SC23.ME.rfa.MS.ac.121.2-Chilled Water Piping & Fitting
-
Upload
cuongphubon -
Category
Documents
-
view
78 -
download
16
description
Transcript of SC23.ME.rfa.MS.ac.121.2-Chilled Water Piping & Fitting
-
2. PRODUCT CATALOGUE
-
ADMINPolygon
-
ADMINPolygon
-
ADMINRectangle
ADMINRectangle
ADMINRectangle
ADMINRectangle
ADMINStamp
ADMINStamp
ADMINStamp
ADMINStamp
-
1
-
2
-
3
-
4
-
5
-
6
ADMINStamp
ADMINPolygon
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
3. APPENDIX
-
CONTENT
+THEBREAKDOWNCONFIRMATION/CLARIFICATIONONCONTRACTSPECIFICATION
+COMPARISIONSHEET(N/A)
+TESTCERTIFICATES
+COMPANYPROFILE
-
+THEBREAKDOWNCONFIRMATION/CLARIFICATIONONCONTRACTSPECIFICATION
-
SECTION 11 PIPEWORK AND FITTINGS
MC 11 NG NG V PH KIN
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/1
GENERAL
11.1 DESCRIPTION
This Section specifies the pipework and fittings for the various systems which shall form part of the Works as shown on the Sub-Contract Drawings.
Unless specifically stated otherwise, the terms "pipework and fittings" or "pipes and fittings", when used in a general context, shall mean all pipework, fittings, valves, gauges, strainers, hangers, supports and all other components and accessories required for the complete installation of the system as shown on the Sub-Contract Drawings.
11.2 MANUFACTURE
All pipework and fittings of the same material shall be supplied by a single manufacturer to ensure uniformity of standards and composition between services installations. Pipework and fittings employed throughout this project shall be of EEC, North American or Japanese origin.
All pipework delivered to site shall be new and shall be colour banded at the factory to identify different grades, materials and manufacturers. Mill certificate shall be submitted before delivery of each batch of pipework to site, these shall certify the standards of the manufacture and testing.
11.3 SELECTION
All valves for isolation and regulation shall be the product of a single manufacturer.
All pipework fittings, accessories, joints and joining media used shall be suitable for the substance conveyed in the pipes and shall not deteriorate due to chemical or atmospheric action.
All pipework, fittings and valves must be suitable for the system test pressures.
11.4 STANDARDS
All pipework and fittings shall comply with the appropriate British Standard as listed in the
TNG QUT
11.1 M T
Chng ny m t nhng c im ca ng ng v ph kin cho nhng h thng khc nhau l phn cng vic c th hin trn bn v thi cng.
Ngai tr cc iu kin c bit khc, cm t ng ng v ph kin hay ng v ph kin s dng mt ni dung tng qut c ngha l tt c ng ng, ph kin, van, ng h, lc, treo ng, ng v tt c cc b phn lin quan khc bo m cho vic lp t han chnh h thng nh th hin trn bn v thi cng.
11.2 NH SN XUT
Tt c ng ng v ph kin ca cng mt vt liu phi c cung cp ch mt nh sn xut bo m cho vic thng nht v tiu chun v cc b phn trong cng tc lp t. ng v ph kin c dng cho d n ny phi c ngun gc t Chu u, Bc M hay Nht Bn.
Tt c ng ng c vn chuyn n cng trng phi mi v c nh du mu khi cn nh my phn bit s khc nhau gia cc lai ng, vt liu v nh sn xut. Giy chng nhn kh nng chu ti ca ng phi c trnh trc khi cung cp tng t ng n cng trng, chng phi c xc nhn ng tiu chun ca nh ch to v kim tra.
11.3 S LA CHN
Tt c van cch ly v iu chnh u phi l sn phm ca cng 1 nh sn xut.
Tt c ph tng, ph kin, mi ni v mt ni ng ng c dng phi bo m thch hp vi cht lng vn chuyn trong ng v khng b h hng bi tc ng ca ha cht v khng kh.
Tt c ng ng, ph kin v van phi thch hp cho vic kim tra p sut
11.4 TIU CHUN
Tt c ng ng v ph kin phi tun theo tiu chun ca Anh nh lit k trong bng tng
ADMINText BoxComply with uPVC apply for condensate drainage shall be De Nhat - VietNam Origin
ADMINLine
ADMINText BoxComply
ADMINLine
ADMINText BoxComply with BS 1387 class M, ASTM A53 Sch20 grade B
ADMINLine
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/2
relevant Table of this Section.
All personnel engaged on welding operations must possess a current certificate of competence issued by an approved authority. These certificates must be produced for inspection by the Engineer before any welding is undertaken and renewal certificates must be provided every six months.
Each weld shall be given a suitable mark in order that the operative concerned may be identified. This will be rigidly enforced.
The Engineer reserves the right to order at random the cutting out of 2% of the welded joints for inspection and testing. Should any one of the above welds prove faulty in materials or workmanship, further removal of welds may be ordered up to a total of 4% of the welded joints. If the number of welds failing the tests within the above 4% is sufficient to suggest that an operative is not consistent in his standard, the Engineer may order any number of that operative's welds to be removed. The cutting out and repair of all such welds for inspection shall be at the cost of the Sub-Contractor.
Oxy-acetylene and metal arc welding of steel pipework shall be Class 2 to B.S. 2640, B.S. 2971 or B.S. 4515.
Fusion welded joints in copper shall be to B.S. 1077 and bronze welding by gas shall comply in every respect with B.S. 1724.
Gas welding of steel pipework of 65mm and above shall not be permitted unless prior permission is obtained.
Welding shall not be permitted on galvanized pipework under any circumstances.
No locally made ductile iron pipework, flanges or fittings will be accepted.
Generally, all ferrous piping systems shall comply with B.S. 806.
All screwed joints shall be made in compliance with B.S. 21 using jointing compounds carefully selected to suit the type of service.
ng ca chng ny.
Tt c cng nhn hn phi c giy chng nhn tay ngh do mt c quan c thm quyn cp. Cc giy chng nhn ny phi c trnh cho Qun l K thut kim tra trc khi tin hnh bt c cng tc hn no v phi lun c gia hn mi 6 thng.
Tng mi hn phi c nh du thch hp c th nhn ra nhng thng tin lin quan. l s bt buc khng c ngai l.
Qun l K thut d tr ct khan 2% mi hn xem xt v kim tra. Nu c bt c mt mi hn no b li do vt liu hay tay ngh, Qun l K thut c th yu cu ct thm s lng mi hn ln n 4% kim tra. Nu c trn 4% s lng mi hn ct kim tra khng t tiu chun th Qun l K thut c th yu cu ct tip bt k cc mi hn khc kim tra m khng b hn ch v s lng. Nh thu phi chu tt c chi ph lin quan n vic ct v sa cha kim tra cc mi hn trn.
ng thp hn gi v hn in phi theo tiu chun typ 2 B.S. 2640, B.S. 2971 hoc B.S. 4515.
Cc mi hn ng nng chy phi theo tiu chun B.S. 1077 v hn ng thic bng gas phi tun theo tiu chun B.S. 1724.
Khng c hn gas i vi ng thp c ng knh ln hn hoc bng 65mm tr khi c cho php trc.
Trong bt c trng hp no cng khng c hn ng trng km.
Khng chp nhn s dng cc lai ng, mt bch, hay ph kin lm bng st mm ti ni a.
Ni chung, tt c h thng ng st phi tun theo tiu chun B.S. 806
Tt c mi ni bng ren phi c thc hin tun theo tiu chun B.S. 21 dng ni cc thnh phn c chn la cn thn ph hp vi cng vic.
Tt c mi ni mt bch phi tun theo tiu chun
ADMINText BoxComply
ADMINLine
ADMINText BoxComply to local regulation
ADMINLine
ADMINText BoxComply
ADMINLine
ADMINLine
ADMINText BoxNot comply, welding shall be proposed to joint pipework for pipe sise above 50A
ADMINText BoxComply
ADMINLine
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/3
All flanged joints shall be made in compliance with B.S. 4505 and all fittings valves etc. shall be compatible with sub flanges. Flanges shall have raised faces and a uniformity of flanges shall be employed between each service installation. All pipework, fittings and plant flanges shall be PN16 type unless otherwise stated or required by the system pressures.
