23-Jun-15 9:00 23-Jun-15 17:00 Daily AMP POWERGRIDWR-II R

    70 765 765 KV SASAN-SATNA Line 1 23-Jun-15 9:00 24-Jun-15 18:00 Daily

    For LA Replacement/Erection,Equipment testing and YearlyMaintenance of Line & Reactor baysincluding NGT

    SASAN RELIANCE

    71 400 RAJGARH (PGCIL )- SSPCKT II 23/Jun/15 6:00 23/Jun/15 18:00 daily

    FOR RECTIFICATION OF DEFECTSOBSERVED DURING ROUTINEPETROLLING ATTEND THEDAMPER ,ARCHINGORN, F/O&BROKEN DISCREPLACEMENTWORK.

    PGCIL/MPPTCL WR - II R71 400 RAJGARH (PGCIL )- SSPCKT II 23/Jun/15 6:00 23/Jun/15 18:00 daily

    FOR RECTIFICATION OF DEFECTSOBSERVED DURING ROUTINEPETROLLING ATTEND THEDAMPER ,ARCHINGORN, F/O&BROKEN DISCREPLACEMENTWORK.

    PGCIL/MPPTCL WR - II R

    72 220 DAMOH PG - TIKAMGARH CKT 23/Jun/15 9:00 23/Jun/15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL R73 220 ANOOPUR - KOTMIKALA CKT - I 23/Jun/15 10:00 23/Jun/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    74 400 MOUDA-IEPL-WARDHA-1 23-Jun-15 9:00 24-Jun-15 18:00 Conti.

    Delilo of IEPL plant with PLCC panelshfting and charging of line as Mouda-Wardha # 1 (for Disconnection fromCTU network)

    WRTS-I IEPL C

    75 400 CGPL GT 40 - Bus-A side 23-Jun-15 6AM 23-Jun-15 6PM DailyGT 40 - Bus A side, 421 CT - B-phaseSF6 Gas Leakage Problem. PGCIL CGPL

    76 40010C06C incoming Feeder bay fromgeneration plant at Mundra HVDCTerminal

    23-Jun-15 9:30 23-Jun-15 18:00 Daily Clamp and connector Tightness workof AC Disconnector Q2 ATIL ATIL R

    77 HVDC HVDC Pole-2 at Bhadrawati 24-Jun-15 7:00 25-Jun-15 18:00 Daily CSD Installation at Bhadrawati WRTS-I WRTS-I R

    78 765 Seoni - Bina line &Seoni-Wardha 1 & 2 line

    24-Jun-15 8:00 26-Jun-15 18:00 Conti. For stringing of auxillary bus at Seoni WRTS-I WRTS-I C

    79 400 BUS-2 at Solapur 24-Jun-15 9:00 25-Jun-15 18:00 Daily For isolator erection work of 406 bay. WRTS-I WRTS-I C

    80 400 Pune (Talegaon)- Padghe Line 24-Jun-15 10:00 24-Jun-15 14:00 Daily FOR NTAMC WORK AT PUNE MSETCL WRTS-I C81 400 Pune (Talegaon)- Kalwa Line 24-Jun-15 14:00 24-Jun-15 18:00 Daily FOR NTAMC WORK AT PUNE MSETCL WRTS-I C

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    82 400 Tie Bay (408)Pune GIS# 2 at Pune(Talegoan)

    24-Jun-15 14:00 24-Jun-15 18:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    83 400 Main Bay (407) Bhadrawati-1 at Parli 24-Jun-15 10:00 24-Jun-15 18:00 Daily For AMP Works at Parli WRTS-I WRTS-I R

    84 400 400Kv Bus-2 at Parli 24-Jun-15 10:00 28-May-15 18:00 Daily For AMP Works at Parli WRTS-I WRTS-I R

    85 132 Beed-Gevrai S/C line 24-Jun-15 6:00 25-Jun-15 19:00 Conti. For Crossing & construction of 765KvAurangabad-Solapur D/C line.

    MSETCL WRTS-I C

    86 765 1500MVA ICT-2 at Aurangabad(PG) 24-Jun-15 7:00 25-Jun-15 18:00 Daily OLTC & Fire fighting commisioningworks.

