Scaffold Inspection Register
Transcript of Scaffold Inspection Register
![Page 1: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/1.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 01.02.18 @ 14.20 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 2: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/2.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 02.01.18 @ 13.10 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 3: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/3.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 02.11.2017 @ 15.15 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 4: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/4.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 04.01.18 @ 14.32 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 5: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/5.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 04.05.2017 @ 10.45 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 6: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/6.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 04.08.2017 @ 13.00 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 7: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/7.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 06.04.2017 @ 10.30 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 8: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/8.jpg)
![Page 9: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/9.jpg)
![Page 10: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/10.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 07.09.2017 @ 13.30 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 11: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/11.jpg)
![Page 12: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/12.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 08.06.2017 @ 11.20 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 13: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/13.jpg)
![Page 14: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/14.jpg)
![Page 15: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/15.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 12.10.2017 @ 14.25 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 16: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/16.jpg)
![Page 17: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/17.jpg)
![Page 18: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/18.jpg)
![Page 19: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/19.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 15.05.2017 @ 11.45 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 20: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/20.jpg)
![Page 21: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/21.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 17.08.2017 @ 13.15 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 22: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/22.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 19.10.2017 @ 15.40 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 23: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/23.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 20.04.2017 @ 14.40 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 24: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/24.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 20.07.2017 @ 13.00pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 25: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/25.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 21.12.2017 @ 14.45 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 26: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/26.jpg)
![Page 27: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/27.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 23.03.2017 @ 12.25 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 28: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/28.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 24.08.2017 @ 13.30 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 29: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/29.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 25.04.2017 @ 11.00 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 30: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/30.jpg)
![Page 31: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/31.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 27.07.2017 @ 12.20 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 32: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/32.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 28.09.2017 @ 14.30 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 33: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/33.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 29.06.2017 @ 13.30 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 34: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/34.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 31.08.2017 @ 13.15 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 35: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/35.jpg)
![Page 36: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/36.jpg)
![Page 37: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/37.jpg)
![Page 38: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/38.jpg)
![Page 39: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/39.jpg)
![Page 40: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/40.jpg)
![Page 41: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/41.jpg)
![Page 42: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/42.jpg)
![Page 43: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/43.jpg)
![Page 44: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/44.jpg)
![Page 45: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/45.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 05.01.2017 @ 10.30 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 46: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/46.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 02.02.2017 @ 11.15 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 47: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/47.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 09.02.2017 @ 09.40 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 48: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/48.jpg)
![Page 49: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/49.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 12.01.2017 @ 13.00 pm
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y
![Page 50: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/50.jpg)
![Page 51: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/51.jpg)
![Page 52: Scaffold Inspection Register](https://reader033.fdocuments.net/reader033/viewer/2022052805/628f4c7120ee716967171dcb/html5/thumbnails/52.jpg)
Scaffold Inspection Register
Name of person inspecting:
Date/time: 26.01.2017 @ 11.25 am
Name and address of Contractor Osborne’s: Liphook station
Description /location of Scaffold being inspected: Support scaffolds to platform staircases
Answer Y, N or N/A: Base sound avoiding drains and services
Boards adequately supported by transoms
Double guardrails and toeboards fitted
Sole boards correct size, free from cracks, firm and level
Boards free from defects including notches and paint
Brickguards fitted where materials Are to be stored/stacked on platform
Standards correctly spaced, plumb, true and joints staggered
Board overhang not more than 150mm on Transoms for standard 38mmboard
Debris netting/Monarflex sheeting Fixed correctly.
Ledgers level, true & joints staggered
Work platform sufficient width & Not overloaded.
Ladders free from defects and adequately tied
Ledgers braced at alternate standards. Facade bracing installed
Ties correctly spaced, fitted & a percentage tested.
Handing over certificate issued/ Scafftag fitted.
Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use
Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.
Scaffold secure against adverse weather e.g. boards secured down
Record of any defects: none @ time of inspection . Can work be carried out safely?
If No- Name of person reported to-
Action taken
Date corrected:
Signature of Inspector:
H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by
Y
Y
Y
Y
Y
N/A
Y
Y
Y
N/A
N/A
N/A
Y
N/A
N/A
N/A
N/A
Y
Y