All capillary fitting shall comply with B.S. 864.
All pipework, fittings and valves shall be of the approved by the Relevant Authorities
11.5 MATERIALS
Table 11.1 lists the material classes for the various piped services forming part of the Works. These classes are referred to in the various Tables of standards and specifications used in this Section.
Table 11.2 lists the materials specifications for the various classes of pipework.
EQUIPMENT
11.6 JOINT AND JOINTING
Table 11.3 lists the joints and jointing materials to be used on straight runs of pipework for the various classes of pipework. No hemp shall be used for jointing.
Table 11.4 lists the joints and jointing materials to be used for connections to items of equipment and adjacent to valves, strainers and other pipeline accessories. In addition, sufficient joints of this type shall be provided in all plant rooms to ensure that access to equipment for maintenance, removal and replacement can be effected without dismantling large sections of pipework or adjacent plant.
Table 11.5 lists the type of flanges and method of attachment for use where flanged joints or connections are specified.
Where pipework is connected to items of equipment having flanges of a dissimilar metal to the pipework, then isolating flanges of a proprietary brand shall be used with plastic bolt inserts.
B.S. 4505 v tt c ph kin van,... vv, cng phi tng thch vi cc mt bch. Cc mt bch phi c mt p ni v cc mt bch phi ng nht vi nhau gia cc ph kin lp t. Tt c ng ng, ph kin v mt bch phi l loi PN16 ngai tr cc trng hp c yu cu khc v p sut ca h thng.
Tt c ph kin ca ng ng dn phi tun theo tiu chun B.S. 864, phn 2.
Tt c ng ng, ph kin v van phi theo cc quy nh ca c quan c thm quyn.
11.5 VT LIU
Bng 11.1 cho bit cc lai vt liu dng cho tng lai ng khc nhau ng vi cc cng vic khc nhau. Cc lai vt liu ny c tham kho trong nhiu bng tiu chun khc nhau v c im k thut ca phn ny.
Bng 11.2 lit k cc thng s vt liu ng vi tng lai ng khc nhau
THIT B
11.6 MI NI
Bng 11.3 lit k cc vt liu ca mi ni s dng cho ng ng thng ca nhiu lai ng khc nhau. Khng dng si gai du cho mi ni
Bng 11.4 lit k cc vt liu dng ni n cc b phn ca thit b v cc van lin k, b lc v cc ph kin ng ng khc. Ngai ra, cc mi ni thch hp s c cung cp bn trong cc phng my bo m cc thit b c th c bo tr, tho lp hay thay th m kng cn tho phn ln cc ng ng hay cc h thng lin k.
Bng 11.5 lit k cc lai mt bch v phng php lp t km theo dng cho cc mi ni mt bch theo quy nh.
ch tip gip gia ng v thit b c dng cc mt bch lm bng kim lai khc vi ng th phi dng cc mt bch ca cng mt nhn hiu vi cc bulong bng plastic.
ADMINLine
ADMINLine
ADMINText BoxRefer to marking comply in those Table
ADMINText BoxRefer to marking comply in this Table
ADMINLine
ADMINLine
ADMINText BoxDepend on equipment manufacture' s Std connection
ADMINText BoxComply
ADMINText BoxRefer to marking comply in those Tables
ADMINText BoxSteel bolt inserts shall be used
ADMINLine
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/4
11.7 FITTINGS
Table 11.6 lists the type of fittings which shall be used with the various classes of pipework.
Long sweep bends shall be used in preference to round elbows wherever practicable. Square elbows or lobster backed bends shall not be used.
Tees shall be of the easy sweep or twin elbow pattern except where square tees are required for venting or draining, etc.
Bushes shall not be used and where a reduction in pipe size is required, reducing sockets or tees shall be used. Eccentric reducing sockets shall be used wherever necessary to ensure proper drainage or elimination of air pockets.
11.8 SUPPORTS
Table 11.7 lists the maximum allowable spacings of support centres for the various classes of pipework.
Pipe supports shall be provided as required for the stable and sufficient support of the pipework as per BS3974 Part l and 2.
Pipe supports shall allow free movement for expansion and contraction and shall be graded to required levels for air elimination and drainage.
To ensure free movement, proprietary PTFE slide bearing pads shall be provided, either welded or screwed to the support member.
Ferrous pipes shall have ferrous brackets and copper pipes shall have brass or gunmetal brackets. For ferrous pipework the pipe brackets shall be hot dip galvanised after manufacture.
Additional supports shall be provided adjacent to mixing valves and every turn of the pipework, and other large pipeline mounted items to prevent undue strain on adjoining pipework. Additional supports shall also be provided adjacent to pump connections, etc., to prevent undue strain on plant.
11.9 AIR VENTS
Key operated air vent cocks of an adequate size
11.7 PH KIN.
Bng 11.6 lit k cc loi ph kin s c dng cho nhiu lai ng ng khc nhau.
Cc co c bn knh cong di s c dng nhiu hn cc co trn nhng v tr thch hp. Cc co vung hoc gp khc s khng c s dng.
T cong hay dng co i thng c dng ngai tr nhng v tr i hi T vung cho ng thng hi hay that nc.
ng lt s khng c dng nhng v tr kch thc ng ng gim, phi dng ni gim hay T gim. Ni gim lch tm phi c dng nhng v tr cn thit m bo nc thot c hay lai tr c bt kh.
11.8 GA
Bng 11.7 lit k cc khang cch cho php ti a gia cc tm gi cho cc lai ng khc nhau
Gi ng s c cung cp phi t yu cu kh nng ng ng n nh v chc chn theo tiu chun BS 3974, phn 1 v 2.
Gi ng phi cho php s co gin di chuyn t do v phi c dc theo mc yu cu loi tr bt kh v d thot nc.
bo m s di chuyn c t do, cc tm trt dng bc n ca PTFE s c cung cp, c th hn hay bt vt vo gi
Cc ng thp th c v bc ng bng thp v ng ng th c v bc bng ng thau hoc kim lai nng sng (gun-metal). i vi ng thp, v bc ng s c nhng km nng sau khi ch to.
Cc gi b sung s c t st bn cc van v t vo u cui ng cp nc, v.v.., v lp vo cc ng ng ln ngn cng qu mc ca cc ng k tip. Gi b sung cng s c lp st bn u ni ca bm,..vv ngn chn cng qu mc ln bm.
11.9 S THNG HI
Cc van x kh c kch thc thch hp s c lp
ADMINLine
ADMINText BoxN/A
ADMINLine
ADMINText BoxRefer to ACMV shop drw
ADMINText BoxRefer to marking comply in this Table
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/5
shall be provided at all high points on water supply pipework.
11.10 DRAIN POINTS
Adequately size key operated drain cocks shall be provided at all low points on liquid circulation Systems.
11.11 PIPELINE STRAINERS
Water strainers shall be installed in all pipelines upstream of all plant and elsewhere as indicated on the Sub-Contract Drawings.
For pipelines of nominal bores between 15mm and 50mm inclusive strainers shall be screwed gunmetal or bronze body 'Y' type with stainless steel screen.
For pipelines of nominal bores from 65mm and above, strainers shall be flanged to B.S. 4504 to the appropriate Table for the material with 'Y' type bronze body, stainless steel screen.
For condenser water pipelines of 65mm and above strainers shall be flanged to BS 4504. The material for the strainer shall be of the Basket type with Cast Iron Body and top access remove.
11.12 VALVES
Valves for the various classes of pipework shall be as indicated in the following Tables:
Table 11.8 - Isolating Valves.
Table 11.9 - Regulating Valves.
Table 11.10 - Check Valves.
Table 11.11 - Drain Cocks.
Table 11.12 - Strainers
Table 11.13 - Vent Cocks
The Tables listed are included for the guidance of the Sub-Contractor in selecting suitable types of valves for a particular service and pressures listed.
The Sub-Contractor shall include for all valves
cc im cao trn h cp nc d c c th hin trn bn v hay khng.
11.10 IM X
Van x nc c kch thc thch hp s c cung cp ti im thp nht trn h thng ng x nc cho h thng d c th hin trn bn v hay khng.