    WRTS-I WRTS-I C

    87 765 BAY 705( TIE BAY OF ICT-II & BINAINDORE CKT) at Indore

    24-Jun-15 9:00 25-Jun-15 18:00 Daily AMP OF BAY EQUIPMENT POWERGRIDWR-II R

    88 765 765 BINA -2 L/R at Gwalior 24-Jun-15 10:00 25-Jun-15 18:00 Daily AMP POWERGRIDWR-II R

    89 400 Dehgam-Sami-1 Main Bay- 424 atDehgam s/s

    24-Jun-15 10:00 24-Jun-15 18:00 Daily AMP works POWERGRID

    WR-II R

    90 400 125 MVAR BR & V-J # I Tie bay (402)at Jabalpur

    24-Jun-15 10:00 24-Jun-15 17:00 Daily Checking of Isolator RemoteOperation.

    POWERGRIDWR-II R

    91 400 Magarwada Kala Ckt 2 24-Jun-15 9:00 24-Jun-15 17:00 Daily Attending Spacer and VD between LocNo 36B to 37

    POWERGRIDWR-II R

    92 220 Bay 205 ( TBC Bay ) at Boisar 24-Jun-15 9:00 24-Jun-15 17:00 Daily AMP POWERGRIDWR-II R

    93 765 765 Satna-Gwalior-2 Main Bay (715Bay) at Satna

    24-Jun-15 9:00 24-Jun-15 18:00 DAILY For annual maintenace work POWERGRIDWR-II R

    94 220 PANDHURANA - KALMESHWARCKT

    24/Jun/15 9:00 24/Jun/15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    95 220 MALANPUR - (GWL) PG CKT - II 24/Jun/15 9:00 25/Jun/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R95 220 MALANPUR - (GWL) PG CKT - II 24/Jun/15 9:00 25/Jun/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    96 400 Bhilai-Bhadrawati & Bhadrawati-Raipur-1 25-Jun-15 7:00 2-Jul-15 18:00 Conti.Shifting of Tower no 638 for VidharbhaIndustrial Dev co. (VIDC) & opportunityavailed for Insulator replacement.

    WRTS-I WRTS-I R

    97 400 412 Main Bay of ICT # 2 at Pune(Talegoan)

    25-Jun-15 9:00 25-Jun-15 13:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    98 400 413 Main Bay of Lonikand at Pune(Talegoan)

    25-Jun-15 13:00 25-Jun-15 18:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    99 400 Main Bay (403) Pune-1 at Parli 25-Jun-15 10:00 25-Jun-15 18:00 Daily For AMP Works at Parli WRTS-I WRTS-I R

    100 400 Tapti Tanda-Babhaleshwar D/C line 25-Jun-15 6:00 26-Jun-15 19:00 Conti. For Crossing & construction of 765KvAurangabad-Solapur D/C line.

    MSETCL WRTS-I C

    101 765 DURG PS -WARDHA_1 & 2 25-Jun-15 9:00 27-Jun-15 18:00 Daily For NTAMC & line rectification work atWardha

    WRTS-I WRTS-I C

    102 400 Dehgam-Sami-1 Tie Bay- 425 atDehgam s/s

    25-Jun-15 10:00 25-Jun-15 18:00 Daily AMP works POWERGRID

    WR-II R

    103 400 400 V-J # I Main Bay (403)at Jabalpur 25-Jun-15 10:00 25-Jun-15 17:00 Daily Checking of Isolator RemoteOperation.

    POWERGRIDWR-II R

    104 400 Navsari Magarwad Ckt I 25-Jun-15 9:00 25-Jun-15 17:00 Daily Attending to VD and Rectification ofshut down nature defects

    POWERGRIDWR-II R

    105 220Bay 207 (220 kV Tarapur BoisarLine Main Bay ) - Line will remain inservice through TBC Bay at Boisar

    25-Jun-15 9:00 25-Jun-15 17:00 Daily AMP POWERGRIDWR-II R

    106 220 Tarapur-Boisar Line 25-Jun-15 8:00 25-Jun-15 18:00 Daily Rectification of shut down naturedefects

    POWERGRIDWR-II R

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    107 765 765 Satna-Gwalior-2 Reactor Bay(715R Bay)

    25-Jun-15 9:00 25-Jun-15 18:00 DAILY For annual maintenace work POWERGRIDWR-II R

    108 220 ANOOPUR - KOTMIKALA CKT - Ii 25/Jun/15 10:00 25/Jun/15 17:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    109 400 WARDHA-WARORA-1 25-Jun-15 9:00 26-Jun-15 18:00 Cont.

