How BIG is the Universe? A Photographic Tour. Apollo 17 Lunar Rover (scale: a few metres)
SCALE IN METRES 1:50 A1
Transcript of SCALE IN METRES 1:50 A1
Brian B. AthertonArchitectural P L A N S
E : [email protected] : 07708 216064
A1
SC
ALE
T
ITLE
C
LIE
NT
PR
OP
OS
AL
DA
TE
Proposed Development @Castle Hill FarmStamford WayEwloeDeeside CH5 3BZ
Mr John Fowkes
Proposed Details
1:50 January2020
Roof joists to be birdsmouthonto 100 x 50mm timber wallplate rawlbolted tobrickwork @ 500mm cts
Sloping section of roof to be insulated with 150mm Kingspan K7between joists and 25mm Kingspan K18 under joists.
1000
150
Min
Min
d.p.c
1000
150
Min
Min
d.p.c
Conservatory
Utility
CloaksBedroom
En-Suite
Living / Dining Area
Kitchen
Covered Patio
Proposed Front Elevation Proposed Side Elevation
Proposed Floor Plan
Rob
esProposed Side Elevation
Proposed Rear Elevation
Roof Pitch = 25°
8026
60003209
2970
Existing brickwork to be made good & any additional brickwork to be matched with existing bricks or reclaimed to match existing.
Existing slate roof with additional slates where required to match existing.
Glass Roof
All new windows to be wood with paint finish colour tbc.
All new doors to be wood with paint finish colour tbc.
Existing opening
Existing door
PLANNING DRAWING
2 No. Rooflights
Garden Wall
Garden Wall
All dimensions are to be verified on site
Garden Wall 3000
3000
3162
3000
Existing door to be blocked up
Existing brick columns
New timber cladding
RWRW
RW
RW
SVP
FW to connect to existingTreatment facility
SW to discharge into 1m³ soakaway minimum 5m away from dwelling
RW RW
GROUND FLOOR To meet min U value required of 0.22 W/m²KSolid ground floor to consist of 150mm consolidated well-compacted hardcore. Blinded with 50mm sand blinding. Provide a 1200 gauge polythene DPM, DPM to be lapped in with DPC in walls. Floor to be insulated over DPM with 125mm Jablite insulation.25mm insulation to continue around floor perimeters to avoid thermal bridging. A VCL should be laid over the insulation boards and turned up 100mm at room perimeters behind the skirting, all joints to be lapped 150mm and sealed, provide 100mm ST2 or Gen2 ground bearing slab concrete mix to conform to BS 8500-2 over VCL. Finish with 65mm sand/cement finishing screed. Where drain runs pass under new floor, provide A142 mesh 1.0m wide within bottom of slab min 50mm concrete cover over length of drain.Where existing suspended timber floor air bricks are covered by new extension, ensure cross-ventilation is maintained by connecting to 100mm dia UPVC pipes to terminate at new 65mm x 215mm air bricks built into new cavity wall with 100mm concrete cover laid under the extension. Ducts to be sleeved through cavity with cavity tray over.
Section
Steel Purlin
RW RW
ROOF Concrete interlocking roof tile to BS550 on 50 x 25mm SW battens on Tyvek breathable roofing felt on 200 x 50mm timber joists @ 400mm cts.All wallplates to be 100 x 75mm timber section fixed to brickwork with 30 x 6mm Galvanised ms straps @ 2000mm cts Max. All verge & eaves tiles to be clipped & 50% of remainder.Roof viod to be cross ventilated using continuous eaves vents ‘Glidevale’ orsimilar & Marley ridge vent system.Provide double joist trimmers adjacent to all velux rooflights.
CEILINGS150 x 50mm timber joist @ 400mm cts, finish with 9.5mm plasterboard and skim finish.
Section
Ridge
Vaulted Roof
Stud wall
1 2 3 4 50
SCALE IN METRES 1:50