11.11 B LC NG NG
B lc nc s c lp trn tt c ng ng i vo tt c cc thit b v cc v tr nh th hin trn bn v thi cng.
i vi ng ng c ng knh danh ngha t 15mm n 50mm, b lc s c v bng ng thit hay kim loi nng sng (gunmetal) kiu ch Y ni ren vi li lc bng i-nox
i vi ng ng c ng knh danh ngha t 65mm v ln hn, b lc s c kiu ni mt bch theo tiu chun B.S 4504 thch hp vi bng vt liu vi thn bng ng thau kiu ch Y, li lc bng inox.
i vi ng ng nc ngng t c ng knh t 65mm tr ln b lc s c kiu ni mt bch theo tiu chun B.S 4504. Vt liu ca b lc s theo gi (Basket) vi thn bng gang c np m ra c.
11.12 VAN
Van cho cc loi ng khc nhau c nu r trong bng sau:
Bng 11.8 - Van cch ly
Bng 11.9 - Van iu chnh
Bng 11.10 - Van mt chiu
Bng 11.11 - Vi x
Bng 11.12 - B lc
Bng 11.13 - Vi thng hi
Cc bng lit k hng dn Nh thu trong vic chn loi van thch hp cho lp t v p sut cho php trong ng ng.
Nh thu s cung cp tt c cc van cn thit cho
ADMINText BoxRefer to ACMV shop drw
ADMINLine
ADMINText BoxN/A
ADMINLine
ADMINText BoxN/A
ADMINLine
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/6
necessary for the proper completion, working, isolation, regulation and control of the installations.
All valves shall be of heavy Duty type with bodies and seats suitable for the working hydraulic and test pressures and installed with the valve stems truly vertical or horizontal.
Where flanged valves, etc., are specified, details of flanges shall correspond to the appropriate specification. Valve flanges and counter flanges shall be to the same British Standard and a common flange type and rating shall be employed throughout this Sub-Contract except where system pressures required flanges rated higher than PNl6.
In addition to pressure gauge locations, gunmetal test cocks 10mm or 15mm size shall be fitted on incoming and outgoing pipes for testing.
Valves of 150mm diameter and above located 2,200mm or more above floor level within plant rooms shall have a chain operating gear descending to 1,000mm above floor level.
Plugs for gland cocks shall be ground-in. A loose key of forged mild steel shall be provided with each gland cock.
Air cocks shall be nickel-plated, of the Spoutless pattern and with screwed taper thread. At least two loose keys shall be provided for each installation.
Balancing valve: All types of balancing valve must be selected in the consideration of the operation and pressure drop of all the system, balancing valve and control valve must be selected together to get valve authority at least 0.25 for modulating. Can combine manual balancing valve and control valve to one valve. Control valve and balancing must not be selected individually. Basing on the latest approved piping layout shop-drawings, and water pressure drop through the coil of FCU/AHU/PAU, the contractor to submit the calculation to show:
Control - Balancing Valve selection.
The pre-setting of each control - balancing valve.
The pressure drop through each control - balancing valve.
Minimum differential pressure need to
vic hon tt ph hp vn hnh, cch ly, iu chnh v kim sot ca cng vic lp t.
Tt c cc van phi l loi dy ph hp vi p sut thu lc h thng hot ng v p lc khi th h thng ng ng v lp van phi tht thng ng hay ngang bng.
ni mt bch van,..vv, c nh r, chi tit ca mt bch phi ph hp vi ch dn k thut. Mt bch ca van v mt bch lp cng phi cng tiu chun Anh, v l loi mt bch thng dng s c dng theo trong cc danh mc ca hp ng ngai tr nhng ni p lc ca h thng yu cu nhng mt bch c gii hn cao hn PN16.
Thm vo v tr ng h p sut, van kim tra vi kch c ng ng 10mm hoc 15mm s c lp trn ng ht v y kim tra.
Van c ng knh t 150mm tr ln t cao 2.200mm hoc cao hn so vi mt sn trong phng my phi c 1 hp chuyn ng vn hng bng dy xch, thng xung n 1.000mm trn mc sn.
u ng phi c bt vo vi ga. Mi vi ga phi c mt tay kho bng loi forged mild steel thp ren mm.
Van x kh phi c m nikel, L lai khng c vi (Spoutless) vi trc vt iu chnh. t nht 2 tay kha s c cung cp lp t cho tng thit b.
Van cn bng: Tt c cc loi van cn bng phi c la chn da trn hot ng v tn tht p ca ton h thng, van cn bng v van iu khin phi c la chn cng nhau m bo h s iu khin ti thiu l 0.25 cho chc nng iu khin v cp. C th kt hp van cn bng v van iu khin thnh mt van duy nht.Van iu khin v van cn bng khng c la chn c lp. Da trn bn v thi cng mt bng ng ng c ph duyt bi nh t vn, h s KVS ca van iu khin v tn tht p qua dn trao i nhit ca FCU/AHU/PAU, nh thu trnh bn tnh ton th hin:
La chn van cn bng v van iu khin.
st ban u ca van cn bng.
Tn tht p sut qua van cn bng, van iu khin.
Chnh p ti thiu cc nhnh FCU,
ADMINText BoxN/A
ADMINLine
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/7
be at each branch of FCU/PAU/AHU. If the modulating control valve is
applied, contractor submits the minimum valve authority.
Pressure drop of each section of pipe system.
Minimum pump head required for the system.
Table of combination of balancing valve, control valve, diffrential pressure control valve:
Plant room Distribution
Chiller
Coolin
g
Tower
Heat
exchange
r
Branch
PAU,
AHU,
FCU
(1) (1)
(1) and
(3) and
(2)
(1)
(1) and
(3) and
(2)
(1)
and
(2)
Option1:
(4) -
Preferre
d
Option2:
(1) and
(3) - if
supplier
cannot
supply
option 1
N/A
(1) and
(3) and
(2)
(1): Manual balancing valve. (2): Differential pressure control valve. (3):Control valve with independent EQM characteristics. (4): Combined control and balancing valve with independent EQM characteristics.
11.13 PRESSURE GAUGES
Pressure gauges shall be of Bourdon type with brass syphon and cock, and piping connection to the measuring point; size to be 100mm diameter dial, conforming to B.S. 1780. All gauges shall have black pointer, red over run indicators, and red mark at normal working pressure.
The pressure gauges shall be of the order of 150% of the known working pressure expected at the tapping point, disregarding any hydrostatic
AHU, PAU. Nu h thng l iu khin v cp, nh
thu trnh h s iu khin nh nht cho tt c cc van iu khin.
Tn tht p ca tt c cc on ng ng.
Ct p ti thiu ca bm.
BN B TR KT HP VAN CN BNG TAY, VAN IU KHIN V VAN KIM SOT CHNH P:
Phng my H thng phn phi
Chiller
Thp gii nhit
B trao i nhit
Nhnh PAU, AHU, FCU
(1) (1) (1) v (3) v (2)
(1) (1) v (3) v (2)
(1) v (2)
La chn 1: (4) u tin
La chn 2: (1) v (3) Nu la chn 1 khng c nh cung cp
N/A (1) v (3) v (2)
(1): Van cn bng tay. (2): Van kim sot chnh p. (3): Van iu khin c c tnh EQM c lp.
(4): Van iu khin v cn bng kt hp c c tnh EQM c lp.
11.13 NG H P LC
p k kiu Bourdon gm siphon, van cock v ng cong bng ng thau ni n im o, ng knh mt ng h 100mm, theo tiu chun B.S 1780. Tt c cc ng h c kim en, chy vng quanh, du hiu mu ch p sut lm vic bnh thng v tnh theo kil pascal (kpa).
p k phi c p sut bng 150% p sut lm vic ln nht ti im lp t, bt chp p sut th thu lc no nh ch nh trong phn Th nghim v
ADMINText BoxN/A
ADMINLine
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/8
pressure as specified in the "Testing and Operation" Section. Pressure gauges shall have scales with divisions not exceeding 0.5 bar and a minimum scale value of 2,500 kPa.
Pressure gauges shall be mounted directly on pipework and shall be labelled as specified elsewhere.
An isolating valve/cock shall be provided for each pressure gauge.
