Transcript of Scaffolding Code of Practice 2009 - WorkSafe Queensland Scaffolding Code of Practice 2009 (PN11186)

  • Scaffolding Code of Practice 2009 (PN11186) Page 1 of 56

    Scaffolding

    Code of Practice 2009

  • Scaffolding Code of Practice 2009 (PN11186) Page 2 of 56

    This Queensland code of practice was preserved as a code of practice under section 284

    of the Work Health and Safety Act 2011.

    This code was varied by the Minister for Education and Industrial Relations on 27

    November 2011 and published in the Queensland Government Gazette on 2 December

    2011.

    This preserved code commenced on 1 January 2012.

    This code was varied by the Minister for Education and Industrial Relations on 1 July 2018.

    PN11186

    © The State of Queensland 2018

    Copyright protects this document. The State of Queensland has no objection to this material being reproduced, but asserts its right to be recognised as author of the original material and the right to have the material unaltered.

    The material presented in this publication is distributed by the Queensland Government as an information source only. The State of Queensland makes no statements, representations, or warranties about the accuracy or completeness of the information contained in this publication, and the reader should not rely on it. The Queensland Government disclaims all responsibility and all liability (including, without limitation, liability in negligence) for all expenses, losses, damages and costs you might incur as a result of the information being inaccurate or incomplete in any way, and for any reason.

  • Scaffolding Code of Practice 2009 (PN11186) Page 3 of 56

    Contents 1. Introduction ....................................................................................................... 5

    2. Training and competency ................................................................................. 6

    2.1 WHS occupational licences ........................................................................... 6

    2.2 Competent persons ....................................................................................... 6

    2.3 Trainees ......................................................................................................... 6

    3. Planning for scaffold work ............................................................................... 7

    3.1 Planning construction activities ...................................................................... 7

    3.1.1 Scaffold plan ............................................................................................ 7

    4. Hazards .............................................................................................................. 7

    4.1 Work near powerlines .................................................................................... 8

    4.2 Mobile plant and traffic ................................................................................... 8

    4.3 Mixing and matching scaffold components .................................................... 8

    4.4 Falls from height ............................................................................................ 9

    4.5 Falling objects ................................................................................................ 9

    4.6 Scaffold collapse .......................................................................................... 10

    4.7 Manual tasks................................................................................................ 10

    4.7.1 Examples of design controls .................................................................. 10

    4.7.2 Examples of administrative controls ....................................................... 10

    5. General design ................................................................................................ 11

    5.1 Design principles ......................................................................................... 11

    5.2 Basis of design ............................................................................................ 11

    5.3 Foundations ................................................................................................. 11

    5.3.1 Ground conditions .................................................................................. 11

    5.3.2 Loadings................................................................................................. 11

    5.4 Supporting structure .................................................................................... 13

    5.4.1 Soleboards and baseplates .................................................................... 13

    5.5 Stability ........................................................................................................ 14

    5.6 Tying ............................................................................................................ 14

    5.7 Working platforms ........................................................................................ 15

    5.8 Fall arresting platforms ................................................................................ 16

    5.9 Edge protection ............................................................................................ 16

    5.10 Access and egress .................................................................................... 16

    5.10.1 Ladders ................................................................................................ 17

    5.11 Perimeter containment screening .............................................................. 17

    6. Erecting or dismantling scaffold .................................................................... 18

    6.1 Risk of a fall at any height ............................................................................ 18

    6.2 Additional safe work practices ..................................................................... 19

    6.2.1 Safe dismantling of scaffolding ............................................................... 19

    6.2.2 Scaffold alteration .................................................................................. 19

    6.2.3 Fall-arrest systems ................................................................................. 20

    7. Types of scaffold ............................................................................................. 20

    7.1 Independent scaffold ................................................................................... 21

    7.1.1 Birdcage scaffold .................................................................................... 21

    7.1.2 Tower scaffold ........................................................................................ 21

    7.1.3 Mobile scaffold ....................................................................................... 22

    7.1.4 Hung scaffold ......................................................................................... 23

    7.2 Single pole scaffold ...................................................................................... 23

  • Scaffolding Code of Practice 2009 (PN11186) Page 4 of 56

    7.3 Suspended (swing-stage) scaffold ............................................................... 23

    7.3.1 Design issues ......................................................................................... 24

    7.4 Special scaffolds .......................................................................................... 26

    7.4.1 Cantilever scaffold .................................................................................. 26

    7.4.2 Hanging bracket scaffold ........................................................................ 26

    7.4.3 Spur scaffold .......................................................................................... 27

    7.5 Scaffolding for demolition work .................................................................... 27

    8. Inspection and maintenance procedures ...................................................... 28

    8.1 Frequency of inspection ............................................................................... 28

    8.2 Structural inspection .................................................................................... 28

    8.3 Hand over inspections ................................................................................. 28

    Appendix 1 – Dictionary ..................................................................................... 29

    Appendix 2 – Inspection checklist ..................................................................... 32

    Appendix 3 – Published technical standards ................................................... 34

    Appendix 4 – Scaffold handover certificate: Scaffold over 4 metres ............. 35

    Appendix 5 – Compliance pack for swing-stage scaffold ............................... 37

    Swing stage advice ............................................................................................ 38

    A5.1 Equipment supply advice ........................................................................ 38

    A5.2 Scaffold environment advice ................................................................... 39

    A5.3 Installation design advice ........................................................................ 40

    A5.4 Scaffold erection advice .........................