    Lilo Of IEPL Plant with PLCC PanelTunning and Protection trials andcharging line as WARORA-IEPL-WARDHA(for connection in STUnetwork

    WRTS-I IEPL/MSETCL C

    110 765 Tiroda Koradi II Line 2 25-Jun-15 9:00 25-Jun-15 18:00 DailySG6 gas leakage in Circuit Breaker ofline-2 Reactor bays. Same is need tobe replaced.

    MEGPTCL MEGPTCL R

    111 400 MOUDA-IEPL-WARDHA-1 26-Jun-15 9:00 27-Jun-15 18:00 Conti.Delilo of IEPL plant with PLCC panelshfting and charging of line as Mouda-Wardha # 1

    WRTS-I IEPL C

    112 765 Tie Bay (711) of Pune at Solapur 26-Jun-15 9:00 26-Jun-15 18:00 DailyRemoval of Jumper from Jack Bus andconnection of Al Tube for AurangabadMain Bay

    WRTS-I WRTS-I R

    113 400 410 Bay Main Bay of AurangabadLine # 2 at Pune (Talegoan)

    26-Jun-15 9:00 26-Jun-15 9:30 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    114 400 411 Tie Bay of Aurangabad Line # 2 &ICT # 2 at Pune (Talegoan)

    26-Jun-15 10:00 26-Jun-15 10:30 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    115 400 418 Main Bay of ICT # 3 at Pune(Talegoan)

    26-Jun-15 11:00 26-Jun-15 17:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    116 400 400 Wardha- Parli # 2 26-Jun-15 9:00 27-Jun-15 18:00 Daily stringing work of broken earth wirebetween span 387 to 390

    WRTS-I WRTS-I R116 400 400 Wardha- Parli # 2 26-Jun-15 9:00 27-Jun-15 18:00 Daily stringing work of broken earth wirebetween span 387 to 390

    WRTS-I WRTS-I R

    117 400 Aurangabad(PG)-Aurangabad(MSETCL) # 2 26-Jun-15 7:00 28-Jun-15 18:00 Conti.Replacement of HCB isolator, CTs,Clamps, connectors, Al.Pipe andjumpers under up gradation work

    WRTS-I WRTS-I C

    118 400 Aurangabad-Pune # 2 26-Jun-15 7:00 28-Jun-15 18:00 Conti.Attending problem of TBC isolator,changing of clamps & connectors andAMP works at MSETCL Waluj S/S.

    WRTS-I &WRTMPL WRTS-I R

    119 765 Seoni - Bilaspur-II Line 26-Jun-15 8:00 27-Jun-15 18:00 Daily Line AMP works WRTS-I WRTS-I R

    120 765 Bilaspur -II (Main bay 716) at Seoni 26-Jun-15 8:00 27-Jun-15 18:00 Conti AMP works (DCRM & Timing test ofCB)

    WRTS-I WRTS-I R

    121 765 BAY 706 (MAIN BAY OF ICT-II )atIndore

    26-Jun-15 9:00 27-Jun-15 18:00 Daily AMP OF BAY EQUIPMENT POWERGRIDWR-II R

    122 765 1500 MVA ICT-02 at Gwalior 26-Jun-15 10:00 26-Jun-15 18:00 DAILY TIE CB CSD POWERGRIDWR-II C

    123 400 V-J # II Main bay (404) at Jabalpur 26-Jun-15 10:00 26-Jun-15 17:00 Daily Checking of Isolator RemoteOperation.