Pressure gauges shall be installed where shown on the Drawings; and whether shown on the Sub-Contract Drawings or not, in the flows and returns connection of all pumps and chillers.
INSTALLATION
11.14 GENERAL
The Sub-Contractor shall provide all labour and material to form complete pipework systems and shall leave the installation adjusted to the designed flow rates.
All pipe runs shall be installed generally in accordance with the Sub-Contract Drawings but full allowance shall be made by the Sub-Contractor for the detailed development and co-ordination of the scheme and for the future removal and dismantling of sections of the Sub-Contract Works.
All pipework shall be free from burrs, rust and scale and shall be thoroughly cleaned before installation.
During the course of the installation, all open ends shall be plugged or capped to prevent ingress of dirt and on completion each system shall be thoroughly flushed out with clean water. Wooden bungs shall not be used for plugging pipework.
Where two or more pipe runs follow the same route, care shall be taken to ensure that all are parallel to each other and to the building structure, except for the required allowance for venting, etc. Pipework which is to be subsequently insulated shall be so spaced to allow an individual finish to each.
Air relief valve shall be provided at all high points where venting may be required, whether shown on
Vn hnh. p k c vch chia ca thang o khng vt qu 0.5 bar v gi tr thang o thp nht phi l 2,500 KPa.
p k c lp trc tip vo ng v c dn nhn theo yu cu.
Van cch ly s c lp cho mi p k.
p k s c lp nhng v tr c th hin trn bn v, cho d c hay khng th hin trn bn v thi cng ti im u ni ng ht v ng y cho cc bm v chiller.
LP T
11.14 TNG QUT
Nh thu ph s cung cp nhn cng v vt t hon tt h thng ng ng v iu chnh h thng theo lu lng thit k.
Tt c cc tuyn ng ni chung s c lp theo bn v thi cng nhng nh thu c tan quyn trin khai chi tit v k hach phi hp trn cng trng trong phn tho d v thu dn trong tng lai ca phn cng vic trong hp ng.
Tt c ng s c bo qun khng b r, r st v cu cn v ng s c v sinh hon ton trc khi lp t.
Trong sut thi gian lp t, tt c u h s c bt hoc y li ngn chn cht bn v trong qu trnh hon tt, mi h thng s c sc bng nc sch. Cc nt g khng c dng bt ng ng.
ni c 2 hoc nhiu ng i theo cng mt ng, ch cn chnh m bo tt c ng song song vi nhau v song song vi kt cu ca cao c, ngoi tr c yu cu cha cho thng hi, v.vSau ng c tch ri s cha khong trng cho php hon chnh ring bit mi ng.
Van x kh s c cung cp tt c cc im trn cao c yu cu x kh cho d chng c c th
ADMINText BoxN/A
ADMINLine
ADMINText BoxRefer to method for installation
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/9
drawings or not.
11.15 FALLS
Pipework shall be installed with correct falls to ensure adequate venting and draining.
11.16 JOINTS
Pipework installed for all particular type of joints are specifically called for in this section.
11.17 ANCHORS
No pipe joints shall be permitted within the thickness of walls or floors, etc.
Joints shall not be closer than 1.0m except where necessitated by fittings.
Anchors shall be positioned in association with pipework change in direction and propriety expansion compensators, etc., such as to absorb the stresses due to pipework expansion and internal pressures by transmission of such forces to the ground or structure at appropriate points.
The Sub-Contractor should particularly note that in addition to serving the purpose of constraining the pipeline, the anchors may be used in connection with testing of pipework, and at such times, it will be necessary to have the extreme ends of the main being tested held with the anchors to prevent the pipeline drawing apart due to the thrust pressures exerted at the end of the pipe.
Adequate pipe anchors shall be provided whether or not shown on the Drawings and shall be constructed from structural steel channel sections secured to the building structure.
11.18 GUIDES
Guides shall be of mild steel riders welded to the pipes on roller or PTFE sliding supports restrained with U-bolts on brackets or as otherwise detailed on the Drawings.
11.19 FLEXIBLE AND EXPANSION COUPLINGS
The couplings shall be arranged such that torsional, co-axial stress and lateral stress caused by expansion and/or settlement shall not be
hin trn bn v hay khng
11.15 DC
ng s c lp t vi dc chnh xc m bo thng hi v thot nc.
11.16 MI NI
H thng ng ng c lp t vi cc mi ni dng c bic c quy nh c th trong phn ny.
11.17 CHT NEO
Khng c mi ni ng no c php lp chm trong tng hoc sn.
Mi ni s khng gn hn 1.0m ngoi tr v tr cn cho cc ph kin.
Cht neo c b tr kt hp vi cc v tr thay i hng ng v b gin n mt cch thch hp, v.v hp gim bt lc cng do gin n ca ng v p sut bn trong bng cch truyn lc n mt t hoc kt cu nhng im thch hp.
Nh thu nn c bit lu rng ngoi mc ch gi ng ng, cht neo c th c s dng c lin quan n s kim tra ng ng, v vo thi im , cn thit c cc im cui cng ca phn chnh c th, c gi bng cht neo ngn chn mt phn tuyn ng b ko i do s tng mnh p sut v pha cui ca ng.
Cc cht neo thch hp s c cung cp cho d c c th hin trn bn v hay khng v s c cu to t cc kt cu st V c bt cht vo kt cu ca ta nh.
11.18 B HNG DN
B dn hng s l loi thp mm c hn vo ng trn trc ln hoc cc gi trt PTFE hm bng bulong-U ln v bc hoc theo chi tit trn bn v thi cng.
11.19 B NI MM V DN N
Cc mi ni s c b tr sao cho lc ng sut ng trc, xon v ng sut mt bn do s gin n v/hoc lng s khng c truyn n ni mt
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/10
transmitted to the flanged connections of the plant.
During sectional testing, the Sub-Contractor shall ensure that the expansion joints are adequately tied, anchored or removed to avoid damage to the bellows.
Wherever necessary, due allowance shall be made for the expansion and contraction of pipework by change in direction of pipework, or expansion loops, whether shown on the Sub-Contract Drawings or not.
At building expansion joints, and wherever else necessary, additional allowance shall be made by the provision of stainless steel axial or articulated bellows type expansion compensators complete with all necessary guides, etc., as recommended by the manufacturer to give a working life of not less than twenty years.
Each compensator shall maintain at least the same cross-sectional area as ajoining pipework for its entire length.
On larger diameter steel, ductile and grey iron pipes (150mm diameter and above) judicious use of "dresser" couplings or other equal flexible couplings shall be made in connection to all plant items.
Flexible couplings shall be fitted to pump suction and delivery connections and where indicated on the Sub-Contract Drawings or schematics.
Flexible couplings shall be line size, made from a multi-ply nylon fabric carcass with wire reinforced collars and stainless steel liners designed to suit the fluid conveyed and the working, test, and shock pressures that will be experienced in the various systems.
Manufacturers shall be alerted by the Sub-Contractor to the possibility of variations of service (e.g. on/off pump operation shock pressures, etc.) to ensure correct selection of items for the particular application.
11.20 PIPE SLEEVES
Where pipe pass through walls, floors, etc., the Sub-Contractor shall supply and install pipe sleeves.
bch ca my mc thit b.
Trong qu trnh th tng phn, Nh thu ph s m bo b ni gin n c ging, neo v di chuyn thch hp trnh lm tn hi n on ng nhng.
Bt k ch no cn phi c php co gin thay i hng ca ng hay cc vng gin n d c th hin trn bn v thi cng hay khng.
Ti cc mi ni gin n ca cao c, v bt k ni no khc, c php b sung b gin n kiu hng trc (axial) hay nhng (articulated bellows) bng i-nox vi tt c thanh dn cn thit, v.vtheo hng dn ca nh sn xut vi tui th lm vic khng t hn 20 nm.
Mi b b gin n phi t nht s gi nguyn din tch ngang nh cc ng lin k i vi tan b chiu di ca n.
Trn cc ng thp, ng gang mm v ng gang xm c ng knh ln (150mm hoc hn), s dng b ni c v bc (dresser) hoc cc b ni mm tng ng kt ni n tt c cc thit b my mc.
B ni mm c gn vo u ht v u y my bm v v tr th hin trn bn v
B ni mm c cng kch c, c ch to t vi nylon a si vi cc vng gia cng v cc lp lt gia c bng si kim loi c thit k thch hp vi cht cng tc v th nghim v p sut t bin (shock) s tri qua trn nhiu h thng khc nhau.
Nh thu ph s thng bo cho cc nh sn xut bit v kh nng thay i ca thit b (v d: p sut t bin khi vn hnh tt/m my bm, vv) m bo chn la ng loi cho ng dng ring.
11.20 NG LT
v tr ng chy xuyn qua tng , sn, v.v , Nh thu ph s cung cp v lp t cc ng lt.
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/11
Where pipes pass through walls, floors or ceilings rendered liquid-tight puddle flanges shall be supplied by the Sub-contractor and fixed by the Main Contractor.
Sleeves for cast iron, copper, steel, uPVC pipes shall be galvanised steel.
Where sleeves are fitted through floors, they shall extend to at least 50mm clear of finished floor.
Sleeves shall be of sufficient size to allow free movement of pipes and where pipes are insulated, the sleeves are to be oversized to allow the insulation to be carried through the sleeves.
Details of pipes through walls and floors to be submitted for checking before installation.
The Sub-Contractor shall set all sleeves in the shuttering of walls, floors, etc., before concrete is poured and in compliance with the Main Contractor programme. Where holes have to be cut through structure after concrete has been poured as a result of the Sub-Contractor's failure to provide the same, then all costs for this shall be to the Sub-Contractor's account.
Where exposed pipes pass through walls, ceilings and floors, hinged mild steel escutcheon rings are to be used. All plates are to be chromium plated steel and samples of such plates are to be submitted to the Engineer for checking.
Pipe sleeves shall also be provided where piping penetrates external walls and roofs. The space between pipe sleeves and the pipe or insulation shall then be completely caulked by the Contractor, with a soft, non-setting waterproof mastic compound giving an air and watertight seal.
Penetrations through roofs shall also be provided with a weatherproof apron and up stand curb or other provisions as may be specified elsewhere or shown on the Sub-Contract Drawings.
Where pipes pass through fire walls and floor slabs, a metal fire stop is to be welded or bolted around the pipe. This shall be in the form of a 6mm thick flange located in the centre of the slab/wall thickness and welded/screwed to the pipe, the flange being of the same diameter as the internal bore of the pipe sleeve.
v tr ng chy xuyn qua tng , sn c tip xc vi nc, mt bch chn cht kn nc lm cng loi vt liu nh ng ni s c nh thu ph cung cp v nh thu chnh lp t.
ng lt cho ng gang, uPVC v thp s bng thp trng km.
v tr ng lt c lp xuyn sn, ng lt s ko di t nht 50mm so vi mt sn hon thin.
ng lt s c kch c tng xng cho php tuyn ng dch chuyn t do, v i vi ng ng c cch nhit, ng lt c kch thc ln lp cch nhit xuyn qua lp ng lt.
Chi tit cc ng xuyn tng v sn phi c trnh duyt trc khi lp t.
Nh thu s c nh cc ng lt vo vn cp pha ca tng, sn,..vv, trc khi b tng v phi phi hp vi lch lm vic ca nh thu chnh. Nh thu ph s phi chu mi cho chi ph cho vic ct thm l vo kt cu sau khi b tng do li ca mnh trong vic xc nh sai cc v tr trc .
v tr ng trn chy xuyn qua tng, trn v sn, ai thp nh c l kho bn l s c s dng. Tt c tm kim loi l thp m crm v cc mu ny c trnh cho Qun l K thut kim tra.
ng lt cng s c lp t ni ng xuyn tng bn ngoi v mi. Nh thu s trm khong trng gia ng lt v ng ng hay lp cch nhit bng hp cht mastic chng thm do kn nc v kh.
Ch xuyn qua mi cng s c lp t vi tm chn chng thm v ko di ti r tng ng hoc cung cp v tr no c ch nh hay th hin trn bn v thi cng.
v tr ng chy xuyn qua tng chu la v sn, kim loi ngn la c hn hay bt cht xung quanh ng. N s c dng mt bch dy 6mm t gia b dy tng/sn v c hn/bt vt vo ng, mt bch c cng ng knh l trong ca ng lt.
-
J. Roger Preston (Vietnam) Co., Ltd SECTION 11 - PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails u tin s dng ting Anh khi c tranh chp SECTION 11/SAIGON CENTRE (PHASE 2)/ MVAC 11/12
11.21 TESTING
All pipework systems shall be tested in accordance with the "Commissioning and Testing" Section of this Specification.
11.22 FINISHES
Pipework insulated and covered with aluminium foil or insulated pipework within false ceilings and pipe shafts need not be painted.
All other exposed pipework including UPVC pipes, galvanized steel pipes and copper pipes shall be painted. All cast iron pipework shall be painted.
Painting shall be as described in the "Insulation and Painting" Section of this Specification.
All equipment forming part of the pipework system or connected to the pipework will be painted as specified.
Any damage to factory applied finishes shall be made good on site in the manner recommended by the manufacturer and to the satisfaction of the Engineer.
All pipework systems shall be colour coded and marked with directional arrows in accordance with British Standard, B.S. 1710 : 1975
11.23 IDENTIFICATION
All pipework, valves and fittings shall be provided with identification markings and labels as specified in the "Insulation and Painting" Section of this Specification.
Construction of identification labels shall be as specified in the "Miscellaneous Provisions" Section of this Specification.
11.21 TH NGHIM
Tt c h thng ng s c kim tra theo phn "Nghim thu v kim tra" trong ch dn k thut.
11.22 HON THIN
ng ng c cch nhit v bao ph bi lp nhm hay ng ng i trong trn gi hay hp i ng th khng cn sn
Tt c ng lp l bn ngoi khc nh ng uPVC, st trng km v ng ng iu phi c sn. ng gang cng phi sn.
Cng tc sn s c m t trong phn cch nhit v sn ca ch dn k thut.
Tt c cc thit b trong h thng ng ng hoc kt ni vi ng s c sn theo ch nh.
Bt k h hng no xy ra cho lp hon thin ti nh my phi c iu chnh trn cng trng theo ch dn ca nh sn xut v p ng yu cu ca Qun l K thut.
Tt c h thng ng s c nh du mu v ghi du vi cc mi tn theo tiu chun ca Anh B.S. 1170 : 1975
11.23 NHN DNG
Tt c cc ng ng, van v ph kin s c cung cp sao cho vic nh du nhn dng v dn nhn theo yu cu trong phn cch nhit v sn ca ch dn k thut.
Vic dn nhn c nu r trong phn "Cc iu khon khc" ca ch dn k thut.
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/11 u tin s dng ting Anh khi c tranh chp
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
TABLE 11.1 - PIPEWORK CLASSES
Piped Service Pipework Classesng nc
Chilled Water Ang nc lnh
Condenser Water, Cooling Towers Bng nc ngng, thp gii nhit
Make-Up Water Pipe, (Chilled Water System) Dng nc b sung (h thng lnh)
Make-Up Water Pipe, Cooling Towers Eng nc b sung (Thp gii nhit)
Condensate Drainage, Down Pipes Cng x nc ngng, ng i xung
Condensate Drainage, In False Ceilings Cng x nc ngng, ng i trong trn gi
Water Treatment Chemicals C or (D)Ho cht x l nc thi
Tanks Vent, Overflow and Drains EBnh thng hi, ng chy trn, ng nc x
Refrigerant Pipework Fng mi cht lnh
BNG 11.1 - CC LAI NG
Loi ng
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/12 u tin s dng ting Anh khi c tranh chp
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
TABLE 11.2 - PIPEWORK SPECIFICATIONS
Pipework Nominal Minimum WallClass Bore (mm) Thickness (mm)Loi ng ng knh Chiu dy thnh
danh ngha ng (mm)
A 15-150 - Black steel to B.S. 1387 Table 8.200 4.9 Black Carbon Steel, Electric Resistance Welded250 6.3 (FRW 410) using 410 PMa grade steel300 6.3 B.S. 3600 and 3601.350 8 ng thp en B.S. 1387 bng 8400 8 ng thp cacbon en hn in450 8.8 FRW 410, s dng cho cp p sut 410 Pma 500 8.8 B.S. 3600 v 3601.