    POWERGRIDWR-II R

    124 400 Navsari Magarwada Ckt 2 26-Jun-15 9:00 26-Jun-15 17:00 Daily Attending to VD and Rectification ofshut down nature defects

    POWERGRIDWR-II R

    125 220Bay 208 ( ICT 2 Main Bay - ICT 2 willremain in service through TBC Bay )at Boisar

    26-Jun-15 9:00 26-Jun-15 17:00 Daily AMP POWERGRIDWR-II R

    126 400 ICT#1 at Satna 26-Jun-15 9:00 26-Jun-15 18:00 DAILY For annual maintenace work POWERGRIDWR-II R

    127 220 Kawas-Vav 1 26-Jun-15 8:00 26-Jun-1518:00 Daily Prementive Maintenance & Relay

    testing NTPC NTPC

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    128 400 RAJGARH (PGCIL )- SSPCKT I 26/Jun/15 6:00 26/Jun/15 18:00 daily

    FOR RECTIFICATION OF DEFECTSOBSERVED DURING ROUTINEPETROLLING ATTEND THEDAMPER ,ARCHINGORN, F/O&BROKEN DISCREPLACEMENTWORK.

    PGCIL/MPPTCL WR - II R

    129 220 DAMOH PG - SAGAR CKT 26/Jun/15 9:00 26/Jun/15 18:00 daily MAINTENANCE WORK MPPTCL MPPTCL R

    130 765 Seoni-Wardha # 1 line 27-Jun-15 8:00 30-Jun-15 18:00 Conti. For stringing of auxillary bus at Seoni WRTS-I WRTS-I C

    131 765 765/400 AT-3 at Seoni 27-Jun-15 8:00 30-Jun-15 18:00 Conti. For stringing of auxillary bus at Seoni WRTS-I WRTS-I C

    132 400 BUS # 2 at Pune (Talegoan) 27-Jun-15 9:00 27-Jun-15 17:00 Daily AMP WORK WRTS-I WRTS-I C

    133 500 HVDC Chadrapur-Padghe bipole line 27-Jun-15 6:00 28-Jun-15 19:00 Conti.

    For Crossing & construction of 400KvAurangabad-Boisar D/C line at AP 30/0to AP 31/0, at AP 7/0 to AP 8/0 and765Kv Aurangabad-Solapur D/C lineAP 117/0-118/0.

    MSETCL WRTS-I C

    134 765 GWALIOR - SATNA -1 Line 27-Jun-15 10:00 27-Jun-15 18:00 Daily main CB CSD, PANEL WIRINGDRESSING

    POWERGRIDWR-II C

    135 220

    Bay 206 ( Main Bay of 220 kV Boisar (MSETCL ) Boisar PGCIL ) Line I -The Line will remain in service throughTBC Bay ) at Boisar

    27-Jun-15 9:00 27-Jun-15 17:00 Daily AMP POWERGRIDWR-II R135 220

    Bay 206 ( Main Bay of 220 kV Boisar (MSETCL ) Boisar PGCIL ) Line I -The Line will remain in service throughTBC Bay ) at Boisar

    27-Jun-15 9:00 27-Jun-15 17:00 Daily AMP POWERGRIDWR-II R

    136 400 ICT#2 at Satna 27-Jun-15 9:00 27-Jun-15 18:00 DAILY For annual maintenace work POWERGRIDWR-II R

    137 400 ISP- NAGDA CkT 27/Jun/15 6:00 27/Jun/15 18:00 daily

    FOR RECTIFICATION OF DEFECTSOBSERVED DURING ROUTINEPETROLLING ATTEND THEDAMPER ,ARCHINGORN, F/O&BROKEN DISCREPLACEMENTWORK.

    MPPTCL MPPTCL R

    138 765 AURANGABAD-WARDHA 3 & 4 28-Jun-15 9:00 30-Jun-15 18:00 Daily Crossing work of up-coming 1200kVWardha-Aurangabad line

    WRTS-I WRTS-I C

    139 220 Aurangabad -Babhaleshwar D/C line 28-Jun-15 6:00 29-Jun-15 19:00 Conti.For Crossing & construction of 400KvAurangabad-Boisar D/C line at AP 39/0-AP 40/0

    MSETCL WRTS-I C

    140 400 Kolhapur-Solapur-1 29-Jun-15 8:00 29-Jun-15 18:00 DailyLine terminal equipments AMP work atKolhapur WRTMPL WRTS-I R

    141 400 BUS # 1 at Pune (Talegoan) 29-Jun-15 9:00 29-Jun-15 17:00 Daily AMP WORK WRTS-I WRTS-I C