B 15-150 - Seamless galvanized steel toB.S. 1397 Table 8. Galvanisingto be carried out by pipe manufacturer.As for Class A, but pipe shall be
above 150 - seamless & galvanized by manufacturer. Trn 150 ng thp c trng km BS. 1397 bng 8. Vic
nhng km c thc hin ti nh my
ng s c c v nhng km i vi thp loi
AC 10-200 - Unplasticized PVC to B.S. 3506 : 1969,
Table 1, Class D.ng PVC cng BS. 3506:1969, bng 1, loi D
D Rigid A.B.S. to B.S. 5391 : 1976.15-100 - To Table 1, Class E
150 To Table 1, Class D200 To Table 1, Class C
cng A.B.S B.S 5391:1976
Bng 1, loi E, D, C
E 6-150 Light gauge copper tube to :B.S.2871 Part 1.To Table X.ng hp kim ng:
Tiu chun B.S.2871 - Phn 1
Tham kho bng X.
F 10-200 - Copper pipe for pressure systems toBS1306, Table 1. cleaned degreased andhermetically sealed to BS2871 Part 2.ng ng cho h thng p sut B.S 1306, bng 1.
khng du m v lm kn B.S. 2871, phn 2.
Note : All batches of pipework supplied for the Sub-Contract must be providedwith mill certificates certifying compliance of the manufacturing standards
Tiu chun k thut
Specification
Bng 11.2 - YU CU K THUT CA NG
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/13 u tin s dng ting Anh khi c tranh chp
ADMINText BoxBlack steel materialup to 150A to BS 1387 Class Mediumabove 150A to ASTM A53 Sch20 Grade B
ADMINText BoxGI steel materialup to 150A to BS 1387 Class Mediumabove 150A to ASTM A53 Sch20 Grade B
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
and testing.
sn xut chng nhn ph hp vi tiu chun sn xut v kim nh.
TABLE 11.3 - JOINTS IN STRAIGHT RUNS OF PIPEBng 11.3 KHP NI THNG TRN NG NG
Pipework Nominal Joints and MaterialsClass Bore (mm)Loi ng ng knh Khp ni v vt liu
danh ngha
A 10-50 Black malleable iron, bronze to iron spherical seatunions with jointing material to B.S. 5292 : 1976.Rc co thp en rn (malleable iron), (seat) cu vi vt liu
khp ni theo tiu chun BS. 5292:1976
65-1000 Welded jointsMi ni hn
Alternatively dresser couplings or other mechanicaljoints shall be used as required and where shown onthe Sub-Contract Drawings or specified.
B 15-50 Galvanized malleable iron, bronze to iron sphericalseat unions with jointing material to B.S. 5292.Rc co thp en rn (malleable iron), (seat) cu vi vt liu
khp ni theo tiu chun BS. 5292
65-150 Galvanized malleable iron, bronze to iron sphericalseat unions with jointing material to B.S 5292 orgalvanized screwed boss flanges to B.S 4504 : 1969 :Part 1.Rc co thp en rn, cu thp, ng thit, vi vt liu khp ni theo
tiu chun BS. 5292. Mt bch c chn bt ren trng km theo tiu
chun BS.4504 :1969 Phn 1
Above 150 Galvanized steel flanges to B.S. 4504 : Part 1 orGrooved mechanical joints.Khp ni bng thp trng km B.S 4504 Phn 1 hoc guc ni
c kh
C 10-200 Solvent welded joints to B.S. 4346 : Part 1.using solvent cements to B.S. 4346 : Part 8.Mi hn dng dung mi theo tiu chun BS.4336 : Phn 1
dng xi-mng lm cht ha tn B.S 4346 Phn 8
D 15-200 Solvent welded spigot and socket fittings toB.S.5392 : Part 1
E 6-50 Capillary joints to B.S. 864 : Part 2.Ni ng theo tiu chun B.S. 864; Phn 2
65-500 Weld on stub flanges to B.S. 4504 : Part 2.Mt bch cui ng hn theo tiu chun B.S. 4504: Phn 2
Tt c cc ng cung cp cho hp ng phi c giy chng ch ca xng
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/14 u tin s dng ting Anh khi c tranh chp
ADMINText Box15-50A: screwed joint to BS thread
Above 65: slip-on welding flanges comply with connection std. follow eqip/accessories manufacture
ADMINPolygon
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
Pipework Nominal Joints and MaterialsClass Bore (mm)Loi ng ng knh Khp ni v vt liu
danh ngha
Welding with silver base alloy having melting pointF 6-200 greater than 540C. Fittings shall be of cast red brass
or wrought brass.Hn vi hp kim bc c im nng chy ln hn 540C. Ph hp
vi ng hoc ng thau.
Note : 1) All joints shall be suitable for system test and operating pressures.Tt c cc mi ni ph hp vi p sut kim tra v vn hnh
2) All flanges shall have raised faces.Tt c cc mt bch u c mt ni
3) All flanges shall be PN16 or PN25 to suit system operating and test pressures.Tt c cc mt bch l loi PN16 hoc cao hn thch hp vi p sut kim tra v
vn hnh ca h thng
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/15 u tin s dng ting Anh khi c tranh chp
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
TABLE 11.4 - JOINTS FOR EQUIPMENT CONNECTIONSBNG 11.4 - KHP NI CHO THIT B
Pipework Nominal Joints and MaterialsClass Bore (mm)Loi ng ng knh Khp ni v vt liu
danh ngha
A 10-50 Black malleable iron, bronze to iron spherical seatunions with jointing material to B.S. 5292.Rc co thp en rn (malleable iron), (seat) cu vi vt liu
khp ni theo tiu chun BS. 5292
65-1000 Black mild steel welding flanges to B.S. 4504 : Part 1Khp ni mt bch bng thp mm en theo tiu chun BS. 4504
phn 1
Alternatively on pipework 100mm diameter andabove dresser couplings or other mechanical jointsshall be used as required and where shown on theDrawings or specified.
B 15-150 As for straight pipe runs.Nh i vi ng thng
Above 150 As for straight pipe runs.Nh i vi ng thng
C 10-200 Mechanical joints to B.S. 4346 : Part 2.
Khp ni c kh B.S. 4346: Phn 2
D 15-200 As for straight pipe runs.
Nh i vi ng thng
E 6-500 As for straight pipe runs.
Nh i vi ng thng
F 6-200 As for straight pipe runs.
Nh i vi ng thng
Note : 1) All flanges shall be suitable for system test and operating pressures.Tt c khp ni ph hp p sut th nghim v vn hnh ca h thng
2) All flanges shall have raised faces.Tt c mt bch u c g ni.
3) All flanges shall be PN16 or PN25 to suit system operating and test pressures.Tt c mt bch l lai PN 16 hoc cao hn ph hp vi p sut th nghim v
vn hnh ca h thng
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/16 u tin s dng ting Anh khi c tranh chp
ADMINText Box15-50A: screwed joint to BS thread
Above 65: slip-on welding flanges comply with connection std. follow eqip/accessories manufacture
ADMINText BoxAs for Class A
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
TABLE 11.5 - FLANGE DETAILSBNG 11. 5 - CHI TIT MT BCH
Pipework Nominal Flange Type and Method of AttachmentClass Bore(mm)Loi ng ng knh
danh ngha
A 15-50 Screwed on steel boss flanges with tapper threads toB.S. 21 : 1978. Flanges to B.S.4504 : 1969 : Part1, Table 6/4.Mt bch thp trng km c phn li lm ren theo tiu chun BS.21,
ng c t vo mt bch. Mt bch theo tiu chun BS.4504: 1,
Loi 4.
65-150 For owy-acetylene welding: Type 7 slip-on steel boss welding flanges. Class 2 welding to B.S. 2640 : 1975. For metal arcwelding : Type 6 Slip-on welding flanges. Class 2 welding to B.S. 4504 : 1969 : Part 1, Table 6/5 or 6/3 welded.
200-1000 Type 6 slip-on welding flanges. Metal arc welding to B.S. B.S. 4515 : 1969. Flanges to B.S. 4504 : 1969 : Part 1, Table 16/4
B 15-150 Screwed on galvanized steel boss flanges with taper threads to B.S. 21 L 1973, pipe expanded into flange. Galvanized flanges to B.S. 4504 : 1969 : Part 1, Table 16/4.Mt bch gang mm c phn li lm ren theo tiu chun BS. 21L 1973
ming m ni theo tiu chun BS.4865 c lm bng cht liu
si nn theo tiu chun BS.1737.
200-1000 Type 6 slip-on welding flanges. Metal arc welding to B.S. 4515 : 1969. Flanges to B.S. 4504 : 1969 : Part 1, Table 16/4. All black steel and galvanized after welding.Care must be taken to ensure the Flange face is not twisted or defaced during the galvanized process.
C 10-200 Flanges equivalent to B.S.4504 : 1969 : Part 1, Table 6/5 or 6/8. Solvent welded using solvent cement to B.S. 4346 :1974 : Part 8.Mt bch tng ng theo tiu chun BS.4504:1969 Bng 6/5 hay
6/8. Dung mi hn s dng dung dch ximng theo tiu chun BS.4346:
Phn 8
D 15-200 Flanges equivalent to B.S.4504 : 1969 : Part 1, Table 6/5 or 6/8. Solvent welded to manufacturer's recommendation.Mt bch tng ng theo tiu chun BS.4504:1969 Bng 6/5 hay
6/8. Dung mi hn s dng dung dch theo yu cu nh my.
Lai mt bch v bin php kt ni
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/17 u tin s dng ting Anh khi c tranh chp
ADMINText Box15-50A: screwed joint to BS thread
Above 65: slip-on welding flanges comply with connection std. follow eqip/accessories manufacture
ADMINPolygon
ADMINText Box15-50A: screwed joint to BS thread
Above 65: slip-on welding flanges comply with connection std. follow eqip/accessories manufacture
ADMINPolygon
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
Pipework Nominal Flange Type and Method of AttachmentClass Bore(mm)Loi ng ng knh
danh ngha
E 6-500 Flanges to B.S. 4504 : 1974 : Part 2, Table 6/22 copper slip-on flanges for brazing to B.s 1723 : 1963 or welding toB.S. 1724 : 1959Mt bch theo theo tiu chun BS.4504:1974 Bng 6/22
6/8. Mc bch lun ng theo tiu chun B.S 1723:1963 hoc hn theo
tiu chun B.S. 1724 : 1959
F 6-200 Flanges to B.S. 4504 : Part 2 : Type 22 Copper slip-on flanges for brazing to BS1723 or welding to BS1729Mt bch theo tiu chun BS.4504: Phn 2, Loi 22 Mc bch ng
lun ng theo tiu chun B.S 1723:1963 hoc hn theo BS1729
Note : 1) All joints to be suitable for system test pressures.Tt c cc khp ni ph hp vi p sut h thng.
2) All flanges shall have raised faces.Tt c cc mt bch u c mt ni
3) All flanges shall be PN16 or PN25 to suit system operating and test pressures.Tt c cc mt bch loi PN16 hoc PN25 ph hp vi p sut kim tra v vn
hnh ca h thng.
Lai mt bch v bin php kt ni
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/18 u tin s dng ting Anh khi c tranh chp
-
J. Roger Preston (Vietnam) Co., LtdSECTION 11 PIPEWORK AND FITTINGS MC 11 - NG NG V PH KIN
TABLE 11.6 - PIPE FITTINGSBNG 11.6 - PH TNG NG
Pipework Nominal FittingsClass Bore (mm)Loi ng ng knh
danh ngha
A 10-500 Black malleable iron screwed fittings to B.S 143 and1256 : 1968 or purpose made heavy weight weldingfittings to B.S. 1965 : 1963 : Part 1.Rc co thp en rn (malleable iron), (seat) cu vi vt liu
khp ni theo tiu chun BS. 5292
65-1000 Heavy weight welding fittings to B.S. 1965 : 1963 :Part 1.
B 15-150 Galvanized malleable iron screwed fittings in B.S.1256: 1968.Ph tng ren bng thp rn trng km theo tiu chun B.S. 1256:1968
Above 150 Galvanized iron fittings to B.S.4772 : 1971.Ph tng bng thp trng km theo tiu chun B.S.4772:1971
C 10-200 Unplasticized PVC injection moulded fittings to B.S.4346 : 1969 : Part 1, Solvents to B.S.4346 : 1974: Part 8.Ph tng c PVC cng theo tiu chun B.S 4346:1969: Phn 1. Dung
mi theo tiu chun B.S.4346:1974;Phn 8
D 15-200 A.B.S. solvent welding fittings to B.S. 5392 : 1976 :Part 1.A.B.S Dung mi hn theo tiu chun BS.5392:1976, Phn 1
E and F 6-50 Copper compression fittings to B.S. 864 : 1971 :Part 2, Dezincification Resistant (D.Z.R)Ph kin chu nn bng ng B.S 864:1971: Phn 2. khng trng km
65-500 Flanged fittings to B.S.4504 : 1974 : Part 2.Mt bch ph hp theo tiu chun B.S 4504: 1974 :Phn 2
Note : 1) All flanges shall be suitable for system test and operating pressures.Tt c cc khp ni v ph kin ph hp vi p sut kim tra v vn hnh ca h thng
2) All flanges shall have raised faces.Tt c cc mt bch u c mt ni
3) All flanges shall be PN16 or PN25 to suit system operating and test pressures.Tt c cc mt bch u c PN 16 hoc PN25 ph hp vi p sut kim tra v
vn hnh ca h thng
Ph kin
The English language version prevails SECTION 11/SAIGON CENTRE (PHASE 2)/MVAC 11/19 u tin s dng ting Anh khi c tranh chp
ADMINText BoxComply with BS EN 1562
ADMINStamp
ADMINText BoxComply with ANSI/ASTM/JIS/Din
ADMINStamp
ADMINText BoxComply with BS EN 1562
ADMINStamp
ADMINText BoxComply with ANSI/ASTM/JIS/Din
ADMINStamp
-
TESTCERTIFICATES
-
Fittings, Cast Iron, Ductile Iron, Malleable Iron and Bronze
Malleable Cast Iron Pipe Fittings - ISO 49
Trademark and/or Tradename:
Copyright 2011 Underwriters Laboratories Inc.
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from Underwriters Laboratories Inc." mustappear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "Copyright 2011 Underwriters Laboratories Inc."
HHXX.EX15298 Fittings, Cast Iron, Ductile Iron, Malleable Iron and Bronze
Page Bottom
See General Information for Fittings, Cast Iron, Ductile Iron, Malleable Iron and Bronze
HEBEI JIANZHI CASTING GROUP LTD EX15298PANGZHUANGZISOUTHEAST OF YUTIAN COUNTYTANGSHAN, HEBEI 064000 CHINA
Model/Fig. Configuration Size (in.)Rated Pressure
(psig)
A1 Elbow 90 1/2, 3/4, 1, 1-1/4, 1-1/2, 2, 2-1/2, 3, 4 363
B1 Equal Tee 1/2, 3/4, 1, 1-1/4, 1-1/2, 2, 2-1/2, 3, 4 363
M2 Socket 1/2, 3/4, 1, 1-1/4, 1-1/2, 2, 2-1/2, 3, 4 363
N8 Hexagonal Nipple 1/2, 3/4, 1, 1-1/4, 1-1/2, 2, 2-1/2, 3, 4 363
Last Updated on 2008-05-21
Questions? Print this page Notice of Disclaimer Page Top
Page 1 of 1HHXX.EX15298 - Fittings, Cast Iron, Ductile Iron, Malleable Iron and Bronze
08/11/11http://database.ul.com/cgi-bin/XYV/template/LISEXT/1FRAME/showpage.html?name=HH...