    142 765 BUS-1 at Solapur 29-Jun-15 9:00 30-Jun-15 18:00 Daily Isolator Erection of 707 & 710 Bays forupcoming Aurangabad Lines

    WRTS-I WRTS-I C

    143 765 765 Bus-2 at Wardha 29-Jun-15 9:00 29-Jun-15 18:00 Daily Bus Extension Work for Raipur Ckt3&4

    WRTS-I WRTS-I R

    144 400 Koradi-Sarni line 29-Jun-15 9:00 30-Jun-15 18:00 Daily Wave trap replacement work at Koradi WRTS-I WRTS-I R

    145 400 Akola-Aurangabad (PG) # 2 29-Jun-15 7:00 29-Jun-15 18:00 Daily Erection & Commissioning of L/Reactorat Aurangabad (PG)

    WRTS-I WRTS-I C

    146 765 Seoni - Bilaspur-I Line 29-Jun-15 8:00 30-Jun-15 18:00 Daily Line AMP works WRTS-I WRTS-I R

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    147 400 50 MVAR Bus reactor at Seoni 29-Jun-15 8:00 30-Jun-15 18:00 Conti AMP works WRTS-I WRTS-I R

    148 765 BAY (707 MAIN BAY BUS-IREACTOR)at Indore

    29-Jun-15 9:00 30-Jun-15 18:00 Daily AMP OF BAY EQUIPMENT POWERGRIDWR-II R

    149 400 414 BAY at Gwalior 29-Jun-15 10:00 29-Jun-15 18:00 COUNT PIR REMOVAL POWERGRIDWR-II R

    150 400 V-J # II & III Tie bay (405) at Jabalpur 29-Jun-15 10:00 29-Jun-15 17:00 Daily Checking of Isolator RemoteOperation.

    POWERGRIDWR-II R

    151 400 Tarapur-Padghe Line # I 29-Jun-15 8:00 29-Jun-15 18:00 Daily Rectification of shut down naturedefects

    POWERGRIDWR-II R

    152 400 63 MVAR Bus Reactor Main Bay (422Bay) at Satna

    29-Jun-15 9:00 29-Jun-15 14:00 DAILY For oil sampling of CT POWERGRIDWR-II R

    153 220 Kawas-Vav 2 29-Jun-15 8:00 29-Jun-1518:00 Daily Prementive Maintenance & Relay

    testing NTPC NTPC

    154 220 BADOD - KOTA CKT 29/Jun/15 6:00 29/Jun/15 18:00 dailyTIEGHTENING OF JUMPER CONE&ARCHING HORN AND OTHERMAINT. WORK

    MPPTCL MPPTCL R

    155 400 401 Main Bay of Talegaon Chakan atPune (Talegoan)

    30-Jun-15 9:30 30-Jun-15 10:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    156 400 415 Main Bay of Bus Reactor at Pune(Talegoan)

    30-Jun-15 10:00 30-Jun-15 16:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    157 400 Kolhapur-Solapur-2 30-Jun-15 8:00 30-Jun-15 18:00 DailyLine terminal equipments AMP work atKolhapur WRTMPL WRTS-I R

    158 400 424 Bay of 400 ICT # 2 at Wardha 30-Jun-15 9:00 30-Jun-15 18:00 Daily AMP work WRTS-I WRTS-I R

    159 220 Jalna-Waluj D/C line 30-Jun-15 6:00 1-Jul-15 19:00 Conti.For Crossing & construction of 765KvAurangabad-Solapur D/C line. AP122/0-AP 123/0

    MSETCL WRTS-I C159 220 Jalna-Waluj D/C line 30-Jun-15 6:00 1-Jul-15 19:00 Conti.For Crossing & construction of 765KvAurangabad-Solapur D/C line. AP122/0-AP 123/0

    MSETCL WRTS-I C

    160 400 Akola-Aurangabad (PG) # 1 30-Jun-15 7:00 30-Jun-15 18:00 Daily Erection & Commissioning of L/Reactorat Aurangabad (PG)

    WRTS-I WRTS-I C

    161 765 Wardha-I (Main bay 721) at Seoni 30-Jun-15 8:00 30-Jun-15 18:00 Daily AMP works (DCRM & Timing test ofCB)

    WRTS-I WRTS-I R

    162 400 V-J # III Main bay (406) at Jabalpur 30-Jun-15 10:00 30-Jun-15 17:00 Daily Checking of Isolator RemoteOperation.