-
COMPANYPROFILE
-
NNearly50yeaarsofaccummulatedknowwledgeandttechnicalexpertise Ex
p
xperienced
romptly
andqualifiedprofessionnalsabletounderstandandfulfillccustomersnneeds
AAresearchannddevelopmmentcentertthatdeveloppsAPImaterrial(withPoosco) HHighestqualityassuranceeratingsguaaranteedbyusingsystemmaticprocessscontrols AAcommitmennttocustommersatisfaction AAstrategicalliancewithPPoscosince2007
-
AE
Aug.1995: O
ngineeringC
btained the
Company.
e investmennt license frrom SCCI.19987. Refrigeeration Elecctrical
MMay1999:Sttartedtheopperationofpproductionlines. NNov.1999:ExxportedtoJaapanattheffirststeelcoompanyinVietNam. Feeb.2001:ObbtainedtheQualityMannagementSyystem.ISO99001:2000veersion. DDec.2004:FinishedofCoompanyrestructuring.LeegalCa[italiis$11,747,470 Ju
E
un.2005:Pa
RWpipe(Bla
articipated t
ack&Galva
theVNInter
nized)
rnationalexhibitionandd received22GoldenPrizeof
DDec.2005:SeeAHSteelCoorp.have1000%investeddcompany Juuly2006:ExpportedtoUSSAatthefirsststeelcompanyinVietNam Ju
m
uly 2006: A
material
Awarded a Gold Medal of the beest trusted enterprises in construuction
Seep.2006:AwwardedagoldencupofthebestbraandnameinconstructionScope O
St
Oct.2006:Ge
teelVinaCo
ettheadjus
rp.
stmentcertifficatefor investment liccensewithnnewname,SSeAH
SeC
ep. 2007:
onstruction
Awarded aa Gold Meedal of Connstruction TTrademark by Ministrry of
Do
Dec.2007:Aw
fIndustryan
wardedaGo
ndTrade
oldMedalofftrustedpreetigebrand,qualityprodductsbyMinnistry
DDec.2008:AwwardedTop40foreigninvestedbyMPI DDec.2008:AwwardedTop100brandsinfluenceViietNammarrket M A O Ja M
Mar.2009:Sttartedtheoperationof88APImillliine
Apr.2010:ObbtainedtheAAPIMonogrramNo.5L07764and5CTT
Oct.2010:Ob
an.2011:Aw
May2011:Ob
btainedthe
wardedGold
btainedthe
ULAuthorize
enDragonC
FMApprova
edLicensefo
CertificateFo
alsLicensefo
orMetalicS
1139
prinklerPipee
orHighQua
orschedule
lityProduct
10SteelSprrinklerPipe
-
VISION:
C H C P
MISSIO
Constant
diverser
oftheco
:
ustomersat
Happinessto
ontribution
rofitstosha
N:
tly improvin
requirement
ompanyduri
tisfaction employees tothelocals
reholders
ng all aspec
fromcusto
ngtheemer
s
cts including
mers.Ensur
rgingtoregio
g products
ingthedyna
onalandwo
and service
amicdevelo
orldwidema
es to meet
pmentandt
rket.
the increassingly
thesustainaability
-
HOTELP
CNG T
PARKHYA
TRNH CAN
ATTSAIGO
NTIVIL APA
ON
ARTMENT
-
CARAVELLEHOTEL1997
NHGASNBAYTNSNNHT
-
UNILEVERHOMEBASE2007
CAO C LAWRENCE S. TING
-
Established in 2004,CangZhou Huaye Metal Products Co.,Ltd as one of sino-
singapore cooperated enterprise, specialized in manufacturing carbon steel
butt-welded pipe fitting and carbon steel flanges.
Covers an area of 17000 square metar, and over 10000 tons annual output
of carbon steel butt-welded pipe fitting and carbon steel flanges.
Our main products carbon steel butt-welded pipe fitting such as elbows, tees
reducers, bends and caps, etc as per ANSI B16.9ASTMA234 WPB standard,
and JIS 2311 and DIN2605 etc standard. Carbon steel flanges contain forge
steel and cast steel, confirm to ANSI B16.5,BS,DIN,EN and JIS standards.
We hava established the quality management system conforming to
ISO9001,and have got the certificate of conformity of quality system
certification.
As an entirely export-oriented pipe fittings and flanges manufacturer, We
provide about 100% of the turnover for Europe and other countries such as
southeast and middle east and have acquired good reputations among the
clients all over the world. With excellent quality, provide the best quality and
highly service is ous purpose.
-
REPLYFORCOMMENTS
-
REPLY FOR COMMENTS PHIU PHN HI KIN
Project/Cng trnh : Sai Gon Centre Phase 2&3
From/T : REE M&E JSC
To/Chuyn ti : Mr.Francis Tan Ama/ Hoa Binh Construction And Real Estate Corporation / Nh thu HaBnh (HBC)
C/c: ..
..
Ref No/S th t : SG23/REE/RFC/AC/121
Submitted Date/Ng. trnh : 04/11/2014
Expected Date/ Ng. y/c phn hi : 11/11/2014
Description Replyed/Ni dung phn hi :
We would like reply herewith our clarification as follow:
Item Description
No
exce
ptio
ns
take
n M
ake
corr
ectio
n no
ted
Am
end
&
Res
ubm
it
Rej
ecte
d Comments Reply
Material Submission No. SG23-ME-RFA-MS-AC-121: Chilled Water piping & fitting
X
1 To comply item 1,2 in specification
For Vietnam market, It s difficult to supply the pipe and fitting from same manufacturer. Pls review.
2 Welding shall be not permit for galvanized steel.
Pls discuss in method statement for installation.
3 Contractor to ensure uniformity of standards and composition of all pipework & fittings incase they are provided by different manufacture
To confirmed.
4 To provide sample board Shall be submitted follow this MS
Consultants comment/ kin ca t vn:
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
-
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
Clients comment/ kin ca Ch u t:
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
KEPPEL LAND WATCO II&III HBC REE J.S.C
Signature/K tn:
...............................................................
Full name/H v Tn:
...............................................................
Date/ Ngy:
...............................................................
Signature/K tn:
...............................................................
Full name/H v Tn:
...............................................................
Date/ Ngy:
...............................................................
Signature/K tn:
...............................................................
Full name/H v Tn:
...............................................................
Date/ Ngy:
...............................................................
-
REPLY FOR COMMENTS PHIU PHN HI KIN
Project/Cng trnh : Sai Gon Centre Phase 2&3
From/T : REE M&E JSC
To/Chuyn ti : Mr.Francis Tan Ama/ Hoa Binh Construction And Real Estate Corporation / Nh thu HaBnh (HBC)
C/c: ..
..
Ref No/S th t : SG23/REE/RFC/AC/121/2
Submitted Date/Ng. trnh : 18/12/2014
Expected Date/ Ng. y/c phn hi : 25/12/2014
Description Replyed/Ni dung phn hi :
We would like reply herewith our clarification as follow:
Item Description
No
exce
ptio
ns
take
n M
ake
corr
ectio
n no
ted
Am
end
&
Res
ubm
it
Rej
ecte
d Comments Reply
Material Submission No. SG23-ME-RFA-MS-AC-121-1: Chilled Water piping & fitting
X
1 No certificate, test report form 3rd party. Certificate SeAH comply BS1387 std. for black steel and BS 1387 for galvanized steel.
3rd paty test report shall be provided when the material delivery on site.
2 SeAH steel pipe 5 to 8 : test report according to grade A (ASTM A53) but the submitted material is grade B (ASTM A53)
3rd paty test report shall be provided when the material delivery on site.
3 No certificate, test report form 3rd party. Certificate Sunco pipe comply BS1387 std.
3rd paty test report shall be provided when the material delivery on site.
4 To do comparison on thickness of pipe between BS std. and ASTM std.
Pls refer to Sch and catalog to see thickness of pipe according BS and ASTM td.
As catalog of SeAH, pipe size up to 600mm, Why to use different brand name
Pls refer to explain letter from SeAH Vina
No test report for fitting 3rd paty test report shall be
-
provided when the material delivery on site.
Consultants comment/ kin ca t vn:
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
Clients comment/ kin ca Ch u t:
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
.............................................................................................................................................................................................
KEPPEL LAND WATCO II&III HBC REE J.S.C
Signature/K tn:
...............................................................
Full name/H v Tn:
...............................................................
Date/ Ngy:
...............................................................
Signature/K tn:
...............................................................
Full name/H v Tn:
...............................................................
Date/ Ngy:
...............................................................
Signature/K tn:
...............................................................
Full name/H v Tn:
...............................................................
Date/ Ngy:
...............................................................