    POWERGRIDWR-II R

    163 400 Tarapur-Padghe Line # II 30-Jun-15 8:00 30-Jun-15 18:00 Daily Rectification of shut down naturedefects

    POWERGRIDWR-II R

    164 765 765kV Bina-Gwalior#1 30-Jun-15 10:00 30-Jun-15 18:00 Daily Commissioning of CSD relay at BinaEnd

    POWERGRIDWR-II C

    165 765 Sasan-Satna 1 Line Reactor at Satna 30-Jun-15 9:00 30-Jun-15 18:00 DAILY ForBushing Oil sampling (Line will beout for 15 minutes to isolate reactor). POWERGRIDWR-II R

    166 765 765/400KV ICT-1 AT SASAN 30-Jun-15 9:00 1-Jul-15 18:00 Daily For Yearly Manitenance andequipment testing

    SASAN RELIANCE

    167 220 BADOD - MODAK CKT 30/Jun/15 6:00 30/Jun/15 18:00 dailyTIEGHTENING OF JUMPER CONE&ARCHING HORN AND OTHERMAINT. WORK

    MPPTCL MPPTCL R

    168 400 402 Tie Bay of Chakan & Padghe Lineat Pune (Talegoan)

    1-Jul-15 9:30 1-Jul-15 10:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

    169 400 403 Main Bay of Padhe at Pune(Talegoan)

    1-Jul-15 10:30 1-Jul-15 11:00 Daily FOR NTAMC WORK AT PUNE WRTS-I WRTS-I C

  • SN KV Line From To Basis Reason System Agency typeDate Time Date Time

    170 765 765/400 AT-1 at Seoni 1-Jul-15 8:00 3-Jul-15 18:00 Conti. Replacement of 390 KV LA with 336KV LA.

    WRTS-I WRTS-I R

    171 765 707 Main bay of 765 Bus Reactor atWardha

    1-Jul-15 9:00 1-Jul-15 18:00 Daily AMP work WRTS-I WRTS-I R

    172 400 Kolhapur-Mapusa # 1& 2 1-Jul-15 8:00 5-Jul-15 18:00 Conti.LILO of line at New Kolhapur (GIS) &crossing of 765Kv Kudgi-Kolhapur D/Cline

    WRTS-I WRTS-I C

    173 765 AURANGABAD-WARDHA 1 1-Jul-15 7:00 1-Jul-15 18:00 Daily Commissioning of Spare Reactor unit WRTS-I WRTS-I C

    174 765 765/400 AT-2 (Main bay 715) at Seoni 01-Jul-15 8:00 02-Jul-15 18:00 Conti Investigation of welding joint of Isolatorby OEM

    WRTS-I WRTS-I R

    175 765 1000 MVA ICT-II at Indore 01-Jul-15 9:00 01-Jul-15 18:00 Daily to take spare unit out and B phase unitinto service

    POWERGRIDWR-II C

    176 765 BAY (708 TIE BAY BUS-I REACTOR& ICT-I) at Indore

    01-Jul-15 9:00 03-Jul-15 18:00 Daily AMP OF BAY EQUIPMENT POWERGRIDWR-II R

    177 765 1500MVA ICT-1 at Gwalior 01-Jul-15 10:00 01-Jul-15 18:00 DAILY TIE CB CSD POWERGRIDWR-II C

    178 400 V-J # IV Main bay (407) at Jabalpur 01-Jul-15 10:00 01-Jul-15 17:00 Daily Checking of Isolator RemoteOperation.

    POWERGRIDWR-II R

    179 400 Boisar-Padghe Line 01-Jul-15 8:00 01-Jul-15 18:00 Daily Rectification of shut down naturedefects

    POWERGRIDWR-II R

    180 765 Satna-Gwalior 1 Line Reactor atSatna 01-Jul-15 9:00 02-Jul-15 18:00 ContinousFor Taking